This document contains a solicitation for a construction contract opportunity and the related federal contract opportunity details. The solicitation is for the McNary Station Services Units Upgrade project located at McNary Dam in Umatilla County, Oregon. The work includes rehabilitation of Station Service Units 1 and 2, which are 3.75 MVA Francis hydro-generating units built in 1950, including replacing stator cores and windings, installing new brushless exciter systems, control circuits and monitoring equipment. The turbine work involves disassembly, inspection, refurbishment and replacement of components. The contract will be fixed price with a period of performance of 1000 calendar days from notice to proceed. The project value is estimated between $5-10 million. The solicitation response is due as outlined in the amended solicitation to be posted on Beta.Sam.gov on or about August 31, 2020. The contract will be unrestricted and utilize small business size standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit 2 Attendee List.pdf | ||
| Techspec_amend0008.pdf | ||
| Amendment 0007 21R0002.pdf | ||
| Amend 0006 21R0002.pdf | ||
| Amend 0005 21R0002.pdf | ||
| Amendment 0004 21R0002 MNA SS Unit.pdf | ||
| Amend 0003 21R002 MNA SS Unit Rehab.pdf | ||
| Site Visit Attendee List.pdf | ||
| Amendment 0002 21R0002.pdf | ||
| Amendment 0002 21R0002.pdf | ||
| Amendment 0001 21R0002.pdf | ||
| CDC and WA COVID 19 Active Screen Questionairre.pdf | ||
| 21R0002_Resource_Plans_Optimized.pdf | ||
| W912EF21R0002 MNA SS Units Upgrade.pdf | ||
| 21R0002_Resource_Plans2.pdf | ||
| 21R0002_Plans.pdf | ||
| 21R0002_Resource_Plans1.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV02401565
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the changes outlined below .
The proposal submission date remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Dec-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF21R0002
X 9B. DATED (SEE ITEM 11)
22-Sep-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Dec-2020
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
KARLYN HOLLAND
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF21R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMEND 0008
Summary of Changes Amendment 0008 McNary Powerhouse Station Service Units 1 & 2 Turbine and Generator Rehabilitation
Solicitation W912EF21R0002
Revised the following Solicitation Sections:
a. SECTION 00 70 00 CONDITIONS OF THE CONTRACT
i. Added solicitation provision 252.204-7019 , Notice of NIST SP 800-171 DoD Assessment
Requirements
ii. Added contract clause 252.204-7020 , NIST SP 800-171 DoD Assessment Requirements
iii. Added contract clause 252.204-7021 , Cybersecurity Maturity Model Certification Requirements
Revised the following Bid Schedule:
b. Added Optional CLIN 0313, Additional Bottom Ring Machining
Revised the following Specifications:
a. SECTION 01 22 00 28, “MEASUREMENT AND PAYMENT”
i. Added the following paragraph
1) 1.6.14, “Item No. 0313 Additional Bottom Ring Machining (Optional)”
See revised specification for details
Revised the following Drawings: N/A
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
BID SCHEDULE
Walla Walla District Corps of Engineers
MCNARY POWERHOUSE STATION SERVICE UNITS 1 & 2
TURBINE & GENERATOR REHABILITATION
The magnitude of construction is estimated to be between $5,000,000 and $10,000,000
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT
0100 Site Mobilization and Demobilization 1 JOB $_______ $_______
0101 Miscellaneous Hire Items 0101A Miscellaneous Welding EST 40 LBS $_______ $_______ 0101B Machinist Hire EST 40 HRS $_______ $_______ 0101C Electrician Hire EST 40 HRS $_______ $_______ 0101D Welding Services EST 40 HRS $_______ $_______ 0101E Painter Hire EST 40 HRS $_______ $_______ 0101F Other Skilled Craftsman Hire EST 40 HRS $_______ $_______ 0101G General Laborer Hire EST 40 HRS $_______ $_______ 0101H Liquid Penetrant Method EST 40 HRS $_______ $_______ 0101I Magnetic Particle Method EST 40 HRS $_______ $_______ 0101J Ultrasonic Method EST 40 HRS $_______ $_______ 0101K Weld Spraying EST 40 HRS $_______ $_______
BASIC ITEMS
SITE WORK AND STRUCTURAL UNIT 1
Generator Rotor and Shaft Combination Lifting Device
1 JOB $_______ $_______
Pre-Disassembly Investigation and Measurements
1 JOB $_______ $_______
Disassemble Turbine and Generator Unit and Inspect Components
1 JOB $_______ $_______
0105 Reassemble Generating Unit 1 JOB $_______ $_______
0106 Furnish Center Hole Jacking System 1 JOB $_______ $_______
Operational Testing After Reassembly of Generating Unit
1 JOB $_______ $_______
0108 Provide Turbine Maintenance Platform 1 JOB $_______ $_______
0109 Generator Stator Frame Lifting Devices 1 JOB $_______ $________
Special Tools, Handling Devices, and Temporary Scaffolding
1 JOB $_______ $_______
Disposal of old grease and grease systems and piping
1 JOB $_______ $_______
0112 Perform Lead-based Paint Abatement 1 JOB $_______ $_______
0113-0119 Reserved
MECHANICAL WORK UNIT 1
0120 New Wicket Gates 1 JOB $_______ $_______ 0121 Runner Refurbishment 1 JOB $_______ $_______
Furnish Upper and Lower Stationary and Rotating Wearing Rings
JOB $_______ $_______
0123 Headcover Refurbishment 1 JOB $_______ $_______ 0124 Bottom Ring Refurbishment 1 JOB $_______ $_______ 0125 Turbine Air Inlet Valve Refurbishment 1 JOB $_______ $_______
Furnish All Self-Lubricating Bushings and Bearing Plates
1 JOB $_______ $_______
0127 Replacement Head Cover Studs and Nuts 1 JOB $_______ $_______
Supply and Install Turbine Shaft Sleeve (Including Spare)
1 JOB $_______ $_______
0129 Operating Ring Refurbishment 1 JOB $_______ $_______
0130 Turbine Shaft Inspection 1 JOB $_______ $_______
0131 Machining of Turbine Shaft 1 JOB $_______ $_______
Wicket Gate Operating Mechanism Refurbishment
1 JOB $_______ $_______
0133 Gate Shaft Refurbishment 1 JOB $_______ $_______
Furnish Set of Wicket Gate Shear Pins (Including Spares)
1 JOB $_______ $_______
0135 Design and Provide Generator Air Coolers 1 JOB $_______ $_______
0136 Spare Generator Air Coolers 1 JOB $_______ $_______
Design and Provide Thrust Bearing Oil Coolers
1 JOB $_______ $_______
Draft Tube Vacuum Breaker Piping Replacement
1 JOB $_______ $_______
0139 Machining With Boring Bar 1 JOB $_______ $_______
Setup for Machining and Machining up to 0.020” of Stay Ring to Bottom Ring Mounting Flange
2 EA $_______ $_______
Setup for Machining and Machining up to 0.020” of Stay Ring to Head Cover Mounting Flanges
2 EA $_______ $_______
0142 Replace Runner Coupling Fasteners and Keys 1 JOB $_______ $_______ 0143 Generator Air Brake and Jacking System
Refurbishment
1 JOB $_______ $_______
0144 Inspect Generator Brake Rings 1 JOB $_______ $_______
0145 Inspect, Ship Equalizer Ring Assembly 1 JOB $_______ $_______
Provide New Teflon Faced PTFE Thrust Bearing Shoes, Including Spares
1 JOB $_______ $_______
Shipment and Refurbishment of Thrust Bearing Runner and Thrust Collar Including Resurface Running Faces, Resurface Mounting Faces, Furnish New Bolts/Hardware. (Includes One Spare)
1 JOB $_______ $_______
Inspect, Ship, and Refurbish Upper Generator Guide Bearing
1 JOB $_______ $_______
Inspect, Ship, Refurbish Lower Generator Guide Bearing
1 JOB $_______ $_______
Inspect, Ship, Refurbish Turbine Guide Bearing
1 JOB $_______ $_______
Inspect, Ship, Refurbish Turbine Guide Bearing, Spare Bearing
1 JOB $_______ $_______
Inspect Spare Upper Generator Guide Bearing
1 JOB $_______ $_______
Inspect, Spare Lower Generator Guide Bearing
1 JOB $_______ $_______
0154 Replace Turbine Pit Piping and Accessories 1 JOB $_______ $_______
Replace Main Cooling Water Piping and Valves
1 JOB $_______ $_______
0156-0169 Reserved
ELECTRICAL WORK UNIT 1 - GENERATOR
Design, Manufacture, and Perform Voltage Endurance Testing on 4 Prototype Coils
1 JOB $_______ $_______
Furnish Complete Set of Stator Coils Including Supplies and Accessories For A Complete New Wiring Including Factory Testing
1 JOB $_______ $_______
0172 Furnish Generator Spare Parts 1 JOB $_______ $_______
0173 Removing Abandoned Rotating Exciter Parts 1 JOB $_______ $_______
0174 Furnish and Install New Stator Core 1 JOB $_______ $_______
0175 Install and Test New Stator Core Winding 1 JOB $_______ $_______
Furnish and Install New Generator Terminal Box
1 JOB $_______ $_______
Clean and Inspect Rotor, Replace Rotor Field Leads, and Test Rotor Field Windings
1 JOB $_______ $_______
0178 Perform Special Field Tests 1 JOB $_______ $_______
Furnish Two Assembled Spare Pole Assemblies with Universal Connections
1 JOB $_______ $_______
Furnish and Install General Field Wiring, RTDs, Conduit, Gauges, and Switches
0181-0189 Reserved
ELECTRICAL WORK UNIT 1 - EXCITER
Design, Manufacture, Test and Deliver Systems and Appurtenances
1 JOB $_______ $_______
Disassemble and Remove Existing Excitation System
1 JOB $_______ $_______
Install and Test Excitation Systems and Appurtenances
1 JOB $_______ $_______
0193 Perform Special Factory Tests 1 JOB $_______ $_______
0194 Perform Special Field Tests 1 JOB $_______ $_______
0195 Furnish Special Tools and Spare Parts 1 JOB $_______ $_______
0196 Provide Training 1 JOB $_______ $_______
Perform Model Validation Testing and Provide Reports
1 JOB $_______ $_______
0198 Concrete Removal and Repair 1 JOB $_______ $_______
0199 Reserved
SITE WORK AND STRUCTURAL UNIT 2
Pre-Disassembly Investigation and Measurements
1 JOB $_______ $_______
Disassemble Generator Unit and Inspect Components
1 JOB $_______ $_______
0202 Reassemble Generating Unit 1 JOB $_______
Disposal of Old Grease and Grease Systems and Piping
1 JOB $_______ $_______
Operational Testing After Reassembly of Generating Unit
1 JOB $_______ $_______
0205 Below-the-Hook Lifting Devices 1 JOB $_______ $_______
0206 Perform Lead-based Paint Abatement 1 JOB $_______ $_______
0207-0210 Reserved
MECHANICAL WORK UNIT 2
0211 New Wicket Gates 1 JOB $_______ $_______ 0212 Runner Refurbishment 1 JOB $_______ $_______
Furnish Upper and Lower Stationary and Rotating Wearing Rings
1 JOB $_______ $_______
0214 Headcover Refurbishment 1 JOB $_______ $_______ 0215 Bottom Ring Refurbishment 1 JOB $_______ $_______ 0216 Turbine Air Inlet Valve Refurbishment 1 JOB $_______ $_______
Furnish All Self-Lubricating Bushings and Bearing Plates
1 JOB $_______ $_______
0218 Replacement Head Cover Studs and Nuts 1 JOB $_______ $_______ 0219 Supply and Install Turbine Shaft Sleeve 1 JOB $_______ $_______ 0220 Operating Ring Refurbishment 1 JOB $_______ $_______ 0221 Turbine Shaft Inspection 1 JOB $_______ $_______ 0222 Machining of Turbine Shaft 1 JOB $_______ $_______
Wicket Gate Operating Mechanism Refurbishment
1 JOB $_______ $_______
0224 Gate Shaft Refurbishment 1 JOB $_______ $_______ 0225 Furnish Set of Wicket Gate Shear Pins 1 JOB $_______ $_______ 0226 Design and Provide Generator Air Coolers 1 JOB $_______ $_______
Design and Provide Thrust Bearing Oil Coolers
1 JOB $_______ $_______
Draft Tube Vacuum Breaker Piping Replacement
1 JOB $_______ $_______
0229 Machining with Boring Bar 1 JOB $_______ $_______
Setup for Machining and Machining up to 0.020” of Stay Ring to Bottom Ring Mounting Flange
2 EA $_______ $_______
Setup for Machining and Machining up to 0.020” of Stay Ring to Head Cover Mounting Flanges
2 EA $_______ $_______
0232 Replace Runner Coupling Fasteners and Key 1 JOB $_______ $_______
Generator Air Brake and Jacking system Refurbishment
1 JOB $_______ $_______
0234 Inspect Generator Brake Rings 1 JOB $_______ $_______ 0235 Inspect, Ship Equalizer Ring Assembly 1 JOB $_______ $_______
Provide New Teflon Faced PTFE Thrust Bearing Shoes
1 JOB $_______ $_______
Shipment and Refurbishment of Thrust Bearing Runner and Thrust Collar Including Resurface Running Faces, Resurface Mounting Faces, Furnish New Bolts/Hardware
1 JOB $_______ $_______
Inspect, Ship, and Refurbish Upper Generator Guide Bearing
1 JOB $_______ $_______
Inspect, Ship, and Refurbish Lower Generator Guide Bearing
1 JOB $_______ $_______
Inspect, Ship, and Refurbish Turbine Guide Bearing
1 JOB $_______ $_______
0241 Replace Turbine Pit Piping and Accessories 1 JOB $_______ $_______
Replace Main Cooling Water Piping and Valves
0243-0253 Reserved
ELECTRICAL WORK UNIT 2 - GENERATOR
Furnish Complete Set of Stator Coils Including Supplies and Accessories For A Complete New Winding Including Factory Testing
1 JOB $_______ $_______
0255 Removing Abandoned Rotating Exciter Parts 1 JOB $_______ $_______ 0256 Furnish and Install New Stator Core 1 JOB $_______ $_______ 0257 Install and Test New Stator Winding 1 JOB $_______ $_______
Furnish and Install New Generator Terminal Box
1 JOB $_______ $_______
Clean and Inspect Rotor, Replace Rotor Field Leads, and Test Rotor Field Windings
1 JOB $_______ $_______
Furnish and Install General Field Wiring, RTDs, Conduit, Gauges, and Switches
0261-0269 Reserved
ELECTRICAL WORK UNIT 2 - EXCITER
Design, Manufacture, Test, and Deliver Rotating Brushless Excitation Systems and Appurtenances
1 JOB $_______ $_______
Disassemble and Remove Existing Excitation System
1 JOB $_______ $_______
Install and Test Rotating Brushless Excitation Systems and Appurtenances
0273 Perform Special Factory Tests 1 JOB $_______ $_______
0274 Perform Special Field Tests 1 JOB $_______ $_______ 0275 Not Used 0276 Concrete Removal and Repair 1 JOB $_______ $_______ 0277-0299 Reserved
BASE ITEMS TOTAL $__________
OPTIONAL ITEMS
0300 Reinsulate Rotor Field Pole Assemblies with
Class F Insulation (Optional)
EST 52 EACH $_______ $_______
03001 Generator Brake Ring Refurbishment (Optional)
EST 2 EACH $_______ $_______
0302 Additional Stay Ring to Head Cover Mounting Surface Machining, .010" (Optional)
EST 4 EACH $_______ $_______
0303 Additional Stay Ring to Bottom Ring Flange Machining, .010” (Optional)
EST 4 EACH $_______ $_______
0304 Additional Head Cover to Stay Ring Flange Machining, .010" (Optional)
EST 4 EACH $_______ $_______
0305 Collector Ring Refurbishment (Optional) EST 2 PAIRS $_______ $_______ 0306 Collector Ring Replacement (Optional) EST 2 PAIRS $_______ $_______ 0307 Brush Rigging Refurbishment (Optional) EST 2 EACH $_______ $_______ 0308 Exciter Shaft Refurbishment (Optional) EST 2 EACH $_______ $_______ 0309 Furnish and Install PDA System (Optional) EST 2 EACH $_______ $_______ 0310 Brush Rigging Replacement (Optional) EST 2 EACH $_______ $_______ 0311 Exciter Shaft Replacement (Optional) EST 2 EACH $_______ $_______ 0312 PMG 360 Degree Platform Installation
(Optional)
EST 2 EACH $_______ $_______
0313 Additional Bottom Ring Machining (Optional)
EST 4 EACH $_______ $_______
OPTIONAL ITEMS TOTAL $__________
SCHEDULE TOTAL $__________
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
Funds are not presently available for this acquisition. No contract award will be made until funds are made available.
U/M = Unit of Measure U/P = Unit Price NTE = Not To Exceed Est = Estimated
Quantities identified as Estimated (“Est”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN ESTIMATED QUANTITY, located in Section 00 70 00.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by reference:
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.204-7021 Contractor Compliance with the Cybersecurity Maturity
Model Certification Level Requirement
NOV 2020
(End of Summary of Changes)
File details come from the government source that posted it. Updated .