This document provides details regarding a construction contract solicitation for McNary Station Services Units Upgrade. The U.S. Army Corps of Engineers seeks to upgrade Station Service Units 1 & 2 at McNary Dam located in Umatilla County, Oregon through rehabilitation of turbine generators, control systems, air coolers and other components. Work includes replacement of stator cores and windings, new brushless exciter systems, control upgrades, turbine disassembly and inspection, optional runner repairs, reassembly and commissioning. The performance period is 1,000 calendar days from notice to proceed. The contract is anticipated to be fixed price between $5-10 million. The solicitation will be posted to Beta.sam.gov on August 31, 2020 with a response date contained in the document. A site visit is scheduled for approximately two weeks after posting. Security clearance is required for foreign nationals to attend and documentation must be provided four weeks in advance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit 2 Attendee List.pdf | ||
| Techspec_amend0008.pdf | ||
| Amendment 0008 21R0002.pdf | ||
| Amendment 0007 21R0002.pdf | ||
| Amend 0006 21R0002.pdf | ||
| Amend 0005 21R0002.pdf | ||
| Amendment 0004 21R0002 MNA SS Unit.pdf | ||
| Amend 0003 21R002 MNA SS Unit Rehab.pdf | ||
| Site Visit Attendee List.pdf | ||
| Amendment 0002 21R0002.pdf | ||
| Amendment 0001 21R0002.pdf | ||
| CDC and WA COVID 19 Active Screen Questionairre.pdf | ||
| 21R0002_Resource_Plans_Optimized.pdf | ||
| W912EF21R0002 MNA SS Units Upgrade.pdf | ||
| 21R0002_Resource_Plans2.pdf | ||
| 21R0002_Plans.pdf | ||
| 21R0002_Resource_Plans1.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV02401565
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the changes outline below .
The required response date/time has changed from 21-Nov-2020 04:00 PM to 24-Nov-2020 04:00 PM.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Oct-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF21R0002
X 9B. DATED (SEE ITEM 11)
22-Sep-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION
NO.0002
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Oct-2020
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF21R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Mcnary Powerhouse Station Services Units 1 & 2 Turbine and Generator Rehabilitation Solicitation W912EF21R0002
Bid Schedule: N/A
Specifications: N/A
Drawings: N/A
Attachments (photos) for 48 13 13.04 26:
• McNary SS Runner Photos.PDF
• Mcnary SS Unit Penstock and Scroll Case Area.PDF
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 21-Nov-2020 04:00 PM to 24-Nov-2020 04:00 PM.
(End of Summary of Changes)
| McNary SS runner photos.pdf |
| IMG_20160317_125733 |
| IMG_20160317_125836 |
| IMG_20160317_125845 |
| IMG_20160317_130318 |
| IMG_20160317_141516 |
| IMG_20160317_141525 |
| IMG_20160317_141534 |
| IMG_20160317_141626 |
| IMG_20160317_141632 |
| IMG_20160317_141637 |
| IMG_20160317_141645 |
| IMG_20160317_141705 |
| IMG_20160317_141757 |
| IMG_20160317_141801 |
| IMG_20160317_141805 |
| IMG_20160317_141900 |
| McNary SS unit penstock and scroll case area.pdf |
| IMG_20160317_122627 |
| IMG_20160317_125327 |
| IMG_20160317_125418 |
| IMG_20160317_125430 |
| IMG_20160317_125438 |
| IMG_20160317_125452 |
| IMG_20160317_125457 |
| IMG_20160317_125518 |
| IMG_20160317_125733 |
| IMG_20160317_125836 |
| IMG_20160317_125845 |
| IMG_20160317_125930 |
| IMG_20160317_130012 |
| IMG_20160317_130025 |
| IMG_20160317_130310 |
| IMG_20160317_132052 |
File details come from the government source that posted it. Updated .