V10_23B0002_Plans_Amend001.pdf

PDF 1 MB Posted

Attached to
MNA Levee Drainage Pump Upgrade Federal contract opportunity
Solicitation number
W912EF23B0002
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This document package includes plans and specifications for upgrading pumps at the McNary Lock and Dam Pump Station 15E in Walla Walla, Washington. The solicitation is identified as number W912EF23B0002 and is being issued by the Department of the Army Corps of Engineers Walla Walla District to replace three existing pumps with new pumps that match the existing mounting arrangement and are compatible with other components like the electrical system and discharge piping. The plans provide details on dimensions, connections to existing infrastructure, and general requirements for submittals, verification of dimensions in the field, expansion couplings, and laminated pump curves.

View the file

Other files for this federal contract opportunity

Other files attached to MNA Levee Drainage Pump Upgrade, newest first.
File Type Posted
C.04.01 Bid Opening Worksheet -09-19-2023.pdf PDF
B.08.03 V9_23B0002_Plans_Amd003.pdf PDF
B.08.03 Solicitation 23B00020003.pdf PDF
B.08.03 V6_23B0002_Plans_Amd003.pdf PDF
B.08.03 V1_23B0002_Plans_Amd003.pdf PDF
B.08.03 V10_23B0002_Plans_Amd003.pdf PDF
B.08.03 V8_23B0002_Plans_Amd003.pdf PDF
B.08.03 V11_23B0002_Plans_Amd003.pdf PDF
B.08.03 V3_23B0002_Plans_Amd003.pdf PDF
B.08.03 V12_23B0002_Plans_Amd003.pdf PDF
B.08.03 TECHSPECS_23B0002_amd0003_McN Levee_8Sep23.pdf PDF
B.08.03 DRAWING AMENDMENT APPROVAL FORM_0003.pdf PDF
B.08.03 V2_23B0002_Plans_Amd003.pdf PDF
B.08.03 V7_23B0002_Plans_Amd003.pdf PDF
B.08.03 V4_23B0002_Plans_Amd003.pdf PDF
B.08.03 V5_23B0002_Plans_Amd003.pdf PDF
B.08.03 VA_23B0002_Plans_Amd003.pdf PDF
B.08.03 Solicitation 23B00020002.pdf PDF
V7_23B0002_Plans_Amend001.pdf PDF
V5_23B0002_Plans_Amend001.pdf PDF
V4_23B0002_Plans_Amend001.pdf PDF
V1_23B0002_Plans_Amend001.pdf PDF
B.08.02 Solicitation 23B00020001.pdf PDF
V6_23B0002_Plans_Amend001.pdf PDF
V9_23B0002_Plans_Amend001.pdf PDF
V3_23B0002_Plans_Amend001.pdf PDF
V11_23B0002_Plans_Amend001.pdf PDF
V8_23B0002_Plans_Amend001.pdf PDF
TECHSPECS_23B0002_McN Levee Pump Stations_amd0001_21Aug23.pdf PDF
MNA Levee Drainage Pumps site visit list.pdf PDF
A.03.09 V7_23B0002_Plans_RE007_8__.pdf PDF
B.08.02 Solicitation 23B0002.pdf PDF
A.03.09 V11_23B0002_Plans.pdf PDF
A.03.09 V03_23B0002_Plans.pdf PDF
A.03.09 V10_23B0002_Plans.pdf PDF
A.03.09 V09_23B0002_Plans.pdf PDF
A.03.09 V08_23B0002_Plans.pdf PDF
A.03.09 V04_23B0002_Plans.pdf PDF
A.02.12 TECHSPECS_23B0002_McN Levee Pump Stations_7Feb23.pdf PDF
A.03.09 V06_23B0002_Plans~.pdf PDF
A.03.09 V02_23B0002_Plans.pdf PDF
A.03.09 V12_23B0002_Plans.pdf PDF
A.03.09 V07_23B0002_Plans.pdf PDF
A.03.09 V05_23B0002_Plans.pdf PDF
A.03.09 V01_23B0002_Plans.pdf PDF
A.03.09 VA_23B0002_Plans.pdf PDF
B.08.02 Solicitation 23B0002.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9'-6" 4'-6"

4'- 1/2 "

/2

2'- 1/2 "

/4

2'- 9/

PIPE TO EXISTING. TYP OF 3

TO ADAPT NEW DISCHARGE

NEW DRESSER COUPLING

SEE SPECIFICATIONS. TYP OF 3

PRESSURE TRANSDUCER.

ADD PRESSURE GAGE &

FLOAT WELL

PUMP NO. 1

PUMP NO. 2

PUMP NO. 3

MANUFACTURER'S RECOMMENDATAIONS

ADAPT NEW PUMP TO EXISTING PIPE PER

A N

S I

D

F

IN

A L

E Q

U

IP

M E

N T

U P

G R

A D

E

L E

V E

E D

R A

IN

A

G E

P U

M P

S T

A T

IO

N

S

C O

L U

M B

IA

R

IV

E

R O

R E

G O

N A

N D

W A

S H

IN

G

T O

N

M C

N A

R Y

L O

C K

A N

D D

A M

W

E F

B

A P

R

IL

W A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

F

IL

E N

O

K E

V

IN

R E

N S

H A

W P

.E

P U

M P

S

P U

M P

S T

A T

IO

N

E

P L

A N

M-103

M F

L A

N A

G A

N

C

C A

N T

IL

/2

U P

D A

T E

D P

U M

P M

O U

N T

IN

G

P L

A T

E H

O L

E D

IA

M

E T

E R

M D

L -1

-3 -5

/5

T

B A

L L

A S

VOLUME 10

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:4

P

M

/1 /2

M N a

\M

N a

V

M

-1

X

X X

.d g n

A7

SCALE: 1/2" = 1'-0"

PLAN: PUMP STATION 15EDETAIL: PUMP MOUNTING HOLE (TYP)

SCALE: 1 1/2" = 1'-0"

A1

NORTH

1' 0" 2' 0" 4' 0"0

ELEVATIONS ON THE SHEET.

MINIMUM SUBMERGENCE DEPTH, AND PUMP CONTROL SET POINT

WITH AND WITHOUT SIPHON. ALSO INDICATE MOTOR OPERATING AMPERAGE,

POINT, BASED ON THE PROVIDED PRESSURE GAUGE, FOR THE PUMP BOTH

CURVE SHALL BE PRINTED ON AN ANSI D SIZE SHEET. MARK THE OPERATING

PLACE A LAMINATED PUMP CURVE ON THE WALL BEHIND THE PUMPS. THE 7.

SYSTEM.

NEW PUMPS SHALL BE COMPATIBLE WITH THE PROVIDED ELECTRICAL 6.

OPENING.

UNVERIFIED. VERIFY THAT THE NEW PUMP CAN PASS THROUGH THE

THE DIMENSIONS FOR THE EXISTING PUMP FLOOR OPENING ARE 5.

SHOWN DIMENSIONS ARE APPROXIMATE AND SHALL BE FIELD VERIFIED.4.

ARRANGEMENT.

RECOMMENDATIONS AND AS REQUIRED TO MATCH THE EXISTING MOUNTING

PROVIDE MOUNTING HARDWARE IN ACCORDANCE WITH MANUFACTURER'S 3.

INSTALLED CONCRETE ANCHORS ARE NOT ACCEPTABLE.

IN ORDER TO FACILITATE A THROUGH BOLTING ARRANGEMENT. POST

EXISTING MOUNTING HOLES COMPLETELY PENETRATE THE CONCRETE SLAB

NEW PUMPS SHALL MATCH THE EXISTING MOUNTING ARRANGEMENT. THE 2.

AND ANGULAR MISALIGNMENT.

SHALL BE OF THE EXPANSION TYPE AND SHALL PROVIDE FOR LIMITED AXIAL

EXISTING DISCHARGE PIPING. FIELD VERIFY THIS DIMENSION. COUPLING

MAKE UP THE DISTANCE BETWEEN THE NEW PUMP ELBOW AND THE

PROVIDE A PIPE SPOOL ALONG WITH THE PUMP COUPLING AS REQUIRED TO 1.

GENERAL NOTES

EXISTING ITEMS

NEW ITEMS

LINE STYLE LEGEND

EL. 340.298

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

M-101

REF

1' 2'0 6"

M-303

A11

M-303

A2

A1

MECHANICAL PUMP PLAN

File details come from the government source that posted it. Updated .