About this file

This document provides details regarding a federal construction contract solicitation for rehabilitation work on two hydroelectric turbine-generator units at McNary Dam in Oregon. The solicitation will require mobilization, pre-disassembly tests, disassembly and inspection of turbine and generator components, replacement of stator cores and windings, installation of new brushless excitation systems and controls, rehabilitation of turbine components, reassembly, testing and commissioning. Generator repairs include replacement of stator cores and windings. Turbine scope of work involves disassembly, inspection and refurbishment or replacement of components. The period of performance is 1000 calendar days following notice to proceed, and bonding is required. The work is to be completed as a firm-fixed price contract awarded based on a best value determination considering experience, work plan, past performance, small business participation and price. The solicitation will be posted on August 31, 2020 with proposals due as specified in the solicitation. The estimated value is between $5-10 million.

View the file

Other files for this federal contract opportunity

Other files attached to McNary Station Services Units Upgrade, newest first.
File Type Posted
Site Visit 2 Attendee List.pdf PDF
Amendment 0008 21R0002.pdf PDF
Techspec_amend0008.pdf PDF
Amendment 0007 21R0002.pdf PDF
Amend 0006 21R0002.pdf PDF
Amend 0005 21R0002.pdf PDF
Amend 0003 21R002 MNA SS Unit Rehab.pdf PDF
Site Visit Attendee List.pdf PDF
Amendment 0002 21R0002.pdf PDF
Amendment 0002 21R0002.pdf PDF
Amendment 0001 21R0002.pdf PDF
CDC and WA COVID 19 Active Screen Questionairre.pdf PDF
21R0002_Resource_Plans_Optimized.pdf PDF
21R0002_Plans.pdf PDF
21R0002_Resource_Plans1.pdf PDF
W912EF21R0002 MNA SS Units Upgrade.pdf PDF
21R0002_Resource_Plans2.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV02401565

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate the changes outlined below .

The proposal submission date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 22

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Oct-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF21R0002

X 9B. DATED (SEE ITEM 11)

22-Sep-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Oct-2020

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

HILLARY A. MORGAN

201 N. THIRD AVENUE

WALLA WALLA WA 99362

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF21R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

Summary of Changes Amendment 0004 McNary Powerhouse Station Service Units 1 & 2 Turbine and Generator Rehabilitation

Solicitation W912EF21R0002

Revised the following Solicitation Sections:

a. SECTION 00 21 00 INSTRUCTIONS

i. Clarified the Volume II Title in submission instructions

ii. Revised Clause 52.236-1, PERFORMNACE OF WORK BY THE CONTRACTOR

(APR 1984)

b. SECTION 00 70 00 CONDITIONS OF THE CONTRACT

i. Added the Offeror Experience Form

Revised the following Bid Schedule: N/A

Revised the following Specifications Sections:

a. SECTION 09 97 02.00 26, “PAINTING: HYDRAULICE STRUCTURES”

i. Revised the following paragraphs

1) 3.5(d)(e), “Painting Schedules, System No. 21-A-Z”

b. SECTION 48 13 13.04 26, “EXISTING TURBINE COMPONENT, REFURBISHMENT AND

REPLACEMENT”

i. Revised the following paragraphs

1) 3.14.2(c), “Inspection”

2) 3.14.7(a)4, “Machining of the Head Cover Mounting Flanges and Surfaces”

c. SECTION 48 13 13.07 26, “TURBINE AND GENERATOR GUIDE BEARING REFURBISHMENT”

i. Revised the following paragraphs

1) 3.4.1(a)(i)(j), “General Requirements”

2) 3.4.2(e), “Instructions for Guide Bearing Refurbishment, Including Babbitting”

See revised specification for details

Revised the following Drawings: N/A

SECTION 00 21 00 - INSTRUCTIONS

A. BASIS FOR AWARD

The award will be made based on the best overall (i.e., best value-tradeoff) proposal that is determined to be the most beneficial to the Government, based on an integrated assessment, with appropriate consideration given to the presented Experience, Work Plan, Small Business Participation, Past Performance and Price.

Factor 1, Experience and Factor 3, Past Performance are approximately equal in importance and more important than Factor 2, Work Plan. Factors 1, 2 and 3 are more important than Factor 4, Small Business Participation. When combined, the non-price factors (Factors 1 through 4) are significantly more important than Factor 5, Price.

However, as proposals become more equal in technical (non-price) merit, the evaluated price will be considered more important in determining the best value proposal.

The following paragraphs B through E cover the Factors to be evaluated, the evaluation approach for each Factor to include factor rating tables, proposal submission requirements and final discussion guidance.

B. FACTORS TO BE EVALUATED

The following evaluation factors will be used to evaluate each proposal.

FACTOR 1 Experience – The evaluation of the Experience Factor will be comprised of three (3) Sub-Factors.

Information provided by the offeror in support of each sub-factor will be evaluated based on its relevance to the Scope of Work. An overall rating for Factor 1 Experience will be based on the merits of each sub-factor. There is not a specified page limit for the Experience Sub-Factors, but offerors are encouraged to be clear and concise in providing the information requested.

Risk will be evaluated as one aspect of the experience evaluation, inherent in the experience evaluation factor or sub-factor ratings. Risk assesses the degree to which the offerors proposed experience approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section.

During evaluation of each proposal, the Government will assign each sub-factor an adjectival rating and write a narrative evaluation reflecting the identified findings.

Subfactor A: Generator Stator Rewind Experience Subfactor B: Turbine Refurbishment Experience Subfactor C: Rotating Brushless Excitation System Design, Manufacturing, and Installation Experience The three (3) Experience subfactors are of equal importance.

FACTOR 2 Work Plan – Each offeror’s proposal will be evaluated to determine the degree to which the work plan demonstrates an understanding of the required scope and the offeror’s capabilities and availability of resources to complete all requirements of the solicitation. The evaluation will consider strengths, weaknesses, and risks of the proposed work plan. Risk assesses the degree to which the offeror’s proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance.

FACTOR 3 Past Performance - Each offeror’s current and past performance will be reviewed to determine relevancy and confidence.

FACTOR 4: Small Business Participation – The extent of Small Business Participation will be evaluated for unrestricted acquisitions.

FACTOR 5 Price – The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the proposal.

C. EVALUATION APPROACH

All proposals will be evaluated by the Source Selection Evaluation Board (SSEB). The following sections define the information to be provided, and describe how the information for each factor will be evaluated and rated.

Proposals shall conform to the solicitation requirements, to include all stated terms, conditions, representations, certifications, and all other information required of this solicitation.

1. The overarching evaluation approach for all factors and sub-factors is as follows:

a. Adequacy of Response. The proposal will be evaluated to determine whether the offerors methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP. Marginal levels of overall detail could indicate a lack of understanding concerning the requirements and may result in the entire factor receiving an unfavorable rating and/or being eliminated from the competitive range.

b. Sub-Contractor Identification and Experience

i. Offerors shall clearly identify the firm(s) that will be utilized during performance of the contract. If the prime contractor proposes to use a subcontractor for the fabrication or the design of the required equipment, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.

ii. If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects, than an offer with a prime and subcontractor with no prior experience working together on relevant projects.

iii. If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the firms working successfully together previously on relevant projects, than an offer with a joint venture with no prior experience working together on relevant projects.

c. Use Attachment “Offeror Experience Form” to describe the projects in which the Offeror has relevant fabrication experience. Project experience shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.

2. Factor 1 Experience This factor is comprised of the following subfactors:

a. Sub-factor A: Generator Stator Rewind Experience

The offeror shall demonstrate recent (on-going work that is substantially complete as defined below or completed within the past 7 years) experience designing, manufacturing, testing, and installing multi-turn coil type hydro-generator stator windings and stator cores, inspecting and testing field windings, disassembly, reassembly, and post reassembly testing of the hydro-generators. The recent experience must have been performed on hydro-generators of different designs, with rated voltages of 4.16 kV and with output ratings of 3 MVA or larger. Different designs are defined as experience between multiple projects rather than a project with multiple units of the same family.

Offerors must demonstrate experience outlined above by submitting up to a maximum of five (5) projects that collectively include design, manufacturing, testing, and installing multi-turn coil type hydro-generator stator windings and stator cores, inspecting and testing field windings, disassembly, reassembly, and post reassembly testing of the hydro-generators.

Offerors shall clearly identify the firm(s) that will be utilized during performance of the contract. If the prime contractor proposes to use a subcontractor for the fabrication or the design of the required equipment, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.

b. Sub-factor B: Turbine Refurbishment Experience

The offeror shall demonstrate recent (on-going work that is substantially complete as defined below or completed within the past 7 years) experience in turbine refurbishment, including alignment, disassembly, reassembly, and post reassembly testing of turbines. The recent experience must have been performed on a Francis turbine with output ratings of a minimum 4500 Horsepower.

Offerors must demonstrate experience outlined above by submitting up to a maximum of five (5) projects that collectively include experience in turbine refurbishment, including alignment, disassembly, reassembly, and post reassembly testing of turbines.

c. Sub-Factor C: Rotating Brushless Excitation System Design, Manufacturing, Testing and Installation Experience

The offeror shall demonstrate recent (on-going work that is substantially complete as defined below or completed within the past 7 years) experience designing, manufacturing, testing, and installing rotating brushless excitation systems and permanent magnet generators (PMGs). The recent experience with rotating brushless exciters must have been performed on hydro-generators of different designs, with rated voltages of 4.16 kV and with output ratings of 3 MVA or larger. The recent experience for the PMGs need not have been performed in conjunction with the rotating brushless excitation system replacement work.

Any project that contains both rotating brushless exciter and PMG work can be used to demonstrate experience in both categories.

Offerors must demonstrate experience outlined above by submitting up to a maximum of five (5) projects that collectively include experience designing, manufacturing, testing, and installing rotating brushless excitation systems and permanent magnet generators (PMGs) as outlined above.

Offerors shall clearly identify the firm(s) that will be utilized during performance of the contract. If the prime contractor proposes to use a subcontractor for the fabrication or the design of the required equipment, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.

Each project submitted by the Offeror must be substantially complete by the date that the proposals are due.

Substantially complete is defined as being 50% complete. If an Offeror submits a project that it represents is “substantially complete,” the Offeror must provide a narrative to explain why the project is considered at least 50% complete.

A letter of commitment is required for the use of any major subcontractor’s past experience as meeting any of the Factor 1 elements. The letter of commitment must be a signed letter of commitment from the subcontractor who is proposed to perform the work. The letter of commitment must be submitted even if the firm is in some way related to a joint venture partner (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered.

The Experience Factor Ratings, excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Experience requirements.

Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.

Proposal is unawardable.

3. Factor 2 – Work Plan This factor evaluates the offeror’s understanding of the required scope of work and evaluates the offerors’ capabilities and availability of resources necessary to complete all requirements.

The information submitted for Factor 2 (Work Plan) including schedule and work plan exposition shall be limited to thirty (30) pages total. Offerors shall submit the following for Factor 2:

1) Schedule reflecting the planned activities, order of major tasks identified, task dependencies and durations proposed to successfully accomplish the entire project from notice to proceed to final commissioning, and contract close-out. Contractor should assume, for evaluation purposes only, a notice to proceed date of 05 Jan 2021. At a minimum, the schedule shall include the following:

a. Pre-Construction Submittals submitted/approved

b. Compliance with work sequencing and acknowledgement of unit outage requirements.

c. Major Activities

i. Pre-construction submittals

ii. Temporary Maintenance Platform fabrication

iii. Below-the-hook lifting devices

iv. Off-site manufacturing and procurement of long lead time items

v. Unit Disassembly activities

vi. Turbine Activities

vii. Generator Activities

viii. Exciter Activities

ix. Commissioning activities including load testing

2) Work plan addressing the following items:

a. Discuss how work to complete one task may impact or be impacted by work to complete other tasks.

b. Stator Winding and Core Manufacturing and Installation Details

c. The offeror shall provide a complete description of the stator winding and stator core manufacturing and installation process. The stator winding manufacturing process shall include details such as coil insulation system, including strand, turn and groundwall insulation material and thickness; cross section dimensions; designed dielectric stress of the ground-wall insulation at rated voltage; and the ground wall insulation application method (hand-wound, machine wound with/without scarf joint, other). The stator core manufacturing process shall include details such as type of steel (high grade non-aging silicon steel), lamination manufacturing method, burr control, lamination coating process, and insulation. The stator winding installation process shall include details of side packing system, wedging system including type, dimensions, and materials of wedges, total number of wedges per slot, number of check wedges per slot and end wedge securing method, spring deflection measurement method, brazing method and quality assurance procedures. The stator core installation process shall include such detail as the key bar placement determination, lamination stacking process and alignment, final core pressing and clamping, and final core alignment checks, measurements of circularity, concentricity, and verticality.

d. Document capabilities and availability of resources (manufacturing, equipment and personnel) necessary to complete all required major tasks identified in the schedule.

e. List all major subcontractors with their respective role and responsibility to complete all major tasks. Refer to the requirement for a letter of commitment for subcontractors in submission requirements for Factor 1.

The Work Plan Ratings, excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Technical requirements.

Rating Description

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.

Proposal is unawardable.

4. Factor 3 - Past Performance There are three aspects to the past performance evaluation: Recency, Relevancy (including context of data) and Quality (including general trends in the contractor performance and source of information). The Offeror will be rated more relevant if past performance for project is submitted by the Offeror under Factor 1 (Experience). The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the scope of work.

a. The Government will focus its inquiries on the offeror’s (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including price, schedule, performance and management of sub-contractors. Major sub-contractors are defined as members of an offeror’s overall team who are expected to perform ten (10) percent or more of the proposed effort. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. In addition, signed letters of commitment shall be included for all major subcontractors for their past performance to be considered.

Offerors are reminded to include the most recent and relevant efforts (within the past seven

(7) years) in their proposal. Absent any recent and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State, or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System (NAICS) 237990, Other Heavy and Civil Engineering Construction. Data submitted by the offeror or gathered from other sources by the government in conducting performance risk assessments shall not extend past ten years prior to the issue date of the request for proposal, but may include performance data generated during the past ten years without regard to the contract award date. CPARS data is limited to the past six (6) years. Offeror’s should provide additional performance data for projects beyond six (6) years.

b. Offerors shall submit all Government and/or commercial contract numbers and descriptions for the prime offeror and each major subcontractor in performance or awarded during the past seven years, from the issue date of this request for proposal, which are relevant to the efforts required by this solicitation.

c. RECENCY: The Government will evaluate recency by examining the offerors’ record of past performance and to assess the time period during which the offeror’s past performance is considered relevant.

d. RELEVANCY: The Government will conduct a performance assessment based on the relevancy of the Offeror's current and past performance, as well as that of its major subcontractors, as it relates to the probability of successful accomplishment of the required effort. These efforts include all aspects of schedule, performance and customer support, including the Offeror’s submitted subcontracting plan for this project and the Offeror’s record of: 1) Conforming to specifications and standards of good workmanship; 2) Maintaining program execution within price; 3) Adherence to contract schedules, including the administrative aspects of performance; 4) Ability to resolve technical and manufacturing problems quickly and effectively; 5) Businesslike concern for the interest of its customers; 6) Establishing and maintaining adequate management of subcontractors; and 7) Compliance with subcontracting plans submitted on previous projects.

Past Performance Relevancy Ratings

Rating Definition

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

a. QUALITY: The third aspect of the past performance evaluation is to establish the overall quality of the offeror’s past performance. The quality past performance evaluations conducted gathers information from offeror’s customers to determine how well the offeror performed those past contracts. This quality assessment will be reflected in the overall confidence assessment described below.

b. PERFORMANCE CONFIDENCE ASSESSMENT: The final step is for the team to arrive at a single consensus performance confidence assessment for the offeror. Because this source selection requires a greater level of discrimination with the past performance evaluation, evaluators shall use the ratings in the chart below. This rating considers the assessed quality of the relevant/current efforts gathered (documented results from Past Performance Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment). Ensure the rationale for the conclusions reached are included.

Performance Confidence Assessments

Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

4. Factor 4 – Small Business Participation

All Offerors (both large and small businesses) will be evaluated on the level of proposed participation of small business concerns in performance of this acquisition (as small business prime offerors or small business sub-contractors) relative to the objectives and goals established herein. The government will evaluate:

a. The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals;

b. The extent of commitment to use such firms. The proposal will be rated more favorably under this sub-factor if it contains an enforceable commitment in the form of a signed letter of commitment (LOC);

c. Identification of the complexity and variety of the work small firms are to perform;

d. The extent past performance is in compliance with FAR 52.219-8 “Utilization of Small Business” and maximizing opportunities for U.S. Small Business Subcontractors.

e. The extent to which the offeror meets or exceeds the goals. The goals for this procurement are:

• Total Small Business (any type of small business) 10% of the total contract value (the sum of all CLINs);

• Subcategory Small Business o Small Disadvantaged Business (SDB) 5 % of the total contract value;

o Woman-Owned Small Business (WOSB) 1% of the total contract value;

o Historically Underutilized Business Zone (HUBZone) 1% of the total contract value;

o Veteran Owned Small Business (VOSB) 2% of the total contract value;

o Service Disabled Veteran Owned Small Business (SDVOSB) 1% of the total contract value;

Small Business Participation Factor Rating Definitions:

Small Business Participation Factor Ratings

Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.

Good Proposal indicates a thorough approach and understanding of the small business objectives.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.

Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.

Unacceptable Proposal does not meet small business objectives. Proposal is non-awardable.

5. Factor 5 – Price

Offerors must submit completed Contract Line Item Numbers (CLINs) with unit price, quantity, and extended price.

All extensions of the unit prices shown will be subject to verification by the Government. In case of discrepancy between the unit price and the extended price, the unit price will govern. For the purpose of evaluating proposals, the following will be used to resolve arithmetic discrepancies found on the face of the pricing schedule as submitted by the offeror:

a. Obviously misplaced decimal points will be corrected;

b. In a discrepancy between unit price and extended price, the unit price will govern;

c. Calculation errors in extension of unit prices will be corrected;

d. Calculation errors in the addition of lump-sum and extended prices will be corrected.

An evaluation will be performed on the proposed prices. The evaluation will not be assigned an adjectival rating.

However, it will be evaluated for completeness and reasonableness in accordance with FAR 15.305 and FAR 15.404.

D. PROPOSAL SUBMISSION

1. Introduction. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically via the DoD SAFE website. All submissions shall be in Adobe PDF format with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. The two (2) volumes listed below shall be submitted as “SEPARATE” single files via AMRDEC. Offerors may use compression utilities such as 7-Zip, WinZip or PKZip to reduce file size and facilitate transmission when using AMRDEC. Offerors are encouraged to send both files in the same AMRDEC transmission, if possible. Scans must be in color and at least 600 dpi

Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.

The offeror’s proposal shall consist of two (2) volumes. The Volumes are:

Volume I – Experience (Factor 1)

Work Plan (Factor 2) Past Performance (Factor 3)

Volume II – Solicitations, Offer and Award Documents and Certifications/Representations Small Business Participation (Factor 4) Price (Factor 45 Solicitation, Offer and Award Documents Certifications/Representations.

Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

2. Proposal Submission Requirements.

Proposals may be rejected for failure to adhere to the proposal preparation requirements.

b. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated.

c. Printing should be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.

d. The following volumes of material shall be submitted:

VOLUME TITLE ELECTRONIC

COPIES

Volume I 1 Volume II 1

e. To submit proposals electronically via DoD SAFE, email Contract Specialist, Hillary Morgan at

Hillary.a.morgan@usace.army.mil for a unique code with valid email address and point of contact for your company. Ms. Morgan will provide you with your unique code, then you will need to go to the following website: https://safe.apps.mil/

At the DoD SAFE website select “Drop-Off, then enter your unique code, and submit your proposal(s). When your proposal is submitted via the DOD SAFE website, the website will provide notification of the submittal to the recipients. For this solicitation, the recipient will be: Hillary Morgan, Hillary.a.morgan@usace.army.mil

When your files have been “picked-up”, you will receive an email notification. If you have not received a notification, and it has been more than one business day since your “drop-off” – please contact Hillary Morgan.

For the purposes of determining whether the proposal was received “late” in accordance with FAR 15.208, the date and time the file(s) are uploaded into the DoD SAFE website as identified in the DoD Safe e-mail sent to the Contract Specialist(s)/Contracting Officer will be the time and date the Government received the proposal. Do not assume that electronic communication is instantaneous.

Please make allowances for delays in transmittal.

NOTE: ONLY in the unusual case that the DoD SAFE website is “down” (not operational);

the Offeror should email their proposal to the following individuals prior to the proposal due date and time: Hillary Morgan whose email address is Hillary.a.morgan@usace.army.mil.

SUBMISSION DEADLINE - Proposals shall be received by the USACE Contracting Activity no later than the time and date specified in Block 13 of Standard Form 1442. Official time will be established by the clock located in the area where proposals are received. Late proposals may not be accepted.

3. Proposal Files.

a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. Scans must be in color and at least 600 dpi. All files created in MS Word (doc) files shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right – 1” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”

NOTE: 11X17 folded pages are acceptable for tables/graphic representations. The following additional restrictions apply:

File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted. Files shall be in read-only format, using PDF files. All price breakdown information to aid in the Price evaluation shall be submitted in Microsoft Office Excel Read/Write format. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting exe files are not acceptable. **The electronic files shall contain identical information to the hard copy files.

b. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file.

Proprietary information shall be clearly marked.

Sub-Contractor Identification:

a. Offerors should clearly identify the firm(s) that will be utilized during performance of the contract or work that will be self-performed. Ensure the proposal is clear as to which function the Offeror or subcontractor will be performing. If the prime contractor proposes to use a subcontractor, the offeror shall submit a signed Letter of Commitment from the subcontractor with the proposal.

a. If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects.

b. If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the joint venture entity working successfully together previously on relevant projects.

(i) VOLUME I, TAB 1 – EXPERIENCE. The volume shall be organized into the following sections:

(1) Section 1 – Subfactor A: Generator Stator Rewind Experience

(2) Section 2 – Subfactor B: Turbine Refurbishment Experience

(3) Section 3 - Subfactor C: Rotation Brushless Excitation System Design, Manufacturing, and Installation Experience

(ii) VOLUME I, TAB 2 –WORK PLAN. This tab shall consist of all information required to support Evaluation Factor 3.

(1) Section 1 – Schedule

(2) Section 2 – Work Plan Exposition

(iii) VOLUME I, TAB 3 – PAST PERFORMANCE. This tab shall contain current and past performance information regarding similar contracts. Offerors shall submit Government and/or commercial contracts for the prime offeror and each major sub-contractor currently in performance or awarded during the past ten (10) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation.

Relevant efforts are defined as services/efforts that are the same as or similar to the effort required by the

RFP. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. In addition, signed letters of commitment shall be included for all major subcontractors for their past performance to be considered.

This tab shall be organized into the following sections:

(1) Section 1 – Contract Descriptions. This section shall include the following information in the following format. Ensure all information is current and accurate.

(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS

Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

(b) Government contracting activity, (or private firm) and current address, Procuring Contracting Officer’s name, e-mail address, telephone and fax numbers.

(c) Technical representative/COR and current email address, telephone and fax numbers.

(d) Government contract administration activity and the Administrative

Contracting Officer’s name, current e-mail address, telephone and fax number.

(e) Government contract administration activity’s Pre-Award point of contact name, and current e-mail address, telephone and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order/Task Order Numbers.

(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).

(h) Awarded price.

(i) Final or projected final price.

(j) Original delivery schedule, including dates of start and completion or work.

(k) Final or projected final, delivery schedule, including dates of start and completion of work.

(2) Section 2 – Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 - Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The offerors shall also provide copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(b) For all contracts, the offeror shall provide data on all manufacturing warranty returns.

Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the offeror’s delivered product.

(3) Section 3 – Subcontracts. Offerors shall provide an outline of how the effort required by the RFP will be assigned for performance within the offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime offeror and each proposed major subcontractor shall include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government technical specification. This includes all subcontractors and suppliers who will be providing critical hardware/services or whose subcontract is for more than 10% of the total proposed Price.

(4) Section 4 – New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited to demonstrate the relevancy of experience and past performance with this solicitation. Information should be included in the files described in the sections above. Signed Letters of Commitment shall be included in the proposal for these employees in order to be considered. Letters of Commitment must be signed both by the company official and the employee.

(5) Section 5-Past Performance Questionnaire. For all contracts identified in Section 1 - Contract Descriptions, complete a Past Performance Questionnaire for any project that has not received a formal Contractor Performance Assessment Reporting System (CPARS) evaluation. The offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to the technical representative responsible for the current and past contract. The Point of Contacts (POCs) shall be instructed to electronically complete Part II of the questionnaire and submit the completed questionnaire directly back to the offeror. The offeror will submit the completed questionnaire with their proposal. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted directly to the USACE Contracting Office. In this case, the client shall e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to Hillary.A.Morgan@usace.army.mil.

The offeror shall submit, with its proposal, a list of all the POCs who were sent questionnaires. The POC List shall be submitted in Word for Windows Table Format to include the following fields:

Solicitation Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mail to POC (month/day).

Offerors are discouraged from providing points of contact with another contractors’ facility, i.e., in case an offeror (or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement. Offerors shall provide and submit the prime contract number and all Governmental agency points of contact (POC) in lieu of subcontract numbers or prime contract POCs in situations as described above.

(iv) VOLUME II, TAB 1 – PRICE. This tab shall consist of all information, required to support proposed prices. Certified pricing data is not currently required; however, the Government reserves the right to request such data prior to award. There are no page limitations for this tab.

The offeror shall ensure that the information submitted in this tab is consistent with and fully supports the amounts set forth in the SF1442 and continuation sheets.

(v) VOLUME II, TAB 2 – Small Business Participation Plan. See Appendix F, Enclosure 4, Small Business Participation Plan. All Offerors (both large and small businesses) are required to complete a mailto:Phyllis.L.Buerstatte@usace.army.mil

Small Business Participation Plan (form attached). Offerors must proposed the level of participation of small businesses (as prime and/or small business sub-contractors) in the performance of this acquisition relative to the objectives/goals set forth in the evaluation of this area.

(vi) VOLUME II, TAB 3– SOLICITATIONS, OFFER AND AWARD DOCUMENTS AND

CERTIFICATIONS/REPRESENTATIONS

Certifications and Representations – Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP. An authorized official of the firm shall sign the SF33 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission.

Section 00 21 00 – Standard Form 1442 Solicitation, Offer and Award Section 00 45 00 – Representations, Certification, and Other Statements of Offerors

Solicitations, Offer and Award Documents and Certifications/Representations shall not be submitted separately from that submitted in VOLUME II – SOLICITATIONS, OFFER AND AWARD

DOCUMENTS AND CERTIFICATIONS /REPRESENTATIONS.

E. DISCUSSIONS

1. GENERAL INFORMATION. In accordance with FAR provision 52.215-1, the Government intends to evaluate proposals and award a contract without discussions with offerors. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 25 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

OFFEROR EXPERIENCE FORM

OFFEROR EXPERIENCE FORM

Technical Subfactor: __________ Subfactor Title: ___________________________

Name of Offeror: ______________________________

Project Title: _________________________________________________________________

Contract/Project Number: _________________________

Project Location: _________________________________

Total Contract Value: $_______________ (Final value if completed, current value if not completed)

If Offeror performed as Subcontractor, Value of Subcontract: $_______________

Construction Phase Start Date: ___________________________________

Construction Phase Completion Date: ______________________________ (Actual date if project has been completed, anticipated date if project is not complete)

Name of Customer/Client: ______________________________________________________

Telephone Number of Customer/Client: __________________________________________

Email Address of Customer/Client: ______________________________________________

Description of Project’s Scope:

Offeror’s role and responsibility during construction of the project:

(Indicate whether your firm performed as a prime or subcontractor.)

Describe the relevancy of the reference project with the scope required in this solicitation:

(End of Summary of Changes)

McNar y Power house St at i on Ser vi ce Tur bi ne & Gener at or Rehab W912EF21R0002

AMEND0004

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 00. 00 26 SUMMARY OF WORK

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 14 00. 10 28 PROJECT SI TE RESTRI CTI ONS

01 14 00. 90 28 I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY

(OPSEC)

01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 32 01. 00 28 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00…