Solicitation Amendment W912EF25BA0020003 SF 30.pdf
PDF 3 MB Posted
- Attached to
- MNA Turbine Draft Tube Slot Fillers
- Solicitation number
- W912EF25BA002
About this file
This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a US Army Corps of Engineers project at the McNary Powerhouse. The amendment, issued by the US Army Engineer District Walla Walla on 23 October 2025, adds multiple technical specification documents to the solicitation, including:
- Technical Specifications for McNary Powerhouse Turbine Draft Tube Slot Fillers (224 pages)
- Technical Specifications for Amendment 0001 (48 pages)
- Technical Specifications - Summary of Changes from Original Version to Amendment 0001 Version (1 page)
The amendment modifies the list of attachments in Section J, adding new technical documentation and updating page counts for various documents related to the McNary Powerhouse project. The solicitation number is W912EF25BA002, and the amendment does not extend the current offer receipt deadline.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section J - List of Attachments
The attachments table has changed from:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
Plans - McNary Powerhouse Turbine Draft Tube Slot Filler
Drawings 27 Feb 2025 27 Attachment No
Plans - Amendment
Drawings 23 Oct 2025 Attachment No
Technical Specifications - Amendment 0002
Performance Work Statement 23 Oct 2025 Attachment No
Technical Specifications - Summary of Changes from Amendment 0001 Version to Amendment 0002 Version
Supporting Technical Documentation 23 Oct 2025 Attachment No
To:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
Plans - McNary Powerhouse Turbine Draft Tube Slot Filler
Drawings 27 Feb 2025 27 Attachment No
Plans - Amendment
Drawings 23 Oct 2025 1 Attachment No
Technical Specifications - Amendment 0002
Performance Work Statement 23 Oct 2025 88 Attachment No
Technical Specifications - Summary of Changes from Amendment 0001 Version to Amendment 0002 Version
Supporting Technical Documentation 23 Oct 2025 1 Attachment No
Technical Specifications - McNary Powerhouse Turbine Draft Tube Slot Fillers
Performance Work Statement 15 Aug 2025 224 Attachment No
Technical Specifications - Amendment 0001
Performance Work Statement 01 Oct 2025 48 Attachment No
Technical Specifications - Summary of Changes from Original Version to Amendment 0001 Version
Supporting Technical Documentation 01 Oct 2025 1 Attachment No
W912EF25BA0020003
The following contract documents were added:
Technical Specifications - Amendment 0001 Technical Specifications - McNary Powerhouse Turbine Draft Tube Slot Fillers Technical Specifications - Summary of Changes from Original Version to Amendment 0001 Version
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FRO
M
T O
Technical Specifications - McNary Powerhouse Turbine Draft Tube Slot Fillers none
Technical Specifications - Amendment 0001 none 48
Technical Specifications - Summary of Changes from Original Version to Amendment 0001 Version none 1
W912EF25BA0020003
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0003 |
| EffDate: 23 OCT 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W912EF |
| AdmCode: |
| IssuedBy: US ARMY ENGINEER DISTRICT WALLA WAL |
KO CONTRACTING DIVISION, 201 NORTH 3RD AVE
WALLA WALLA, WA 99362-1876
UNITED STATES
KRISTIN HYDE, EMAIL: KRISTIN.A.HERNANDEZ@USACE.ARMY.MIL TELEPHONE: 509-939-8152
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912EF25BA002 |
| SolDate: 22 SEP 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE PURPOSE OF THIS AMENDMENT IS TO: |
A. ADD COMPLETE TECHNICAL SPECIFICATIONS TO THE SOLICITATION. TECHNICAL SPECIFICATIONS WERE ADDED AS ATTACHMENT 0008 (PREVIOUSLY ATTACHMENT 0001). TECHNICAL SPECIFICATION CHANGES FROM AMENDMENT 0001 WERE ADDED AS ATTACHMENT 0009 (PREVIOUSLY ATTACHMENT 0003). SUMMARY OF CHANGES DOCUMENT FROM ORIGINAL SOLICITATION TO AMENDMENT 0001 WAS ADDED AS ATTACHMENT 0010 (PREVIOUSLY ATTACHMENT 0004). NO CHANGES TO THE DOCUMENTS WERE MADE OTHER THAN RE-ADDING THEM TO THE SOLICITATION.
ALL OTHER TERMS AND CONDITIONS OF THIS SOLICITATION REMAIN UNCHANGED.
| ContNameTitle: |
| CoNameTitle: BROOKE N. MOORE |
| ContDate: |
| CODate: 28 OCT 2025 |
File details come from the government source that posted it. Updated .