W912EF21R0015 McNary Intake Gates and Isophase Bus Systems Solicitation.pdf
PDF 5 MB Posted
- Attached to
- McNary Intake Gates and Isophase Bus Systems
- Solicitation number
- W912EF21R0015
About this file
This federal contract opportunity notice provides details for a construction project involving rehabilitation of intake gates and isophase bus systems at McNary Dam in Umatilla County, Oregon. The project includes rehabilitating 45 intake gates, providing new hydraulic and electrical systems, replacing isophase bus infrastructure between generators and transformer banks, replacing high voltage switches and surge arresters, and performing other upgrades. The estimated value is between $25-100 million. Offerors must submit proposals by the date specified in the solicitation to be posted on beta.sam.gov in June 2021. The performance period is from December 2021 through May 2030. Work will occur in outage windows for units taken offline in pairs over 6 months each year from 2023 through 2029. The award will be a fixed price contract for the Army Corps of Engineers Walla Walla District.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV11532941
CONSTRUCTION PROJECT: McNary Intake Gates and Isophase Bus Systems
HILLARY A MORGAN 509-527-7214
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-Jun-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________Section 00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________05 Aug 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
509-527-7802FAX:TEL: 509-527-7214 TEL: FAX:
W912EF21R0015 1 OF 75
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 01 10 - Table of Contents
INDEX
Section 00 10 00, Solicitation Contract Form Section 00 21 00, Instructions Section 00 45 00, Representations and Certifications Section 00 70 00, Conditions of the Contract Section 00 73 00 Supplementary Conditions Technical Specifications Drawings
Section 00 21 00 - Instructions
ATTENTION TO OFFERORS
The apparent successful offeror must provide the following information upon request to assist in the Contracting Officer’s determination of contractor responsibility.
QUALIFICATIONS
1. Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal year and certified by an officer of the company.
2. The name of your banking firm, telephone number and the name of the individual to contact for a line-of-credit reference.
Banking Institution ______________________________________________
Telephone Number ______________________________________________
Person to Contact ______________________________________________
Email Address ______________________________________________
3. Tax Identification Number ___________________________________
4. Years of experience (in the field of the proposed work)._______________________ Indicate similarity of work currently under way to work required for this project.
5. List of present work to include agency or firm name, address, telephone number and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
6. List of previous work to include agency or firm name, address, telephone number and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
7. Percentage of work under this contract to be subcontracted _______________ %
Return completed form with all attachments to:
Hillary Morgan Contracting Division Walla Walla District Corps of Engineers 201 North Third Walla Walla, WA 99362-1876
NPW FL 118 (Rev Oct 2009)
Walla Walla District Corps of Engineers McNary Intake Gates and Isophase Bus Systems
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000
ITEM DESCRIPTION QUANTITY U/M U/P
AMOUNT
INTAKE GATES WORK BASE ITEMS
PRE-MAIN UNIT OUTAGE CLINS
0001 Pre-Main Unit Outage Hydraulic System Work 1 JOB XXXXX $_________
0002 Rehabilitate Spare Intake Gate
0002AA Rehabilitate Spare Intake Gate (Gate) 1 JOB XXXXX $_________
0002AB Rehabilitate Spare Intake Gate (Hydraulic) 1 JOB XXXXX $_________
0003 Additional Intake Gate Paint Repair 50 EST* SF $_______ $_________
0004 New Hydraulic Fluid for Pre-Main Unit Outage Work 4205 EST GL $_______ $_________
STATION SERVICE UNIT ONE OUTAGE
CLINS
0005 First Station Service Outage
0005AA Rehabilitate First Station Service Unit (Gate) 1 JOB XXXXX $_________
0005AB Rehabilitate First Station Service Unit (Hydraulic) 1 JOB XXXXX $_________
0005AC New Hydraulic Fluid for First Station Service Unit Outage 385 EST GL $_______ $_________
0005AD Additional Intake Gate Paint Repair for First Station Service Unit Outage 50 EST SF $_______ $_________
INTAKE GATES MAIN UNIT OUTAGE
CLINS
0006 Main Unit Outage One
0006AA Rehabilitate First Main Unit of Main Unit Outage One (Gate) 1 JOB XXXXX $_________
0006AB Rehabilitate First Main Unit of Main Unit Outage One (Hydraulic) 1 JOB XXXXX $_________
0006AC Rehabilitate Second Main Unit of Main Unit Outage One (Gate) 1 JOB XXXXX $_________
0006AD Rehabilitate Second Main Unit of Main Unit Outage One (Hydraulic) 1 JOB XXXXX $_________
0006AE New Hydraulic Fluid for Main Unit Outage One 2300 EST GL $_______ $_________
0006AF Additional Intake Gate Paint Repair for Main Unit Outage One 150 EST SF $_______ $_________
0006AG Training 1 JOB XXXXX $_________
0006AH Spare Parts 1 JOB XXXXX $_________
0007 Main Unit Outage Two
0007AA Rehabilitate First Main Unit of Main Unit Outage Two (Gate) 1 JOB XXXXX $_________
0007AB Rehabilitate First Main Unit of Main Unit Outage Two (Hydraulic) 1 JOB XXXXX $_________
0007AC Rehabilitate Second Main Unit of Main Unit Outage Two (Gate) 1 JOB XXXXX $_________
0007AD Rehabilitate Second Main Unit of Main Unit Outage Two (Hydraulic) 1 JOB XXXXX $_________
0007AE New Hydraulic Fluid for Main Unit Outage Two 2300 EST GL $_______ $_________
0007AF Additional Intake Gate Paint Repair for Main Unit Outage Two 150 EST SF $_______ $_________
0008 Main Unit Outage Three
0008AA Rehabilitate First Main Unit of Main Unit Outage Three (Gate) 1 JOB XXXXX $_________
0008AB Rehabilitate First Main Unit of Main Unit Outage Three (Hydraulic) 1 JOB XXXXX $_________
0008AC Rehabilitate Second Main Unit of Main Unit Outage Three (Gate) 1 JOB XXXXX $_________
0008AD Rehabilitate Second Main Unit of Main Unit Outage Three (Hydraulic) 1 JOB XXXXX $_________
0008AE New Hydraulic Fluid for Main Unit Outage Three 2300 EST GL $_______ $_________
0008AF Additional Intake Gate Paint Repair for Main Unit Outage Three 150 EST SF $_______ $_________
0009 Main Unit Outage Four
0009AA Rehabilitate First Main Unit of Main Unit Outage Four (Gate) 1 JOB XXXXX $_________
0009AB Rehabilitate First Main Unit of Main Unit Outage Four (Hydraulic) 1 JOB XXXXX $_________
0009AC Rehabilitate Second Main Unit of Main Unit Outage Four (Gate) 1 JOB XXXXX $_________
0009AD Rehabilitate Second Main Unit of Main Unit Outage Four (Hydraulic) 1 JOB XXXXX $_________
0009AE New Hydraulic Fluid for Main Unit Outage Four 2300 EST GL $_______ $_________
0009AF Additional Intake Gate Paint Repair for Main Unit Outage Four 150 EST SF $_______ $_________
00010 Main Unit Outage Five
0010AA Rehabilitate First Main Unit of Main Unit Outage Five (Gate) 1 JOB XXXXX $_________
0010AB Rehabilitate First Main Unit of Main Unit Outage Five (Hydraulic) 1 JOB XXXXX $_________
0010AC Rehabilitate Second Main Unit of Main Unit Outage Five (Gate) 1 JOB XXXXX $_________
0010AD Rehabilitate Second Main Unit of Main Unit Outage Five (Hydraulic) 1 JOB XXXXX $_________
0010AE New Hydraulic Fluid for Main Unit Outage Five 2300 EST GL $_______ $_________
0010AF Additional Intake Gate Paint Repair for Main Unit Outage Five 150 EST SF $_______ $_________
0010AG Training 1 JOB XXXXX $_________
00011 Main Unit Outage Six
0011AA Rehabilitate First Main Unit of Main Unit Outage Six (Gate) 1 JOB XXXXX $_________
0011AB Rehabilitate First Main Unit of Main Unit Outage Six (Hydraulic) 1 JOB XXXXX $_________
0011AC Rehabilitate Second Main Unit of Main Unit Outage Six (Gate) 1 JOB XXXXX $_________
0011AD Rehabilitate Second Main Unit of Main Unit Outage Six (Hydraulic) 1 JOB XXXXX $_________
0011AE New Hydraulic Fluid for Main Unit Outage Six 2300 EST GL $_______ $_________
0011AF Additional Intake Gate Paint Repair for Main Unit Outage Six 150 EST SF $_______ $_________
00012 Main Unit Outage Seven
0012AA Rehabilitate First Main Unit of Main Unit Outage Seven (Gate) 1 JOB XXXXX $_________
0012AB Rehabilitate First Main Unit of Main Unit Outage Seven (Hydraulic) 1 JOB XXXXX $_________
0012AC Rehabilitate Second Main Unit of Main Unit Outage Seven (Gate) 1 JOB XXXXX $_________
0012AD Rehabilitate Second Main Unit of Main Unit Outage Seven (Hydraulic) 1 JOB XXXXX $_________
0012AE New Hydraulic Fluid for Main Unit Outage Seven 2300 EST GL $_______ $_________
0012AF Additional Intake Gate Paint Repair for Main Unit Outage Seven 150 EST SF $_______ $_________
INTAKE GATES POST-MAIN UNIT
OUTAGE CLINs
0013 Post-Outage Hydraulic System Work 1 JOB XXXXX $_________
0014 New Hydraulic Fluid for Post-Outage Work 4400 EST GL $_______ $_________
0015 Provide Spare Hydraulic Cylinders 1 JOB XXXXX $_________
0016 Second Station Service Outage
0016AA Rehabilitate Second Station Service Unit (Gate) 1 JOB XXXXX $_________
0016AB Rehabilitate Second Station Service Unit (Hydraulic) 1 JOB XXXXX $_________
0016AC New Hydraulic Fluid for Second Station Service Unit Outage 385 EST GL $_______ $_________
0016AD Additional Intake Gate Paint Repair for Second Station Service Unit Outage 150 EST SF $_______ $_________
INTAKE GATES BASE ITEMS TOTAL $____________
ISOPHASE BUS SYSTEM BASE ITEMS
ISOPHASE BUS SYSTEM WORK FOR
UNITS 1 AND 2
0017 Replace Line 1 230kV Disconnect Switch A490 and Grounding Switch 7516 1 JOB XXXXX $_________
Provide 480 Volt - 240/120 Volt Step-Down Transformer and 120 Volt Load Center at
MCC CQ12
1 JOB XXXXX $_________
0019 Modify Sections of Existing 230kV Tubular Bus at Line 1 1 JOB XXXXX $_________
0020 Replace 230kV Line 1 Surge Arresters on Existing Pedestals 1 JOB XXXXX $_________
0021 Replace 15kV Isophase Bus and Instrument Transformers for Main Units 1 and 2
0021AA
Replace 15kV Isophase Bus and Instrument Transformers from Delta 01 & 02 to Transformer T1
0021AB Replace 15kV Isophase Bus and Instrument Transformers from XJ01 to Delta 01 & 02 1 JOB XXXXX $_________
0021AC Replace 15kV Isophase Bus and Instrument Transformers from XJ02 to Delta 01 & 02 1 JOB XXXXX $_________
UNITS 3 AND 4
0022 Replace Line 2 230kV Disconnect Switch A491 and Grounding Switch 7517 1 JOB XXXXX $_________
Transformer and 120 Volt Load Center at
MCC CQ22
0024 Modify Sections of Existing 230kV Tubular Bus at Line 2 1 JOB XXXXX $_________
0025 Replace 230kV Line 2 Surge Arresters on
Replace 15kV Isolated-Phase Bus and Instrument Transformers For Main Units 3 and 4
0026AA
Transformers from Delta 03 & 04 to Transformer T2
0026AB Replace 15kV Isophase Bus and Instrument Transformers from XJ03 to Delta 03 & 04 1 JOB XXXXX $_________
0026AC Replace 15kV Isophase Bus and Instrument Transformers from XJ04 to Delta 03 & 04 1 JOB XXXXX $_________
UNITS 5 AND 6
Replace Line 3 and Line 4 230kV Disconnect Switches A492 and Grounding Switches 7518
Transformer and 120 Volt Load Center at
MCC CQ32
0029 Modify Sections of Existing 230kV Tubular Bus at Line 3 1 JOB XXXXX $_________
0030 Replace 230Kv Line 3 Surge Arresters on
Replace 15Kv Isolated-Phase Bus and Instrument Transformers for Main Units 5 and 6
0031AA
Transformers from Delta 05 & 06 to Transformer T3
0031AB Replace 15kV Isophase Bus and Instrument Transformers from XJ05 to Delta 05 & 06 1 JOB XXXXX $_________
0031AC Replace 15kV Isophase Bus and Instrument Transformers from XJ06 to Delta 05 & 06 1 JOB XXXXX $_________
UNITS 7 AND 8
0032 Replace Line 4 230kV Disconnect Switch A493 and Grounding Switch 7519 1 JOB XXXXX $_________
Transformer and 120 Volt Load Center at
MCC CQ42
0034 Modify Sections of Existing 230kV Tubular Bus at Line 4 1 JOB XXXXX $_________
0035 Replace 230kV Line 4 Surge Arresters on
Instrument Transformers for Main Units 7 and 8
0036AA
Transformers from Delta 07 & 08 to Transformer T4
0036AB Replace 15kV Isophase Bus and Instrument Transformers from XJ07 to Delta 07 & 08 1 JOB XXXXX $_________
0036AC Replace 15kV Isophase Bus and Instrument Transformers from XJ08 to Delta 07 & 08 1 JOB XXXXX $_________
UNITS 9 AND 10
0037 Replace Line 5 230kV Disconnect Switch A494 and Grounding Switch 7520 1 JOB XXXXX $_________
Transformer and 120 Volt Load Center at
MCC CQ52
0039 Replace 230kV Line 5 Surge Arresters on
Instrument Transformers for Main Units 9 and 10
0040AA
Transformers from Delta 09 & 10 to Transformer T5
0040AB Replace 15kV Isophase Bus and Instrument Transformers from XJ09 to Delta 09 & 10 1 JOB XXXXX $_________
0040AC Replace 15kV Isophase Bus and Instrument Transformers from XJ10 to Delta 09 & 10 1 JOB XXXXX $_________
UNITS 11 AND 12
0041 Replace Line 5 230kV Disconnect Switch A495 and Grounding Switch 7522 1 JOB XXXXX $_________
Transformer and 120 Volt Load Center at
MCC CQ62
0043 Replace 230kV Line 5 Surge Arresters on
Replace 15kV Isolated-Phase (Isophase) Bus and Instrument Transformers for Main Units 11 and 12
0044AA
Transformers from Delta 11 & 12 to Transformer T6
0044AB Replace 15kV Isophase Bus and Instrument Transformers from XJ11 to Delta 11 & 12 1 JOB XXXXX $_________
0044AC Replace 15kV Isophase Bus and Instrument Transformers from XJ12 to Delta 11 & 12 1 JOB XXXXX $_________
UNITS 13 AND 14
0045 Replace Line 6 115kV Disconnect Switch B996 and Grounding Switch 7521 1 JOB XXXXX $_________
Transformer and 120 Volt Load Center at
MCC CQ72
0047 Replace 115kV Line 6 Surge Arresters on
Instrument Transformers for Main Units 13 and 14
0048AA
Transformers from Delta 13 & 14 to Transformer T7
0048AB Replace 15kV Isophase Bus and Instrument Transformers from XJ13 to Delta 13 & 14 1 JOB XXXXX $_________
0048AC Replace 15kV Isophase Bus and Instrument Transformers from XJ14 to Delta 13 & 14 1 JOB XXXXX $_________
0049 Isophase Bus System Training 1 JOB XXXXX $_________
0050 Tubular Bus and Lattice Isophase Inspections
0050AA Tubular Bus and Lattice Isophase Inspections for Units 1 & 2 1 JOB XXXXX $_________
0050AB Tubular Bus and Lattice Isophase Inspections for Units 3 & 4 1 JOB XXXXX $_________
0050AC Tubular Bus and Lattice Isophase Inspections for Units 5 & 6 1 JOB XXXXX $_________
0050AD Tubular Bus and Lattice Isophase Inspections for Units 7 & 8 1 JOB XXXXX $_________
0050AE Tubular Bus and Lattice Isophase Inspections for Units 9 & 10 1 JOB XXXXX $_________
0050AF Tubular Bus and Lattice Isophase Inspections for Units 11 & 12 1 JOB XXXXX $_________
0050AG Tubular Bus and Lattice Isophase Inspections for Units 13 & 14 1 JOB XXXXX $_________
0051 Transformer Bank Oil Draining, Processing, and Refilling Submittals 1 JOB XXXXX $_________
ISOPHASE BUS SYSTEM BASE ITEMS TOTAL $_____________
ISOPHASE BUS SYSTEM OPTIONAL ITEMS
0052 Transformer Bank T1 Transformer Tank Oil Draining, Processing, And Refilling 3 NTE* EA $_______ $_________
0053 Transformer Bank T2 Transformer Tank Oil Draining, Processing, And Refilling 3 NTE EA $_______ $_________
0054 Transformer Bank T3 Transformer Tank Oil
0055 Transformer Bank T4 Transformer Tank Oil
0056 Transformer Bank T5 Transformer Tank Oil
0057 Transformer Bank T6 Transformer Tank Oil
0058 Transformer Bank T7 Transformer Tank Oil
ISOPHASE BUS SYSTEM OPTIONAL ITEMS TOTAL $____________
SCHEDULE TOTAL (BASE + OPTIONAL ITEMS)
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
NTE*: Not to Exceed
EST* = Estimated Quantities identified as Estimated (“EST”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN ESTIMATED QUANTITY
A. BASIS FOR AWARD
The award will be made based on the best overall (i.e., best value subjective tradeoff) proposal that is determined to be the most beneficial to the Government based on an integrated assessment with appropriate consideration given to the five evaluation factors: Technical Work Plan & Schedule; Technical Experience; Past Performance; Small Business Participation; and Price.
The relative importance between factors is as follows:
• Factor 1, Technical Work Plan & Schedule is equal in importance to Factor 3, Past Performance.
• Both Factors 1 Technical Work Plan & Schedule and 3 Past Performance are more important than Factor 2, Technical Experience.
• All sub-factors of Factor 2 are equal in importance.
• Factors 1, Factor 2 and Factor 3 individually, are more important than Factor 4, Small Business
Participation.
• When combined, the non-price factors (Factors 1, 2, 3, and 4) are significantly more important than Factor
5, Price.
Contract award will be made as a whole to one offeror. As proposals become more equal in their technical (non-price) merit, the evaluated price becomes more important in determining the best value proposal.
The following paragraphs B through E cover the Factors and Sub-Factors to be evaluated, the evaluation approach for each Factor and Sub-Factor to include factor rating tables, Proposal Submission requirements, and discussion guidance.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
The following evaluation factors and sub-factors will be used to evaluate each proposal.
FACTOR 1: Technical Work Plan & Schedule –the Technical Work Plan & Schedule Factor is comprised of three Sections. This Factor evaluates the offeror’s understanding of the required scope of work, identifying the major tasks and outlining all major work necessary to complete those tasks. The three Sections are 1) Schedule 2) Schedule Narrative and 3) Contractor Roles.
Risk will be evaluated as one aspect of the technical evaluation, inherent in the technical evaluation factor ratings. Risk assesses the degree to which the offerors proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section. During evaluation of each proposal, the Government will assign an adjectival rating and write a narrative evaluation reflecting the identified findings.
• Factor 1 – Technical Work Plan & Schedule
FACTOR 2: Technical Experience - The Technical Experience factor is comprised of three Sub-Factors.
Information provided by the offeror in support of each sub-factor will be evaluated based on its relevance to the Scope of Work. An overall rating for Factor 2 Technical Experience will be based on the merits of each sub-factor. There is not a specified page limit for the technical Sub-Factors, but offerors are encouraged to be clear and concise in providing the information requested.
Risk will be evaluated as one aspect of the technical evaluation, inherent in the technical evaluation factor or sub-factor ratings. Risk assesses the degree to which the offerors proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section. During evaluation of each proposal, the Government will assign each sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.
• Sub-factor 2A – High Voltage Electrical Systems
• Sub-factor 2B – Hydraulic Systems
• Sub-factor 2C – Construction Management
FACTOR 3: Past Performance - Each offeror’s past performance will be reviewed to determine recency, relevancy, and quality.
FACTOR 4: Small Business Participation – The extent of Small Business Participation will be evaluated for unrestricted acquisitions.
FACTOR 5: Price - The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the proposal.
C. EVALUATION APPROACH
Factor 1 – Technical Work Plan & Schedule – This factor evaluates the offeror’s understanding of the required scope of work, identifying the major tasks and outline all major work necessary to complete those tasks. The Technical Work Plan and Schedule Factor 1 will be separated into three sections: 1) Schedule 2) Schedule Narrative and 3) Contractor Roles.
a. Factor 1: Technical Work Plan & Schedule
SECTION 1: SCHEDULE – Develop and submit a pre-award schedule consisting of the two parts described in greater detail below. Primavera P6 Enterprise Project Portfolio Management software is the only accepted format for the schedule included in the Offerors proposal. The schedules shall be presented on 11x17 Gannt chart(s) showing project relationships and other key information (i.e. activity names, durations, start/end dates, total float.) Primavera P6 files (e.g. “xer” export file) shall be included with the proposal.
Part 1: OVERALL SCHEDULE – Develop a project schedule for the entire project duration from contract award to contract closeout. This overall schedule should be a schedule that demonstrates the offeror’s understanding of the requirements of this solicitation. It should include the completion of all base-bid items of work and depict nodes and activities necessary to complete each phase of work (design, supply, and installation) as described in the specification and correspond to the offeror’s discussion of critical path and assumptions.
Part 2: DETAILED SCHEDULE FOR 2025 ON-SITE WORK – Develop a separate, detailed schedule for the on-site work in 2025 (encompassing main unit outage THREE). The schedule will include all on-site work between the anticipated interim mobilization and demobilization dates for the period. The schedule will include all Government performed items, show the interrelationship of the schedule for the intake gates/isophase portions of the work (particularly for work performed on/from the intake deck and during commissioning phases), show all preparatory activities performed prior to the main unit outage start date, and all activities after the main unit outage end date until interim demobilization for the year.
Both Part 1 and Part 2 schedules shall be prepared in Primavera P6. The Government will utilize the P6 files to examine schedule logic and other schedule details that may not be readily visible on the printed schedules included in the proposal. The Government will also conduct a diagnostic review of the P6 files to identify:
1. Use of inappropriate schedule logic (i.e. lags should not be used to replace appropriate logic, leads (negative lags) and start-to-finish relationships should not be used).
2. Inappropriate use of constraints to restrict schedule calculations (constraints other than those dates identified in the Contract Clause, FAR 52.211-10 Commencement, Prosecution, and Completion of Work should not be used).
3. Appropriate calendars are used for Government activities as defined in specification 01 14 00.10 28 – Project Site Restrictions
For proposal purposes only, the offeror should use the arbitrary, non-binding Notice to Proceed date of 10 December 2021. Consistent with the PROJECT SCHEDULE Specification the offeror’s DRAFT schedules (Part 1 and Part 2) should clearly delineate:
1. For each line or activity on the schedule, identify:
a. The activity name and/or description
b. Start and end dates
c. Duration in days
d. Running count of total float in [days]
2. Show interdependencies between work activities or tasks
3. Clearly identify the critical path
4. The following milestones must be clearly represented on the schedule:
a. Notice to proceed
b. Interim mobilization/demobilization dates
c. Each main unit outage start and end dates
d. Each station service unit start and end dates
e. Contract completion
5. The following phases or specific tasks must be represented on the schedule
a. Preconstruction activities including preparation of submittals and Government review of submittals (accounting for contract defined review times) for significant material items.
b. Equipment procurement and delivery, identifying items with particularly long lead times.
c. Pre-main unit outage, on-site activities
d. Higher level main unit outage on-site activities (for Part 1: Overall Schedule)
e. Station service unit outage, on-site activities, including testing and commissioning
f. Post-main outage, on-site activities
g. Training of Government personnel
h. Preparation, submittal, and Government review of operation and maintenance manuals and as-built drawings.
6. Additional details only for Part 2: Detailed Schedule For 2025 On-Site Work must include the following items:
a. Detailed on-site construction activities encompassing main unit outage THREE.
b. All Government performed activities (i.e. lockout/tagout, headgate/bulkhead/fishscreen moves using crane 5, installation/removal of tailrace stoplogs, dewatering/watering of unit, government commissioning activities, etc.) (See Work Sequence Specification 01 12
16.00 26 and Project Site Restrictions 01 14 00.10 28)
c. Detailed testing and commissioning sequences.
SECTION 2: SCHEDULE NARRATIVE - Submit a ten page maximum narrative that explains the proposed schedules and details the Offerors schedule management approach to ensure successful completion of the project and compliance with the requirements of the solicitation. The narrative should include a description of the intended method of coordinating Government work activities that are integrated in the on-site work. The narrative shall include necessary, extra, or unusual efficiencies that will be required to meet the schedule. The maximum allowable schedule shall not exceed the stated durations specified in Contract Clause, FAR 52.211-10 Commencement, Prosecution, and Completion of Work.
SECTION 3: CONTRACTOR ROLES - Submit a work plan that designates whether the Offeror will be self-performing, or sub-contracting the major sub-portions of work indicated below:
• Construction management (superintendence, quality control, safety management)
• Installation of isolated phase bus
• Installation of motor operated disconnect switches
• Design of hydraulic power system and components
• Fabrication and shop testing of hydraulic power system and components
• Installation of hydraulic power system and components
If the Offeror proposes to use a subcontractor for one of the sub-portions of the work defined above, the proposal must include a signed letter of commitment from the subcontractor. The letter of commitment must clearly identify the role of the subcontractor and what portion of the work they will be performing.
The work plan does not need to identify subcontractors performing portions of the work other than defined above. If an Offeror elects to identify other key subcontractors in their proposal, a signed letter of commitment from the subcontractor must be included in the proposal. The letter of commitment must clearly identify the role of the subcontractor and what portion of the work they will be performing.
If the Offeror proposes a joint venture, the proposal must include a joint venture agreement signed by all participating firms. The agreement must identify the role of each party.
Technical Factor Ratings: ratings outlined below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Technical sub-factor requirements.
Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is un-awardable.
Factor 2 – Technical Experience
a. Sub-factor 2A: High Voltage Electrical Systems
Offerors shall submit the following for Sub-factor 2A:
Provide past project information on relevant projects that best demonstrate the breadth and depth of an Offeror’s and/or their subcontractor’s relevant experience with high voltage electrical systems. If a subcontractor is identified in Factor 1 to perform work on the high voltage electrical systems, the experience of that subcontractor must be represented in the submitted project information. If a subcontractor’s experience is included in Factor 2, that subcontractor must be identified in Factor 1.
Submit a minimum of three and maximum of five relevant projects. If the proposal includes more than five projects, only the first five projects, in the order they appear in the proposal, will be evaluated.
Projects must have been completed within seven years of the date of issue of the RFP or ongoing. Ongoing or partially completed projects will only be considered if the portion of the work being submitted has been completed and accepted by the customer. For ongoing or partially completed projects offerors must submit percentage completed.
The combined experience demonstrated by the submitted projects must cover the relevancy requirements listed below. It is not required that each project cover all of the relevancy requirements.
The relevancy requirements are:
• Submitted projects should demonstrate experience with the installation and commissioning of 15kV or higher isolated phase bus.
• Submitted projects should demonstrate experience with installation and commissioning of 115kV and 230kV high-voltage systems and components such as:
o Surge arresters o High-voltage tubular busses o Motor Operated Disconnect (MOD) switches and manually operated grounding switches o Motor Control Centers o Low voltage AC and DC power and control systems o Work involving large oil filled electrical transformers that includes, but is not limited to, movement of transformers.
Use Attachment “Offeror Experience Form” to describe the projects in which the Offeror has relevant experience. Project experience should include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation and must include at minimum:
1. General description of the work performed on the project
2. Discussion of the disciplines of work involved
3. Discussion of any significant schedule challenges or limitations
4. A detailed description of the design, fabrication, installation, shop testing and/or field commissioning experience involved with the project. Any engineering drawings and sketches, if submitted, must be accompanied by narrative explaining the drawings and sketches.
Evaluation Method:
When evaluating the strengths and weaknesses of each proposal, the Government will consider the following:
• Projects that involve experiences with low, medium, and high voltage systems will be considered more relevant and evaluated more favorably than projects involving work with only medium, or only high voltage class equipment.
• Submitted projects that include work with MODs that include surge resistors will be considered more relevant than projects involving work with other equipment.
• Submitted projects that demonstrate experience involving large oil filled electrical transformers that includes, but is not limited to, movement of transformers will be considered more relevant and evaluated more favorably than projects involving work with other equipment.
b. Sub-factor 2B: Hydraulic Systems
Offerors shall submit the following for Sub-factor 2B:
Provide past project information on relevant projects that best demonstrate the breadth and depth of an Offeror’s and/or their subcontractor’s relevant experience with hydraulic systems. If a subcontractor is identified in Factor 1 to perform work on the hydraulic system, the experience of that subcontractor must be represented in the submitted project information. If a subcontractor’s experience is included in Factor 2, that subcontractor must be identified in Factor 1.
Submit a minimum of three and maximum of five relevant projects. If the proposal includes more than five projects, only the first five projects, in the order they appear in the proposal, will be evaluated. Projects must have been completed within seven years of the date of issue of the RFP or ongoing. Ongoing or partially completed projects will only be considered if the portion of the work being submitted has been completed and accepted by the customer.
The combined experience demonstrated by the submitted projects must cover the relevancy requirements listed below. It is not required that each project cover all of the relevancy requirements.
• Submitted projects should involve hydraulic systems with a rated operating pressure of 3000 psi or greater.
• Only experience with industrial or precision type hydraulics is considered relevant. Experience with mobile hydraulics is considered not relevant and will not be evaluated.
• Submitted projects must demonstrate experience with the following aspects of hydraulic power systems:
o Design, including but not limited to, system design and integration of sub-components, selection of off the shelf components such as valves, configuration of manifolds and control panels, design, and configuration of hydraulic power units.
o Fabrication of custom hydraulic components or systems, such as: hydraulic power units, manifolds and control panels, large hydraulic cylinders.
o Installation, of the equipment referenced above.
o Shop testing, of the equipment referenced above.
o Field commissioning, of the equipment referenced above.
Use Attachment “Offeror Experience Form” to describe the projects in which the Offeror has relevant experience. Project experience should include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation and must include at minimum:
1. General description of the work performed on the project
2. Discussion of the disciplines of work involved
3. Discussion of any significant schedule challenges or limitations
4. Configuration of the system and description of what type of equipment is being operated with the hydraulic system.
5. Include a detailed description of the design, fabrication, installation, shop testing and/or field commissioning experience involved with the project. Any engineering drawings and sketches, if submitted, must be accompanied by narrative explaining the drawings and sketches.
Evaluation Method:
When evaluating the strengths and weaknesses of each proposal, the Government will consider the following:
• Proposals that demonstrate experience with hydraulic power systems that use environmentally acceptable lubricants (as defined by VGP 2013) as a hydraulic fluid will be considered more relevant than proposals that demonstrate experience with hydraulic power systems that use conventional hydraulic fluids.
• Projects that involve use of hydraulics with water control structures such as turbine intake gates, spillway gates, regulating outlet gates or valves, or navigation lock gates will be more considered more relevant than projects involving work on or at other equipment.
• Submitted projects that include a hydraulic power system rated for less than 3000 psi will be evaluated but will be considered significantly less relevant and evaluated less favorably.
• Submitted projects that include hydraulic cylinders with a stroke length of over 20 feet will be considered more relevant than projects that include cylinders with a shorter stroke.
c. Sub-factor 2C: Construction Management Experience
Proposals will be evaluated to determine construction management experience relevant with the scope and complexity required in the solicitation.
Provide past project information on relevant projects that best demonstrate the breadth and depth of an Offeror’s relevant experience with construction management.
Submit a minimum of three up to a maximum of five projects that have been completed within the last seven years that collectively meet all of the relevancy requirements defined below. If the proposal includes more than five projects, only the first five projects, in the order they appear in the proposal, will be evaluated. Projects that are ongoing will not be considered.
• Projects must involve work in an industrial setting, such as a powerhouse, manufacturing factory, fabrication shop, water treatment facility, sawmill or other similar facility. Projects that involve work in vertical type construction such as office building construction, commercial, or residential development is considered not relevant and will not be considered.
• Projects must involve managing and coordinating multiple disciplines or areas of work, such as electrical, mechanical, hydraulic, structural fabrication, civil or site work.
Use Attachment “Offeror Experience Form” to describe the projects in which the Offeror has relevant experience. Project experience shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation and shall include at minimum:
1. General description of the work performed on the project
2. Discussion of the disciplines of work involved
3. Discussion of any significant schedule challenges or limitations
4. Discussion of extent of owner involvement
Evaluation Criteria:
When evaluating the strengths and weaknesses of each proposal, the Government will consider the following:
• Projects that demonstrate experience managing work that is similar to the work defined in this RFP, such as work on industrial hydraulic systems or high voltage electrical systems, will be evaluated as more relevant than projects involving other areas of work.
• Projects that span multiple years will be evaluated as more relevant than projects that have a duration of one year or less.
• Demonstrated experience in coordination between multiple tiers of subcontractors or in work areas with multiple prime contracts will be evaluated more relevant.
• Projects that involve substantial owner participation and interaction will be evaluated more relevant than projects without substantial owner participation.
• Projects that are well below the immediate project’s construction magnitude as provided in the bid schedule will be considered less relevant and rated less favorably.
Technical Factor Ratings: ratings outlined below focus on the strengths, deficiencies, weaknesses, risks, and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Technical sub-factor requirements.
Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is un-awardable.
Factor 3 – Past Performance
There are three aspects to the past performance evaluation: recency, relevancy (including context of data) and quality (including general trends in contractor performance and source of information).
a. The Government will focus its inquiries on the Offeror’s (and major subcontractors’) record of performance as it relates to all solicitation requirements, including price, schedule, performance, and management of subcontractors. Past performance evaluation will be conducted for all subcontractors that are identified in Factor 1 – Section 3 Contractor Roles. Therefore, offerors are reminded to include the most current and relevant past performance efforts (within the past fifteen years) in their proposal. Absent any current and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated either favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System NAICS 237990, Other Heavy and Civil Engineering Construction. Data submitted by the offeror or gathered from other sources by the government in conducting performance risk assessments shall not extend past fifteen years prior to the issue date of the RFP but may include performance data generated during the past fifteen years without regard to the contract award date.
CPARS data is limited to the past 6 years. Offeror’s should provide additional performance data for projects beyond 6yrs.
b. Offerors should submit all Government and/or commercial contract numbers and descriptions for the prime offeror and each major subcontractor in performance or awarded during the past fifteen years, from the issue date of this RFP, which are relevant to the efforts required by this RFP.
c. RECENCY: The Government will evaluate recency by examining the offerors’ record of past performance and to assess the time period during which the offeror’s past performance is considered relevant.
d. RELEVANCY: The Government will evaluate those aspects of an offeror’s history of contract performance that would provide the most context and give the greatest ability to measure whether the offeror will successfully satisfy the current requirement. This evaluation will include all aspects of the offeror’s execution of schedule, performance, customer support and subcontracting plan for these projects and the offeror’s record of: 1) Conforming to specifications and standards of good workmanship; 2) Maintaining program execution within price; 3) Adherence to contract schedules, including the administrative aspects of performance; 4) Ability to resolve technical and manufacturing problems quickly and effectively; 5) Businesslike concern for the interest of its customers; 6) Establishing and maintaining adequate management of subcontractors; and 7) Compliance with subcontracting plans submitted on previous projects.
Past Performance Relevancy Ratings
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
e. QUALITY: The third aspect of the past performance evaluation is to establish the overall quality of the offeror’s past performance. The quality past performance evaluation conducted gathers information from the offeror’s customers to determine how well the offeror performed those past contracts. This quality assessment will be reflected in the overall confidence assessment described below.
PERFORMANCE CONFIDENCE ASSESSMENT: Because this source selection requires a greater level of discernment with the past performance evaluation, the SSEB shall use all ratings in the chart below and reach a single consensus performance confidence assessment for the offeror, selecting the most appropriate rating below. This rating considers the assessed quality of the relevant efforts gathered (documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment). The rationale for the conclusions reached by the SSEB will be included in the SSEB report.
Performance Confidence Assessments
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance
Limited Confidence Based on the offeror’s recent/ relevant performance record, the Government has low expectation that the offeror will be able to successfully perform the required effort.
No Confidence Based on the offeror’s recent/ relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Factor 3 – Small Business Participation
All offerors (both large and small businesses) will be evaluated on the level of proposed participation of small business concerns in performance of this acquisition (as small business prime offerors or small business subcontractors) relative to the objectives and goals established herein. Proposals shall be submitted under a Small Business Participation Commitment Document (SBPCD) and is separate from subcontracting plans. The government will evaluate:
a. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;
b. The extent of commitment to use such firms.
This is the start of the file's text. The full file is on GovTribe.