Technical Specifications - Summary of Changes from Original Version to Amendment 0001 Version.docx
DOCX document 22 KB Posted
- Attached to
- MNA Turbine Draft Tube Slot Fillers
- Solicitation number
- W912EF25BA002
About this file
This document is a Technical Specifications Amendment (0001) for the McNary Powerhouse Turbine Draft Tube Slot Filler project, solicitation number W912EF25BA002. The amendment outlines specific revisions to three technical sections: Section 01 11 01.00 28 Supplementary Requirements, Section 01 33 00 Submittal Procedures, and Section 01 78 00.00 28 Closeout Submittals. Key changes include updates to submittal requirements, CAD file submission guidelines, production briefing protocols, and significant modifications to closeout documentation procedures, such as deleting references to as-built and record drawings. The project is being managed by the Department of the Army Corps of Engineers Engineering District Walla Walla, and the amendment was uploaded to SAM.gov on 10/7/2025, indicating ongoing refinement of technical specifications for the solicitation.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of changes for Amend - 0001 McNary Powerhouse Turbine Draft Tube Slot Filler
W912EF25BA002
1. Revised the following Specifications (See revised specification for details):
a. SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS:
· Revised Paragraph 1.2 SUBMITTALS.
· Revised Paragraph 1.4 REQUIRED DELIVERY DATES.
· Added Paragraph 1.12.2 “CAD Requirements and Coordination Meeting”.
· Revised Paragraph 1.13.1 “Production Briefings”.
· Renumbered Paragraphs.
b. SECTION 01 33 00 SUBMITTAL PROCEDURES:
· Revised Paragraph 1.2 SUBMITTALS.
· Revised Paragraph 1.5 CAD FILE REQUIREMENTS.
· Revised Paragraph 1.5.1 “CAD File Requirements for Design Drawings Created After Award”.
· Renamed and Revised Paragraph 1.5.1.1 “Autodesk File Submittal Requirements”.
· Revised Paragraph 1.6.4.1 “Shop Drawing Submittals”.
· Revised Submittal Register.
· Renumbered Paragraphs.
c. SECTION 01 78 00.00 28 CLOSEOUT SUBMITTALS:
· Deleted Paragraph 1.1 REFERENCES.
· Revised Paragraph 1.1 SUBMITTALS.
· Deleted Paragraph 1.2.3 “As-Built Drawings”.
· Deleted Paragraph 1.2.4 “Record Drawings”.
· Revised Paragraph 3.1 FINAL SHOP DRAWINGS.
· Deleted Paragraph 3.2 WORKING AS-BUILT DRAWINGS.
· Deleted Paragraph 3.2.1 “Submission of Working As-Built Drawings”.
· Deleted Paragraph 3.3 FINAL AS-BUILT DRAWINGS.
· Deleted Paragraph 3.4 RECORD DRAWINGS - CAD FILES.
· Deleted Paragraph 3.4.1 “Drawing Submittal Requirements”.
· Renumbered Paragraphs.
File details come from the government source that posted it. Updated .