B.08.02 Solicitation 23B0002.pdf
PDF 2 MB Posted
- Attached to
- MNA Levee Drainage Pump Upgrade Federal contract opportunity
- Solicitation number
- W912EF23B0002
About this file
This is an invitation for bids for a requirements contract to provide construction services for the rehabilitation of eleven levee pump stations in the Tri-Cities and Finley, Washington areas. The contract will have a one-year base period with four optional one-year extensions. Bids are due by September 1st, 2023.
The solicitation requires bids on all line items in the bid schedule, which includes upgrades to pumps, electrical and controls, buildings, fencing, and installation of trash racks and floating booms at the various pump stations. The contractor will also install annunciation systems and perform concrete repairs. Prices should be provided for the base year and each optional extension year. The award will be made to a single contractor for task orders issued under an indefinite delivery contract.
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
McNary Levees Pump Stations Equipment Upgrades
X
CHANDRA D. CROW 509-527-7202
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20-Jul-2023
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 70 00
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________01 Sep 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than ___45__ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, WALLA WALLA - CONTRACTING DIV.
CHANDRA D. CROW
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
509-527-7802FAX:TEL: 509-527-7202 TEL: FAX:
W912EF23B0002 111
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912EF23B0002
Section 00 01 10 - Table of Contents
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Tech Specs 885 07-FEB-2023 Attachment 2 VA_23B0002_Plans 54 06-APR-2023 Attachment 3 V01_23B0002_Plans 61 10-APR-2023 Attachment 4 V02_23B0002_Plans 44 06-APR-2023 Attachment 5 V03_23B0002_Plans 63 06-APR-2023 Attachment 6 V04_23B0002_Plans 56 06-APR-2023 Attachment 7 V05_23B0002_Plans 47 06-APR-2023 Attachment 8 V06_23B0002_Plans 80 18-APR-2023 Attachment 9 V07_23B0002_Plans 61 07-APR-2023 Attachment 10 V08_23B0002_Plans 58 07-APR-2023 Attachment 11 V09_23B0002_Plans 64 07-APR-2023 Attachment 12 V10_23B0002_Plans 53 07-APR-2023 Attachment 13 V11_23B0002_Plans 71 07-APR-2023 Attachment 14 V12_23B0002_Plans 75 07-APR-2023
Section 00 10 00 - Solicitation
BID SCHEDULE
Walla Walla District Corps of Engineers McNary Levee Drainage Pump Stations Equipment Upgrade
SCHEDULE A - BASE YEAR
Magnitude of the Construction Project is estimated to be between $25,000,000 and $100,000,000.
ITEM
DESCRIPTION
QUANTITY
U/M*
U/P*
AMOUNT
Items
Pump Station 2C
0001AA
Pump 1
JOB
XXXXX
0001AB
Pump 2
0001AC
Pump 3
0001AD
Electrical and Controls
0001AE
Building Improvements
0001AF
Fencing and Gate Bollards
0001AG
Interior Bollards
0001AH
Annunciation System
0001AJ
Annunciation System Finalization
Pump Station 4A
0002AA
0002AB
Electrical
0002AC
0002AD Interior Bollards 1 JOB XXXXX $_____________
Pump Station 5D
0003AA
0003AB
0003AC
0003AD
0003AE
0003AF
0003AG
0003AH
0003AJ
0003AK
Trash Racks
0003AL
Floating Trash Boom
Pump Station 6B
0004AA
0004AB
0004AC
0004AD
0004AE
0004AF
0004AG
0004AH
0004AJ
0004AK
0004AL
Pump Station 12-1
0005AA
0005AB
0005AC
0005AD
0005AE
0005AF
0005AG
0005AH
0005AJ
0005AK
Pump Station 12-1A
0006AA
0006AB
0006AC
0006AD
0006AE
0006AF
0006AG
0006AH
0006AJ
0006AK
0006AL
0006AM
Bulkhead Improvements
Pump Station 12-2
0007AA
0007AB
0007AC
0007AD Electrical and Controls 1 JOB XXXXX $_____________
0007AE
0007AF
0007AG
0007AH
0007AJ
0007AK
Pump Station 15C
0008AA
0008AB
0008AC
0008AD
0008AE
0008AF
0008AG
0008AH
0008AJ
0008AK
0008AL
Pump Station 15D
0009AA
0009AB
0009AC
0009AD
0009AE
0009AF
0009AG
0009AH
0009AJ
0009AK
0009AL
Pump Station 15E
0010AA
0010AB
0010AC
0010AD
0010AE
0010AF
0010AG
0010AH
0010AJ
0010AK
Pump Station 15E-1
0011AA
0011AB
0011AC
0011AD
0011AE
0011AF
0011AG
0011AH
0011AJ
0011AK
0012 Portable Generator Set 400kVA 2 EA $_________ $_____________
Portable Generator Set 500kVA
EA
Concrete Repair
50 EST
CF
Tri Rivers Shop Control Center
0016 Ice Harbor Dam Secondary
Control Center Annunciation System
Temporary Power Racks
BASE YEAR SCHEDULE A TOTAL $_________________________
SCHEDULE B – 1st OPTION YEAR
1001AA
1001AB
1001AC
1001AD
1001AE
1001AF
1001AG
1001AH
1001AJ
1002AA
1002AB
1002AC
1002AD
1003AA
1003AB
1003AC
1003AD
1003AE
1003AF
1003AG
1003AH
1003AJ
1003AK
1003AL
1004AA
1004AB
1004AC
1004AD
1004AE
1004AF
1004AG
1004AH
1004AJ
1004AK
1004AL
1005AA
1005AB
1005AC
1005AD
1005AE
1005AF
1005AG
1005AH
1005AJ
1005AK
1006AA Pump 1 1 JOB XXXXX $_____________
1006AB
1006AC
1006AD
1006AE
1006AF
1006AG
1006AH
1006AJ
1006AK
1006AL
1006AM
1007AA
1007AB
1007AC
1007AD
1007AE
1007AF
1007AG
1007AH
1007AJ
1007AK
1008AA
1008AB
1008AC
1008AD
1008AE
1008AF
1008AG
1008AH
1008AJ
1008AK
1008AL
1009AA
1009AB
1009AC
1009AD
1009AE
1009AF
1009AG
1009AH
1009AJ
1009AK
1009AL
1010AA
1010AB
1010AC
1010AD
1010AE
1010AF Fencing and Gate Bollards 1 JOB XXXXX $_____________
1010AG
1010AH
1010AJ
1010AK
1011AA
1011AB
1011AC
1011AD
1011AE
1011AF
1011AG
1011AH
1011AJ
1011AK
Portable Generator Set 400kVA
1016 Ice Harbor Dam Secondary
OPTION YEAR ONE SCHEDULE B TOTAL $_________________________
SCHEDULE C – 2nd OPTION YEAR
2001AA
2001AB
2001AC
2001AD
2001AE
2001AF
2001AG
2001AH
2001AJ
2002AA
2002AB
2002AC
2002AD
2003AA
2003AB
2003AC
2003AD
2003AE
2003AF
2003AG
2003AH
2003AJ
2003AK
2003AL
2004AA
2004AB
2004AC
2004AD
2004AE
2004AF
2004AG
2004AH
2004AJ
2004AK
2004AL
2005AA
2005AB
2005AC
2005AD
2005AE
2005AF
2005AG
2005AH
2005AJ
2005AK
2006AA Pump 1 1 JOB XXXXX $_____________
2006AB
2006AC
2006AD
2006AE
2006AF
2006AG
2006AH
2006AJ
2006AK
2006AL
2006AM
2007AA
2007AB
2007AC
2007AD
2007AE
2007AF
2007AG
2007AH
2007AJ
2007AK
2008AA
2008AB
2008AC
2008AD
2008AE
2008AF
2008AG
2008AH
2008AJ
2008AK
2008AL
2009AA
2009AB
2009AC
2009AD
2009AE
2009AF
2009AG
2009AH
2009AJ
2009AK
2009AL
2010AA
2010AB
2010AC
2010AD
2010AE
2010AF Fencing and Gate Bollards 1 JOB XXXXX $_____________
2010AG
2010AH
2010AJ
2010AK
2011AA
2011AB
2011AC
2011AD
2011AE
2011AF
2011AG
2011AH
2011AJ
2011AK
2016 Ice Harbor Dam Secondary
OPTION YEAR TWO SCHEDULE C TOTAL $_________________________
SCHEDULE D – 3rd OPTION YEAR
3001AA
3001AB
3001AC
3001AD
3001AE
3001AF
3001AG
3001AH
3001AJ
3002AA
3002AB
3002AC
3002AD
3003AA
3003AB
3003AC
3003AD
3003AE
3003AF
3003AG
3003AH
3003AJ
3003AK
3003AL
3004AA
3004AB
3004AC
3004AD
3004AE
3004AF
3004AG
3004AH
3004AJ
3004AK
3004AL
3005AA
3005AB
3005AC
3005AD
3005AE
3005AF
3005AG
3005AH
3005AJ
3005AK
3006AA Pump 1 1 JOB XXXXX $_____________
3006AB
3006AC
3006AD
3006AE
3006AF
3006AG
3006AH
3006AJ
3006AK
3006AL
3006AM
3007AA
3007AB
3007AC
3007AD
3007AE
3007AF
3007AG
3007AH
3007AJ
3007AK
3008AA
3008AB
3008AC
3008AD
3008AE
3008AF
3008AG
3008AH
3008AJ
3008AK
3008AL
3009AA
3009AB
3009AC
3009AD
3009AE
3009AF
3009AG
3009AH
3009AJ
3009AK
3009AL
3010AA
3010AB
3010AC
3010AD
3010AE
3010AF Fencing and Gate Bollards 1 JOB XXXXX $_____________
3010AG
3010AH
3010AJ
3010AK
3011AA
3011AB
3011AC
3011AD
3011AE
3011AF
3011AG
3011AH
3011AJ
3011AK
Ice Harbor Dam Secondary
OPTION YEAR THREE SCHEDULE D TOTAL $_________________________
SCHEDULE E – 4th OPTION YEAR
4001AA
4001AB
4001AC
4001AD
4001AE
4001AF
4001AG
4001AH
4001AJ
4002AA
4002AB
4002AC
4002AD
4003AA
4003AB
4003AC
4003AD
4003AE
4003AF
4003AG
4003AH
4003AJ
4003AK
4003AL
4004AA
4004AB
4004AC
4004AD
4004AE
4004AF
4004AG
4004AH
4004AJ
4004AK
4004AL
4005AA
4005AB
4005AC
4005AD
4005AE
4005AF
4005AG
4005AH
4005AJ
4005AK
4006AA Pump 1 1 JOB XXXXX $_____________
4006AB
4006AC
4006AD
4006AE
4006AF
4006AG
4006AH
4006AJ
4006AK
4006AL
4006AM
4007AA
4007AB
4007AC
4007AD
4007AE
4007AF
4007AG
4007AH
4007AJ
4007AK
4008AA
4008AB
4008AC
4008AD
4008AE
4008AF
4008AG
4008AH
4008AJ
4008AK
4008AL
4009AA
4009AB
4009AC
4009AD
4009AE
4009AF
4009AG
4009AH
4009AJ
4009AK
4009AL
4010AA
4010AB
4010AC
4010AD
4010AE
4010AF Fencing and Gate Bollards 1 JOB XXXXX $_____________
4010AG
4010AH
4010AJ
4010AK
4011AA
4011AB
4011AC
4011AD
4011AE
4011AF
4011AG
4011AH
4011AJ
4011AK
4016 Ice Harbor Dam Secondary
OPTION YEAR FOUR SCHEDULE E TOTAL $_________________________
IMPORTANT: See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
U/M* = Unit of Measure U/P* = Unit Price QTY* = Quantity
ATTENTION TO BIDDERS
Bidder is asked to provide the following information for the Government’s use in the determination of bidder responsibility, pursuant to FAR Part 9.
1. Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal/calendar year and certified by an officer of the company.
2. The name of your banking institution, telephone number and the name of the individual to contact for a line-of-credit reference. (Please contact your bank reference to let him/her know our office will be calling for financial information.)
Bank Institution ________________________________
Telephone Number ______________________________
Contact ________________________________________
BASE YEAR SCHEDULE A TOTAL
OPTION YEAR ONE SCHEDULE B TOTAL
OPTION YEAR TWO SCHEDULE C TOTAL
OPTION YEAR THREE SCHEDULE D TOTAL
OPTION YEAR FOUR SCHEDULE E TOTAL
GRAND TOTAL (BASE + ALL OPTIONS)
Email Address __________________________________
3. Tax Identification Number ________________________
4. List of present work to include agency or firm name, address, telephone number, and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
Percentage of work under this contract to be subcontracted. ________ %.
Will performance of the present work inhibit your ability to perform this contract? ___________
5. Bidder’s email address: ____________________________________
Return completed form with all attachments to:
Email: chandra.d.crow@usace.army.mil.
OR
Physical/Mailing Address: ATTN: Chandra Crow, Contracting, Walla Walla District Corps of Engineers, 201 North Third Avenue, Walla Walla WA 99362-1876.
PAYMENT AND PERFORMANCE BONDS: WILL BE REQUESTED AT THE TASK ORDER LEVEL.
REQUIRED LIABILITY INSURANCE PURSUANT TO FAR 28: WILL BE REQUESTED AT THE TASK
ORDER LEVEL.
INSTRUCTIONS TO BIDDERS
Bidders are required to bid on ALL line items of the Bid Schedule. Bidders are required to complete and submit the Standard Form 1442 Back, Bid Schedule, and Section 00 45 00, Representations and Certifications.
INDEFINITE DELIVERY REQUIREMENTS CONTRACT:
The resulting contract will be an indefinite delivery “Requirements” contract, awarded to one contractor, for construction services which involves the rehabilitation of eleven (11) Levee Pump Station within the Tri-Cities and Finley Washington areas. The contract performance period is one base year, which begins on the date of contract award. The Government may exercise options to extend the contract period for up to four additional years of contract performance. A requirements contract provides for filling all actual purchase requirements of a designated Government activity for services during a specified contract period (from one contractor) with deliveries or performance to be scheduled by placing task orders with the contractor. The quantities of services specified in the Bid Schedule are estimates only and are not purchased by this contract; purchases are only made when the Government places task orders for specific services. See Federal Acquisition Regulation Clause 52.216-21, Requirements (OCT 1995), located in Section 00 70 00 of this solicitation.
CONSTRUCTION WAGE REQUIREMENTS STATUTE WAGE DETERMINATIONS FOR OPTION
PERIODS:
In accordance with FAR 22.404-12, Labor Standards for Contracts Containing Construction Requirements and Option Provisions that Extend the Term of the Contract, the following apply to wage determinations for option periods:
a. Upon exercise of an option to extend the term of this contract, the most current Construction Wage Requirements Statute wage determination will be incorporated into the modified contract for that option period.
b. In accordance with FAR 52.222-30, Construction Wage Rate Requirements – Price Adjustment (None or Separately Specified Pricing Method), incorporated in Section 00 70 00, no adjustments in contract price will be made as a result of incorporation of the new wage determination(s). The solicitation provides the opportunity to bid separate prices for each option period. The option prices may include an amount to cover estimated increases.
c. For indefinite delivery requirements contracts, the wage determination incorporated into the contract at the exercise of the option will be automatically incorporated into all task orders issued during that option period. The wage determination will be in effect for the complete period of performance of those task orders without further revision.
PRICE BASIS
Bidders are advised that only bids submitted on a firm price basis will be considered, and that bids submitted on any other than firm price basis will be rejected. (FAR 14.201-2 (a)) NOTE; Bid prices must include all Federal, state, and local taxes in accordance with Contract Clause: FEDERAL, STATE, AND LOCAL TAXES.
BID SUBMISSION INSTRUCTIONS
Bidders shall submit their bids hardcopy to the following address no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable.
OFFICE PHONES ARE NOT FOR USE BY BIDDERS ON BID OPENING DAY.
TELEGRAPHIC BID MODIFICATIONS. The Walla Walla District does not have in-house capability of receiving telegrams directly. Offerors wishing to modify their bid/proposal by telegram are urged to ensure that telegrams are submitted in sufficient time to allow for arrival via U.S. Postal service at the Walla Walla District office PRIOR to the time specified in the solicitation for receipt of bids/proposals.
FAXED BIDS, FAXED BID MODIFICATIONS WILL NOT BE ACCEPTED.
Bid price alterations, i.e., crossed-out or white-out changes on the bid will not be accepted unless the change (s) is/are initialed by the person authorized to sign bid package.
ENVELOPE(S), PURSUANT TO FAR 14.201-5
Envelope (s) shall be plainly marked with the following information:
Solicitation No. __________________________________ Opening Date ___________________________________ Number of each amendment acknowledged
Attn: Chandra Crow Contracting Division 201 N 3rd Ave Walla Walla, WA 99362
Cynthia Jacobsen, Contracting Officer: cynthia.h.jacobsen@usace.army.mil
Chandra Crow, Contracting Specialist: chandra.d.crow@usace.army.mil LeAnne Walling, Secondary Contracting Specialist: leanne.r.walling@usace.army.mil
Each bid package shall display the following information:
Solicitation No. W912EF23B0002 Bid Due Date and Time: Friday, September 1; 2:00 PM Bid Validity Date: (45 days from the bid due date)
Bids received after the date and time stated within Block 13 of the SF1442, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a bid, the offeror must make every effort to ensure the bid is delivered by the date and time specified.
BID QUANTITIES
Bids for less than specified quantities of each item in Section 00 10 00 of the Schedule will not be considered.
Failure to submit a unit price for each item where required in the Schedule will be considered as a material deviation from the requirements of the solicitation, and the bid will be rejected. (FAR 14.201-5)
BID OPENING
Bidders are advised there will be a physical bid opening held for this invitation for bids. The bid opening will be held in the Bid Opening Room at 201 N 3rd Ave, Walla Walla WA, 99362, at 2:00 pm on the date bids are due.
Bidders wishing to participate in the bid opening must email a list of participants to both Contracting Officer (cynthia.h.jacobsen@usace.army.mil) and Contract Specialist (chandra.d.crow@usace.army.mil) no later than the close of business 24 hours prior to the bid due date and time so a list of names can be provided to security.
CONTRACTOR RESPONSIBILITY, PREAWARD SURVEY
To determine a contractor’s responsibility for purposes of contract award the contractor is required to provide a statement regarding previous experience and past performance in performing comparable work, information related to the business organization, financial resources, and/or plant to be used in performing the work. (See the Attention to Bidders form included in this solicitation.) In accordance with FAR 9.104-1, to be determined responsible, a prospective contractor must –
(a) Have adequate financial resources to perform the contract, or the ability to obtain them;
(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(c) Have a satisfactory performance record. (A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history except as provided in FAR 9.104-2);
(d) Have a satisfactory record of integrity and business ethics;
(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them;
(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and
(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
ARITHMETIC DISCREPENCIES
(a) The following will be used in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by the bidder:
(1) In a discrepancy between unit price and extended price, the unit price stated on the bid schedule will govern;
(2) Apparent errors in the extension of unit prices will be corrected;
(3) Apparent errors in the addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
BIDDER INQUIRY
Bidder/Offeror Solicitation Questions:
All inquiries regarding this solicitation are to be submitted via Bidder Inquiry. Telephone and email inquiries will not be accepted. Bidder Inquiry is a web-site that allows bidders to post questions regarding the solicitation and view all questions by other bidders and responses by USACE. Bidder Inquiry can be accessed through ProjNet at (https://www.projnet.org)
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of the comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.
TIMING OF BIDDER INQUIRIES: Deadline for submitting bidder inquiries is 7 calendar days prior to the solicitation close date. The Government will make every effort to answer all bidder inquiries, however after the deadline we cannot guarantee a response.
Bidder Inquiry Key: ICI89J-F3MVQU
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for Entering Questions:
1. After you are logged in click on the "post new inquiry", it is on the left side of the window under the Word "Submit" a.) This is the window where you will enter your questions b.) Comment Classification: Click on the down arrow to the right of the words “Please select from below”, select “Public” c.) Discipline: This is where you select who this question should be directed to. Example; if the question is about an electrical drawing or specification select: “Electrical” from the pull down list.
d.) Sheet. Enter the sheet number of the drawing you are asking about.
e.) Detail. Enter the detail name of the detail shown on the drawing that you are asking about.
f.) Specification. Enter the Specification number and paragraph number.
g.) File. Use this if you are going to attach a pdf file.
h.) Question. Enter your question here.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
For questions about the ProjNet Bidder Inquiry, please contact the Call Center help desk toll free at 1-800-428- HELP, which operates from 8AM to 5PM (Central US time zone). Bidder inquiry help questions can also be emailed to the helpdesk at staff@rcesupport.com.
NOTICE: All bidders/offerors will be held to have reviewed the questions and responses in Bidder Inquiry prior to bid submission. Nothing is changed in the solicitation unless an amendment is issued.
Per USACE Policy Alert 23-HQ-013, Limitations of Subcontracting Guidance, we are required to include Clause 52.219-14 in all actions for Small Business or Socioeconomic set-aside action valued over the Simplified Acquisition Threshold (SAT) ($250,000), or in any action set aside or awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, or 19.15, regardless of dollar value, the clause at FAR 52.219-14 is required.
Prime contractor is to complete and submit the following Limitations on Subcontracting Report at the completion of the base term of the contract and each subsequent option period or by the end of the performance period of each order issued under the contract.
Limitations on Subcontracting Report USACE Walla Walla District
This report is required for 8(a) or socio-economic set-aside service contracts (including construction) priced at or above $250,000.
Contract Number:
Task Order Number:
Prime Contractor:
Total Current Contract Price:
Current Evaluation Period:
Type of Set-Aside:
Required Participation:
1) Services or Supplies (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
2) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
3) Construction by special trade Contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
Blue Fields are calculated field. DO
NOT OVERWRITE
Participartion Calculation as of the Current Invoice
Amounts shown below shall include amounts from all previous invoices and the current invoice.
Exclude the cost of materials.
1) Amount Invoiced by the Prime Contractor: $0.00
2) Prime Contractor Material Cost
3) Minus Prime Material Cost $0.00
4) Portion of Amount Invoiced for Similarly Situated Subcontractors (SSS)*
5) Portion of Amount Invoiced for Non-Similarly Situated Subcontractors (NSS)
6) Prime Contractor's XX% #DIV/0! $0.00
* Similarly Situated Subcontractor (SSS): A small business Subcontractor that is a participant of the same Small Business Administration (SBA) program that qualified the Prime Contractor as an eligible offeror and awardee of the contract as defined in 13 CFR 125.6 (i.e. Small Business, HUBZone Business, Service Disabled Veteran Owned Small Business (SDOVB), etc.) ENTRY FOR INFO ONLY. DON'T SUBTRACT
** Limitation on Subcontracting Percentage = (Total amount invoiced by the Prime Contractor - Portion of total amount invoiced for Non-Similarly Situated Subcontractors (NSS) / Total amount invoiced by the Prime Contractor)
Corrective Action Plan
If the Prime Contractor's Participation XX% noted in line 6 above is not in compliance with the XX% required by contract clause 52.219-14 then the Prime Contractor shall provide a written corrective action plan below:
I certify that to the best of its knowledge and belief, the information provided in this report is accurate, complete, and current as of the date of report.
Contractor Signature :
Title:
Date:
Contracting Officer Signature:
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.225-10 Notice of Buy American Requirement--Construction Materials
MAY 2014
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.215-7008 Only One Offer JUL 2019 252.215-7013 Supplies and Services Provided by Nontraditional Defense
Contractors
JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price Requirements Contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
7.5% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Pasco, WA, Franklin County, Benton County and Walla Walla County areas.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be twenty percent of schedule A (Base Year) or $3,000,000, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
NOTE: The bid bond shall be based on the total amount of Schedule A, the Base Year of the contract.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer at 201 N. 3rd Ave, Walla Walla WA 99362
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) There will be only one site visit offered. Offerors planning to attend must register for the site by sending an email to: chandra.d.crow@usace.army.mil and leanne.r.walling@usace.army.mil.
Firms must register no later than 4:00 pm 10 August 2023. Site visit attendees must provide the following information in the email:
(1) Solicitation Number
(2) Project Title
(3) Name of individual(s) attending
(4) Name of company being represented
(5) Phone number of company
(6) Are all individuals U.S. Citizens?
If not, please refer to ACCESS FOR FOREIGN NATIONALS in Section 0800. Each individual must have picture identification on his/her person while at the project site. There can be no substitutions of one individual for another.
If an individual arrives at the site visit without having called ahead of time and/or without picture identification, that individual may not be allowed on the project.
Participants of scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, “Personal Protective and Safety Equipment.” It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation.
FAILURE TO COMPLY COULD RESULT IN DENIAL OF ACCESS TO SITE VISIT LOCATION.
(c) Site visit will be held on August 14 & 15, 2023 starting at 9am. Please plan to be present both days as we will be unable to visit all pump stations in one day. Site visit will be held from 9am to 3pm both days to assure all potential contractors have ample time to view all locations where work will be performed under this requirement:
Tri-Rivers Natural Resource Office at:
1215 East Ainsworth Street Pasco, WA 99301
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (DFARS) (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 22 00 - Supplementary Instructions
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days of contract expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.
(End of clause)
Section 00 45 00 - Representations and Certifications
CLAUSES INCORPORATED BY REFERENCE
52.209-7 Information Regarding Responsibility Matters OCT 2018 52.209-13 Violation of Arms Control Treaties or Agreements --
Certification
NOV 2021
252.203-7005 Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
MAY 2021
252.225-7974 (Dev) Representation Regarding Business Operations with the Maduro Regime (DEVIATION 2020-O0005)
FEB 2020
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237110.
(2) The small business size standard is $45,000,000.
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition--
(i) Is set aside for small business and has a value above the simplified acquisition threshold;
(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $92,319, the provision with its Alternate II applies.
(D) If the acquisition value is $92,319 or more but is less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
X (i) 52.204-17, Ownership or Control of Offeror.
X (ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).
(vii) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes iden