Offeror Experience Form.pdf
PDF 116 KB Posted
- Attached to
- McNary Intake Gates and Isophase Bus Systems
- Solicitation number
- W912EF21R0015
About this file
This notice provides details for a construction contract opportunity with the Department of the Army Corps of Engineers Engineering District Walla Walla. The contract involves rehabilitation and replacement of intake gates and isophase bus systems at McNary Dam in Umatilla County, Oregon.
The intake gate portion of the contract requires rehabilitating 45 intake gates, providing new hydraulic cylinders, support beams, and control consoles. A new hydraulic power unit and header piping will also be installed along with flexible hose assemblies and electrical work. For the isophase bus systems, the contract involves replacing 4,000 amp copper bus and 2,500 amp delta bus with higher capacity aluminum bus. Additional work includes replacing potential transformers, tubular aluminum bus segments, manual disconnect switches with motorized units, surge arresters and electrical equipment. The period of performance is from December 2021 to May 2030. Work will occur in scheduled generation unit outage windows to minimize lost power production.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFEROR EXPERIENCE FORM
Technical Subfactor: __________ Subfactor Title: ___________________________
Name of Offeror: ______________________________
Project Title: _________________________________________________________________
Contract/Project Number: _________________________
Project Location: _________________________________
Total Contract Value: $_______________ (Final value if completed, current value if not completed)
If Offeror performed as Subcontractor, Value of Subcontract: $_______________
Construction Phase Start Date: ___________________________________
Construction Phase Completion Date: ______________________________ (Actual date if project has been completed, anticipated date if project is not complete)
Name of Customer/Client: ______________________________________________________
Telephone Number of Customer/Client: __________________________________________
Email Address of Customer/Client: ______________________________________________
Description of Project’s Scope:
Offeror’s role and responsibility during construction of the project:
(Indicate whether your firm performed as a prime or subcontractor.)
Describe the relevancy of the reference project with the scope required in this solicitation:
File details come from the government source that posted it. Updated .