25RA001_Plans_Amend 0006_20May25.pdf

PDF 4 MB Posted

Attached to
Ice Harbor Dam Intake Gate Hydraulic System Upgrades
Solicitation number
W912EF25RA001
Issued by

About this file

These are technical mechanical drawings and schematic diagrams for the Ice Harbor Dam Intake Gate Hydraulic System Upgrades project, prepared by the US Army Corps of Engineers. The documents include detailed engineering specifications for hydraulic systems, focusing on transverse section layouts, cylinder arrangements, reservoir tanks, power unit schematics, and control systems. The drawings cover various technical aspects such as gate positioning, hydraulic pump controls, power unit configurations, and electrical wiring diagrams, with specific attention to the mechanical and electrical components required for upgrading the intake gate hydraulic systems at the dam site.

The technical drawings are comprehensive, featuring multiple sheets that provide top views, section views, and schematic representations of complex hydraulic and electrical systems. Key components detailed include hydraulic reservoirs, power pumps, control panels, valves, pressure gauges, and electrical motor controls. The documents are marked with the US Army Corps of Engineers logo and include general notes, legends, and technical specifications to guide the implementation of the hydraulic system upgrades, with a focus on precise engineering details and system interconnectivity.

View the file

Other files

File Type Posted
Solicitation Amendment W912EF25RA0010009 SF 30.pdf PDF
25RA001_Plans_amd0009_12Jun25.pdf PDF
TECHSPECS_25RA001_IH Hyd Sys Upgrade_amd0009_12Jun25.pdf PDF
Solicitation Amendment W912EF25RA0010008 SF30.pdf PDF
25RA001_Plans_amend007_29May25.pdf PDF
Solicitation Amendment W912EF25RA0010007 SF 30.pdf PDF
25RA001_Supplemental_Drawings Amend-007.pdf PDF
TECHSPECS_25RA001_IH Hyd Sys Upgrade_amd0007_2Jun25.pdf PDF
25RA001_Supplemental Drawings_Amend 0006_20May25.pdf PDF
Solicitation Amendment W912EF25RA0010006 SF 30.pdf PDF
Past Performance Questionnaire Form.pdf PDF
TECHSPECS_25RA001_IH Hyd Sys Upgrade_amd0006_19May25.pdf PDF
Solicitation Amendment W912EF25RA0010005 SF 30.pdf PDF
Solicitation Amendment W912EF25RA0010004 SF 30.pdf PDF
Solicitation Amendment W912EF25RA0010003 SF 30.pdf PDF
TECHSPECS_25RA001_IH Hyd Sys Upgrade_amd0003.pdf PDF
Solicitation Amendment W912EF25RA0010002 SF 30.pdf PDF
20 March 2025 Site Visit Attendance List - W912EF25RA001 HLD IGH System Upgrades.pdf PDF
Solicitation Amendment W912EF25RA0010001 SF 30.pdf PDF
Justification and Approval - HLD IGH - Paint Ingredients_FINAL_Redacted.pdf PDF
Justification and Approval - HLD IGH - Opto22 PLC Equipment_FINAL_Redacted.pdf PDF
TECHSPECS_25RA001_IH Intake Gate Hyd Sys Upgrade_19Feb25.pdf PDF
Solicitation - W912EF25RA001.pdf PDF
25RA001_Supplemental Drawings.pdf PDF
25RA001_Plans.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HL484925_E-601

HL484925_E-603
HL484925_E-801
HL484925_M-101
HL484925_M-203
HL484925_M-504
HL484925_M-601
HL484925_M-602
HL484925_M-603

File details come from the government source that posted it. Updated .