Amend 0004 W912EF21R0015.pdf
PDF 1 MB Posted
- Attached to
- McNary Intake Gates and Isophase Bus Systems
- Solicitation number
- W912EF21R0015
About this file
This federal contract opportunity notice describes a construction project to rehabilitate the intake gates and isophase bus systems at McNary Dam.
The project involves rehabilitating 45 intake gates including replacing seals, seal bars, anodes and painting. It also includes inspecting sealing bar surfaces for 44 intake gate slots and providing new hydraulic cylinders, support beams, control systems and hydraulic fluid. For the isophase bus systems, the project includes replacing 15kV copper bus and transformers with aluminum bus and installing new disconnect switches, surge arresters, control systems and cabling. Optional work includes draining transformer tanks.
The period of performance is from December 2021 to May 2030. Work will occur in annual outages of approximately 6 months each when two generating units will be taken offline. The estimated value is between $25-100 million. The contract will be fixed price with performance and payment bonds required. The solicitation will be issued on Beta SAM and proposals are due as specified in the solicitation.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV11532941
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Construction project: McNary Intake Gates and Isophase Bus Systems
The purpose of this amendment is to incorporate the changes outlined below .
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF21R0015
X 9B. DATED (SEE ITEM 11)
16-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jul-2021
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF21R0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Summary of Changes for McNary Intake Gates and Isophase Bus Systems (McDouble)(21R0015)
Amendment 0004
Specifications:
00 01 15.00 28 LIST OF DRAWINGS
• 1.2: Table revised to show revisions to drawings
01 22 00.00 28 MEASUREMENT AND PAYMENT
• 1.2.2.1: Added a minimum touch up painting area to item e.
01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
• 1.5: Added a sentence to the 2nd paragraph to provide additional information regarding Contractor Cranes on the Intake Deck.
01 78 00.00 28 CLOSEOUT SUBMITTALS
• 2.1: item 4 revised since there are now two paragraphs titled “Spare Parts”
09 97 02.13 26 PAINTING – HYDRAULIC STRUCTURES
• 3.5: Updated schedule for System 16-A
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS FOR ISOPHASE SYSTEMS
• 1.2 – Replaced ASTM B221 with ASTM B241
• 2.8 – Replaced ASTM B221 with ASTM B241
26 25 01.00 26 BUS STRUCTURES AND INSTRUMENT TRANSFORMERS
• 1.2 – Added - ASTM B317/B317M
• 2.2.4 – Added in first sentence, after ASTM B221 - or 6101-T6 alloy conforming to ASTM B317/B317M
33 56 53.00 26 REHABILITATION OF OIL STORAGE TANKS
• Added 2.4 Desiccant Breathers
• Added 3.4 Desiccant Breathers
• Previous 3.4 is now 3.5
35 05 40.14 26 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
• 1.2: 2 references added. ASTM A240 and ASTM B209
• 1.4.3.i – Updated lowering speed and cushion speed
• 2.3.1.e – Updated cushion speed
• 2.3.2.1 – Updated specification requirements regarding cylinder rod end design.
• 2.4.1i – Corrected to paragraph to “I” from “g” (the 2nd one)
• 2.4.1.j – Added piping material requirements
W912EF21R0015
• 2.4.4.g – Clarified location of pump rubber isolation bushings
• 2.4.5.i – Added rubber isolation bushings between motor and skid.
• 2.4.6.f – Added fluid temperature requirements.
• 2.5.2.a – Material callouts added
• 2.6.3.d – Clarified requirements regarding sizing of accumulator tanks.
• 2.9.4.c – Modified cartridge type valve materials
• 2.9.8.f – Modified cartridge valve materials
• 2.9.9.e – Modified directional control valve materials
• 2.9.10.f – Modified pressure relief valve materials
• 2.9.12.b – Modified check valve materials
• 3.5.5.2.a – Added piping material requirements
• 3.5.5.3.c – Added piping material requirements.
• 3.5.5.6 – Added piping material requirements.
• Added 3.7.4 System Cleanliness
35 05 40.15 26 HYDRAULIC FLUID
• 2.1.1: Value for maximum water content changed
Drawings:
Volume 1
• SD-503 and S-503: Revised anode information
Volume 2
• No changes
(End of Summary of Changes)
McNary Intake Gates and Isophase Bus Systems (McDouble) W912EF21R0015 amend 0004
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15.00 28 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 11 00.00 28 SUMMARY OF WORK
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 12 16.00 26 WORK SEQUENCE
01 14 00.10 28 PROJECT SITE RESTRICTIONS
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 22 00.00 28 MEASUREMENT AND PAYMENT
01 32 01.00 28 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.00 28 CONTRACTOR QUALITY CONTROL
01 51 00.00 28 TEMPORARY UTILITIES
01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
01 57 20.00 28 ENVIRONMENTAL PROTECTION
01 78 00.00 28 CLOSEOUT SUBMITTALS
01 78 23.00 28 OPERATION AND MAINTENANCE DATA
01 91 00.00 26 SYSTEMS TESTING AND COMMISSIONING
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND
MINOR EQUIPMENT FOUNDATIONS
DIVISION 05 - METALS
05 00 00.01 26 INTAKE GATE STRUCTURE REHABILITATION
05 05 23.17 26 WELDING (STEEL), FABRICATION, AND MACHINE WORK
05 50 03.01 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 04.01 26 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED
ITEMS
05 56 09.00 26 INTAKE GATE SEALS
DIVISION 09 - FINISHES
09 97 02.13 26 PAINTING - HYDRAULIC STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS FOR ISOPHASE
SYSTEMS
26 05 01.00 26 BASIC ELECTRICAL MATERIALS AND METHODS FOR INTAKE GATES
26 05 19.00 26 INSULATED WIRE AND CABLE FOR ISOPHASE SYSTEMS
PROJECT TABLE OF CONTENTS Page 1
26 05 19.01 26 INSULATED WIRE AND CABLE FOR INTAKE GATES
26 05 26.00 26 GROUNDING AND GROUND TESTING
26 05 33.00 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 25 01.00 26 BUS STRUCTURES AND INSTRUMENT TRANSFORMERS
26 42 14.01 26 CATHODIC PROTECTION BY SACRIFICIAL ANODES
DIVISION 33 - UTILITIES
33 56 53.00 26 REHABILITATION OF OIL STORAGE TANKS
33 75 10.00 26 HIGH VOLTAGE GROUP-OPERATED DISCONNECT SWITCHES AND
GROUNDING SWITCHES
33 78 26.00 26 HIGH VOLTAGE SURGE ARRESTERS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 05 40.14 26 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
35 05 40.15 26 HYDRAULIC FLUID
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13.96 26 WELDING: PIPING AND PRESSURIZED SYSTEMS
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.75 26 NEW SUPPORT BEAMS
DIVISION 48 - ELECTRICAL POWER GENERATION
48 19 23.60 26 (OPTIONAL) CLASS II GSU POWER TRANSFORMER OIL DRAINING
AND FILLING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15.00 28
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
1.2 VOLUME 1 CONTRACT DRAWINGS
1.2.1 Use Of Government Prepared Contract CAD Electronic Files
1.3 VOLUME 2 CONTRACT DRAWINGS
1.4 RESOURCE DRAWINGS (R) VOLUME 1
1.5 RESOURCE DRAWINGS (R) VOLUME 2
-- End of Section Table of Contents --
DOCUMENT 00 01 15.00 28 Page 1
SECTION 00 01 15.00 28
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 VOLUME 1 CONTRACT DRAWINGS
Volume 1 Contract drawings are as follows:
SHEET
NUMBER
FILE NUMBER DESCRIPTION Revision Number
Date
GENERAL
G-001 MDP-1-0/1 PROJECT LOCATION AND VICINITY MAPS
G-002 MDP-1-0/2 DRAWING INDEX - VOLUME 1
G-003 MDP-1-0/3 DRAWING INDEX - VOLUME 2
G-004 MDP-1-0/4 DRAWING INDEX - VOL 1 - RESOURCE
DRAWINGS - SHEET 1
G-005 MDP-1-0/5 DRAWING INDEX - VOL 1 - RESOURCE
DRAWINGS - SHEET 2
G-006 MDP-1-0/6 DRAWING INDEX - VOL 2 - RESOURCE
DRAWINGS - SHEET 1
G-007 MDP-1-0/7 DRAWING INDEX - VOL 2 - RESOURCE
DRAWINGS - SHEET 2
G-101 MDP-1-0/8 SITE PLAN - CONTRACTOR STAGING AREA
G-102 MDP-1-0/9 ELECTRICAL SYMBOLS, ABBREVIATIONS
- & GENERAL NOTES
STRUCTURAL
SD501 MDP-1-5-0/1 SEAL BARS - REMOVAL
SD502 MDP-1-5-0/2 SEAL DETAILS - REMOVAL
SD503 MDP-1-5-0/3 ANODE DETAILS - REMOVAL 1 7/22/21
S-501 MDP-1-5-0/4 SEAL BARS - INSTALL
S-502 MDP-1-5-0/5 SEAL DETAILS - INSTALL
S-503 MDP-1-5-0/6 ANODE DETAILS - INSTALL 1 7/22/21
MECHANICAL
DOCUMENT 00 01 15.00 28 Page 2
G4EDDMTJ
Line
G4EDDMTJ
Line
MD101 MDP-1-3-2/1 PLAN VIEW - EL346.0 - DEMOLITION
MD201 MDP-1-3-2/2 HYDRAULIC PIPING - DEMOLITION -
SHEET 1 OF 2
MD202 MDP-1-3-2/3 HYDRAULIC PIPING - DEMOLITION -
SHEET 2 OF 2
MD501 MDP-1-3-2/4 CYLINDERS, SUPPORT BEAM, AND HOSES
- DEMOLITION
MD502 MDP-1-3-2/5 HYDRAULIC FLUID STORAGE TANKS &
HPU - DEMOLITION - SHEET 1 OF 2
MD503 MDP-1-3-2/6 CONTROL CONSOLE - DEMOLITION
MD601 MDP-1-3-2/7 HYDRAULIC SCHEMATIC - DEMOLITION -
MD602 MDP-1-3-2/8 HYDRAULIC SCHEMATIC - DEMOLITION -
MD603 MDP-1-3-2/9 HYDRAULIC SCHEMATIC - DEMOLITION -
MD604 MDP-1-3-2/10 HYDRAULIC SCHEMATIC - DEMOLITION -
VALVE SCHEDULE
M-101 MDP-1-3-2/11 PLAN VIEW - EL346.0 - INSTALL
M-201 MDP-1-3-2/12 HYDRAULIC PIPING - NEW EQUIPMENT -
SHEET 1 OF 2 - INSTALL
M-202 MDP-1-3-2/13 HYDRAULIC PIPING - NEW EQUIPMENT -
SHEET 2 OF 2 - INSTALL
M-501 MDP-1-3-2/14 CYLINDERS, SUPPORT BEAM, AND HOSES
- INSTALL
M-502 MDP-1-3-2/15 HYDRAULIC FLUID STORAGE TANKS &
HPU - INSTALL
M-503 MDP-1-3-2/16 NEW CONTROL CONSOLE
M-504 MDP-1-3-2/17 NEW SUPPORT BEAMS
M-505 MDP-1-3-2/18 NEW HPU CONTROL PANEL
M-601 MDP-1-3-2/19 HYDRAULIC SCHEMATIC - INSTALL - 1
OF 3
M-602 MDP-1-3-2/20 HYDRAULIC SCHEMATIC - INSTALL - 2
OF 3
M-603 MDP-1-3-2/21 HYDRAULIC SCHEMATIC - INSTALL - 3
OF 3
M-604 MDP-1-3-2/22 HYDRAULIC SCHEMATIC - INSTALL -
VALVE SCHEDULE
ELECTRICAL
ED103 MDP-1-6-0A0/1 ELECTRICAL PLAN VIEW - EL 346.0 -
REMOVAL
ED202 MDP-1-6-0A0/2 ELEVATION AND ONE LINE - CQ22 480V
MCC - REMOVAL
ED203 MDP-1-6-0A0/3 ELEVATION AND ONE LINE - CQ32 480V
MCC - REMOVAL
DOCUMENT 00 01 15.00 28 Page 3
ED601 MDP-1-6-9A24/1 INTAKE GATE HOIST - CONTROL
SCHEMATIC - REMOVAL
ED801 MDP-1-6-0A1/1 CABLE AND CONDUIT SCHEDULE -
REMOVAL
E-101 MDP-1-6-0A0/4 POWERHOUSE LAYOUT EL 287 - INSTALL
E-102 MDP-1-6-0A0/5 CONTROL ROOM & SURROUNDING - AREA
PARTIAL PLAN - EL 305.0 - INSTALL
E-103 MDP-1-6-0A0/6 ELECTRICAL PLAN VIEW - EL 346.0 -
INSTALL
E-201 MDP-1-6-0A4/1 SC SWITCHBOARD FRONT ARRANGEMENT -
INSTALL
E-202 MDP-1-6-0A0/7 ELEVATION AND ONE-LINE - CQ22 480V
MCC - INSTALL
E-203 MDP-1-6-0A0/8 ELEVATION AND ONE-LINE - CQ32 480V
MCC - INSTALL
E-204 MDP-1-6-0A0/9 ELEVATION AND ONE-LINE - CQ52 480V
MCC - INSTALL
E-205 MDP-1-6-0A0/10 ELEVATION AND ONE-LINE - CQ72 480V
MCC - INSTALL
E-601 MDP-1-6-9A24/2 INTAKE GATE HOIST - ONE LINE AND
THREE LINE - INSTALL
E-602 MDP-1-6-9A24/3 INTAKE GATE HOIST - CONTROL
SCHEMATIC - INSTALL
E-603 MDP-1-6-9A24/4 UNIT RTU DIGITAL INPUT - INSTALL
E-604 MDP-1-6-9A24/5 PLANT RTU ANALOG INPUT - INSTALL
E-605 MDP-1-6-9A24/6 PLANT RTU DIGITAL INPUT - INSTALL
E-701 MDP-1-6-9A61/1 ODD UNIT RTU WIRING DIAGRAM -
INSTALL
E-702 MDP-1-6-9A61/2 ODD UNIT RTU I/O TERMINAL BLOCK
WIRING - INSTALL
E-703 MDP-1-6-9A61/3 EVEN UNIT RTU WIRING DIAGRAM -
INSTALL
E-704 MDP-1-6-9A61/4 EVEN UNIT RTU I/O TERMINAL BLOCK
WIRING - INSTALL
E-705 MDP-1-6-9A52/1 PLANT PLC (SC9) EXTERNAL CABLES -
INSTALL
E-706 MDP-1-6-9A61/5 SC OPTO22 CABINET - INSTALL
E-707 MDP-1-6-9A52/2 IGCC_ EXTERNAL CABLES - INSTALL
E-708 MDP-1-6-9A52/3 HPU, IGCCO1 AND IGCCO2 - EXTERNAL
CABLES WIRING - INSTALL
E-710 MDP-1-6-9A42/1 SC_ SWITCHBOARD WIRING & LAYOUT -
INSTALL
E-711 MDP-1-6-9A42/2 SC_ SWITCHBOARD - ODD UNIT WIRING
DIAGRAM - INSTALL
E-712 MDP-1-6-9A42/3 SC_ SWITCHBOARD - EVEN UNIT WIRING
DIAGRAM - INSTALL
DOCUMENT 00 01 15.00 28 Page 4
E-713 MDP-1-6-9A42/4 GOV ACTUATOR CAB, FR PNL - ODD
UNIT SECTION WIRING DIAGRAM -
INSTALL
E-714 MDP-1-6-9A42/5 GOV ACTUATOR CAB, FR PNL - EVEN
UNIT SECTION WIRING DIAGRAM -
E-801 MDP-1-6-0A1/2 CABLE AND CONDUIT SCHEDULE - SHEET
1 - INSTALL
E-802 MDP-1-6-0A1/3 CABLE AND CONDUIT SCHEDULE - SHEET
2 - INSTALL
1.2.1 Use Of Government Prepared Contract CAD Electronic Files
a. No Resource (R)("For Information Only") drawings are available on
CAD.
b. The Contractor assumes all risks associated in using electronic CAD drawings.
c. Electronic copies of CAD drawings are only available in Bentley DGN format.
d. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies.
The Government will not be responsible to correct the electronic CAD drawing.
1.3 VOLUME 2 CONTRACT DRAWINGS
Volume 2 Contract drawings are as follows:
SHEET
NUMBER
FILE NUMBER DESCRIPTION Revision Number
Date
GENERAL
G-004 MDP-1-7-0-0/4 ELECTRICAL LEGEND
G-101 MDP-1-7-0-0/7 POWERPLANT EQUIPMENT
ARRANGEMENT EL 276.00
G-102 MDP-1-7-0-0/9 POWERPLANT EQUIPMENT
ARRANGEMENT EL 287.00
G-103 MDP-1-7-0-0/10 PLAN - POWERHOUSE EL 305.00
G-104 MDP-1-7-0-0/5 PLAN - POWERHOUSE EL 320.00
G-105 MDP-1-7-0-0/5 TYPICAL FLOOR PLAN EL 346.00
- MCC
G-106 MDP-1-7-0-0/6 PLAN - POWERHOUSE EL 361.00
ELECTRICAL
DOCUMENT 00 01 15.00 28 Page 5
ED201 MDP-1-7-6-01D5/1 ISOPHASE BUS FRONT ELEVATION
- EL. 274.00 TO EL. 333.00
- REMOVAL
ED202 MDP-1-7-6-01D5/2 ISOPHASE BUS FRONT ELEVATION
- EL. 333.00 TO
TRANSFORMERS - REMOVAL
ED501 MDP-1-7-6-01D5/3 DELTA BUS DETAILS - EL.
333.00 - REMOVAL
ED502 MDP-1-7-6-01D5/4 ISOPHASE BUS DETAILS -
REMOVAL
ED503 MDP-1-7-6-01D5/5 TRANSVERSE SECTION AT UNIT 1
- HV DISC.SWITCH & SURGE
ARRESTER TYPICAL FOR LINE
1-4 - REMOVAL
ED504 MDP-1-7-6-01D5/6 230 KV DISC. SWITCH PLAN AND
ELEVATION - REMOVAL
ED505 MDP-1-7-6-01D5/7 230 KV DISC. SWITCH PLAN &
ELEVATION - UNITS 9-12
DETAILS - REMOVAL
ED506 MDP-1-7-6-01D5/8 115KV DISCONNECT & SURGE
ARRESTER UNITS 13-14 -
REMOVALED507 MDP-1-7-6-01D5/9 115KV & 230KV EQUIPMENT PLAN
& SURGE ARRESTERS DETAILS -
REMOVAL
ED508 MDP-1-7-6-01D5/10 PLAN BAY 1-8 - DISC.
SWITCHES AND SURGE
ARRESTERS - REMOVAL
ED509 MDP-1-7-6-01D5/11 PLAN BAY 9-14 - DISC.
SWITCHES AND SURGE ARRESTERS
- REMOVAL
ED601 MDP-1-7-6-1D21/1 ONE LINE DIAGRAM POWERHOUSE
OVERVIEW - REMOVAL
ED602 MDP-1-7-6-1D21/2 ONE-LINE DIAGRAM MAIN UNITS
AND GSU TRANSFORMER - REMOVAL
ED603 MDP-1-7-6-1D22/1 THREE-LINE DIAGRAM GENERATOR
BREAKER & 15KV BUS - REMOVAL
ED604 MDP-1-7-6-1D22/2 THREE-LINE DIAGRAM ODD UNITS
- REMOVAL
ED605 MDP-1-7-6-1D22/3 THREE-LINE DIAGRAM EVEN
UNITS - REMOVAL
ED606 MDP-1-7-6-1D22/4 THREE-LINE DIAGRAM GENERATOR
MANUAL SYNC CKT - REMOVAL
ED701 MDP-1-7-6-9D51/1 MU SWITCHBOARD S_4 TERMINAL
BLOCKS (TBL) WIRING DIAGRAM
- REMOVAL
ED702 MDP-1-7-6-1D51/2 MU SWITCHBOARD S_4
TRANSFORMER RELAY TEST
SWITCH WIRING DIAGRAM -
REMOVAL
E-101 MDP-1-7-6-0E0/1 PLAN EL 267.50 BAYS 1 & 2 -
INSTALL
DOCUMENT 00 01 15.00 28 Page 6
E-102 MDP-1-7-6-0F0/1 POWERHOUSE LAYOUT EQUIPMENT
PLAN EL 287.00 UNITS 3 & 4 -
INSTALL
E-103 MDP-1-7-6-9D40/1 POWERPLANT EQUIPMENT
ARRANGEMENT CONTROL ROOM EL
305.00 LAYOUT - INSTALL
E-104 MDP-1-7-6-0A0/1 TYPICAL TRANSFORMER BAY -
TRANSFORMER MOVEMENT WORK
ITEMS - INSTALL
E-201 MDP-1-7-6-01D5/12 ISOPHASE BUS FRONT ELEVATION
- EL. 274.00 TO EL. 333.00
- INSTALL
E-202 MDP-1-7-6-1D5/13 ISOPHASE BUS FRONT ELEVATION
- EL. 333.00 TO TRANSFORMERS
- INSTALL
E-501 MDP-1-7-6-1D13/1 TYPICAL ELECTRICAL DETAILS -
INSTALL
E-502 MDP-1-7-6-1D5/14 DELTA BUS DETAILS - EL.
333.0 - INSTALL
E-503 MDP-1-7-6-1D5/15 ISOPHASE BUS DETAILS -
INSTALL
E-504 MDP-1-7-6-01D5/16 TRANSVERSE SECTION AT UNIT 1
- HV DISC.SWITCH & SURGE
ARRESTER TYPICAL FOR LINE
1-4 - INSTALL
E-505 MDP-1-7-6-1D5/17 230 KV DISC. SWITCH PLAN &
ELEVATION - INSTALL
E-506 MDP-1-7-6-01D5/16 230 KV DISC. SWITCH PLAN &
ELEVATION - UNITS 9-12
DETAILS - INSTALL
E-507 MDP-1-7-6-01D5/19 115KV DISCONNECT & SURGE
ARRESTER UNITS 13-14 -
INSTALL
E-508 MDP-1-7-6-01D5/20 115KV & 230KV EQUIPMENT PLAN
& SURGE ARRESTERS DETAILS -
INSTALL
E-509 MDP-1-7-6-01D5/21PLAN BAY 1-8 - DISC.
SWITCHES AND SURGE ARRESTERS
- INSTALL
E-510 MDP-1-7-6-01D5/22PLAN BAY 9-14 - DISC.
SWITCHES AND SURGE ARRESTERS
- INSTALL
E-511 MDP-1-7-6-01D5/23ROOF TOP DISC. GROUNDING
MATS & OPERATOR PLAN AND
SECTIONS - INSTALL
E-512 MDP-1-7-6-01D5/24TYPICAL FLOOR PLAN EL.346.00
- MCC - INSTALL
E-601 MDP-1-7-6-1D21/3 ONE-LINE DIAGRAM POWERHOUSE
OVERVIEW - INSTALL
E-602 MDP-1-7-6-1D21/4 ONE-LINE DIAGRAM MAIN UNITS
AND GSU TRANSFORMER - INSTALL
E-603 MDP-1-7-6-01D22/5THREE-LINE DIAGRAM GENERATOR
BREAKER & 15KV BUS - INSTALL
DOCUMENT 00 01 15.00 28 Page 7
E-604 MDP-1-7-6-1D22/6 THREE-LINE DIAGRAM ODD UNITS
- INSTALL
E-605 MDP-1-7-6-1D22/7 THREE-LINE DIAGRAM EVEN
UNITS - INSTALL
E-606 MDP-1-7-6-1D22/8 THREE-LINE DIAGRAM GENERATOR
MANUAL SYNC CKT - INSTALL
E-607 MDP-1-7-6-1D22/9 MOD RTU DIGITAL INPUTS -
INSTALL
E-608 MDP-1-7-6-1D22/10MOD CONTROL DIAGRAM -
INSTALL
E-609 MDP-1-7-6-1D21/1 MCC ONE-LINE DIAGRAM CQ12 &
CQ22 - INSTALL
E-610 MDP-1-7-6-1D21/2 MCC ONE-LINE DIAGRAM CQ32 &
CQ42 - INSTALL
E-611 MDP-1-7-6-1D21/3 MCC ONE-LINE DIAGRAM CQ52 &
CQ62 - INSTALL
E-612 MDP-1-7-6-1D21/4 MCC ONE-LINE DIAGRAM CQ72 -
INSTALL
E-613 MDP-1-7-6-9D18/1 MOD KEY INTERLOCK DIAGRAM -
INSTALL
E-701 MDP-1-7-6-9D51/1 MU SWITCHBOARD S_2 EVEN UNIT
TERMINAL BLOCKS (TBL) WIRING
DIAGRAM - INSTALL
E-702 MDP-1-7-6-9D51/2 MU SWITCHBOARD S_2 EVEN UNIT
GENERATOR RELAY TEST SWITCH
WIRING DIAGRAM - INSTALL
E-703 MDP-1-7-6-1D51/3 MU SWITCHBOARD S_3 EVEN UNIT
TERMINAL BLOCKS (TBR) WIRING
DIAGRAM - INSTALL
E-704 MDP-1-7-6-9D51/4 MU SWITCHBOARD S_3 EVEN UNIT
TERMINAL BLOCKS (TBL) WIRING
DIAGRAM - INSTALL
E-705 MDP-1-7-6-9D51/5 MU SWITCHBOARD S_3 EVEN UNIT
PANEL CONTROLS WIRING
DIAGRAM - INSTALL
E-706 MDP-1-7-6-9D51/6 MU SWITCHBOARD S_4 TERMINAL
BLOCKS (TBR) WIRING DIAGRAM
- INSTALL
E-707 MDP-1-7-6-9D51/7 MU SWITCHBOARD S_4
TRANSFORMER RELAY TEST
E-708 MDP-1-7-6-9D51/8 MU SWITCHBOARD S_4 PANEL
CONTROLS WIRING DIAGRAM -
INSTALL
E-709 MDP-1-7-6-9D51/9 MU SWITCHBOARD SC_ TERMINAL
BLOCKS (TBR) WIRING DIAGRAM,
SHEET 1 - INSTALL
E-710 MDP-1-7-6-9D51/10MU SWITCHBOARD SC_ TERMINAL
BLOCKS (TBR) WIRING
DIAGRAM, SHEET 2 - INSTALL
E-711 MDP-1-7-6-9D51/11MU SWITCHBOARD SC_ EVEN UNIT
PANEL CONTROLS WIRING
DIAGRAM - INSTALL
DOCUMENT 00 01 15.00 28 Page 8
E-712 MN481086E-712.dgnMU SWITCHBOARD SC_
TRANSFORMER PANEL CONTROLS
WIRING DIAGRAM - INSTALL
E-713 MDP-1-7-6-9D51/13RTU1 UNIT 1 DIG I/O WIRING,
ALL ODD UNITS SIMILAR -
INSTALL
E-714 MDP-1-7-6-9D51/14RTU1 UNIT 1 DIG I/O TERMINAL
BLOCK WIRING, ALL ODD UNITS
SIMILAR - INSTALL
E-801 MDP-1-7-6-9D1/1 CABLE AND CONDUIT SCHEDULE
SHEET 1 - INSTALL
E-802 MDP-1-7-6-9D1/1 CABLE AND CONDUIT SCHEDULE
SHEET 2 - INSTALL
1.4 RESOURCE DRAWINGS (R) VOLUME 1
These R drawings are included with the drawings for information only. The Government does not warrant the accuracy of the R drawings. The Government recommends that the Contractor verify the accuracy of R drawings.
Volume 1 Resource (R) drawings are as follows:
SHEET
NUMBER
FILE NUMBER DESCRIPTION Revision Number
Date
MCNARY DAM (ORIGINAL CONTRACT DRAWINGS)
R-001 MDP-1-3-4/1 INTAKE GATES - ASSEMBLY
R-002 MDP-1-3-4/4 INTAKE GATES - HYDRAULIC
CYLINDERS
R-003 MDP-1-3-4/5 INTAKE GATES - DOGS & GATE
- POSITION INDICATOR
R-004 MDP-1-3-4/6 INTAKE GATES - ROLLER
ASSEMBLY & DETAILS
INTAKE GATES (SHOP DRAWINGS)
R-005 A-5543 EXTERNAL SNAP RING
R-006 B-5540 ROLLER SHAFT
R-007 B-5541 ROLLER
R-008 B-5542 SIDE BAR
R-009 D-5544 ROLLER ASSEMBLY FOR
MCNARY DAM CHAIN
DOCUMENT 00 01 15.00 28 Page 9
R-010 G-2759 ALT. WELDED DESIGN - LOAD
DIAGRAM & SECTIONAL VIEWS
R-011 G-2924 INTAKES GATES CENTER OF
GRAVITY CALCULATIONS
R-012 G-3164 GATE CYLINDER STOP & PIPE
SUPPORT DETAILS
R-013 H-106 INTAKE GATES MATCH
MARKING ARRANGEMENT -
TRACK PLATES & GUIDES
R-014 H-280 INTAKE GATES - SECTION
NO.1 - TOP
R-015 H-281 INTAKE GATES - SECTION
NO.2 - INT
R-016 H-282 INTAKE GATES - SECTION
NO.3 - INT
R-017 H-283 INTAKE GATES - SECTION
NO.4 - BOTTOM
R-018 H-284 TRACK BEAM - SECTIONS
NUMBER 1 & 2
R-019 H-285 TRACK BEAM - SECTIONS
NUMBER 3 & 4
R-020 H-286 TRACK PLATES & GUIDES
R-021 H-287 TOP TRACK & CASTING -
MISC. DETAILS
R-022 H-288 BOTTOM TRACK CASTING -
DETAILS & ASSY
R-023 H-289 SEAL BARS
R-024 H-290 SEAL DETAILS
R-025 H-291 TRACK PLATE ARRANGEMENT
R-026 Z-428 INTAKE GATES - ASSEMBLY
R-027 Z-507 INTAKE GATES - SHOP
ASSEMBLY AND FIELD
ERECTIONINTAKE GATES ROLLER CHAIN (SHOP DRAWINGS)
R-028 MDP-1-3-15/1 ROLLER CHAIN - ASSEMBLY
R-029 MDP-1-3-15/2 ROLLER CHAIN - PART
DETAILS
R-030 MDP-1-3-15/3 UPPER CAP - ASSEMBLY
R-031 MDP-1-3-15/4 UPPER CAP - PART DETAILS
INTAKE GATES HYDRAULIC SYST. REHAB (1983 CONTRACT DWGS)
DOCUMENT 00 01 15.00 28 Page 10
R-032 MDP-1.23-3-4/3 HYDRAULIC SCHEMATICS AND
CONTROL DIAGRAMS
R-033 MDP-1.23-3-4/4 GATE CONTROL PIPING ITEM
LIST AND NOTES
R-034 MDP-1.23-3-4/5 GATE CONTROL PIPING SHEET
R-035 MDP-1.23-3-4/6 GATE CONTROL PIPING SHEET
R-036 MDP-1.23-3-4/7 GATE CONTROL PIPING SHEET
R-037 MDP-1.23-3-4/8 GATE SLOT PIPING
R-038 MDP-1.23-3-4/9 HYDRAULIC CONTROL PANEL
SHEET 1 OF 2
R-039 MDP-1.23-3-4/10 HYDRAULIC CONTROL PANEL
SHEET 2 OF 3
R-040 MDP-1.23-3-4/11 CONTROL PANEL SUPPORT
PIPE ANCHOR AND GUIDES
R-041 MDP-1.23-3-4/12 ELECTRICAL CONTROL PANEL
DETAIL
R-042 MDP-1.23-3-4/13 OIL STORAGE TANK LOCATION
SHEET 1 OF 2
R-043 MDP-1.23-3-4/14 OIL STORAGE TANK LOCATION
SHEET 2 OF 2
R-044 MDP-1.23-3-4/15 OIL STORAGE TANK DETAIL
R-045 MDP-1.23-3-4/16 HYDRAULIC PUMPING UNIT
SHEET 1 OF 5
R-046 MDP-1.23-3-4/17 HYDRAULIC PUMPING UNIT
SHEET 2 OF 5
R-047 MDP-1.23-3-4/18 HYDRAULIC PUMPING UNIT
SHEET 3 OF 5
R-048 MDP-1.23-3-4/19 HYDRAULIC PUMPING UNIT
SHEET 4 OF 5
R-049 MDP-1.23-3-4/20 HYDRAULIC PUMPING UNIT
SHEET 5 OF 5
R-050 MDP-1.23-3-4/21 GATE POSITION INDICATOR
SHEET 1 OF 2
R-051 MDP-1.23-3-4/22 GATE POSITION INDICATOR
SHEET 2 OF 2
R-052 MDP-1.23-3-4/23 INTAKE GATE HANDLING
ARRANGEMENT
R-053 MDP-1.23-3-4/28 SUPPORT BEAM 1 OF 3
R-054 MDP-1.23-3-4/29 SUPPORT BEAM 2 OF 3
R-055 MDP-1.23-3-4/30 SUPPORT BEAM 3 OF 3
R-056 MDP-1.23-3-4/31 SUPPORT BEAM ANODE DETAILS
DOCUMENT 00 01 15.00 28 Page 11
R-057 MDP-1.23-3-4/32 INTAKE GATE HANDLING FOR
TRANSPORTATION
R-058 MDP-1.23-3-4/33 SWIVELING LIFTING BEAM
ASSEMBLY
R-059 MDP-1.23-3-4/34 GATE MODIFICATION
R-060 MDP-1.23-3-4/35 LIFTING BEAM AND DETAILS
R-061 MDP-1.23-3-4/36 MISCELLANEOUS DETAILS
R-062 MDP-1.23-6-0A70 EXISTING EQUIPMENT
R-063 MDP-1.23-6-9A24 CONTROL SCHEMATICS
R-064 MDP-1.23-6-9A51/1WIRING DIAGRAM SHEET 1
R-065 MDP-1.23-6-9A51/2WIRING DIAGRAM SHEET 2
R-066 MDP-1.23-6-1A9 CONDUIT AND WIRE
R-067 MDP-1.23-6-1A10 ELECTRICAL INSTALLATION
DETAILS
SUPPORT BEAM MODIFICATIONS (2008 CONTRACT DRAWINGS)
R-068 85-C-53-1 SERVICE STATION UNIT
HYDRAULIC CONTROL MANIFOLD
R-069 85-C-53-2 MAIN UNIT HYDRAULIC
CONTROL MANIFOLD
R-070 85-C-53-4 HYDRAULIC CONTROL PANEL -
ASSEMBLY DETAILS
R-071 85-C-53-5 HYDRAULIC CONTROL PANEL -
DIAGRAMS
R-072 85-C-53-6 HYDRAULIC CONTROL PANEL
SUPPORT AND DRIP PANS -
DETAILS
R-073 85-C-53-7 ELECTRICAL CONTROL PANEL
DETAIL
R-074 85-C-53-8 HYDRAULIC PUMPING UNIT
SHEET 1 OF 5
R-075 85-C-53-9 HYDRAULIC PUMPING UNIT
SHEET 2 OF 5
R-076 85-C-53-10 HYDRAULIC PUMPING UNIT
SHEET 3 OF 5
R-077 85-C-53-11 HYDRAULIC PUMPING UNIT
SHEET 4 OF 5
R-078 85-C-53-12 HYDRAULIC PUMPING UNIT
SHEET 5 OF 5
SUPPORT BEAM (ORIGINAL SHOP DRAWINGS)
DOCUMENT 00 01 15.00 28 Page 12
R-079 G-2885 GATE HOOK OPERATING
MECHANISM ASSEMBLY &
DETAILS
R-080 G-2887 SUPPORT BEAM POSITION
INDICATORS
R-081 G-2889 SUPPORT BEAM ASSEMBLY
R-082 G-2893 ROLLER BRACKET & BEAM
HOOK DETAILS
R-083 G-2894 SUPPORT BEAM DIAPHRAGM,
COVER & END PLATES
R-084 G-2896 GATE HOOK DETAILS
R-085 Z-460 SUPPORT BEAM FRAME
ASSEMBLY & DETAILS
R-086 310098-225 SUPPORT BEAM LATCHING
CYLINDER
SUPPORT BEAM MODIFICATIONS (2008 CONTRACT DRAWINGS)
R-087 MDP-1-3-15/36 EXISTING CONDITIONS -
REMOVAL AND PREP WORK
PLANS AND SECTIONS
R-088 MDP-1-3-15/37 EXISTING CONDITIONS -
REMOVAL AND PREP WORK
LOCKING PIN AND GUIDE
ASSEMBLY
R-089 MDP-1-3-15/38 MODIFICATIONS - NEW WORK -
PLANS AND SECTIONS
R-090 MDP-1-3-15/39 MODIFICATIONS - NEW WORK -
REINSTALL LOCKING PIN
GUIDE ASSEMBLY
R-091 MDP-1-3-15/40 MODIFICATIONS - NEW WORK -
ANODE REPLACEMENT
R-092 MDP-1-3-15/41 NEW STIFFENERS - SECTIONS
AND DETAILS
R-093 MDP-1-3-15/42 PINNING MODIFICATIONS
PART DETAILS 1
R-094 MDP-1-3-15/43 PINNING MODIFICATIONS
PART DETAILS 2
R-095 MDP-1-3-15/44 LUBRICATION SYSTEM
EXPLODED VIEW AND PARTS
R-096 MDP-1-3-15/45 LOCKING PIN INDICATOR
ASSEMBLY AND DETAILS
SUPPORT BEAM MODIFICATIONS (SHOP DRAWINGS)
R-097 21228 LATCHING PIN CYLINDER
R-098 KJBA26264V HEAD GATE BUSHING
R-099 KJBA26364V HEAD GATE BUSHING
INTAKE GATE HYDRAULIC CYLINDERS (SHOP DRAWINGS)
DOCUMENT 00 01 15.00 28 Page 13
R-100 51-V2-1 CYLINDER SUPPORT BASE
R-101 51-V2-4 CYLINDER BASE
R-102 51-V2-7 PISTON
R-103 51-V2-9 CYLINDER HEAD
R-104 51-V2-10 ROD HEAD COVER
R-105 51-V2-11 PISTON ROD HEAD, BODY
R-106 51-V2-13 PISTON ROD NUT
R-107 51-V2-15 PISTON ROD ASSEMBLY
R-108 51-V2-16 INSIDE TUBE AND COLLAR
R-109 51-V2-17 PACKING GLAND
R-110 51-V2-19 CYLINDER SEAL
R-111 51-V2-25/26/27 CYLINDER SHELL
R-112 51-V2-25 LOWER CYLINDER SECTION
R-113 51-V2-26 CENTER CYLINDER SECTION
R-114 51-V2-27 UPPER CYLINDER SECTION
R-115 53-V2-8 EXTRACTOR FOR OIL RETURN
TUBE
R-116 53-V2-9 WELDING SEQUENCE CYLINDER
TUBE TO FLANGES
R-117 53-V2-10 CYLINDER ASSEMBLY
R-118 53-V2-11 MATERIAL LIST AND MISC.
PARTS
R-119 53-V2-12 DETAILS OF MISC. PARTS
R-120 53-V2-13 DETAILS OF MISC. PARTS
R-121 53-V2-14 DETAILS OF CYLINDERS
R-122 53-V2-15 DETAILS - BOLTS, NUTS &
RETAINING RINGS
R-123 53-V2-16 CYLINDER DATA
R-124 53-V2-17 SUBASSEMBLIES AND MISC.
DETAILS
R-125 53-V2-1C PISTON ROD PLATING
INTAKE GATE DOGS (SHOP DRAWINGS)
R-126 10018-D DOG LIFTING DEVICE
ASSEMBLY & DETAILS
R-127 10048-D POSITION INDICATORS
ASSEMBLY & DETAILS
R-128 10128-C GATE DOG
DOCUMENT 00 01 15.00 28 Page 14
R-129 10129-B GATE DOG PIN & KEEPER
MCNARY DAM (GATE REPAIR PIT)
R-130 MDP-3-5-11/1 INTAKE GATE SUPPORTS IN
REPAIR PIT
R-131 MDP-3-5-11/3 GATE REPAIR PIT STEEL
SCAFFOLD 7' - 6"; WIDTH
R-132 MDP-3-5-11/4 GATE REPAIR PIT STEEL
SCAFFOLD 6' WIDTH
R-133 MDP-3-3-9/14 GATE REPAIR PIT PLAN -
R-134 MDP-1-4-0/1 STA 41+85.00 to sta 45 +
62.00 PLAN OF ROOF &
INTAKE DECK
R-135 MDP-1-4-0/6 STRUCTURAL PLANS EL
361.00 & 320.00
R-136 MDP-1-4-0/7 STRUCTURAL PLAN EL 287.00
R-137 MDP-2-4-0/1 ASSEMBLY BAY - INTAKE
PLAN - EL 361.00
R-138 MDP-2-4-0/2 ASSEMBLY BAY - INTAKE
PLANS - EL 333.00 & 346.00
R-139 MDP-2-4-0/5 ASSEMBLY BAY - INTAKE
PLAN - EL 287.00
MCNARY DAM (OIL STORAGE ROOM)
R-140 MDP-3-3-9/4 PIPING ARRANGEMENT - OIL
R-141 MDP-3-3-9/5 PIPING ARRANGEMENT - OIL
STORAGE ROOM SECTIONS &
DETAILS
1.5 RESOURCE DRAWINGS (R) VOLUME 2
These R drawings are included with the drawings for information only. The Government does not warrant the accuracy of the R drawings. The Government recommends that the Contractor verify the accuracy of R drawings.
Volume 2 Resource (R) drawings are as follows:
SHEET
NUMBER
FILE NUMBER DESCRIPTION Revision Number
Date
GENERAL POWERSHOUSE DRAWINGS, ISOPHASE, 115 & 230KV EQUIPMENT
R-001 7113E42 HIGH VOLTAGE DIV
PHILIDELPHIA WORKS
R-002 MDP-1.46-6-1E40/6 PLAN EL 267.5 BAYS 1 & 2 SU1
INSTALLATION
R-003 MDP-1-0-0/2 TRANSVERSE SECTION AT UNIT 1
TYPICAL FOR ALL MAIN UNITS
DOCUMENT 00 01 15.00 28 Page 15
R-004 MDP-1-6-7/2 STATION SURGE ARRESTORS
115KV AND 230KV INSTALLATION
DETAILS
R-005 MDP-1.001_E-601 SINGLE LINE DIAGRAM
EQUIPMENT INSTALLATION
R-006 MDP-2-2-6-1A5/1 230KV EQUIPMENT STEEL
STRUCTURE PLAN & SECTIONS
R-007 MDP-2.2-6-1A5/4 230KV EQUIPMENT UNITS 9-12
INSTALATION DETAILS
R-008 MDP-2.2-6-1A5/5 115KV EQUIPMENT UNITS 13-14
INSTALATION DETAILS
R-009 MDP-2.2-6-1E6/1 15 KV EQUIPMENT TYPICAL
EQUIPMENT LOCATION EL 267.5
AND EL 287 0
R-010 MDP-2.2-6-1E8/13 MAIN UNITS 1 THRU 8
INSTALLATION DETAILS EL
267.5, 274, 305, & 361
R-011 MDP1.52_E-103V1XX POWERHOUSE LAYOUT EQUIPMENT
PLAN EL. 287 MAIN UNITS 3&4
INSTALL
ONE-LINE & THREE-LINE DIAGRAMS
R-012 MDP1.52_E-600V1XX POWERHOUSE OVERVIEW ONE LINE
DIAGRAM INSTALL
R-013 MDP-1.001_E-602 ONE-LINE DIAGRAM MAIN AND
GSU TRANSFORMER INSTALL
R-014 MDP-1.001_E-603 THREE-LINE DIAGRAM GEN BKR &
15KV BUS INSTALL
R-015 MDP-1.001_E-604 THREE-LINE DIAGRAM EVEN
UNITS INSTALL
R-016 MDP-1.001_E-606 THREE-LINE DIAGRAM ODD UNITS
INSTALL
R-017 MDP-1.001_E-607 THREE-LINE DIAGRAM GEN
MANUAL SYNCH CKT INSTALL
R-018 MDP1.52_E-609V1XX 125 VDC (CE_2) POWER PANELS
INSTALL
MAIN UNIT SWITCHBOARDS
R-019 MDP1.52_E-621DV2X MU SWITCHBOARDS S_2 SHEET 4
WIRING & LAYOUT INSTALL
R-020 MDP1.52_E-621GV2X MU SWITCHBOARDS S_2 SHEET 7
WIRING & LAYOUT INSTALL
R-021 MDP1.52_E-622CV2X MU SWITCHBOARDS S_3 SHEET 3
WIRING & LAYOUT INSTALL
R-022 MDP1.52_E-622DV2X MU SWITCHBOARDS S_3 SHEET 4
WIRING & LAYOUT INSTALL
R-023 MDP1.52_E-622FV2X MU SWITCHBOARDS S_3 SHEET 6
WIRING & LAYOUT INSTALL
R-024 MDP1.52_E-624CV2X MU SWITCHBOARDS S_4 SHEET 3
WIRING & LAYOUT INSTALL
R-025 MDP1.52_E-624DV2X MU SWITCHBOARDS S_4 SHEET 4
WIRING & LAYOUT INSTALL
R-026 MDP1.52_E-624FV2X MU SWITCHBOARDS S_4 SHEET 6
WIRING & LAYOUT INSTALL
DOCUMENT 00 01 15.00 28 Page 16
R-027 MDP1.52_E-624HV2X MU SWITCHBOARDS S_4 SHEET 8
WIRING & LAYOUT INSTALL
R-028 MDP1.52_E-625BV2X MU SWITCHBOARDS S_R4 SHEET 2
WIRING & LAYOUT INSTALL
R-029 MDP1.52_E-625CV2X MU SWITCHBOARDS S_R4 SHEET 3
WIRING & LAYOUT INSTALL
R-030 MDP1.52_E-625DV2X MU SWITCHBOARDS S_R4 SHEET 4
WIRING & LAYOUT INSTALL
R-031 MDP1.52_E-628GV2X MU SWITCHBOARDS S_R6 SHEET 7
WIRING & LAYOUT INSTALL
R-032 MDP1.52_E-635DV2X MU SWITCHBOARDS SC_ SHEET 4
WIRING & LAYOUT INSTALL
R-033 MDP1.52_E-635EV2X MU SWITCHBOARDS SC_ SHEET 5
WIRING & LAYOUT INSTALL
R-034 MDP1.52_E-635FV2X MU SWITCHBOARDS SC_ SHEET 6
WIRING & LAYOUT INSTALL
R-035 MDP1.52_E-635HV2X MU SWITCHBOARDS SC_ SHEET 8
WIRING & LAYOUT INSTALL
R-036 MDP1.52_E-635JV2X MU SWITCHBOARDS SC_ SHEET 10
WIRING & LAYOUT INSTALL
RELAY TERMINAL UNITS
R-037 MDP1.52_E-638V1XX PORT RELAYING CONTROL SCH
GSU XFMR LOCKOUTS SHEET 2
INSTALL
R-038 MDP-1.52_E-654V1XXRTU DIGITAL INPUTS U1 SH 3
INSTALL
R-039 MDP1.52_E-703V1XX RTU1 UNIT 1 WIRING, ALL ODD
UNITS SIMILAR INSTALL
R-040 MDP1.52_E-704V1XX RTU1 UNIT 1 DIGITAL I/O
TERMINAL BLOCKS, ALL ODD
UNITS SIMILAR INSTALL
ROOF TOP SURGE ARRESTORS AND DISCONNEC GROUNDING MATS
R-041 MDP-1-6-7/2 STATION SURGE ARRESTORS
115KV AND 230KV INSTALLATION
DETAILS
R-042 SKET637 ROOF TOP DISCONNECT
GROUNDING MATS PLAN &
CQ MCCs ELEVATION & ONE-LINES (STATION SERVICE AS-BUILTS
R-043 SK-V6-174-E206A ELEVATION & ONE-LINE CQ12
480V MCC
R-044 SK-V6-179-E207 ELEVATION & ONE-LINE CQ22
480V MCC
R-045 SK-V6-180-E207A ELEVATION & ONE-LINE CQ32
480V MCC
R-046 SK-V6-184-E208A ELEVATION & ONE-LINE CQ52
480V MCC
R-047 SK-V6-188-E209 ELEVATION & ONE-LINE CQ62
480V MCC
R-048 SK-V6-190-E209A ELEVATION & ONE-LINE CQ72
480V MCC
DOCUMENT 00 01 15.00 28 Page 17
R-049 MDP-9-6-8/68 THREE LINE DIAGRAM UNITS 9-14
SCHEMATIC/CONNECTION WIRING DIAGRAMS
R-050 LNL9628-04, Sh 1 SCHEMATIC WIRING DIAGRAM
SHEET 1 (T7)
R-051 LNL9628-04, Sh 2 SCHEMATIC WIRING DIAGRAM
SHEET 2 (T7)
R-052 LNL9628-05, Sh 1 CONNECTION WIRING DIAGRAM
SHEET 1 (T7)
R-053 LNL9628-05, Sh 2 CONNECTION WIRING DIAGRAM
SHEET 2 (T7)
R-054 LNL9628-05, Sh 3 CONNECTION WIRING DIAGRAM
SHEET 3 (T7)
R-055 LNL962805, Sh 4 EXTERNALS CONNECTION WIRING
DIAGRAM SHEET 4 (T7)
R-056 LNL9629-04, Sh 1 SCHEMATIC WIRING DIAGRAM
SHEET 1 (T1 - T6)
R-057 LNL9629-04, Sh 2 SCHEMATIC WIRING DIAGRAM
SHEET 2 (T1 - T6)
R-058 LNL9629-05, Sh 1 CONNECTION WIRING DIAGRAM
SHEET 1 (T1 - T6)
R-059 LNL9629-05, Sh 2 CONNECTION WIRING DIAGRAM
SHEET 2 (T1 - T6)
R-060 LNL9629-05, Sh 3 CONNECTION WIRING DIAGRAM
SHEET 3 (T1 - T6)
R-061 LNL9629-05, Sh 4 EXTERNALS CONNECTION WIRING
DIAGRAM SHEET 4 (T1 - T6)
MAIN TRANSFORMERS SHOP DRAWINGS
R-062 MDP-1.38-3-9/7 MAIN TRANSFORMER T3
INSTALLATION DELUGE PIPING -
SINGLE VAULT
R-063 MDP-1.38-6-1A10/6 MAIN TRANSFORMER T3
INSTALLATION TRANSFORMER
CONTROL CABINET - DETAILS
AND CONNECTIONS
R-064 MDP138-3-9/9 MAIN TRANSFORMER T3
INSTALLATION DELUGE PIPING
DETAILS
R-065 XUL460010AIB, Sh
CUSTOMER OUTLINE SHEET 1
(T7)
R-066 XUL460010AIB, Sh
CUSTOMER OUTLINE SHEET 2
(T7)
R-067 XUL460010AIB, Sh
CUSTOMER OUTLINE SHEET 3 (T7)
R-068 XUL460010AIB, Sh
CUSTOMER OUTLINE SHEET 4 (T7)
R-069 XUL460010AIC, Sh
CUSTOMER OUTLINE SHEET 1 (T1
- T6)
R-070 XUL460010AIC, Sh
CUSTOMER OUTLINE SHEET 2 (T1
- T6)
R-071 XUL460010AIC, Sh
CUSTOMER OUTLINE SHEET 3 (T1
- T6)
DOCUMENT 00 01 15.00 28 Page 18
R-072 XUL460010AIC, Sh
CUSTOMER OUTLINE SHEET 4 (T1
- T6)
McNARY DISC SW KEY INTERLOCKS 1954 SHOP DWG
R-073 1-5449-0 McNARY DISC SW KEY
INTERLOCKS 1954 SHOP DWG
HIGH VOLTAGE DISCONNECT SWITCH SHOP DRAWINGS
R-074 WW-6109869 ARRANGEMENT DETAIL BUS
R-075 1-2670-0 DETAIL: BELL CRANK, 5" B.C.
R-076 1-3418-0 SINGLE POLE ASMB. TA-3A WITH
GRD. SW.
R-077 1-3467-1 ASMB: OUTBOARD BRG.
R-078 1-3468-0 ASMB: OUTBOARD BRG.
R-079 1-3524-0 ASMB: TA-3A GRD. BLADE
SUPPORT
R-080 1-5540-0 KEY INTERLOCK LOCATIONS FOR
230 KV SWITCHES
R-081 2-47-5 ASSEMBLY CONTROL HANDLE 2"
IPS PIPE
R-082 2-1123-1 ASSEMEBLY KIRK KEY TYPE
INTERLOCK
R-083 3-756-4 ASMB. HINGE MECHANISM, TA-3A
R-084 3-778-1 ASSEMBLY, CONTACT 5" B.C.
1200 AMP
R-085 3-807-2 SUB ASMB. SINGLE POLE TA-3A,
196 KV 1200A W/GR.SW
R-086 3-996-1 ASMB: TA-3A BASE, 196 KV
R-087 3-1502-0 RE-ARRANGEMENT OF 196 KV
SWITCH FOR UNITS 11 & 12
R-088 3-1503-0 RE-ARRANGEMENT OF 196 KV
SWITCH FOR UNITS 13 & 14
R-089 3-7150-0 ASMB. INTERLOCK FOR 2" IPS
ROTARY CONTROL
R-090 4-454-3 CONTROL MECHANISM & SWITCH
TA-3A 196 KV 1200A
R-091 MDP-2-2-6-7A0/5 GROUNDING SYSTEM - HIGH
VOLTAGE DISCONNECT AND
TRANSFORMER FOG SYSTEM
R-092 MDP-1.52_E-626D2VXMU SWITCHBOARD S_5 SHEET 4
WIRING & LAYOUT INSTALL
STEEL LATTICE STRUCTURE
R-093 MDP-2.1-5-0/102 230 KV SWITCH STRUCTURE
TRAVERSE BENTS
DOCUMENT 00 01 15.00 28 Page 19
R-094 85850-D 230 KV SWITCH STRUCTURE
DETAIL BEAN B1
R-095 89851-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B2
R-096 89852-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B15 & B17
R-097 89853-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B16
R-098 89854-D 230 KV SWITCH STRUCTURE
DETAIL COL IC LOWER SECTION
R-099 89855-D 230 KV SWITCH STRUCTURE
DETAIL COL '16" & "4C" TOP
SECTIONS
R-100 89856-D 230 KV SWITCH STRUCTURE
DETAIL BEAM G4
R-101 89857-D 230 KV SWITCH STRUCTURE
DETAIL BEAM G1, G3 & G5
R-102 89858-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B11L
R-103 89859-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B3 - B5 - B9
R-104 89860-D 230 KV SWITCH STRUCTURE
DETAIL BEAM G2 & G6
R-105 89861-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B7
R-106 89862-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B8
R-107 89863-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B12
R-108 89864-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B4-B6-B10
R-109 89865-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B13L
R-110 89866-D 230 KV SWITCH STRUCTURE
DETAIL BEAM B14
R-111 89867-D 230 KV SWITCH STRUCTURE TIE
BACK T1 DETAIL
R-112 89868-D 230 KV SWITCH STRUCTURE
DETAIL COL "4C" LOWER SECTION
R-113 89869-D 230 KV SWITCH STRUCTURE
DETAIL COL "3C" & "2C" LOWER
R-114 89870-D 230 KV SWITCH STRUCTURE
TIE-BACK T2 DETAIL
R-115 89871-D 230 KV SWITCH STRUCTURE
TIE-BACK T3 DETAIL
R-116 89872-D 230 KV SWITCH STRUCTURE
TIE-BACK T4 DETAIL
R-117 89873-D 230 KV SWITCH STRUCTURE
TIE-BACK T5 DETAIL
R-118 89874-D 230 KV SWITCH STRUCTURE
DETAILS OF COLUMNS 1A, 2A,
3A & 4A
DOCUMENT 00 01 15.00 28 Page 20
R-119 89875-D 230 KV SWITCH STRUCTURE TIE
BACK T6 DETAIL
R-120 89876-D 230 KV SWITCH STRUCTURE
DETAIL COL 3C & 2C UPPER
SECTION
R-121 89877-D 230 KV SWITCH STRUCTURE
DETAIL COL 1B, 2B, 3B & 4B
R-122 89878-D 230 KV SWITCH STRUCTURE
ERECTION
R-123 95898D 230 KV SWITCH STRUCTURE
DETAILS - BEAM B43
R-124 95914D 230 KV SWITCH STRUCTURE
PROPOSED SUBSTITUTIONS
R-125 MDP-1.3-5-0/48 230 KV SWITCH STRUCTURE
GENERAL ARRANGEMENT
R-126 MDP-1.3-5-0/49 230 KV SWITCH STRUCTURE
DETAILS - BEAMS B36 THRU B40
R-127 MDP-1.3-5-0/51 230 KV SWITCH STRUCTURE
DETAILS - BEAMS B18, B19,
B24, B25, & B26
R-128 MDP-1.3-5-0/52 230 KV SWITCH STRUCTURE
DETAILS - BEAMS B20 THRU
B23, & B27 THRU B32
R-129 MDP-1.3-5-0/53 230 KV SWITCH STRUCTURE
DETAILS - BEAMS B33, B34, &
B35
R-130 MDP-1.3-5-0/54 230 KV SWITCH STRUCTURE
COLUMN DETAILS - BENTS 5
THRU 8
R-131 MDP-1.3-5-0/55 230 KV SWITCH STRUCTURE
BEAMS - B41 THRU B45 & B50
THRU B52
R-132 MDP-1.3-5-0/56 230 KV SWITCH STRUCTURE
BEAMS - B46 THRU B49,
GIRDERS - G13 THRU G15
R-133 MDP-1.3-5-0/57 230 KV SWITCH STRUCTURE
COLUMN DETAILS - BENTS 9
THRU 12R-134 MDP-1.3-5-0/58 115 KV SW STRUCT. UNITS 13 &
14 GENERAL ARRANGEMENT
R-135 MDP-1.3-5-0/59 115 KV SW STRUCT. UNITS 13 &
14 FRAMING DETAILS B53
R-136 MDP-1.3-5-0/60 115 KV SW STRUCT. UNITS 13 &
14 FRAMING DETAILS G16 TO G21
R-137 MDP-1.3-5-0/61 115 KV SW STRUCT. UNITS 13 &
14 FRAMING DETAILS B54 TO
B59 INCL.
R-138 MDP-1.3-5-0/62 115 KV SW STRUCT. UNITS 13 &
14 COLUMN FRAMING DETAILS
DOCUMENT 00 01 15.00 28 Page 21
R-139 MDP-1.3-5-0/49 230 KV SWITCH STRUCTURE
DETAILS - BEAMS B36 THRU B40
R-140 MDP-1.3-5-0/50 230 KV SWITCH STRUCTURE
DETAILS - GIRDERS G7 THRU G12
R-141 MDP-1.3-5-0/51 230 KV SWITCH STRUCTURE
DETAILS - BEAMS B18, B19,
B24, B25, & B26
R-142 MDP-1.3-5-0/52 230 KV SWITCH STRUCTURE
BEAMS-B20 THRU B23 & B27
THRU B32
R-143 MDP-1.3-5-0/53 230 KV SWITCH STRUCTURE
DETAILS-BEAMS B33, B34, & B35
R-144 MDP-1.3-5-0/54 230 KV SWITCH STRUCTURE
COLUMN DETAILS-BENTS 5 THRU 8
R-145 MDP-1.3-5-0/55 230 KV SWITCH STRUCTURE
BEAMS-B41 THRU B45 & B50
THRU B52
R-146 MDP-1.3-5-0/56 230 KV SWITCH STRUCTURE
BEAMS-B46 THRU B49,
GIRDERS-G13 THRU G15
R-147 MDP-1.3-5-0/57 230 KV SWITCH STRUCTURE
COLUMN DETAILS-BENTS 9 THRU
R-148 MDP-1.3-5-0/58 115 KV SW. STRUCT. UNITS 13
& 14 GENERAL ARRANGEMENT
R-149 MDP-1.3-5-0/59 115 KV SW. STRUCT. UNITS 13
& 14 FRAMING DETAILS B53
R-150 MDP-1.3-5-0/60 115 KV SW. STRUCT. UNITS 13
& 14 FRAMING DETAILS G16 TO
G21
R-151 MDP-1.3-5-0/61 115 KV SW. STRUCT. UNITS 13
& 14 FRAMING DETAILS B54 TO
B59 INCL.
R-152 MDP-1.3-5-0/62 115 KV SW. STRUCT. UNITS 13
& 14 FRAMING DETAILS B54 TO
B59 INCL.
R-153 MDP-2.1-5-0/100 230 KV SWITCH STRUCTURE
GENERAL ARRANGEMENT
R-154 MDP-2.1-5-0/101 230 KV SWITCH STRUCTURE
LONGITUDINAL BENT
R-155 MDP-2.1-5-0/102 230 KV SWITCH STRUCTURE
TRANSVERSE BENTS
R-156 MDP-2.1-5-0/103 230 KV SWITCH STRUCTURE
FRAMING DETAILS B-15, B-16 &
B-17
DOCUMENT 00 01 15.00 28 Page 22
-- End of Document --
DOCUMENT 00 01 15.00 28 Page 23
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 RETAINAGE OF PAYMENT
1.2 INTAKE GATES PRE-MAIN UNIT OUTAGE CLINS
1.2.1 CLIN 0001 Pre-Main Unit Outage Hydraulic System Work
1.2.2 CLIN 0002 Rehabilitate Spare Intake Gate
1.2.2.1 CLIN 0002AA Rehabilitate Spare Intake Gate (Gate)
1.2.2.2 CLIN 0002AB Rehabilitate Spare Intake Gate (Hydraulic)
1.2.3 CLIN 0003 Additional Intake Gate Paint Repair
1.2.4 CLIN 0004 New Hydraulic Fluid For Pre-Main Unit Outage Work
1.2.5 CLIN 0005 First Station Service Outage
1.2.5.1 CLIN 0005AA Rehabilitate First Station Service Unit (Gate)
1.2.5.2 CLIN 0005AB Rehabilitate First Station Service Unit
(Hydraulic)
1.2.5.3 CLIN 0005AC New Hydraulic Fluid for First Station Service
Unit Outage
1.2.5.4 CLIN 0005AD Additional Intake Gate Paint Repair for First
Station Service Unit Outage
1.3 INTAKE GATES MAIN UNIT OUTAGE CLINS
1.3.1 CLIN 0006 Main Unit Outage One
1.3.1.1 CLIN 0006AA Rehabilitate First Main Unit of Main Unit
Outage One (Gate)
1.3.1.2 CLIN 0006AB Rehabilitate First Main Unit of Main Unit
Outage One (Hydraulic)
1.3.1.3 CLIN 0006AC Rehabilitate Second Main Unit of Main Unit
Outage One (Gate)
1.3.1.4 CLIN 0006AD Rehabilitate Second Main Unit of Main Unit
Outage One (Hydraulic)
1.3.1.5 CLIN 0006AE New Hydraulic Fluid for Main Unit Outage One
1.3.1.6 CLIN 0006AF Additional Intake Gate Paint Repair for Main
Unit Outage One
1.3.1.7 CLIN 0006AG Training
1.3.1.8 CLIN 0006AH Spare Parts
1.3.2 CLIN 0007 Main Unit Outage Two
1.3.2.1 CLIN 0007AA Rehabilitate First Main Unit of Main Unit
Outage Two (Gate)
1.3.2.2 CLIN 0007AB Rehabilitate First Main Unit of Main Unit
Outage Two (Hydraulic)
1.3.2.3 CLIN 0007AC Rehabilitate Second Main Unit of Main Unit
Outage Two (Gate)
1.3.2.4 CLIN 0007AD Rehabilitate Second Main Unit of Main Unit
Outage Two (Hydraulic)
1.3.2.5 CLIN 0007AE New Hydraulic Fluid for Main Unit Outage Two
1.3.2.6 CLIN 0007AF Additional Intake Gate Paint Repair for Main
Unit Outage Two
1.3.3 CLIN 0008 Main Unit Outage Three
SECTION 01 22 00.00 28 Page 1
1.3.3.1 CLIN 0008AA Rehabilitate First Main Unit of Main Unit Outage Three (Gate)
1.3.3.2 CLIN 0008AB Rehabilitate First Main Unit of Main Unit Outage Three (Hydraulic)
1.3.3.3 CLIN 0008AC Rehabilitate Second Main Unit of Main Unit Outage Three (Gate)
1.3.3.4 CLIN 0008AD Rehabilitate Second Main Unit of Main Unit Outage Three (Hydraulic)
1.3.3.5 CLIN 0008AE New Hydraulic Fluid for Main Unit Outage Three
1.3.3.6 CLIN 0008AF Additional Intake Gate Paint Repair for Main
Unit Outage Three
1.3.4 CLIN 0009 Main Unit Outage Four
1.3.4.1 CLIN 0009AA Rehabilitate First Main Unit of Main Unit
Outage Four (Gate)
1.3.4.2 CLIN 0009AB Rehabilitate First Main Unit of Main Unit
Outage Four (Hydraulic)
1.3.4.3 CLIN 0009AC Rehabilitate Second Main Unit of Main Unit
Outage Four (Gate)
1.3.4.4 CLIN 0009AD Rehabilitate Second Main Unit of Main Unit
Outage Four (Hydraulic)
1.3.4.5 CLIN 0009AE New Hydraulic Fluid for Main Unit Outage Four
1.3.4.6 CLIN 0009AF Additional Intake Gate Paint Repair for Main
Unit Outage Four
1.3.5 CLIN 0010 Main Unit Outage Five
1.3.5.1 CLIN 0010AA Rehabilitate First Main Unit of Main Unit
Outage Five (Gate)
1.3.5.2 CLIN 0010AB Rehabilitate First Main Unit of Main Unit
Outage Five (Hydraulic)
1.3.5.3 CLIN 0010AC Rehabilitate Second Main Unit of Main Unit
Outage Five (Gate)
1.3.5.4 CLIN 0010AD Rehabilitate Second Main Unit of Main Unit
Outage Five (Hydraulic)
1.3.5.5 CLIN 0010AE New Hydraulic Fluid for Main Unit Outage Five
1.3.5.6 CLIN 00010AF Additional Intake Gate Paint Repair for Main
Unit Outage Five
1.3.5.7 CLIN 0010AG Training
1.3.6 CLIN 0011 Main Unit Unit Outage Six
1.3.6.1 CLIN 0011AA Rehabilitate First Main Unit of Main Unit
Outage Six (Gate)
1.3.6.2 CLIN 0011AB Rehabilitate First Main Unit of Main Unit
Outage Six (Hydraulic)
1.3.6.3 CLIN 0011AC Rehabilitate Second Main Unit of Main Unit
Outage Six (Gate)
1.3.6.4 CLIN 0011AD Rehabilitate Second Main Unit of Main Unit
Outage Six (Hydraulic)
1.3.6.5 CLIN 0011AE New Hydraulic Fluid for Main Unit Outage Six
1.3.6.6 CLIN 0011AF Additional Intake Gate Paint Repair for Main
Unit Outage Six
1.3.7 CLIN 0012 Main Unit Outage Seven
1.3.7.1 CLIN 0012AA Rehabilitate First Main Unit of Main Unit
Outage Seven (Gate)
1.3.7.2 CLIN 0012AB Rehabilitate First Main Unit of Main Unit
Outage Seven (Hydraulic)
1.3.7.3 CLIN 0012AC Rehabilitate Second Main Unit of Main Unit
Outage Seven (Gate)
1.3.7.4 CLIN 0012AD Rehabilitate Second Main Unit of Main Unit
Outage Seven (Hydraulic)
1.3.7.5 CLIN 0012AE New Hydraulic Fluid for Main Unit Outage Seven
1.3.7.6 CLIN 0012AF Additional Intake Gate Paint Repair for Main
SECTION 01 22 00.00 28 Page 2
Unit Outage Seven
1.4 INTAKE GATES POST-MAIN UNIT OUTAGE CLINS
1.4.1 CLIN 0013 Post-Outage Hydraulic System Work
1.4.2 CLIN 0014 New Hydraulic Fluid for Post-Outage Work
1.4.3 CLIN 0015 Provide Spare Hydraulic Cylinders
1.4.4 CLIN 0016 Second Station Service Outage
1.4.4.1 CLIN 0016AA Rehabilitate Second Station Service Unit (Gate)
1.4.4.2 CLIN 0016AB Rehabilitate Second Station Service Unit
(Hydraulic)
1.4.4.3 CLIN 0016AC New Hydraulic Fluid for Second Station Service
Unit Outage
1.4.4.4 CLIN 0016AD Additional Intake Gate Paint Repair for Second
Station Service Unit Outage
1.5 ISOPHASE BUS SYSTEM WORK FOR UNITS 1 AND 2
1.5.1 CLIN 0017 Replace Line 1 230kV Disconnect Switch A490 and
Grounding Switch 7516
1.5.2 CLIN 0018 Provide 480 Volt - 240/120 Volt Step-Down Transformer and 120 Volt Load Center at MCC CQ12
1.5.3 CLIN 0019 Modify Sections of Existing 230kV Tubular Bus at Line
1.5.4 CLIN 0020 Replace 230kV Line 1 Surge Arresters on Existing
Pedestals
1.5.5 CLIN 0021 Replace 15kV Isolated-Phase Bus and Instrument
Transformers for Main Units 1 and 2
1.5.5.1 CLIN 0021AA Replace 15kV Isophase Bus and Instrument
Transformers from Delta 01 & 02 to Transformer T1
1.5.5.2 CLIN 0021AB Replace 15kV Isophase Bus and Instrument
Transformers from XJ01 to Delta 01 & 02
1.5.5.3 CLIN 0021AC Replace 15kV Isophase Bus and Instrument
Transformers from XJ02 to Delta 01 & 02
1.6 ISOPHASE BUS SYSTEM WORK FOR UNITS 3 AND 4
1.6.1 CLIN 0022 Replace Line 2 230kV Disconnect Switch A491 and
Grounding Switch 7517
1.6.2 CLIN 0023 Provide 480 Volt - 240/120 Volt Step-Down Transformer and 120 Volt Load Center at MCC CQ22
1.6.3 CLIN 0024 Modify Sections of Existing 230kV Tubular Bus at Line
1.6.4 CLIN 0025 Replace 230kV Line 2 Surge Arresters on Existing
Pedestals
1.6.5 CLIN 0026 Replace 15kV Isophase Bus And Instrument Transformers
For Main Units 3 And 4
1.6.5.1 CLIN 0026AA Replace 15kV Isophase Bus and Instrument
Transformers from Delta 03 & 04 to Transformer T2
1.6.5.2 CLIN 0026AB Replace 15kV Isophase Bus and Instrument
Transformers from XJ03 to Delta 03 & 04
1.6.5.3 CLIN 0026AC Replace 15kV Isophase Bus and Instrument
Transformers from XJ04 to Delta 03 & 04
1.7 ISOPHASE BUS SYSTEM WORK FOR UNITS 5 AND 6
1.7.1 CLIN 0027 Replace Line 3 230kV Disconnect Switch A492 and
Grounding Switch 7518.
1.7.2 CLIN 0028 Provide 480 Volt - 240/120 Volt Step-Down Transformer
And 120 Volt Load Center At MCC CQ32
1.7.3 CLIN 0029 Modify Sections of Existing 230kV Tubular Bus At Line
1.7.4 CLIN 0030 Replace 230Kv Line 3 Surge Arresters on Existing
Pedestals
1.7.5 CLIN 0031 Replace 15Kv Isolated-Phase Bus and Instrument
Transformers for Main Units 5 and 6
1.7.5.1 CLIN 0031AA Replace 15kV Isophase Bus and Instrument
SECTION 01 22 00.00 28 Page 3
Transformers from Delta 05 & 06 to Transformer T3
1.7.5.2 CLIN 0031AB Replace 15kV Isophase Bus and Instrument
Transformers from XJ05 to Delta 05 & 06
1.7.5.3 CLIN 0031AC Replace 15kV Isophase Bus and Instrument
Transformers from XJ06 to Delta 05 & 06
1.8 ISOPHASE BUS SYSTEM WORK FOR UNITS 7 AND 8
1.8.1 CLIN 0032 Replace Line 4 230kV Disconnect Switch A493 and
Grounding Switch 7519
1.8.2 CLIN 0033 Provide 480 Volt - 240/120 Volt Step-Down Transformer and 120 Volt Load Center at MCC CQ42
1.8.3 CLIN 0034 Modify Sections of Existing 230kV Tubular Bus at Line
1.8.4 CLIN 0035 Replace 230kV Line 4 Surge Arresters on Existing
Pedestals
1.8.5 CLIN 0036 Replace 15kV Isolated-Phase Bus and Instrument
Transformers for Main Units 7 and 8
1.8.5.1 CLIN 0036AA Replace 15kV Isophase Bus and Instrument
Transformers from Delta 07 & 08 to Transformer T4
1.8.5.2 CLIN 0036AB Replace 15kV Isophase Bus and Instrument
Transformers from XJ07 to Delta 07 & 08
1.8.5.3 CLIN 0036AC Replace 15kV Isophase Bus and Instrument
Transformers from XJ08 to Delta 07 & 08
1.9 ISOPHASE BUS SYSTEM WORK FOR UNITS 9 AND 10
1.9.1 CLIN 0037 Replace Line 5 230kV Disconnect Switch A494 and
Grounding Switch 7520
1.9.2 CLIN 0038 Provide 480 Volt - 240/120 Volt Step-Down Transformer and 120 Volt Load Center at MCC CQ52
1.9.3 CLIN 0039 Replace 230kV Line 5 Surge Arresters on Existing
Pedestals
1.9.4 CLIN 0040 Replace 15kV Isolated-Phase Bus and Instrument
Transformers for Main Units 9 and 10
1.9.4.1 CLIN 0040AA Replace 15kV Isophase Bus and Instrument
Transformers from Delta 09 & 10 to Transformer T5
1.9.4.2 CLIN 0040AB Replace 15kV Isophase Bus and Instrument
Transformers from XJ09 to Delta 09 & 10
1.9.4.3 CLIN 0040AC Replace 15kV Isophase Bus and Instrument
Transformers from XJ10 to Delta 09 & 10
1.10 ISOPHASE BUS SYSTEM WORK FOR UNITS 11 AND 12
1.10.1 CLIN 0041 Replace Line 5 230kV Disconnect Switch A495, and
Grounding Switch 7522
1.10.2 CLIN 0042 Provide 480 Volt - 240/120 Volt Step-Down
Transformer and 120 Volt Load Center at MCC CQ62
1.10.3 CLIN 0043 Replace 230kV Line 5 Surge Arresters on Existing
Pedestals
1.10.4 CLIN 0044 Replace 15kV Isolated-Phase (Isophase) Bus and
Instrument Transformers for Main Units 11 and 12
1.10.4.1 CLIN 0044AA Replace 15kV Isophase Bus and Instrument
Transformers from Delta 11 & 12 to Transformer T6
1.10.4.2 CLIN 0044AB Replace 15kV Isophase Bus and Instrument
Transformers from XJ11 to Delta 11 & 12
1.10.4.3 CLIN 0044AC Replace 15kV Isophase Bus and Instrument
Transformers from XJ12 to Delta 11 & 12
1.11 ISOPHASE BUS SYSTEM WORK FOR UNITS 13 AND 14
1.11.1 CLIN 0045 Replace Line 6 115kV Disconnect Switch B996 and
Grounding Switch 7521
1.11.2 CLIN 0046 Provide 480 Volt - 240/120 Volt Step-Down
Transformer and 120 Volt Load Center at MCC CQ72
1.11.3 CLIN 0047 Replace 115kV Line 6 Surge Arresters on Existing
Pedestals
SECTION 01 22 00.00 28 Page 4
1.11.4 CLIN 0048 Replace 15kV Isolated-Phase Bus and Instrument Transformers for Main Units 13 and 14
1.11.4.1 CLIN 0048AA Replace 15kV Isophase Bus and Instrument Transformers from Delta 13 & 14 to Transformer T7
1.11.4.2 CLIN 0048AB Replace 15kV Isophase Bus and Instrument Transformers from XJ13 to Delta 13 & 14
1.11.4.3 CLIN 0048AC Replace 15kV Isophase Bus and Instrument Transformers from XJ14 to Delta 13 & 14
1.12 CLIN 0049 ISOPHASE BUS SYSTEM TRAINING
1.13 CLIN 0050 ISOPHASE TUBULAR BUS AND STEEL LATTICE STRUCTURE
INSPECTIONS
1.13.1 CLIN 0050AA Isophase Tubular Bus and Steel Lattice Structure
Inspections for Units 1 & 2
1.13.2 CLIN 0050AB Isophase Tubular Bus and Steel Lattice Structure
Inspections for Units 3 & 4
1.13.3 CLIN 0050AC Isophase Tubular Bus and Steel Lattice Structure
Inspections for Units 5 & 6
1.13.4 CLIN 0050AD Isophase Tubular Bus and Steel Lattice Structure
Inspections for Units 7 & 8
1.13.5 CLIN 0050AE Isophase Tubular Bus and Steel Lattice Structure
Inspections for Units 9 &…