W912EF21R0002 MNA SS Units Upgrade.pdf
PDF 9 MB Posted
- Attached to
- McNary Station Services Units Upgrade
- Solicitation number
- W912EF21R0002
About this file
This federal contract opportunity notice describes a construction project to upgrade two station service units at McNary Dam in Umatilla County, Oregon. The project involves mobilization, pre-disassembly tests and measurements, turbine-generator unit disassembly and rehabilitation, replacement of stator cores and windings, new brushless exciter systems, control systems upgrades, and reassembly. The mechanical scope includes turbine disassembly, component inspection and repairs, bushing and seal replacements, and reassembly. The magnitude is estimated between $5-10 million. The acquisition will use best value tradeoff source selection and result in a fixed price contract. The response date will be in the solicitation posted around August 31, 2020 to Beta.sam.gov. Security clearance is required for foreign nationals to attend the scheduled site visit occurring approximately two weeks after solicitation posting.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV02401565
CONSTRUCTION PROJECT: MCNARY STATION SERVIES UNITS UPGRADE
HILLARY A MORGAN 509-527-7214
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Sep-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________Section 00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________22 Oct 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
509-527-7802FAX:TEL: 509-527-7214 TEL: FAX:
W912EF21R0002 79
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 01 10 - Table of Contents
INDEX
Section 00 10 00, Solicitation Contract Form Section 00 21 00, Instructions Section 00 45 00, Representations and Certifiations Section 00 70 00, Conditions of the Contract Section 00 73 00, Supplementary Conditions Technical Specifications Drawings
Section 00 21 00 - Instructions
ATTENTION TO OFFERORS
The successful offeror must provide the following information upon request to assist in the Contracting Officer’s determination of contractor responsibility.
QUALIFICATIONS
1. Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal year and certified by an officer of the company.
2. The name of your banking firm, telephone number and the name of the individual to contact for a line-of-credit reference.
Banking Institution ______________________________________________
Telephone Number ______________________________________________
Person to Contact ______________________________________________
Email Address ______________________________________________
3. Tax Identification Number ___________________________________
4. Years of experience (in the field of the proposed work)._______________________ Indicate similarity of work currently under way to work required for this project.
5. List of present work to include agency or firm name, address, telephone number and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
6. List of previous work to include agency or firm name, address, telephone number and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
7. Percentage of work under this contract to be subcontracted _______________ %
Return completed form with all attachments via email to:
Hillary Morgan Contracting Division Hillary.A.Morgan@usace.army.mil
NPW FL 118 (Rev Oct 2009) mailto:Hillary.A.Morgan@usace.army.mil
Walla Walla District Corps of Engineers
MCNARY POWERHOUSE STATION SERVICE UNITS 1 & 2
TURBINE & GENERATOR REHABILITATION
The magnitude of construction is estimated to be between $5,000,000 and $10,000,000
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT
0100 Site Mobilization and Demobilization 1 JOB $_______ $_______ 0101 Miscellaneous Hire Items 0101A Miscellaneous Welding EST 40 LBS $_______ $_______ 0101B Machinist Hire EST 40 HRS $_______ $_______ 0101C Electrician Hire EST 40 HRS $_______ $_______ 0101D Welding Services EST 40 HRS $_______ $_______ 0101E Painter Hire EST 40 HRS $_______ $_______ 0101F Other Skilled Craftsman Hire EST 40 HRS $_______ $_______ 0101G General Laborer Hire EST 40 HRS $_______ $_______ 0101H Liquid Penetrant Method EST 40 HRS $_______ $_______ 0101I Magnetic Particle Method EST 40 HRS $_______ $_______ 0101J Ultrasonic Method EST 40 HRS $_______ $_______ 0101K Weld Spraying EST 40 HRS $_______ $_______
BASIC ITEMS
SITE WORK AND STRUCTURAL UNIT 1
Generator Rotor and Shaft Combination Lifting Device 1 JOB $_______ $_______
0103 Pre-Disassembly Investigation and Measurements 1 JOB $_______ $_______
0104 Disassemble Turbine and Generator Unit and Inspect Components 1 JOB $_______ $_______
0105 Reassemble Generating Unit 1 JOB $_______ $_______ 0106 Furnish Center Hole Jacking System 1 JOB $_______ $_______
0107 Operational Testing After Reassembly of Generating Unit 1 JOB $_______ $_______
0108 Provide Turbine Maintenance Platform 1 JOB $_______ $_______ 0109 Generator Stator Frame Lifting Devices 1 JOB $_______ $________
0110 Special Tools, Handling Devices, and Temporary Scaffolding 1 JOB $_______ $_______
0111 Disposal of old grease and grease systems and piping 1 JOB $_______ $_______
0112 Perform Lead-based Paint Abatement 1 JOB $_______ $_______ 0113-0119 Reserved
MECHANICAL WORK UNIT 1
0120 New Wicket Gates 1 JOB $_______ $_______ 0121 Runner Refurbishment 1 JOB $_______ $_______
0122 Furnish Upper and Lower Stationary and Rotating Wearing Rings
1 JOB $_______ $_______
0123 Headcover Refurbishment 1 JOB $_______ $_______ 0124 Bottom Ring Refurbishment 1 JOB $_______ $_______ 0125 Turbine Air Inlet Valve Refurbishment 1 JOB $_______ $_______
0126 Furnish All Self-Lubricating Bushings and Bearing Plates 1 JOB $_______ $_______
0127 Replacement Head Cover Studs and Nuts 1 JOB $_______ $_______
0128 Supply and Install Turbine Shaft Sleeve (Including Spare) 1 JOB $_______ $_______
0129 Operating Ring Refurbishment 1 JOB $_______ $_______ 0130 Turbine Shaft Inspection 1 JOB $_______ $_______ 0131 Machining of Turbine Shaft 1 JOB $_______ $_______
0132 Wicket Gate Operating Mechanism Refurbishment 1 JOB $_______ $_______
0133 Gate Shaft Refurbishment 1 JOB $_______ $_______
0134 Furnish Set of Wicket Gate Shear Pins (Including Spares) 1 JOB $_______ $_______
0135 Design and Provide Generator Air Coolers 1 JOB $_______ $_______ 0136 Spare Generator Air Coolers 1 JOB $_______ $_______
0137 Design and Provide Thrust Bearing Oil Coolers 1 JOB $_______ $_______
0138 Draft Tube Vacuum Breaker Piping Replacement 1 JOB $_______ $_______
0139 Machining With Boring Bar 1 JOB $_______ $_______
Setup for Machining and Machining up to 0.020” of Stay Ring to Bottom Ring Mounting Flange
2 EA $_______ $_______
Setup for Machining and Machining up to 0.020” of Stay Ring to Head Cover Mounting Flanges
2 EA $_______ $_______
0142 Replace Runner Coupling Fasteners and Keys 1 JOB $_______ $_______ 0143 Generator Air Brake and Jacking System
Refurbishment 1 JOB $_______ $_______
0144 Inspect Generator Brake Rings 1 JOB $_______ $_______ 0145 Inspect, Ship Equalizer Ring Assembly 1 JOB $_______ $_______
0146 Provide New Teflon Faced PTFE Thrust Bearing Shoes, Including Spares 1 JOB $_______ $_______
Shipment and Refurbishment of Thrust Bearing Runner and Thrust Collar Including Resurface Running Faces, Resurface Mounting Faces, Furnish New Bolts/Hardware. (Includes One Spare)
1 JOB $_______ $_______
0148 Inspect, Ship, and Refurbish Upper Generator Guide Bearing 1 JOB $_______ $_______
0149 Inspect, Ship, Refurbish Lower Generator Guide Bearing 1 JOB $_______ $_______
0150 Inspect, Ship, Refurbish Turbine Guide Bearing 1 JOB $_______ $_______
0151 Inspect, Ship, Refurbish Turbine Guide Bearing, Spare Bearing 1 JOB $_______ $_______
0152 Inspect Spare Upper Generator Guide Bearing 1 JOB $_______ $_______
0153 Inspect, Spare Lower Generator Guide Bearing 1 JOB $_______ $_______
0154 Replace Turbine Pit Piping and Accessories 1 JOB $_______ $_______
0155 Replace Main Cooling Water Piping and Valves 1 JOB $_______ $_______
0156-0169 Reserved
ELECTRICAL WORK UNIT 1 - GENERATOR
0170 Design, Manufacture, and Perform Voltage Endurance Testing on 4 Prototype Coils 1 JOB $_______ $_______
Furnish Complete Set of Stator Coils Including Supplies and Accessories For A Complete New Wiring Including Factory Testing
1 JOB $_______ $_______
0172 Furnish Generator Spare Parts 1 JOB $_______ $_______ 0173 Removing Abandoned Rotating Exciter Parts 1 JOB $_______ $_______ 0174 Furnish and Install New Stator Core 1 JOB $_______ $_______
0175 Install and Test New Stator Core Winding 1 JOB $_______ $_______
0176 Furnish and Install New Generator Terminal Box 1 JOB $_______ $_______
0177 Clean and Inspect Rotor, Replace Rotor Field Leads, and Test Rotor Field Windings 1 JOB $_______ $_______
0178 Perform Special Field Tests 1 JOB $_______ $_______
0179 Furnish Two Assembled Spare Pole Assemblies with Universal Connections 1 JOB $_______ $_______
0180 Furnish and Install General Field Wiring, RTDs, Conduit, Gauges, and Switches 1 JOB $_______ $_______
0181-0189 Reserved
ELECTRICAL WORK UNIT 1 - EXCITER
0190 Design, Manufacture, Test and Deliver Systems and Appurtenances 1 JOB $_______ $_______
0191 Disassemble and Remove Existing Excitation System 1 JOB $_______ $_______
0192 Install and Test Excitation Systems and Appurtenances 1 JOB $_______ $_______
0193 Perform Special Factory Tests 1 JOB $_______ $_______
0194 Perform Special Field Tests 1 JOB $_______ $_______
0195 Furnish Special Tools and Spare Parts 1 JOB $_______ $_______
0196 Provide Training 1 JOB $_______ $_______
0197 Perform Model Validation Testing and Provide Reports 1 JOB $_______ $_______
0198 Concrete Removal and Repair 1 JOB $_______ $_______
0199 Reserved
SITE WORK AND STRUCTURAL UNIT 2
0200 Pre-Disassembly Investigation and Measurements 1 JOB $_______ $_______
0201 Disassemble Generator Unit and Inspect Components 1 JOB $_______ $_______
0202 Reassemble Generating Unit 1 JOB $_______
0203 Disposal of Old Grease and Grease Systems and Piping 1 JOB $_______ $_______
0204 Operational Testing After Reassembly of Generating Unit 1 JOB $_______ $_______
0205 Below-the-Hook Lifting Devices 1 JOB $_______ $_______
0206 Perform Lead-based Paint Abatement 1 JOB $_______ $_______ 0207-0210 Reserved
MECHANICAL WORK UNIT 2
0211 New Wicket Gates 1 JOB $_______ $_______ 0212 Runner Refurbishment 1 JOB $_______ $_______
0213 Furnish Upper and Lower Stationary and Rotating Wearing Rings 1 JOB $_______ $_______
0214 Headcover Refurbishment 1 JOB $_______ $_______ 0215 Bottom Ring Refurbishment 1 JOB $_______ $_______ 0216 Turbine Air Inlet Valve Refurbishment 1 JOB $_______ $_______
0217 Furnish All Self-Lubricating Bushings and Bearing Plates 1 JOB $_______ $_______
0218 Replacement Head Cover Studs and Nuts 1 JOB $_______ $_______ 0219 Supply and Install Turbine Shaft Sleeve 1 JOB $_______ $_______ 0220 Operating Ring Refurbishment 1 JOB $_______ $_______ 0221 Turbine Shaft Inspection 1 JOB $_______ $_______ 0222 Machining of Turbine Shaft 1 JOB $_______ $_______
0223 Wicket Gate Operating Mechanism Refurbishment 1 JOB $_______ $_______
0224 Gate Shaft Refurbishment 1 JOB $_______ $_______ 0225 Furnish Set of Wicket Gate Shear Pins 1 JOB $_______ $_______ 0226 Design and Provide Generator Air Coolers 1 JOB $_______ $_______
0227 Design and Provide Thrust Bearing Oil Coolers 1 JOB $_______ $_______
0228 Draft Tube Vacuum Breaker Piping Replacement 1 JOB $_______ $_______
0229 Machining with Boring Bar 1 JOB $_______ $_______
Setup for Machining and Machining up to 0.020” of Stay Ring to Bottom Ring Mounting Flange
2 EA $_______ $_______
Setup for Machining and Machining up to 0.020” of Stay Ring to Head Cover Mounting Flanges
2 EA $_______ $_______
0232 Replace Runner Coupling Fasteners and Key 1 JOB $_______ $_______
0233 Generator Air Brake and Jacking system Refurbishment 1 JOB $_______ $_______
0234 Inspect Generator Brake Rings 1 JOB $_______ $_______ 0235 Inspect, Ship Equalizer Ring Assembly 1 JOB $_______ $_______
0236 Provide New Teflon Faced PTFE Thrust Bearing Shoes 1 JOB $_______ $_______
Shipment and Refurbishment of Thrust Bearing Runner and Thrust Collar Including Resurface Running Faces, Resurface Mounting Faces, Furnish New Bolts/Hardware
1 JOB $_______ $_______
0238 Inspect, Ship, and Refurbish Upper Generator Guide Bearing 1 JOB $_______ $_______
0239 Inspect, Ship, and Refurbish Lower Generator Guide Bearing 1 JOB $_______ $_______
0240 Inspect, Ship, and Refurbish Turbine Guide Bearing 1 JOB $_______ $_______
0241 Replace Turbine Pit Piping and Accessories 1 JOB $_______ $_______
0242 Replace Main Cooling Water Piping and Valves 1 JOB $_______ $_______
0243-0253 Reserved
ELECTRICAL WORK UNIT 2 - GENERATOR
Furnish Complete Set of Stator Coils Including Supplies and Accessories For A Complete New Winding Including Factory Testing
1 JOB $_______ $_______
0255 Removing Abandoned Rotating Exciter Parts 1 JOB $_______ $_______ 0256 Furnish and Install New Stator Core 1 JOB $_______ $_______ 0257 Install and Test New Stator Winding 1 JOB $_______ $_______
0258 Furnish and Install New Generator Terminal Box 1 JOB $_______ $_______
0259 Clean and Inspect Rotor, Replace Rotor Field Leads, and Test Rotor Field Windings 1 JOB $_______ $_______
0260 Furnish and Install General Field Wiring, RTDs, Conduit, Gauges, and Switches 1 JOB $_______ $_______
0261-0269 Reserved
ELECTRICAL WORK UNIT 2 - EXCITER
Design, Manufacture, Test, and Deliver Rotating Brushless Excitation Systems and Appurtenances
1 JOB $_______ $_______
0271 Disassemble and Remove Existing Excitation System 1 JOB $_______ $_______
0272 Install and Test Rotating Brushless Excitation Systems and Appurtenances 1 JOB $_______ $_______
0273 Perform Special Factory Tests 1 JOB $_______ $_______ 0274 Perform Special Field Tests 1 JOB $_______ $_______ 0275 Not Used 0276 Concrete Removal and Repair 1 JOB $_______ $_______ 0277-0299 Reserved
BASE ITEMS TOTAL $__________
OPTIONAL ITEMS
0300 Reinsulate Rotor Field Pole Assemblies with
Class F Insulation (Optional) EST 52 EACH $_______ $_______
03001 Generator Brake Ring Refurbishment (Optional) EST 2 EACH $_______ $_______
0302 Additional Stay Ring to Head Cover Mounting Surface Machining, .010" (Optional)
EST 4 EACH $_______ $_______
0303 Additional Stay Ring to Bottom Ring Flange Machining, .010” (Optional) EST 4 EACH $_______ $_______
0304 Additional Head Cover to Stay Ring Flange Machining, .010" (Optional) EST 4 EACH $_______ $_______
0305 Collector Ring Refurbishment (Optional) EST 2 PAIRS $_______ $_______ 0306 Collector Ring Replacement (Optional) EST 2 PAIRS $_______ $_______ 0307 Brush Rigging Refurbishment (Optional) EST 2 EACH $_______ $_______ 0308 Exciter Shaft Refurbishment (Optional) EST 2 EACH $_______ $_______ 0309 Furnish and Install PDA System (Optional) EST 2 EACH $_______ $_______ 0310 Brush Rigging Replacement (Optional) EST 2 EACH $_______ $_______ 0311 Exciter Shaft Replacement (Optional) EST 2 EACH $_______ $_______ 0312 PMG 360 Degree Platform Installation
(Optional) EST 2 EACH $_______ $_______
OPTIONAL ITEMS TOTAL $__________
SCHEDULE TOTAL $__________
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
Funds are not presently available for this acquisition. No contract award will be made until funds are made available.
U/M = Unit of Measure U/P = Unit Price NTE = Not To Exceed Est = Estimated
Quantities identified as Estimated (“Est”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN ESTIMATED QUANTITY, located in Section 00 70 00.
A. BASIS FOR AWARD
The award will be made based on the best overall (i.e., best value-tradeoff) proposal that is determined to be the most beneficial to the Government, based on an integrated assessment, with appropriate consideration given to the presented Experience, Work Plan, Small Business Participation, Past Performance and Price.
Factor 1, Experience and Factor 3, Past Performance are approximately equal in importance and more important than Factor 2, Work Plan. Factors 1, 2 and 3 are more important than Factor 4, Small Business Participation. When combined, the non-price factors (Factors 1 through 4) are significantly more important than Factor 5, Price.
However, as proposals become more equal in technical (non-price) merit, the evaluated price will be considered more important in determining the best value proposal.
The following paragraphs B through E cover the Factors to be evaluated, the evaluation approach for each Factor to include factor rating tables, proposal submission requirements and final discussion guidance.
B. FACTORS TO BE EVALUATED
The following evaluation factors will be used to evaluate each proposal.
FACTOR 1 Experience – The evaluation of the Experience Factor will be comprised of three (3) Sub-Factors.
Information provided by the offeror in support of each sub-factor will be evaluated based on its relevance to the Scope of Work. An overall rating for Factor 1 Experience will be based on the merits of each sub-factor. There is not a specified page limit for the Experience Sub-Factors, but offerors are encouraged to be clear and concise in providing the information requested.
Risk will be evaluated as one aspect of the experience evaluation, inherent in the experience evaluation factor or sub-factor ratings. Risk assesses the degree to which the offerors proposed experience approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section.
During evaluation of each proposal, the Government will assign each sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.
Subfactor A: Generator Stator Rewind Experience Subfactor B: Turbine Refurbishment Experience Subfactor C: Rotating Brushless Excitation System Design, Manufacturing, and Installation Experience The three (3) Experience subfactors are of equal importance.
FACTOR 2 Work Plan – Each offeror’s proposal will be evaluated to determine the degree to which the work plan demonstrates an understanding of the required scope and the offeror’s capabilities and availability of resources to complete all requirements of the solicitation. The evaluation will consider strengths, weaknesses, and risks of the proposed work plan. Risk assesses the degree to which the offeror’s proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance.
FACTOR 3 Past Performance - Each offeror’s current and past performance will be reviewed to determine relevancy and confidence.
FACTOR 4: Small Business Participation – The extent of Small Business Participation will be evaluated for unrestricted acquisitions.
FACTOR 5 Price – The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the proposal.
C. EVALUATION APPROACH
All proposals will be evaluated by the Source Selection Evaluation Board (SSEB). The following sections define the information to be provided, and describe how the information for each factor will be evaluated and rated.
Proposals shall conform to the solicitation requirements, to include all stated terms, conditions, representations, certifications, and all other information required of this solicitation.
1. The overarching evaluation approach for all factors and sub-factors is as follows:
a. Adequacy of Response. The proposal will be evaluated to determine whether the offerors methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP. Marginal levels of overall detail could indicate a lack of understanding concerning the requirements and may result in the entire factor receiving an unfavorable rating and/or being eliminated from the competitive range.
b. Sub-Contractor Identification and Experience
i. Offerors shall clearly identify the firm(s) that will be utilized during performance of the contract. If the prime contractor proposes to use a subcontractor for the fabrication or the design of the required equipment, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.
ii. If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects, than an offer with a prime and subcontractor with no prior experience working together on relevant projects.
iii. If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the firms working successfully together previously on relevant projects, than an offer with a joint venture with no prior experience working together on relevant projects.
c. Use Attachment “Offeror Experience Form” to describe the projects in which the Offeror has relevant fabrication experience. Project experience shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.
2. Factor 1 Experience This factor is comprised of the following subfactors:
a. Sub-factor A: Generator Stator Rewind Experience
The offeror shall demonstrate recent (on-going work that is substantially complete as defined below or completed within the past 7 years) experience designing, manufacturing, testing, and installing multi-turn coil type hydro-generator stator windings and stator cores, inspecting and testing field windings, disassembly, reassembly, and post reassembly testing of the hydro-generators. The recent experience must have been performed on hydro-generators of different designs, with rated voltages of 4.16 kV and with output ratings of 3 MVA or larger. Different designs are defined as experience between multiple projects rather than a project with multiple units of the same family.
Offerors must demonstrate experience outlined above by submitting up to a maximum of five (5) projects that collectively include design, manufacturing, testing, and installing multi-turn coil type hydro-generator stator windings and stator cores, inspecting and testing field windings, disassembly, reassembly, and post reassembly testing of the hydro-generators.
Offerors shall clearly identify the firm(s) that will be utilized during performance of the contract. If the prime contractor proposes to use a subcontractor for the fabrication or the design of the required equipment, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.
b. Sub-factor B: Turbine Refurbishment Experience
The offeror shall demonstrate recent (on-going work that is substantially complete as defined below or completed within the past 7 years) experience in turbine refurbishment, including alignment, disassembly, reassembly, and post reassembly testing of turbines. The recent experience must have been performed on a Francis turbine with output ratings of a minimum 4500 Horsepower.
Offerors must demonstrate experience outlined above by submitting up to a maximum of five (5) projects that collectively include experience in turbine refurbishment, including alignment, disassembly, reassembly, and post reassembly testing of turbines.
c. Sub-Factor C: Rotating Brushless Excitation System Design, Manufacturing, Testing and Installation Experience
The offeror shall demonstrate recent (on-going work that is substantially complete as defined below or completed within the past 7 years) experience designing, manufacturing, testing, and installing rotating brushless excitation systems and permanent magnet generators (PMGs). The recent experience with rotating brushless exciters must have been performed on hydro-generators of different designs, with rated voltages of 4.16 kV and with output ratings of 3 MVA or larger. The recent experience for the PMGs need not have been performed in conjunction with the rotating brushless excitation system replacement work.
Any project that contains both rotating brushless exciter and PMG work can be used to demonstrate experience in both categories.
Offerors must demonstrate experience outlined above by submitting up to a maximum of five (5) projects that collectively include experience designing, manufacturing, testing, and installing rotating brushless excitation systems and permanent magnet generators (PMGs) as outlined above.
Offerors shall clearly identify the firm(s) that will be utilized during performance of the contract. If the prime contractor proposes to use a subcontractor for the fabrication or the design of the required equipment, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.
Each project submitted by the Offeror must be substantially complete by the date that the proposals are due.
Substantially complete is defined as being 50% complete. If an Offeror submits a project that it represents is “substantially complete,” the Offeror must provide a narrative to explain why the project is considered at least 50% complete.
A letter of commitment is required for the use of any major subcontractor’s past experience as meeting any of the Factor 1 elements. The letter of commitment must be a signed letter of commitment from the subcontractor who is proposed to perform the work. The letter of commitment must be submitted even if the firm is in some way related to a joint venture partner (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered.
The Experience Factor Ratings, excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Experience requirements.
Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is unawardable.
3. Factor 2 – Work Plan This factor evaluates the offeror’s understanding of the required scope of work and evaluates the offerors’ capabilities and availability of resources necessary to complete all requirements.
The information submitted for Factor 2 (Work Plan) including schedule and work plan exposition shall be limited to thirty (30) pages total. Offerors shall submit the following for Factor 2:
1) Schedule reflecting the planned activities, order of major tasks identified, task dependencies and durations proposed to successfully accomplish the entire project from notice to proceed to final commissioning, and contract close-out. Contractor should assume, for evaluation purposes only, a notice to proceed date of 05 Jan 2021. At a minimum, the schedule shall include the following:
a. Pre-Construction Submittals submitted/approved
b. Compliance with work sequencing and acknowledgement of unit outage requirements.
c. Major Activities
i. Pre-construction submittals
ii. Temporary Maintenance Platform fabrication
iii. Below-the-hook lifting devices
iv. Off-site manufacturing and procurement of long lead time items
v. Unit Disassembly activities
vi. Turbine Activities
vii. Generator Activities
viii. Exciter Activities
ix. Commissioning activities including load testing
2) Work plan addressing the following items:
a. Discuss how work to complete one task may impact or be impacted by work to complete other tasks.
b. Stator Winding and Core Manufacturing and Installation Details
c. The offeror shall provide a complete description of the stator winding and stator core manufacturing and installation process. The stator winding manufacturing process shall include details such as coil insulation system, including strand, turn and groundwall insulation material and thickness; cross section dimensions; designed dielectric stress of the ground-wall insulation at rated voltage; and the ground wall insulation application method (hand-wound, machine wound with/without scarf joint, other). The stator core manufacturing process shall include details such as type of steel (high grade non-aging silicon steel), lamination manufacturing method, burr control, lamination coating process, and insulation. The stator winding installation process shall include details of side packing system, wedging system including type, dimensions, and materials of wedges, total number of wedges per slot, number of check wedges per slot and end wedge securing method, spring deflection measurement method, brazing method and quality assurance procedures. The stator core installation process shall include such detail as the key bar placement determination, lamination stacking process and alignment, final core pressing and clamping, and final core alignment checks, measurements of circularity, concentricity, and verticality.
d. Document capabilities and availability of resources (manufacturing, equipment and personnel) necessary to complete all required major tasks identified in the schedule.
e. List all major subcontractors with their respective role and responsibility to complete all major tasks. Refer to the requirement for a letter of commitment for subcontractors in submission requirements for Factor 1.
The Work Plan Ratings, excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Technical requirements.
Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is unawardable.
4. Factor 3 - Past Performance There are three aspects to the past performance evaluation: Recency, Relevancy (including context of data) and Quality (including general trends in the contractor performance and source of information). The Offeror will be rated more relevant if past performance for project is submitted by the Offeror under Factor 1 (Experience). The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the scope of work.
a. The Government will focus its inquiries on the offeror’s (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including price, schedule, performance and management of sub-contractors. Major sub-contractors are defined as members of an offeror’s overall team who are expected to perform ten (10) percent or more of the proposed effort. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. In addition, signed letters of commitment shall be included for all major subcontractors for their past performance to be considered.
Offerors are reminded to include the most recent and relevant efforts (within the past seven
(7) years) in their proposal. Absent any recent and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State, or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System (NAICS) 237990, Other Heavy and Civil Engineering Construction. Data submitted by the offeror or gathered from other sources by the government in conducting performance risk assessments shall not extend past ten years prior to the issue date of the request for proposal, but may include performance data generated during the past ten years without regard to the contract award date. CPARS data is limited to the past six (6) years. Offeror’s should provide additional performance data for projects beyond six (6) years.
b. Offerors shall submit all Government and/or commercial contract numbers and descriptions for the prime offeror and each major subcontractor in performance or awarded during the past seven years, from the issue date of this request for proposal, which are relevant to the efforts required by this solicitation.
c. RECENCY: The Government will evaluate recency by examining the offerors’ record of past performance and to assess the time period during which the offeror’s past performance is considered relevant.
d. RELEVANCY: The Government will conduct a performance assessment based on the relevancy of the Offeror's current and past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort. These efforts include all aspects of schedule, performance and customer support, including the Offeror’s submitted subcontracting plan for this project and the Offeror’s record of: 1) Conforming to specifications and standards of good workmanship; 2) Maintaining program execution within price; 3) Adherence to contract schedules, including the administrative aspects of performance; 4) Ability to resolve technical and manufacturing problems quickly and effectively; 5) Businesslike concern for the interest of its customers; 6) Establishing and maintaining adequate management of subcontractors; and 7) Compliance with subcontracting plans submitted on previous projects.
Past Performance Relevancy Ratings
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
a. QUALITY: The third aspect of the past performance evaluation is to establish the overall quality of the offeror’s past performance. The quality past performance evaluations conducted gathers information from offeror’s customers to determine how well the offeror performed those past contracts. This quality assessment will be reflected in the overall confidence assessment described below.
b. PERFORMANCE CONFIDENCE ASSESSMENT: The final step is for the team to arrive at a single consensus performance confidence assessment for the offeror. Because this source selection requires a greater level of discrimination with the past performance evaluation, evaluators shall use the ratings in the chart below. This rating considers the assessed quality of the relevant/current efforts gathered (documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment). Ensure the rationale for the conclusions reached are included.
Performance Confidence Assessments
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
4. Factor 4 – Small Business Participation
All Offerors (both large and small businesses) will be evaluated on the level of proposed participation of small business concerns in performance of this acquisition (as small business prime offerors or small business sub-contractors) relative to the objectives and goals established herein. The government will evaluate:
a. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;
b. The extent of commitment to use such firms. The proposal will be rated more favorably under this sub-factor if it contains an enforceable commitment in the form of a signed letter of commitment (LOC);
c. Identification of the complexity and variety of the work small firms are to perform;
d. The extent past performance is in compliance with FAR 52.219-8 “Utilization of Small Business” and maximizing opportunities for U.S. Small Business Subcontractors.
e. The extent to which the offeror meets or exceeds the goals. The goals for this procurement are:
• Total Small Business (any type of small business) 10% of the total contract value (the sum of all CLINs);
• Subcategory Small Business o Small Disadvantaged Business (SDB) 5 % of the total contract value;
o Woman-Owned Small Business (WOSB) 1% of the total contract value;
o Historically Underutilized Business Zone (HUBZone) 1% of the total contract value;
o Veteran Owned Small Business (VOSB) 2% of the total contract value;
o Service Disabled Veteran Owned Small Business (SDVOSB) 1% of the total contract value;
Small Business Participation Factor Rating Definitions:
Small Business Participation Factor Ratings
Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.
Good Proposal indicates a thorough approach and understanding of the small business objectives.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.
Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.
Unacceptable Proposal does not meet small business objectives. Proposal is non-awardable.
5. Factor 5 – Price
Offerors must submit completed Contract Line Item Numbers (CLINs) with unit price, quantity, and extended price.
All extensions of the unit prices shown will be subject to verification by the Government. In case of discrepancy between the unit price and the extended price, the unit price will govern. For the purpose of evaluating proposals, the following will be used to resolve arithmetic discrepancies found on the face of the pricing schedule as submitted by the offeror:
a. Obviously misplaced decimal points will be corrected;
b. In a discrepancy between unit price and extended price, the unit price will govern;
c. Calculation errors in extension of unit prices will be corrected;
d. Calculation errors in the addition of lump-sum and extended prices will be corrected.
An evaluation will be performed on the proposed prices. The evaluation will not be assigned an adjectival rating.
However, it will be evaluated for completeness and reasonableness in accordance with FAR 15.305 and FAR 15.404.
D. PROPOSAL SUBMISSION
1. Introduction. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically via the DoD SAFE website. All submissions shall be in Adobe PDF format with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. The two (2) volumes listed below shall be submitted as “SEPARATE” single files via AMRDEC. Offerors may use compression utilities such as 7-Zip, WinZip or PKZip to reduce file size and facilitate transmission when using AMRDEC. Offerors are encouraged to send both files in the same AMRDEC transmission, if possible. Scans must be in color and at least 600 dpi
Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.
The offeror’s proposal shall consist of two (2) volumes. The Volumes are:
Volume I – Experience (Factor 1)
Work Plan (Factor 2) Past Performance (Factor 3)
Volume II – Small Business Participation (Factor 4) Price (Factor 45 Solicitation, Offer and Award Documents Certifications/Representations.
Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
2. Proposal Submission Requirements.
Proposals may be rejected for failure to adhere to the proposal preparation requirements.
b. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated.
c. Printing should be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.
e. The following volumes of material shall be submitted:
VOLUME TITLE ELECTRONIC
COPIES
Volume I 1 Volume II 1
e. To submit proposals electronically via DoD SAFE, email Contract Specialist, Hillary Morgan at
Hillary.a.morgan@usace.army.mil for a unique code with valid email address and point of contact for your company. Ms. Morgan will provide you with your unique code, then you will need to go to the following website: https://safe.apps.mil/
At the DoD SAFE website select “Drop-Off, then enter your unique code, and submit your proposal(s). When your proposal is submitted via the DOD SAFE website, the website will provide notification of the submittal to the recipients. For this solicitation, the recipient will be: Hillary Morgan, Hillary.a.morgan@usace.army.mil
When your files have been “picked-up”, you will receive an email notification. If you have not received a notification, and it has been more than one business day since your “drop-off” – please contact Hillary Morgan.
For the purposes of determining whether the proposal was received “late” in accordance with FAR 15.208, the date and time the file(s) are uploaded into the DoD SAFE website as identified in the DoD Safe e-mail sent to the Contract Specialist(s)/Contracting Officer will be the time and date the Government received the proposal. Do not assume that electronic communication is instantaneous.
Please make allowances for delays in transmittal.
NOTE: ONLY in the unusual case that the DoD SAFE website is “down” (not operational);
the Offeror should email their proposal to the following individuals prior to the proposal due date and time: Hillary Morgan whose email address is Hillary.a.morgan@usace.army.mil.
SUBMISSION DEADLINE - Proposals shall be received by the USACE Contracting Activity no later than the time and date specified in Block 13 of Standard Form 1442. Official time will be established by the clock located in the area where proposals are received. Late proposals may not be accepted.
3. Proposal Files.
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. Scans must be in color and at least 600 dpi. All files created in MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
NOTE: 11X17 folded pages are acceptable for tables/graphic representations. The following additional restrictions apply:
File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted.