This document package includes plans and sections for a bathymetric survey of Puma Energy's dock facilities in San Juan, Puerto Rico, as well as details of a related federal solicitation for dredging work in the harbor.

The plans and sections depict survey results for Puma Energy's berthing area and detail required dredging to deepen areas and maintain agreed upon depths. The related solicitation from the U.S. Army Corps of Engineers seeks bids to conduct maintenance and construction dredging across several federal channels and berths in the San Juan harbor. The solicitation specifies depths for deepening and widening various channels and berths, as well as the cruise ship and Pan American berthing areas. All dredged materials will be disposed of in the San Juan Ocean Dredge Material Disposal Site. The solicitation is divided into a base requirement and two options, and includes environmental, turbidity, and vibration monitoring.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G-101

NOT TO SCALE

N

N

N www.tetratech.com

CLIENT INFORMATION:PROJECT LOCATION:

PROJECT DESCRIPTION / NOTES:

Tt PROJECT No.: PURCHASE ORDER:

ISSUED:

GENERAL LOCATION

INDEX OF SHEETS

FOR INTERNAL REVIEW

- NOT FOR CONSTRUCTION -

PUMA ENERGY

BATHYEMTRY SURVEY SECTIONS

26-32 CALLE M MARITIMA

FRENTE PORTUARIO GUAYNABO, PR

100-PRE-T41904

PUMA ENERGY

PUMA ENERGY OIL DOCK

RECINTO SUR ST. #251, SUITE 200

SAN JUAN, PR 00901

BATHYMETRY SECTIONS AT PUMA DOCK FROM SURVEY

CONDUCTED BY LUIS BERRIOS MONTES & ASSOC.

10-21-2022 - BATHYMETRIC SURVEY SECTIONS

01-20-2023 - REVISED SURVEY PLAN AND SECTIONS

VICINITY MAP:

PROJECT LOCATION

PROJECT LOCATION

PROJECT LOCATION

0+00 1+00 2+00

0+00 1+00 2+00

-15 -20

-2

-3

-35

-40

-10 -10

-15 -20

-25 -30 -35

-35

-30-25

-2

-15

-10

28'-0"

DREDGING OFFSET REQUIRED. DREDGING OFFSET

FROM THE PUMA PIER IS MEASURED FROM FACE

OF PILES AT CHIKSAN PLATFORM (NOT FROM

ARBITRARY LOCATION/PLATFORM ON THE PIER).

DREDGING LIMITPUMA DOCK

CHIKSAN

PLATFORM

N

30'15' 60'0

A

PUMA BERTHING AREA PLAN

SCALE: 1"=30'

CHKD:

DRWN:

PROJ:

DESN:

w w w .te tra te ch .c om

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

BY

1/

/2

3:

:5

PM

- C :\U

SE

R

S\

KE

VI

N

.S

AN

AB

R

IA

G

O M

EZ

\D

ES

KT

O P\

PR

O

JE

C

TS

\P

U M

A_ D

O C

K\

PU

M A_

D O

C K_

SU

R

VE

Y\

C

AD

\S H

EE

TF

IL

ES

\C -1

.D

W G

SA

N

AB

R

IA

G O

M

EZ

, K

EV

IN

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch, otherwise drawing not to scale

C op yr ig ht : T et ra

T ec h

100-PRE-T41904

PU

M

A

EN

ER

G

Y

SA

N J

U

AN

BA

TH

YM

ET

R

IC

S U

R

VE

Y

AN

D S

EC

TI

O N

S

R ec in to

S ur

S t., S ui te

Sa n Ju an , P

R , 0

N/A

K. SANABRIA

RV/FP

-2 0-

BA

TH

YM

ET

R

IC

S U

R

VE

Y

SE

C

TI

O N

S

KS

PU

M

A

EN

ER

G

Y

-3

C

AL

LE

M

M

AR

IT

IM

A

-2 1-

R

EV

IS

ED

S U

R

VE

Y

PL

AN

A

N D

S

EC

TI

O

N S

KS

B

NOTES:

1. THE HYDROGRAPHIC SURVEY WAS CONDUTED BY LUIS BERRIOS

MONTES & ASSOCIATES IN OCTOBER 12, 2022.

2. THE HORIZONTAL CONTROLS AND GRID NORTH USED FOR THIS

SURVEY ARE REFERRED TO THE PUERTO RICO STATE PLANE

COORDINATE SYSTEM, LAMBERT PROJECTION ZONE 5200 PR/VI,

DATUM NAD83 (NA 2011) EPOCH 2010. HORIZONTAL CONTROL WAS

ESTABLISHED USING GNSS TRIMBLE R 12i EQUIPMENT AND

REFERRED TO NAD 83 (NA 2011) EPOCH 2010.

3. THE ORTHOMETRIC HEIGHT WAS DETERMINED USING GNSS &

HYBRID GEOID MODEL 18. VERTICAL ELEVATIONS ARE REFERRED

TO THE MEAN LOWER LOW WATER (MLLW) USING THE PUBLISHED

CORRECTION FROM PRVD02, LOCAL MEAN SEA LEVEL (LMSL)

DATUM TO MLLW FOR CONTROL STATION 9755371 AT TIDAL EPOCH

(1982-2001), LOCATED AT LA PUNTILLA, SAN JUAN, PUERTO RICO,

0.77 ft.

4. CONTOURS ARE SHOWN AT ONE (1) FOOT INTERVAL.

5. ALL DISTANCES AND ELEVATIONS ARE SHOWN IN US SURVEY FEET.

6. TO OBTAIN DEPTH IN REAL TIME, (RTK) A TRIMBLE R12i GNSS UNIT &

SEA FLOOR HYDROLITE TM SINGLE BEAM UNIT WAS USED.

C-101

PU

M

A

BE

R

TH

IN

G

A R

EA

PL

AN

M

AT

C H

LI

N

E

ST

A 0+

M

AT

C H

LI

N

E

ST

A 2+

SCALE: HORIZ: 1"= 10' VERT: 1"= 10'

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5

0+00 0+10

0+20 0+30

0+40 0+50

0+60 0+70

0+80 0+90

1+00 1+10

1+20 1+30

1+40 1+50

1+60 1+70

1+80 1+90

2+00 2+10

2+20 2+30

2+40 2+50

-1.78:1

Horizontal

2022 BATHYMETRY

CHIKSAN PLATFORM

28'-0"

DREDGING OFFSET REQUIRED. DREDGING OFFSET

FROM THE PUMA PIER IS MEASURED FROM FACE

OF PILES AT CHIKSAN PLATFORM (NOT FROM

ARBITRARY LOCATION/PLATFORM ON THE PIER).

DREDGING

LIMIT

PROPOSED DREDGE

ELEVATION -47 ft MLLW

2014 BATHYMETRY5'-0"

10'5' 20'0

SECTION

SCALE: 1"=10'A

CHKD:

DRWN:

PROJ:

DESN:

w w w .te tra te ch .c om

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

BY

1/

/2

3:

:5

PM

- C :\U

SE

R

S\

KE

VI

N

.S

AN

AB

R

IA

G

O M

EZ

\D

ES

KT

O P\

PR

O

JE

C

TS

\P

U M

A_ D

O C

K\

PU

M A_

D O

C K_

SU

R

VE

Y\

C

AD

\S H

EE

TF

IL

ES

\C -1

.D

W G

SA

N

AB

R

IA

G O

M

EZ

, K

EV

IN

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch, otherwise drawing not to scale

C op yr ig ht : T et ra

T ec h

100-PRE-T41904

PU

M

A

EN

ER

G

Y

SA

N J

U

AN

BA

TH

YM

ET

R

IC

S U

R

VE

Y

AN

D S

EC

TI

O N

S

R ec in to

S ur

S t., S ui te

Sa n Ju an , P

R , 0

N/A

K. SANABRIA

RV/FP

-2 0-

BA

TH

YM

ET

R

IC

S U

R

VE

Y

SE

C

TI

O N

S

KS

PU

M

A

EN

ER

G

Y

-3

C

AL

LE

M

M

AR

IT

IM

A

-2 1-

R

EV

IS

ED

S U

R

VE

Y

PL

AN

A

N D

S

EC

TI

O

N S

KS

C-102

PU

M

A D

O C

K C

H

IK

SA

N

P

LA

TF

O

R M

SE

C

TI

O

N A

M

AT

C H

LI

N

E

ST

A 0+

M

AT

C H

LI

N

E

ST

A 2+

SCALE: HORIZ: 1"= 10' VERT: 1"= 10'

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5

0+00 0+10

0+20 0+30

0+40 0+50

0+60 0+70

0+80 0+90

1+00 1+10

1+20 1+30

1+40 1+50

1+60 1+70

1+80 1+90

2+00 2+10

2+20 2+30

2+40 2+50

-1.80:1

Horizontal

2022 BATHYMETRY

CHIKSAN PLATFORM

DREDGING

LIMIT

28'-0"

DREDGING OFFSET REQUIRED. DREDGING OFFSET

FROM THE PUMA PIER IS MEASURED FROM FACE

OF PILES AT CHIKSAN PLATFORM (NOT FROM

ARBITRARY LOCATION/PLATFORM ON THE PIER).

2014 BATHYMETRY APPROXIMATE DREDGE

ELEVATION (-) 47 ft MLLW

5'-0"

10'5' 20'0

CHKD:

DRWN:

PROJ:

DESN:

w w w .te tra te ch .c om

M

AR

K D

AT

E

D

ES

C R

IP

TI

O N

BY

1/

/2

3:

:0

PM

- C :\U

SE

R

S\

KE

VI

N

.S

AN

AB

R

IA

G

O M

EZ

\D

ES

KT

O P\

PR

O

JE

C

TS

\P

U M

A_ D

O C

K\

PU

M A_

D O

C K_

SU

R

VE

Y\

C

AD

\S H

EE

TF

IL

ES

\C -1

.D

W G

SA

N

AB

R

IA

G O

M

EZ

, K

EV

IN

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch, otherwise drawing not to scale

C op yr ig ht : T et ra

T ec h

100-PRE-T41904

PU

M

A

EN

ER

G

Y

SA

N J

U

AN

BA

TH

YM

ET

R

IC

S U

R

VE

Y

AN

D S

EC

TI

O N

S

R ec in to

S ur

S t., S ui te

Sa n Ju an , P

R , 0

N/A

K. SANABRIA

RV/FP

-2 0-

BA

TH

YM

ET

R

IC

S U

R

VE

Y

SE

C

TI

O N

S

KS

PU

M

A

EN

ER

G

Y

-3

C

AL

LE

M

M

AR

IT

IM

A

-2 1-

R

EV

IS

ED

S U

R

VE

Y

PL

AN

A

N D

S

EC

TI

O

N S

KS

SECTION

SCALE: 1"=10'B

C-103

PU

M

A D

O C

K C

H

IK

SA

N

P

LA

TF

O

R M

SE

C

TI

O

N B

Sheets and Views
C-101-Plan
C-101-Section A
C-101-Section B
G-101-G-101.pdf
Sheets and Views
G-101

File details come from the government source that posted it. Updated .