V3_23B0002_Plans_Amend001.pdf

PDF 1 MB Posted

Attached to
MNA Levee Drainage Pump Upgrade Federal contract opportunity
Solicitation number
W912EF23B0002
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This document is the plans and specifications for upgrading pumps at the McNary Lock and Dam Levee Drainage Pump Station in Oregon and Washington. The project involves replacing three existing pumps with new pumps compatible with the existing electrical and mounting arrangements. The new pumps must be able to pass through the existing floor opening dimensions of 5'-6 5/8" by 1'-5 3/8". Mounting plates for the new pumps must match the existing arrangement and include expansion couplings to connect to the existing discharge piping. Dimensions on the plans are approximate and must be field verified. The specifications require providing pump curves, operating points, motor amperage, and control set points printed on an ANSI D size sheet and laminated on the pump room wall. The solicitation number for this project is W912EF23B0002 and was issued by the US Army Corps of Engineers Walla Walla District.

View the file

Other files for this federal contract opportunity

Other files attached to MNA Levee Drainage Pump Upgrade, newest first.
File Type Posted
C.04.01 Bid Opening Worksheet -09-19-2023.pdf PDF
B.08.03 V9_23B0002_Plans_Amd003.pdf PDF
B.08.03 V11_23B0002_Plans_Amd003.pdf PDF
B.08.03 V3_23B0002_Plans_Amd003.pdf PDF
B.08.03 V12_23B0002_Plans_Amd003.pdf PDF
B.08.03 TECHSPECS_23B0002_amd0003_McN Levee_8Sep23.pdf PDF
B.08.03 DRAWING AMENDMENT APPROVAL FORM_0003.pdf PDF
B.08.03 Solicitation 23B00020003.pdf PDF
B.08.03 V6_23B0002_Plans_Amd003.pdf PDF
B.08.03 V1_23B0002_Plans_Amd003.pdf PDF
B.08.03 V10_23B0002_Plans_Amd003.pdf PDF
B.08.03 V8_23B0002_Plans_Amd003.pdf PDF
B.08.03 V2_23B0002_Plans_Amd003.pdf PDF
B.08.03 V7_23B0002_Plans_Amd003.pdf PDF
B.08.03 V4_23B0002_Plans_Amd003.pdf PDF
B.08.03 V5_23B0002_Plans_Amd003.pdf PDF
B.08.03 VA_23B0002_Plans_Amd003.pdf PDF
B.08.03 Solicitation 23B00020002.pdf PDF
V7_23B0002_Plans_Amend001.pdf PDF
V5_23B0002_Plans_Amend001.pdf PDF
V4_23B0002_Plans_Amend001.pdf PDF
V1_23B0002_Plans_Amend001.pdf PDF
V8_23B0002_Plans_Amend001.pdf PDF
B.08.02 Solicitation 23B00020001.pdf PDF
V6_23B0002_Plans_Amend001.pdf PDF
V9_23B0002_Plans_Amend001.pdf PDF
V11_23B0002_Plans_Amend001.pdf PDF
V10_23B0002_Plans_Amend001.pdf PDF
TECHSPECS_23B0002_McN Levee Pump Stations_amd0001_21Aug23.pdf PDF
MNA Levee Drainage Pumps site visit list.pdf PDF
A.03.09 V7_23B0002_Plans_RE007_8__.pdf PDF
B.08.02 Solicitation 23B0002.pdf PDF
A.03.09 V11_23B0002_Plans.pdf PDF
A.03.09 V03_23B0002_Plans.pdf PDF
A.03.09 V06_23B0002_Plans~.pdf PDF
A.03.09 V02_23B0002_Plans.pdf PDF
A.03.09 V10_23B0002_Plans.pdf PDF
A.03.09 V09_23B0002_Plans.pdf PDF
A.03.09 V08_23B0002_Plans.pdf PDF
A.03.09 V04_23B0002_Plans.pdf PDF
A.02.12 TECHSPECS_23B0002_McN Levee Pump Stations_7Feb23.pdf PDF
A.03.09 V12_23B0002_Plans.pdf PDF
A.03.09 V07_23B0002_Plans.pdf PDF
A.03.09 V05_23B0002_Plans.pdf PDF
A.03.09 V01_23B0002_Plans.pdf PDF
A.03.09 VA_23B0002_Plans.pdf PDF
B.08.02 Solicitation 23B0002.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3'- 5/8 "

1'-7 1/4 " 1'-5 3/8 "

/8

/8

/1

4'-2"

1'-7 1/4 "

4'-6" 9'-0" 9'-0" 4'-6"

A N

S I

D

F

IN

A L

E Q

U

IP

M E

N T

U P

G R

A D

E

L E

V E

E D

R A

IN

A

G E

P U

M P

S T

A T

IO

N

S

C O

L U

M B

IA

R

IV

E

R O

R E

G O

N A

N D

W A

S H

IN

G

T O

N

M C

N A

R Y

L O

C K

A N

D D

A M

W

E F

B

A P

R

IL

W A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

F

IL

E N

O

K E

V

IN

R E

N S

H A

W

P .E

P U

M P

S

P U

M P

S T

A T

IO

N

D

P L

A N

M-103

M F

L A

N A

G A

N

C

C A

N T

IL

/2

U P

D A

T E

D P

U M

P M

O U

N T

IN

G

P L

A T

E H

O L

E D

IA

M

E T

E R

M D

L -1

-3 -5

/7

P

A U

T H

VOLUME 3

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:1

:1

A M

/1

/2

M N a

\M

N a V

M

-1 X

X X

.d g n

A4

SCALE: 1/2"=1'-0"

PLAN: PUMP STATION 5D

1' 0" 2' 0" 4' 0"0

K8 1" = 1'-0"

DETAIL: PUMP MOUNTING HOLES (TYP)

NORTH

6" 1' 0" 2' 0"0

ELEVATIONS ON THE SHEET.

MINIMUM SUBMERGENCE DEPTH, AND PUMP CONTROL SET POINT

WITH AND WITHOUT SIPHON. ALSO INDICATE MOTOR OPERATING AMPERAGE,

POINT, BASED ON THE PROVIDED PRESSURE GAUGE, FOR THE PUMP BOTH

CURVE SHALL BE PRINTED ON AN ANSI D SIZE SHEET. MARK THE OPERATING

PLACE A LAMINATED PUMP CURVE ON THE WALL BEHIND THE PUMPS. THE 7.

SYSTEM.

NEW PUMPS SHALL BE COMPATIBLE WITH THE PROVIDED ELECTRICAL 6.

OPENING.

UNVERIFIED. VERIFY THAT THE NEW PUMP CAN PASS THROUGH THE

THE DIMENSIONS FOR THE EXISTING PUMP FLOOR OPENING ARE 5.

SHOWN DIMENSIONS ARE APPROXIMATE AND SHALL BE FIELD VERIFIED.4.

ARRANGEMENT.

RECOMMENDATIONS AND AS REQUIRED TO MATCH THE EXISTING MOUNTING

PROVIDE MOUNTING HARDWARE IN ACCORDANCE WITH MANUFACTURER'S 3.

INSTALLED CONCRETE ANCHORS ARE NOT ACCEPTABLE.

IN ORDER TO FACILITATE A THROUGH BOLTING ARRANGEMENT. POST

EXISTING MOUNTING HOLES COMPLETELY PENETRATE THE CONCRETE SLAB

NEW PUMPS SHALL MATCH THE EXISTING MOUNTING ARRANGEMENT. THE 2.

AND ANGULAR MISALIGNMENT.

SHALL BE OF THE EXPANSION TYPE AND SHALL PROVIDE FOR LIMITED AXIAL

EXISTING DISCHARGE PIPING. FIELD VERIFY THIS DIMENSION. COUPLING

MAKE UP THE DISTANCE BETWEEN THE NEW PUMP ELBOW AND THE

PROVIDE A PIPE SPOOL ALONG WITH THE PUMP COUPLING AS REQUIRED TO 1.

GENERAL NOTES

EXISTING ITEMS

NEW ITEMS

LINE STYLE LEGEND

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

PUMP NO. 3

PUMP NO. 2

PUMP NO. 1

3 TYPICAL.

NEW DISCHARGE PIPE TO EXISTING.

NEW DRESSER COUPLING TO ADAPT

MANUFACTURER RECOMMENDATION

ADAPT NEW PUMP TO PIPE PER

SEE SPECIFICATIONS, 3 TYPICAL

& PRESSURE TRANSDUCER,

ADD PRESSURE GAUGE

M-101

REF

DIMENSIONS ARE APPROXIMATE, FIELD VERIFY.

NOTE: DETAIL SHOWS EMBEDED MOUNTING PLATE AND ANCHOR LOCATIONS.

M-303

A1

M-303

A9

K8

MN333719a_V3M-103XXX

File details come from the government source that posted it. Updated .