B.08.02 Solicitation 23B00020001.pdf
PDF 730 KB Posted
- Attached to
- MNA Levee Drainage Pump Upgrade Federal contract opportunity
- Solicitation number
- W912EF23B0002
About this file
This solicitation requests proposals for upgrades to drainage pump stations along levees in the McNary area. The U.S. Army Corps of Engineers Walla Walla District is seeking a contractor to perform work such as replacing pumps, motors, controls, and electrical systems; improving buildings, fencing, security, and communications; and providing temporary power at 16 pump stations over a 28-month initial period. Bids are due by September 14, 2023 with the work involving tasks orders for individual stations. Options to continue work for additional years are included. Pricing is by line item with unit rates required. The scope includes repairs, improvements, and equipment replacement to modernize aging infrastructure and address reliability issues.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to extend bid due date from 9/1/23 to 9/14/23, update the bid schedule, Clause 52.211-10 COMMENCEMENT, PROSECUSTIONS, AND COMPLETION OF WORK, provide revised technical specifications sections 01 14 00.10.28 PROJECT SITE RESTRICTIONS, 26 29 01.00 28 ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE, & 43 21 39 PUMPS:WATER, VERTICAL. Draw ings Vol 1: M-103, Vol 3: M-103, Vol 4: M-103, Vol 5: M-102, E-601, ED601, Vol 6: M-103, M-581, E-301, ED501, Vol 7:
M-103, RE0007, RE0008, Vol 8: M-102,Vol 9: M-102, Vol 10: M-103, & Vol 11: M-103. See Summary of Changes for further details.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 48
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF23B0002
X 9B. DATED (SEE ITEM 11)
02-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Aug-2023
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
CHANDRA D. CROW
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF23B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 01-Sep-2023 02:00 PM to 14-Sep-2023 02:00 PM.
The solicitation issue date has changed from 20-Jul-2023 to 02-Aug-2023.
The offeror acceptance period has increased by 15 from 30 to 45.
The following have been added by full text:
SUMMARY OF CHANGES AMEND #0001
Summary of Changes McNary Levee Drainage Pump Stations Equipment Upgrades
W912EF23B0002-0001
1. Bid Schedule: Updated to reflect the work already included in the plans and specifications and show in SECTION 01 22 00 MEASUREMENT AND PAYMENT.
2. FAR CLAUSE 52.211-10: Revised to provide information on duration for task orders.
Specifications:
3. 01 14 00.10 28 PROJECT SITE RESTRICTIONS
1.10: Revised period of performance for each task order awarded from one year to twenty eight (28) months from Notice to Proceed.
4. 26 29 01.00 28 ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE
2.3.2: Requirement for inverter rated motors has been removed.
5. 43 21 39 PUMPS: WATER, VERTICAL
2.5.1.3.1: Revised to allow either hollow or solid shafts 2.5.3.1: Revised pump bowls requirements 2.5.3.2: Removed bronze and cast-iron as material choice for impellers 2.6.3: Subpart “bearing Temperature Monitoring” has been deleted.
2.12.2: Revised “notice of award” to “notice to proceed” and revised last sentence in subpart.
Drawings:
Vol 1: M-103 Vol 3: M-103 Vol 4: M-103 Vol 5: M-102, E-601, ED601 Vol 6: M-103, M-581, E-301, ED501 Vol 7: M-103, RE0007, RE0008 (for RE0007 & 0008, they were inadvertently left out when the solicitation was initially posted) Vol 8: M-102 Vol 9: M-102 Vol 10: M-103 Vol 11: M-103
The following have been modified:
BID SCHEDULE
Walla Walla District Corps of Engineers McNary Levee Drainage Pump Stations Equipment Upgrade
Amendment 23B0002-0001
SCHEDULE A - BASE YEAR
Magnitude of Construction Project is estimated to be between $25,000,000 and $100,000,000
ITEM
DESCRIPTION
QUANTITY
U/M*
U/P*
AMOUNT
Items
Pump Station 2C
0001AA
Pump 1
JOB
XXXXX
0001AB
Pump 2
0001AC
Pump 3
0001AD
Electrical and Controls
0001AE
Building Improvements
0001AF
Fencing and Gate Bollards
0001AG
Interior Bollards
0001AH
Annunciation System
0001AJ
Annunciation System Finalization
0001AK
Siphon Breaker Conduit Replacement
Pump Station 4A
0002AA
0002AB
Electrical
0002AC
0002AD
0002AE
0002AF
0002AG
Pump Station 5D
0003AA
0003AB
0003AC
0003AD
0003AE
0003AF
0003AG
0003AH
0003AJ
0003AK
Trash Rake
0003AL Floating Trash Boom 1 JOB XXXXX $_____________
0003AM
Pump Station 6B
0004AA
0004AB
0004AC
0004AD
0004AE
0004AF
0004AG
0004AH
0004AJ
0004AK
0004AL
Floating Trash Boom
0004AM
Pump Station 12-1
0005AA
0005AB Pump 2 1 JOB XXXXX $_____________
0005AC
0005AD
0005AE
0005AF
0005AG
0005AH
0005AJ
0005AK
0005AL
Pump Station 12-1A
0006AA
0006AB
0006AC
0006AD
0006AE
0006AF
0006AG
0006AH
0006AJ
0006AK
0006AL
0006AM
Bulkhead Improvements
0006AN
Pump Station 12-2
0007AA
0007AB
0007AC
0007AD
0007AE
0007AF
0007AG
0007AH
0007AJ
0007AK
0007AL
Pump Station 15C
0008AA
0008AB
0008AC
0008AD
0008AE
0008AF
0008AG
0008AH
0008AJ
0008AK
0008AL
0008AM
Pump Station 15D
0009AA
0009AB
0009AC
0009AD
0009AE
0009AF
0009AG
0009AH
0009AJ
0009AK
0009AL
0009AM
Pump Station 15E
0010AA
0010AB
0010AC
0010AD
0010AE
0010AF
0010AG
0010AH
0010AJ
0010AK
0010AL
Pump Station 15E-1
0011AA
0011AB
0011AC
0011AD
0011AE
0011AF
0011AG
0011AH
0011AJ
0011AK
0011AL
Portable Generator Set 400kVA
012AA
0012AB
Portable Generator Set 500kVA
Concrete Repair
50 EST
CF
Tri Rivers Shop Control Center
0016 Ice Harbor Dam Secondary Control
Center Annunciation System
Temporary Power
0017AA Temporary Power and New Rack for Pump Station 12-2
0017AB Temporary Power and
Reconfigured Rack for Pump Station 2C
0017AC Temporary Power and
Station 5D
0017AD Temporary Power and
Station 6B
0017AE Temporary Power and
Station 15C
0017AF Temporary Power and New Rack for Pump Station 15D
BASE YEAR SCHEDULE A TOTAL $_________________________
SCHEDULE B – 1st OPTION YEAR
1001AA
1001AB
1001AC
1001AD
1001AE
1001AF
1001AG
1001AH
1001AJ
1001AK
1002AA
1002AB
1002AC
1002AD
1002AE
1002AF
1002AG
1003AA
1003AB
1003AC
1003AD
1003AE
1003AF
1003AG
1003AH
1003AJ
1003AK
1003AL
1003AM
1004AA
1004AB
1004AC
1004AD
1004AE
1004AF
1004AG
1004AH
1004AJ
1004AK
1004AL
1004AM
1005AA
1005AB
1005AC
1005AD
1005AE
1005AF
1005AG
1005AH
1005AJ
1005AK
1005AL
1006AA
1006AB
1006AC
1006AD
1006AE
1006AF
1006AG
1006AH
1006AJ
1006AK Trash Rake 1 JOB XXXXX $_____________
1006AL
1006AM
1006AN
1007AA
1007AB
1007AC
1007AD
1007AE
1007AF
1007AG
1007AH
1007AJ
1007AK
1007AL
1008AA Pump 1 1 JOB XXXXX $_____________
1008AB
1008AC
1008AD
1008AE
1008AF
1008AG
1008AH
1008AJ
1008AK
1008AL
1008AM
1009AA
1009AB
1009AC
1009AD
1009AE
1009AF
1009AG
1009AH
1009AJ
1009AK
1009AL
1009AM
1010AA
1010AB
1010AC
1010AD
1010AE
1010AF
1010AG
1010AH
1010AJ
1010AK
1010AL
1011AA
1011AB
1011AC
1011AD
1011AE
1011AF
1011AG
1011AH
1011AJ
1011AK
1011AL
1012AA
1012AB
1013 Portable Generator Set 500kVA 1 JOB XXXXX $_____________
1016 Ice Harbor Dam Secondary Control
1017AA Temporary Power and New Rack
1017AB Temporary Power and
1017AC Temporary Power and
1017AD Temporary Power and
1017AE Temporary Power and
1017AF Temporary Power and New Rack
OPTION YEAR ONE SCHEDULE B TOTAL $_________________________
SCHEDULE C – 2nd OPTION YEAR
2001AA
2001AB
2001AC
2001AD
2001AE
2001AF
2001AG
2001AH
2001AJ
2001AK
2002AA
2002AB
2002AC
2002AD
2002AE
2002AF
2002AG
2003AA
2003AB
2003AC
2003AD
2003AE
2003AF
2003AG
2003AH
2003AJ
2003AK
2003AL
2003AM
2004AA
2004AB
2004AC
2004AD
2004AE
2004AF
2004AG
2004AH
2004AJ
2004AK
2004AL
2004AM
2005AA
2005AB
2005AC
2005AD
2005AE
2005AF
2005AG
2005AH
2005AJ
2005AK
2005AL
2006AA
2006AB
2006AC
2006AD
2006AE
2006AF
2006AG
2006AH
2006AJ
2006AK Trash Rake 1 JOB XXXXX $_____________
2006AL
2006AM
2006AN
2007AA
2007AB
2007AC
2007AD
2007AE
2007AF
2007AG
2007AH
2007AJ
2007AK
2007AL
2008AA Pump 1 1 JOB XXXXX $_____________
2008AB
2008AC
2008AD
2008AE
2008AF
2008AG
2008AH
2008AJ
2008AK
2008AL
2008AM
2009AA
2009AB
2009AC
2009AD
2009AE Building Improvements 1 JOB XXXXX $_____________
2009AF
2009AG
2009AH
2009AJ
2009AK
2009AL
2009AM
2010AA
2010AB
2010AC
2010AD
2010AE
2010AF
2010AG
2010AH
2010AJ
2010AK
2010AL
2011AA
2011AB
2011AC
2011AD
2011AE
2011AF
2011AG
2011AH
2011AJ
2011AK
2011AL
2012AA
2012AB
2016 Ice Harbor Dam Secondary Control
2017AA Temporary Power and New Rack
2017AB Temporary Power and
2017AC Temporary Power and
2017AD Temporary Power and
2017AE Temporary Power and
2017AF Temporary Power and New Rack
OPTION YEAR TWO SCHEDULE C TOTAL $_________________________
SCHEDULE D – 3rd OPTION YEAR
3001AA
3001AB
3001AC
3001AD
3001AE
3001AF
3001AG
3001AH
3001AJ
3001AK
3002AA
3002AB
3002AC
3002AD
3002AE
3002AF
3002AG
3003AA
3003AB
3003AC
3003AD
3003AE
3003AF
3003AG
3003AH
3003AJ
3003AK
3003AL
3003AM
3004AA
3004AB
3004AC
3004AD
3004AE
3004AF
3004AG
3004AH
3004AJ
3004AK
3004AL
3004AM
3005AA
3005AB
3005AC
3005AD
3005AE
3005AF
3005AG
3005AH
3005AJ
3005AK
3005AL
3006AA
3006AB
3006AC
3006AD
3006AE
3006AF
3006AG
3006AH
3006AJ
3006AK Trash Rake 1 JOB XXXXX $_____________
3006AL
3006AM
3006AN
3007AA
3007AB
3007AC
3007AD
3007AE
3007AF
3007AG
3007AH
3007AJ
3007AK
3007AL
3008AA Pump 1 1 JOB XXXXX $_____________
3008AB
3008AC
3008AD
3008AE
3008AF
3008AG
3008AH
3008AJ
3008AK
3008AL
3008AM
3009AA
3009AB
3009AC
3009AD
3009AE
3009AF
3009AG
3009AH
3009AJ
3009AK
3009AL
3009AM
3010AA
3010AB
3010AC
3010AD
3010AE
3010AF
3010AG
3010AH
3010AJ
3010AK
3010AL
3011AA
3011AB
3011AC
3011AD
3011AE
3011AF
3011AG
3011AH
3011AJ
3011AK
3011AL
3012AA
3012AB
Ice Harbor Dam Secondary Control
3017AA Temporary Power and New Rack
3017AB Temporary Power and
3017AC Temporary Power and
3017AD Temporary Power and
3017AE Temporary Power and
3017AF Temporary Power and New Rack
OPTION YEAR THREE SCHEDULE D TOTAL $_________________________
SCHEDULE E – 4th OPTION YEAR
4001AA
4001AB
4001AC
4001AD
4001AE
4001AF
4001AG
4001AH
4001AJ
4001AK
4002AA
4002AB
4002AC
4002AD
4002AE
4002AF
4002AG
4003AA
4003AB
4003AC
4003AD
4003AE
4003AF
4003AG
4003AH
4003AJ
4003AK
4003AL
4003AM
4004AA
4004AB
4004AC
4004AD
4004AE
4004AF
4004AG
4004AH
4004AJ
4004AK
4004AL
4004AM
4005AA
4005AB
4005AC
4005AD
4005AE
4005AF
4005AG
4005AH
4005AJ
4005AK
4005AL
4006AA
4006AB
4006AC
4006AD
4006AE
4006AF
4006AG
4006AH
4006AJ
4006AK Trash Rake 1 JOB XXXXX $_____________
4006AL
4006AM
4006AN
4007AA
4007AB
4007AC
4007AD
4007AE
4007AF
4007AG
4007AH
4007AJ
4007AK
4007AL
4008AA Pump 1 1 JOB XXXXX $_____________
4008AB
4008AC
4008AD
4008AE
4008AF
4008AG
4008AH
4008AJ
4008AK
4008AL
4008AM
4009AA
4009AB
4009AC
4009AD
4009AE
4009AF
4009AG
4009AH
4009AJ
4009AK
4009AL
4009AM
4010AA
4010AB
4010AC
4010AD
4010AE
4010AF
4010AG
4010AH
4010AJ
4010AK
4010AL
4011AA
4011AB
4011AC
4011AD
4011AE
4011AF
4011AG
4011AH
4011AJ
4011AK
4011AL
4012AA
4012AB
4016 Ice Harbor Dam Secondary Control
4017AA Temporary Power and New Rack
4017AB Temporary Power and
4017AC Temporary Power and
4017AD Temporary Power and
4017AE Temporary Power and
4017AF Temporary Power and New Rack
OPTION YEAR FOUR SCHEDULE E TOTAL $_________________________
BASE YEAR SCHEDULE A TOTAL
OPTION YEAR ONE SCHEDULE B TOTAL
OPTION YEAR TWO SCHEDULE C TOTAL
OPTION YEAR THREE SCHEDULE D TOTAL
OPTION YEAR FOUR SCHEDULE E TOTAL
GRAND TOTAL (BASE + ALL OPTIONS)
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
Work for this Requirements Contract will be performed at the task order level. Each task order will include this clause. See SECTION 01 14 00.10 28 PROJECT SITE RESTRICTIONS, paragraph “TASK ORDER DURATIONS” for the Government’s intent on number of task orders and performance duration.
The Contractor shall be required to
(a) commence work under each Task Order as stated in the task order requirements;
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than the date(s) specified in the task order. The time stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .