V5_23B0002_Plans_Amend001.pdf
PDF 2 MB Posted
- Attached to
- MNA Levee Drainage Pump Upgrade Federal contract opportunity
- Solicitation number
- W912EF23B0002
About this file
This package contains plans and specifications for upgrading pumps and electrical equipment at Pump Station 12-1 located on the Columbia River in Oregon and Washington. The work includes replacing three existing 60 HP pumps with new compatible pumps, modifying the mounting arrangement, and upgrading ancillary equipment. Electrical upgrades involve installing a manual transfer switch to allow connection of a portable generator, replacing motor starters with combination soft starters and bypass, and connecting the neutral conductor from the utility transformer to the MCC. The project is solicited under Solicitation Number W912EF23B0002 for the McNary Lock and Dam Pump Upgrade by the U.S. Army Corps of Engineers, Walla Walla District. The response due date and award date are not specified in the document.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3'-8"
1'-10"
/2
/2
4'-2"
2' -5 /1
A N
S I
D
F
IN
A L
E Q
U
IP
M E
N T
U P
G R
A D
E
L E
V E
E D
R A
IN
A
G E
P U
M P
S T
A T
IO
N
S
C O
L U
M B
IA
R
IV
E
R O
R E
G O
N A
N D
W A
S H
IN
G
T O
N
M C
N A
R Y
L O
C K
A N
D D
A M
W
E F
B
A P
R
IL
W A
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
F
IL
E N
O
K E
V
IN
R E
N S
H A
W P
.E
P U
M P
S
P U
M P
S T
A T
IO
N
-1
P L
A N
M-102
M F
L A
N A
G A
N
C
C A
N T
IL
/2
U P
D A
T E
D P
U M
P M
O U
N T
IN
G
P L
A T
E H
O L
E D
IA
M
E T
E R
M D
L -1
-3 -5
/5
B A
L L
A S
VOLUME 5
D S
A
E C
S c re e n
F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:3
:0
A M
/1
/2
M N a
\M
N a V
M
-1 X
X X
.d g n
1' 0" 2' 0" 4' 0"0
NORTH
A1
SCALE: 3/4" = 1'-0"
PLAN: PUMP STATION 12-1 DETAIL: PUMP MOUNTING HOLES (TYP)
SCALE: NTS
A15
TYPICAL OF 3.
SPECIFICATIONS,
TRANSDUCER, SEE
GAUGE AND PRESSURE
ADD PRESSURE
RECOMMENDATION
MANUFACTURER'S
TO PIPE PER
ADAPT NEW PUMP
PUMP NO. 3
PUMP NO. 2 PUMP NO. 1
3'-0"6'-0"6'-0"3'-0"
PIPE TO EXISTING. 3 TYPICAL
TO ADAPT NEW DISCHARGE
WITH THRUST RESTRAINT
NEW HARNESS TYPE COUPLING
ELEVATIONS ON THE SHEET.
MINIMUM SUBMERGENCE DEPTH, AND PUMP CONTROL SET POINT
WITH AND WITHOUT SIPHON. ALSO INDICATE MOTOR OPERATING AMPERAGE,
POINT, BASED ON THE PROVIDED PRESSURE GAUGE, FOR THE PUMP BOTH
CURVE SHALL BE PRINTED ON AN ANSI D SIZE SHEET. MARK THE OPERATING
PLACE A LAMINATED PUMP CURVE ON THE WALL BEHIND THE PUMPS. THE 7.
SYSTEM.
NEW PUMPS SHALL BE COMPATIBLE WITH THE PROVIDED ELECTRICAL 6.
OPENING.
UNVERIFIED. VERIFY THAT THE NEW PUMP CAN PASS THROUGH THE
THE DIMENSIONS FOR THE EXISTING PUMP FLOOR OPENING ARE 5.
SHOWN DIMENSIONS ARE APPROXIMATE AND SHALL BE FIELD VERIFIED.4.
ARRANGEMENT.
RECOMMENDATIONS AND AS REQUIRED TO MATCH THE EXISTING MOUNTING
PROVIDE MOUNTING HARDWARE IN ACCORDANCE WITH MANUFACTURER'S 3.
INSTALLED CONCRETE ANCHORS ARE NOT ACCEPTABLE.
IN ORDER TO FACILITATE A THROUGH BOLTING ARRANGEMENT. POST
EXISTING MOUNTING HOLES COMPLETELY PENETRATE THE CONCRETE SLAB
NEW PUMPS SHALL MATCH THE EXISTING MOUNTING ARRANGEMENT. THE 2.
AND ANGULAR MISALIGNMENT.
SHALL BE OF THE EXPANSION TYPE AND SHALL PROVIDE FOR LIMITED AXIAL
EXISTING DISCHARGE PIPING. FIELD VERIFY THIS DIMENSION. COUPLING
MAKE UP THE DISTANCE BETWEEN THE NEW PUMP ELBOW AND THE
PROVIDE A PIPE SPOOL ALONG WITH THE PUMP COUPLING AS REQUIRED TO 1.
GENERAL NOTES
EXISTING ITEMS
NEW ITEMS
LINE STYLE LEGEND
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
M-101
REF
EL. 344.918
DIMENSIONS ARE APPROXIMATE, FIELD VERIFY.
NOTE: DETAIL SHOWS EMBEDED MOUNTING PLATE AND ANCHOR LOCATIONS.
M-302
A13
M-302
A5
A15
XXXX KCMIL, X SET X PH, NEU
N
S I
D
F
IN
A L
E Q
U
IP
M E
N T
U P
G R
A D
E
L E
V E
E D
R A
IN
A
G E
P U
M P
S T
A T
IO
N
S
C O
L U
M B
IA
R
IV
E
R O
R E
G O
N A
N D
W A
S H
IN
G
T O
N
M C
N A
R Y
L O
C K
A N
D D
A M
W
E F
B
A P
R
IL
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
E N
O
L E
V I
V A
N S
T E
D U
M P
.E
D E
M O
L
IT
IO
N
O N
E -L
IN
E
P U
M P
S T
A T
IO
N
-1
D
IA
G R
A M
ED601
P H
A R
P O
L E
S
S C
H E
IF
F
/2
X
IS
T
IN
G
M O
T O
R D
A T
A U
P D
A T
D
D
L -1
-6 -5
/7
S
S U
M M
E R
S
VOLUME 5
D S
A
E C
S c re e n
F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:3
:5
A M
/1
/2
M N a
\M
N a
V
E D
X
X X
.d g n
PUMP 12-1 STATION POWER SINGLE LINE
A9
SCALE: NTS
PANEL
LIGHTING
SEC 120/240 V
PRI 480 V
3KVA
15A 2P
F FRAME
WESTINGHOUSE
73.5 FLA
60 HP
GE
150A 3P
K FRAME
WESTINGHOUSE
FUSE EAGLE ELECT CAT NO. 659
CUTLER HAMMER 4105H315
METER # 32467
FRANKLIN CO PUD
60 60
RECEP
480 V S
BREAKER
SIPHON
5A
S
BREAKER
SIPHON
5A
S
BREAKER
SIPHON
5A
3C-#2/0 2"C 3C-#2/0 2"C 3C-#2/0 2"C
2C-#12 3/4"C 2C-#12 3/4"C 2C-#12 3/4"C
133GR27
2" NPT MAGNATROL
133GR27
2" NPT MAGNATROL
133GR27
2" NPT MAGNATROL
150A 3P
K FRAME
WESTINGHOUSE
150A 3P
K FRAME
WESTINGHOUSE
30A 3P
F FRAME
WESTINGHOUSE
FRANKLIN COUNTY PUD
12,470V SYSTEM
T1
TO PUMP STATION 12-1
NON-MAGNETIC
3EA. - #350KCM, #1/0
C2
TO PUMP STATION 12-1A
NON-MAGNETIC
3#400KCM, #1/0
C1
MCC
M
45159A SYM SCA@480V
Z=3.5%
12470V - 480 / 277V
750 KVA, 3PH
73.5 FLA
60 HP
GE
73.5 FLA
60 HP
GE
1 1 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
DEMO ITEMS
EXISTING ITEMS
LEGEND
T1
1-1/0 G FROM PLUG. 4"C
6-250 KCMIL, 1-250 KCMIL(N)
1/0 GRD
RODS
GROUND
NEW
GRID
GROUND
EXISTING
SEC NEUTRAL
TRANSFORMER
LIGHTING
1/0 GEC
3"C UG (EXISTING)
6-250 KCMIL, 1-250 KCMIL(N)
A N
S I
D
F
IN
A L
E Q
U
IP
M E
N T
U P
G R
A D
E
L E
V E
E D
R A
IN
A
G E
P U
M P
S T
A T
IO
N
S
C O
L U
M B
IA
R
IV
E
R O
R E
G O
N A
N D
W A
S H
IN
G
T O
N
M C
N A
R Y
L O
C K
A N
D D
A M
W
E F
B
A P
R
IL
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
E N
O
L E
V I
V A
N S
T E
D U
M P
.E
O N
E -L
IN
E
P U
M P
S T
A T
IO
N
-1
D
IA
G R
A M
E-601
P H
A R
P O
L E
S
S C
H E
IF
F
/2
O
T O
R S
IZ
E
U P
D A
T
D
D
L -1
-6 -5
/1
S
S U
M M
E R
S
VOLUME 5
D S
A
E C
S c re e n
F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:3
:4
A M
/1
/2
M N a
\M
N a
V
E -6
X X
X .d g n
DETAIL: NEUTRAL AND GROUND
G14
A7
PUMP STATION 12-1 SINGLE LINE
MMM
PANEL SCHEDULE
MOTOR CONTROL CENTER
4-POLE
600AF
350AT
480VAC, 800AMP, BUS, 42KAIC
30A 15A
WITH BYPASS
SOFT START
WITH BYPASS
SOFT START
WITH BYPASS
SOFT START
60 HP
PUMP 1 60 HP
PUMP 2
60 HP
PUMP 3
MCC GROUND
RECEPTACLE
480V POWER
20A
SPARE
30A
HTR
HEATER
WALL
S
BREAKER
SIPHON
5A
S
BREAKER
SIPHON
5A
S
BREAKER
SIPHON
5A
(TYP)
#12 GND 3/4"C
2C#12, METER # 32467
FRANKLIN CO PUD
FRANKLIN COUNTY PUD
12,470V SYSTEM
NON-MAGNETIC
3 SETS, 3 - #350 KCM, #1/0 GND
C2
TO PUMP STATION 12-1A
250AF
150AT
4 POLE SWITCHED NEUTRAL
CIRCUIT BREAKER TYPE
600 A INTERLOCKED
SERVICE ENTRANCE RATED
MANUAL TRANSFER SWITCH (MTS)
4P
600AF
400 AT
4P
600 AF
400AT
12-1A
TO PUMP STATION
250AF
150AT
250AF
150AT
(TYP)
3C-#1/0, #4GND, 2"C
SHUNT TRIP TO GENERATOR CB
INCLUDES SAFETY INTERLOCK
WITH GROUNDING PLUG
3 PH, 4 WIRE
RECEPTACLE 400A
PORTABLE GENERATOR (MTS)
MCC
M
45159A SYM SCA@480V
Z=3.5%
12470V - 480 / 277V
750 KVA, 3PH
MCC
MCC NEUTRAL BUS
MCC GROUND BUS
MTS
AT TRANSFER SWITCH
SERVICE ENTRANCE
G
CB
MAIN
N
N
N
M
ACTUATOR
SLIDE GATE
2 HP
FVR
15A
3P, 9 KVA
480-208/120V, TRANSFORMER
PANEL
DIST
MCC
40A
SPACE
DM
1 1 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
G14
TO THE NEUTRAL OF THE MCC.
BE EXTENDED THROUGH THE NEW TRANSFER SWITCH AND CONNECTED
NEUTRAL FROM THE SECONDARY OF THE UTILITY TRANSFORMER SHALL
THE MCC DESIGN SHALL BE A 3 PHASE, 4 WIRE BUS. THE EXISTING
MCC NEUTRAL: 3.
1008 AS SUITABLE FOR SERVICE ENTRANCE USE.
THE TRANSFER SWITCH SHALL BE SERVICE ENTRANCE RATED PER UL
SWITCH INTERNAL CIRCUIT BREAKER FOR THE EMERGENCY SOURCE.
THE PLUG AND RECEPTACLE SHALL BE PROTECTED BY THE TRANSFER
THE OPERATOR TO INITIATE THE TRANSFER.
OPERATED DESIGN. FRONT DOOR MOUNTED CONTROLS SHALL ALLOW
THE TRANSFER SWITCH SHALL BE A MANUALLY INITIATED ELECTRICALLY
BE OF A CIRCUIT BREAKER BASED DESIGN.
GENERATOR CONNECTION TO THE PUMP STATION. THE SWITCH SHALL
A MANUAL TRANSFER SWITCH SHALL BE PROVIDED FOR STANDBY
TRANSFER SWITCH:2.
PROVIDED.
MOTOR SOFT STARTS WITH FULL BYPASS STARTERS SHALL BE
MOTOR CONTROL CENTER:1.
GENERAL SHEET NOTES
| MECHANICAL INTAKE PUMPS PLAN |
| MN333719a_V5ED601XXX |
| MN333719a_V5E-601XXX |