Bid Abstract W912EP23B0008 San Juan Harbor.pdf

PDF 126 KB Posted

Attached to
San Juan Harbor Construction and Maintenance Dredging, 44-Foot and 36-Foot Project, San Juan, Puerto Rico
Solicitation number
W912EP23B0008
Issued by

About this file

This document is an abstract of bids received in response to a solicitation for construction and maintenance dredging services in San Juan Harbor, Puerto Rico. Work includes deepening and widening various channels and berthing areas to required depths between 36 to 47 feet, with allowable overdepths. Maintenance dredging is also required in other areas to depths ranging from 36 to 39 feet. Dredged material will be disposed of in the San Juan ODMDS. Seven contractors submitted bids by the March 10, 2023 deadline. Bid amounts for base line items and four options are provided for each contractor, along with acknowledgement of solicitation amendments and business size. The Department of the Army Corps of Engineers Engineering District Jacksonville issued the solicitation and will award the contract.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USA ENGINEER DISTRICT, JACKSONVILLE

PRUDENTIAL OFFICE BUILDING

701 SAN MARCO BLVD

ATTN: CESAJ-CT

JACKSONVILLE FL 32207-8175 BIDDERS

NO. 1 NO. 2 NO. 3 NO. 4 NO. 5 NO. 6 NO. 7

OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR:

B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) C. BUSINESS SIZE: SB C. BUSINESS SIZE: Large C. BUSINESS SIZE: C. BUSINESS SIZE: SB C. BUSINESS SIZE: Large C. BUSINESS SIZE: Large C. BUSINESS SIZE: SB

D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA

NUMBER OF AMENDMENTS ISSUED: 7 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

CLIN NO. 7B DESCRIPTION OF OFFERED ITEM: QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $8,960,000.00 $8,960,000.00 $7,500,000.00 $7,500,000.00 $20,250,000.00 $20,250,000.00 $0.00 $13,602,720.00 $13,602,720.00 $15,150,000.00 $15,150,000.00 $13,550,000.00 $13,550,000.00 $18,000,000.00 $18,000,000.00

0002 EXCAVATION, UNCLASSIFIED CUT-6 AND ANEGADO STA 3+00 THRU ATT 2,078,000 CY $11.55 $24,000,900.00 $16.58 $34,453,240.00 $18.50 $38,443,000.00 $0.00 $15.50 $32,209,000.00 $17.50 $36,365,000.00 $21.50 $44,677,000.00 $23.00 $47,794,000.00

0003 EXCAVATION, UNCLASSIFIED SAN ANTONIO CHANNEL, CRUISE SHIP BASIN WEST,

AND CRUISE SHIP BASIN EAST 426,000 CY $14.30 $6,091,800.00 $14.20 $6,049,200.00 $15.70 $6,688,200.00 $0.00 $11.50 $4,899,000.00 $20.00 $8,520,000.00 $65.00 $27,690,000.00 $19.50 $8,307,000.00

0004 EXCAVATION, UNCLASSIFIED MAINTENANCE DREDGING AREAS 78,000 CY $15.00 $1,170,000.00 $9.65 $752,700.00 $13.50 $1,053,000.00 $0.00 $13.00 $1,014,000.00 $25.00 $1,950,000.00 $16.00 $1,248,000.00 $10.70 $834,600.00

0005 ENVIRONMENTAL SPECIES MONITORING 1 JOB $378,100.00 $378,100.00 $340,000.00 $340,000.00 $800,000.00 $800,000.00 $0.00 $1,700,000.00 $1,700,000.00 $1,000,000.00 $1,000,000.00 $1,887,500.00 $1,887,500.00 $451,000.00 $451,000.00

0006 TURBIDITY MONITORING 1 JOB $281,100.00 $281,100.00 $95,000.00 $95,000.00 $550,000.00 $550,000.00 $0.00 $300,000.00 $300,000.00 $400,000.00 $400,000.00 $520,000.00 $520,000.00 $392,500.00 $392,500.00

0007 STANDBY TIME 24 HR $5,300.00 $127,200.00 $4,500.00 $108,000.00 $5,000.00 $120,000.00 $0.00 $9,000.00 $216,000.00 $6,000.00 $144,000.00 $6,550.00 $157,200.00 $2,370.00 $56,880.00

0008 PARTNERING REGROUP 1 EACH $7,700.00 $7,700.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $0.00 $6,000.00 $6,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00

0009 CONSTRUCTION/VIBRATION CONTROL AND MONITORING 1 JOB $135,300.00 $135,300.00 $350,000.00 $350,000.00 $720,000.00 $720,000.00 $0.00 $622,000.00 $622,000.00 $1,000,000.00 $1,000,000.00 $845,000.00 $845,000.00 $1,212,500.00 $1,212,500.00

$41,152,100.00 $49,653,140.00 $68,634,200.00 $0.00 $54,568,720.00 $64,534,000.00 $90,584,700.00 $77,053,480.00

0010 MUNICIPAL TAXES (5.5 % OF THE BASE SUBTOTAL) 1 JOB $2,263,370.00 $2,263,370.00 $2,730,922.70 $2,730,922.70 $3,774,881.00 $3,774,881.00 $0.00 $3,001,280.00 $3,001,280.00 $3,549,370.00 $3,549,370.00 $4,982,158.50 $4,982,158.50 $4,237,941.40 $4,237,941.40

$43,415,470.00 $52,384,062.70 $72,409,081.00 $0.00 $57,570,000.00 $68,083,370.00 $95,566,858.50 $81,291,421.40

0011 EXCAVATION, UNCLASSIFIED PRPA CRUISE BERTHS 47,000 CY $22.00 $1,034,000.00 $9.10 $427,700.00 $16.60 $780,200.00 $0.00 $19.00 $893,000.00 $20.00 $940,000.00 $40.00 $1,880,000.00 $30.80 $1,447,600.00

0012 EXCAVATION, UNCLASSIFIED PAN AMERICAN BERTHS 50,000 CY $15.80 $790,000.00 $23.26 $1,163,000.00 $24.30 $1,215,000.00 $0.00 $19.00 $950,000.00 $40.00 $2,000,000.00 $65.00 $3,250,000.00 $31.90 $1,595,000.00

0013 ENVIRONMENTAL SPECIES MONITORING 1 JOB $24,400.00 $24,400.00 $10,000.00 $10,000.00 $68,000.00 $68,000.00 $0.00 $100,000.00 $100,000.00 $50,000.00 $50,000.00 $182,500.00 $182,500.00 $77,500.00 $77,500.00

0014 TURBIDITY MONITORING 1 JOB $308,900.00 $308,900.00 $5,000.00 $5,000.00 $30,000.00 $30,000.00 $0.00 $18,000.00 $18,000.00 $25,000.00 $25,000.00 $50,000.00 $50,000.00 $67,800.00 $67,800.00

0015 CONSTRUCTION/VIBRATION CONTROL AND MONITORING 1 JOB $56,300.00 $56,300.00 $120,000.00 $120,000.00 $210,000.00 $210,000.00 $0.00 $39,000.00 $39,000.00 $75,000.00 $75,000.00 $80,000.00 $80,000.00 $173,600.00 $173,600.00

$2,213,600.00 $1,725,700.00 $2,303,200.00 $0.00 $2,000,000.00 $3,090,000.00 $5,442,500.00 $3,361,500.00

0016 MUNICIPAL TAXES (5.5 % OF THE OPTION A SUBTOTAL) 1 JOB $121,750.00 $121,750.00 $94,913.50 $94,913.50 $126,676.00 $126,676.00 $0.00 $110,000.00 $110,000.00 $169,950.00 $169,950.00 $299,337.50 $299,337.50 $184,882.50 $184,882.50

$2,335,350.00 $1,820,613.50 $2,429,876.00 $0.00 $2,110,000.00 $3,259,950.00 $5,741,837.50 $3,546,382.50

$45,750,820.00 $54,204,676.20 $74,838,957.00 $0.00 $59,680,000.00 $71,343,320.00 $101,308,696.00 $84,837,803.90

0017 EXCAVATION, UNCLASSIFIED LNG BERTH 99,000 CY $12.60 $1,247,400.00 $10.28 $1,017,720.00 $18.90 $1,871,100.00 $0.00 $22.00 $2,178,000.00 $20.00 $1,980,000.00 $30.00 $2,970,000.00 $15.90 $1,574,100.00

0018 ENVIRONMENTAL SPECIES MONITORING 1 JOB $15,300.00 $15,300.00 $10,000.00 $10,000.00 $60,000.00 $60,000.00 $0.00 $131,000.00 $131,000.00 $50,000.00 $50,000.00 $42,500.00 $42,500.00 $26,100.00 $26,100.00

0019 TURBIDITY MONITORING 1 JOB $403,500.00 $403,500.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00 $0.00 $30,000.00 $30,000.00 $25,000.00 $25,000.00 $12,500.00 $12,500.00 $22,600.00 $22,600.00

0020 CONSTRUCTION/VIBRATION CONTROL AND MONITORING 1 JOB $54,200.00 $54,200.00 $50,000.00 $50,000.00 $110,000.00 $110,000.00 $0.00 $61,000.00 $61,000.00 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $58,100.00 $58,100.00

$1,720,400.00 $1,082,720.00 $2,061,100.00 $0.00 $2,400,000.00 $2,105,000.00 $3,055,000.00 $1,680,900.00

0021 MUNICIPAL TAXES (5.5% OF THE OPTION B SUBTOTAL) 1 JOB $94,630.00 $94,630.00 $59,549.60 $59,549.60 $113,360.50 $113,360.50 $0.00 $132,000.00 $132,000.00 $115,775.00 $115,775.00 $168,025.00 $168,025.00 $92,449.50 $92,449.50

$1,815,030.00 $1,142,269.60 $2,174,460.50 $0.00 $2,532,000.00 $2,220,775.00 $3,223,025.00 $1,773,349.50

$47,565,850.00 $55,346,945.80 $77,013,417.50 $0.00 $62,212,000.00 $73,564,095.00 $104,531,721.00 $86,611,153.40

0022 EXCAVATION, UNCLASSIFIED PUMA BERTH 31,000 CY $12.00 $372,000.00 $22.63 $701,530.00 $39.20 $1,215,200.00 $0.00 $24.00 $744,000.00 $50.00 $1,550,000.00 $35.00 $1,085,000.00 $15.60 $483,600.00

0023 ENVIRONMENTAL SPECIES MONITORING 1 JOB $4,600.00 $4,600.00 $10,000.00 $10,000.00 $60,000.00 $60,000.00 $0.00 $36,000.00 $36,000.00 $50,000.00 $50,000.00 $37,500.00 $37,500.00 $10,000.00 $10,000.00

0024 TURBIDITY MONITORING 1 JOB $117,200.00 $117,200.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00 $0.00 $6,000.00 $6,000.00 $25,000.00 $25,000.00 $10,000.00 $10,000.00 $8,100.00 $8,100.00

0025 CONSTRUCTION/VIBRATION CONTROL AND MONITORING 1 JOB $51,800.00 $51,800.00 $50,000.00 $50,000.00 $75,000.00 $75,000.00 $0.00 $14,000.00 $14,000.00 $50,000.00 $50,000.00 $20,000.00 $20,000.00 $21,400.00 $21,400.00

$545,600.00 $766,530.00 $1,370,200.00 $0.00 $800,000.00 $1,675,000.00 $1,152,500.00 $523,100.00 $523,100.00

0026 MUNICIPAL TAXES (5.5% OF THE OPTION C SUBTOTAL) 1 JOB $30,010.00 $30,010.00 $42,159.15 $42,159.15 $75,361.00 $75,361.00 $0.00 $44,000.00 $44,000.00 $92,125.00 $92,125.00 $63,387.50 $63,387.50 $28,770.50 $28,770.50

$575,610.00 $808,689.15 $1,445,561.00 $0.00 $844,000.00 $1,767,125.00 $1,215,887.50 $551,870.50

$48,141,460.00 $56,155,634.95 $78,458,978.50 $0.00 $63,056,000.00 $75,331,220.00 $105,747,608.50 $87,163,023.90

0027 EXCAVATION, UNCLASSIFIED COD BERTH 34,000 CY $11.55 $392,700.00 $14.00 $476,000.00 $34.90 $1,186,600.00 $0.00 $22.00 $748,000.00 $40.00 $1,360,000.00 $25.00 $850,000.00 $15.10 $513,400.00

0028 ENVIRONMENTAL SPECIES MONITORING 1 JOB $4,600.00 $4,600.00 $10,000.00 $10,000.00 $60,000.00 $60,000.00 $0.00 $32,000.00 $32,000.00 $50,000.00 $50,000.00 $27,500.00 $27,500.00 $11,100.00 $11,100.00

0029 TURBIDITY MONITORING 1 JOB $117,200.00 $117,200.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00 $0.00 $6,000.00 $6,000.00 $25,000.00 $25,000.00 $7,500.00 $7,500.00 $9,000.00 $9,000.00

0030 CONSTRUCTION/VIBRATION CONTROL AND MONITORING 1 JOB $51,800.00 $51,800.00 $25,000.00 $25,000.00 $85,000.00 $85,000.00 $0.00 $14,000.00 $14,000.00 $50,000.00 $50,000.00 $15,000.00 $15,000.00 $23,700.00 $23,700.00

$566,300.00 $516,000.00 $1,351,600.00 $0.00 $800,000.00 $1,485,000.00 $900,000.00 $557,200.00

0031 MUNICIPAL TAXES (5.5% OF THE OPTION D SUBTOTAL) 1 JOB $31,150.00 $31,150.00 $28,380.00 $28,380.00 $74,338.00 $74,338.00 $0.00 $44,000.00 $44,000.00 $81,675.00 $81,675.00 $49,500.00 $49,500.00 $30,646.00 $30,646.00

$597,450.00 $544,380.00 $1,425,938.00 $0.00 $844,000.00 $1,566,675.00 $949,500.00 $587,846.00

$48,738,910.00 $56,700,014.95 $79,884,916.50 $0.00 $63,900,000.00 $76,897,895.00 $106,697,108.50 $87,750,869.90

SOLICITATION NUMBER: W912EP23B0008

NAME AND TITLE OF CERTIFYING OFFICIAL: Adeline Fuata, Contract Specialist

Signature

BIDDERS (Continued)

Norfolk Dredging Company

Yes

Yes

BIDDERS (Continued)

DUTRA Group

Yes

Yes

ABSTRACT OF BIDDERS DATE ISSUED

ISSUING OFFICE

March 7, 2023 May 9, 2023

SAN JUAN HARBOR CONSTRUCTION AND MAINTENANCE DREDGING 44-FOOT & 36-

FOOT PROJECT, SAN JUAN, PUERTO RICO

Original Government Estimate

PROJECT TITLE

Cashman Contracting Co., LLC

Yes

IGE

Curtin Maritime Corp. Manson Construction Co.

Yes Yes

Yes Yes

BIDDERS (Continued) BIDDERS (Continued)BIDDERS (Continued)

DATE CLOSED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation:

Weeks Marine, Inc.

Yes

Yes

GLDD, LLC

Yes

TOTAL AMOUNT BID - LINE ITEMS 0001 THROUGH 0031

OPTION B

OPTION C

OPTION D

TOTAL BASE (LINE ITEMS 0001 THROUGH 0010)

TOTAL OPTION A (LINE ITEMS 0011 THROUGH 0016)

TOTAL OPTION B (LINE ITEMS 0017 THROUGH 0021)

TOTAL OPTION C (LINE ITEMS 0022 THROUGH 0026)

OPTION A

TOTAL OPTION D SUBTOTAL (LINE ITEMS 0027 THROUGH 0030)

TOTAL OPTION D TOTAL (LINE ITEMS 0027 THROUGH 0031)

TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0016)

TOTAL BASE PLUS OPTION AND B (LINE ITEMS 0001 THROUGH 0021)

TOTAL BASE PLUS OPTION A.B. AND C (LINE ITEMS 0001 THROUGH 0026)

BASE BID

BASE SUBTOTAL (LINE ITEMS 0001 THROUGH 0009)

OPTION A SUBTOTAL (LINE ITEMS 0011 THROUGH 0015)

OPTION B SUBTOTAL (LINE ITEMS 0017 THROUGH 0020)

OPTION C SUBTOTAL (LINE ITEMS 0022 THROUGH 0025)