W912EF-15-R-0044 _Amendment_0003.pdf
PDF 19 MB Posted
- Solicitation number
- W912EF-15-R-0044
About this file
Amendment 0003
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV50771656
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TITLE: ICE HARBOR DAM REWINDS AND TURBINE RUNNER REPLACEMENTS
The purpose of this amendment is to make the changes indicated in the Summary of Changes.
The proposal due date is extended to November 10, 2015 at 4:00 p.m.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Oct-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0044
X 9B. DATED (SEE ITEM 11)
01-Sep-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Oct-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
JANI C. LONG
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-R-0044
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. Revised the following Specifications:
a: SECTION 01 45 04.00 28 CONTRACTOR QUALITY CONTROL
Revised Paragraph 3.4.1 Personnel Requirements b: SECTION 03 37 13.00 28 DRAFT TUBE CEILING FILL - SHOTCRETE
Revised Paragraph PART 1 GENERAL c: SECTION 48 13 13.03 26 EXISTING TURBINE COMPONENT REFURBISHMENT, MODIFICATION AND REPLACEMENT
Revised Attachment G REV B See yellow highlights
2. Revised the following Drawings:
Sheet G-003 Sheet G-004 Sheet TM‐001‐4 Sheet TM‐001‐6 Sheet TM‐069 Sheet TM‐136 Sheet TM‐137 Sheet TM‐140 Sheet TM‐141 Sheet TM‐143 Sheet TM‐144
Sheet TM‐145
Sheet TM‐146
Sheet TM‐147
Sheet TM‐148
Sheet TM‐149
Sheet TM‐150
Sheet TM‐151‐1
Sheet TM‐154
Sheet TM‐155
Sheet TM‐156
Sheet TM‐157
Sheet TM‐157‐1
Sheet TM‐158
Sheet TM‐160‐1
Sheet TM‐161
Sheet TM‐162
Sheet TM‐163
Sheet TM‐164
Sheet TM‐165
3. Added the following Drawings:
Sheet TM‐048 Sheet TM‐049 Sheet TM‐050 Sheet TM‐051 Sheet TM‐052 Sheet TM‐053 Sheet TM‐054 Sheet TM‐102 Sheet TM‐103
Sheet TM‐146‐1
Sheet TM‐202
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 27-Oct-2015 04:00 PM to 10-Nov-2015 04:00 PM.
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet Number
Title
Revision Number
Date
LOCK AND DAM
ICE HARBOR TURBINEUNIT INSTALLATION UNITS 1-3
GENERAL
IHP-1.24-0-0/1 G-001 PROJET LOCATION AND - VICINTY MAP
IHP-1.24-0-0/2 G-002 DRAWING INDEX
IHP-1.24-0-0/3 G-003 REFERENCE INDEX - SHEET 1 A 10-07-15
IHP-1.24-0-0/4 G-004 REFERENCE INDEX - SHEET 2 A 10-07-15
IHP-1.24-0-0/5 G-005 REFERENCE INDEX - SHEET 3
IHP-1.24-0-0/6 G-006 REFERENCE INDEX - SHEET 4
IHP-1.24-0-0/7 G-007 REFERENCE INDEX - SHEET 5
IHP-1.24-0-0/8 G-008 OUTSIDE STORAGE LOCATIONS
STRUCTURAL
IHP-1.24-4-0/1 S-301
POWERHOUSE TRANSVERSE - SECTION
FLOOR
IHP-1.24-4-0/1 S-501
POWERHOUSE ALLOWABLE STORAGE, -
STAGING AND WORK AREAS
IHP-1.24-5-0/1 SR401
DRAFT TUBE - REFLECTED CEILING
PLAN, - PLAN AND DETAILS
IHP-1.24-5-0/2 SR402
PLAN, - SECTION A AND DETAIL
IHP-1.24-5-0/3 SR403
PLAN, - SECTION B AND DETAIL
IHP-1.24-5-0/4 SR404 DRAFT TUBE - SECTIONS
TURBINE MANUFACTURER
2-01009687 TM-001 LOCKWIRE PROCEDURE
2TKV02-0111-
01588002 TM-001-2
TURBINE SHAFT MACHINING - FOR
COUPLING WITH RUNNERS
2TKV02-0151-
01351121 TM-001-4
ADJ. AND FIXED BLADE - SHAFT TO HUB
DRILL TEMPLATE
A 9-25-15
2TKV02-0151- TM-001-6 ADJ. AND FIXED BLADE, - DRILL A 9-25-15
01351126 TEMPLATE CHECK BUSHING
2TKV02-0221-
01298820 TM-001-8
SPECIAL HVY HEX NUT - - NUT - 6.000-
8UN
2TKV03-0211-
01237840 1/2 TM-002 STAY VANE EXTENSION 1
01237840 2/2 TM-003 STAY VANE EXTENSION 1
01237841 1/2 TM-004 STAY VANE EXTENSION 2
01237841 2/2 TM-005 STAY VANE EXTENSION 2
01237842 1/2 TM-006 STAY VANE EXTENSION 3
01237842 2/2 TM-007 STAY VANE EXTENSION 3
01237844 1/2 TM-008 STAY VANE EXTENSION 4
01237844 2/2 TM-009 STAY VANE EXTENSION 4
01237845 1/2 TM-010 STAY VANE EXTENSION 5
01237845 2/2 TM-011 STAY VANE EXTENSION 5
01237846 1/2 TM-012 STAY VANE EXTENSION 6
01237846 2/2 TM-013 STAY VANE EXTENSION 6
01237847 1/3 TM-014 SV TRAILING EDGE EXTENSION
01237847 2/3 TM-015 SV TRAILING EDGE EXTENSION
01237847 3/3 TM-016 SV TRAILING EDGE EXTENSION
01237848 TM-017 STAY VANE EMBEDDED PLATE, LARGE
01237849 TM-018 STAY VANE EMBEDDED PLATE, SMALL
01237850 TM-019 PLUG DETAIL
01237851 1/4 TM-020 STAY RING MODIFICATION
01237851 2/4 TM-021 STAY RING MODIFICATION
01237851 3/4 TM-022 STAY RING MODIFICATION
01237851 4/4 TM-023 STAY RING MODIFICATION
01237853 1/2 TM-024 STAY VANE LE PRESSURE TEMPLATE
01237853 2/2 TM-025 STAY VANE LE PRESSURE TEMPLATE
01237854 1/2 TM-026
STAY VANE LEADING - EDGE SUCTION
TEMPLATE
01237854 2/2 TM-027
STAY VANE LEADING - EDGE SUCTION
TEMPLATE
01238052 1/3 TM-028 STAY VANE TRAILING EDGE TEMPLATES
01238052 2/3 TM-029 STAY VANE TRAILING EDGE TEMPLATES
01238052 3/3 TM-030 STAY VANE TRAILING EDGE TEMPLATES
01284893 TM-031 ANCHOR NO. 8 REBAR
2TKV04-0621-
01651179 TM-032 GATE SERVOMOTOR STROKE LIMITER
01651186 TM-032-1
GATE SERVOMOTOR - PISTON
MODIFICATION
01661199 TM-032-2 GATE SERVOMOTOR - ASSEMBLY
2TKV04-0700-
01275006 TM-032-3
HEAD COVER SUMP PUMP - CONCEPT
LAYOUT
01276434 TM-032-4 LEVEL SENSOR CONCEPT LAYOUT
2TKV04-0731-
01638226 TM-032-5 PIPE NUT
2TKV05-0100-
01241081 1/2 TM-033 PACKING BOX FAB AND MACHINE
01241081 2/2 TM-033-1 PACKING BOX FAB AND MACHINE
01276927 TM-036 PACKING BOX KEEPER RING - QUARTER
01276929 TM-037 PACKING GLAND ASSEMBLY
01276948 TM-038 SHAFT SEAL WEARING RING
2TKV05-0101-
01276945 TM-040 H-RING ASSEMBLY
01278598 TM-042 PACKING BOX LOCKING SCREW
2TKV06-0101-
01208781 TM-045 ANCHOR NO. 10 REBAR
01233620 TM-046 ERECTION SPIDER DETAILS
2TKV12-0102-
01355138 TM-047
LIFTING DEVICE FOR SHAFTS - AND
RUNNERS
01709594 TM-048
INTERMEDIATE HEADCOVER - LIFTING
DEVICE
NEW
2TKV12-0102-
01682167 TM-049
LIFTING DEVICE SPACER - FOR
RUNNERS
NEW
2TKV12-0102-
01682126 TM-050
LIFTING DEVICE WASHER - FOR
TURBINE SHAFT
NEW
2TKV12-0102-
01682154 TM-051
LIFTING DEVICE WASHER - FOR
INTERMEDIATE SHAFT
NEW
2TKV12-0102-
01682180 TM-052 LIFTING DEVICE STRAIGHT PIN
NEW
2TKV12-0102- TM-053 LIFTING DEVICE ASSY FOR - SHAFTS NEW
01714575 AND RUNNERS
01717031 TM-054 SPACER FOR LIFTING - DEVICE PIN
2TKV01-0000-
01079628 TM-065
%%c 280.5 5 X FIXED BLADE -
DISTRIBUTER SECTION
2TKV01-0204-
01180465 TM-066
FIXED BLADE RUNNER CONE -
FAB/MACHINE
2TKV01-0257-
01213837 TM-067
FIXED BLADE RUNNER - ASSEMBLY
PEDESTAL
10290503 1/8 TM-068 SHAFT AND RUNNER CONE ASSEMBLY
10290503 2/8 TM-068-1 SHAFT AND RUNNER CONE ASSEMBLY
10290503 3/8 TM-068-2 SHAFT AND RUNNER CONE ASSEMBLY
10290503 4/8 TM-068-3 SHAFT AND RUNNER CONE ASSEMBLY
10290503 5/8 TM-068-4 SHAFT AND RUNNER CONE ASSEMBLY
10290503 6/8 TM-068-5 SHAFT AND RUNNER CONE ASSEMBLY
10290503 7/8 TM-068-6 SHAFT AND RUNNER CONE ASSEMBLY
01237088 TM-069
FIXED BLADE TURBINE - SHAFT SHEAR
SLEEVE
A 9-25-15
2TKV02-0123-
01237089 TM-070
FIXED BLADE SHAFT - - RUNNER
COUPLING STUD
01312318 TM-072 SHAFT BORE COVER FIXED BLADE
2TKV04-0732-
01218118 TM-075 FIXED BLADE PACKING BOX SUPPORT
01218121 TM-076 FIXED BLADE THRUST RING SEGMENT
01218127 TM-077 FIXED BLADE TWIST OFF SCREW
01227640 TM-078
FIXED BLADE EXTENSION PIECE - AIR
PIPE
01230642 1/3 TM-079
FXD BLD INTERMEDIATE HEAD COVER
MOD
01230642 2/3 TM-080
01230642 3/3 TM-081
01236301 TM-082
FXD BLD RIB - BAFFLE PLATE INT - HEAD
COVER
01255413 TM-083
FIXED BLD SPLIT FLANGE INT -
HEADCOVER MOD
01645965 TM-083-2 FIXED BLD HEAD COVER PIPING
01646637 TM-083-4 FIXED BLD DRAINAGE PIPE
01646643 TM-083-6 FIXED BLD PIPE SLEEVE
01252282 TM-084 FIXED BLADE PACKING BOX ASSEMBLY
01197393 1/6 TM-085
FIXED BLADE DISCHARGE RING
MACHINE
01197393 2/6 TM-086
FIXED BLADE DISCHARGE RING
01198350 TM-087
FXD BLD DRAFT TUBE TRANSITION
SECTION
01204835 TM-088 DOWEL STUD
01208771 TM-089 ANCHOR STUB END
01208807 TM-090 ERECTION STAND DISCHARGE RING
01208838 1/5 TM-091
FIXED BLADE DISCHARGE - RING
INSTALLATION
01208838 2/5 TM-092
01208838 3/5 TM-093
01208838 4/5 TM-094
01208838 5/5 TM-095
01206622 TM-095-2 FIXED BLADE WEDGE ADJUSTING
01206637 TM-095-4 FIXED BLADE DOG
01206647 TM-095-6 FIXED BLADE ANGLE BRACKET
2TKV08-0101-
01264834 TM-096
FIXED BLADE - EXCITER SHAFT CHECK
SHEET
01264836 TM-097
FIXED BLADE - PMG DRIVE COUPLING
CHECK SHEET
01264837 TM-098
FIXED BLADE - PMG DRIVE ADAPTER
PLATE
01264839 TM-099
FIXED BLADE EXCITER - HOUSING
COVER PLATE
01264841 TM-100
FIXED BLADE - PMG DRIVE TO EXCITER
SHAFT - ASSEMBLY
01609425 TM-100-1
FIXED BLADE OIL HEAD - TO OIL HEAD
SUPPORT - INSULATOR CHECKSHEET
2TKV11-0121-
01303670 TM-101 RATING PLATE FIXED BLADE
2TKV01-0201-
01703531 TM-102 FIXED BLADE FIELD LIFTING BOSS
NEW
2TKV01-0201-
01703275 TM-103 FIXED BLADE FIELD SEGMENT LIFTING
NEW
2TKV01-0000-
00856270 TM-122
%%C292.4 5XA KAPLAN DISTRIBUTOR
2TKV01-0101- TM-122-1 ADJ. BLADE STUD DOWEL - 2.000-8UN-2A
01638812 X 10.5 LG
2TKV01-0200-
01314791 1/2 TM-123 KAPLAN RUNNER LAYOUT
01314791 2/2 TM-124 KAPLAN RUNNER LAYOUT
01364614 1/13 TM-125 ADJ. BLADE TOWER FIELD ASSY
01364614 2/13 TM-126 ADJ. BLADE TOWER FIELD ASSY
01364614 3/13 TM-127 ADJ. BLADE TOWER FIELD ASSY
01364614 4/13 TM-128 ADJ. BLADE TOWER FIELD ASSY
01364614 5/11 TM-129
ADJ. BLADE TOWER FIELD ASSY -
PROCEDURE
01364614 6/11 TM-130
01364614 7/11 TM-131
01364614 8/11 TM-132
01364614 9/11 TM-133
01364614 10/11 TM-134
01364614 11/11 TM-135
01364614 12/13 TM-135-1 ADJ. BLADE TOWER FIELD ASSY
01364614 13/13 TM-135-2 ADJ. BLADE TOWER FIELD ASSY
01312690 1/2 TM-136
ADJUSTABLE BLADE DS=292.4 IN 5XA
CW
A 09-25-15
2TKV01-0201-
01312690 2/2 TM-137
ADJUSTABLE BLADE DS=292.4 IN 5XA
CW
A 09-25-15
01319687 TM-138 ADJUSTABLE BLADE LEVER MACHINED
01639640 TM-139 ADJUSTABLE BLADE DOWEL SPACER
2TKV01-0202-
01319591 TM-140 ADJUSTABLE BLADE CROSSHEAD KEY
A 09-25-15
2TKV01-0202-
01319605 TM-141
ADJUSTABLE BLADE SERVOMOTOR -
CROSSHEAD MACHINE
A 09-25-15
01319608 TM-142 LINKAGE AXLE SUPPORT
01319659 TM-143 LINK SPACER
A 09-25-15
2TKV01-0202-
01319660 TM-144 LOWER LINK PIN
A 09-25-15
2TKV01-0202-
01319661 TM-145 UPPER LINK PIN
A 09-25-15
2TKV01-0202-
01319662 TM-146 RUNNER - LINKS INNER AND OUTER
A
01319662 TM-146-1
ADJ. BLADE RUNNER - LINKS INNER AND
OUTER
NEW
2TKV01-0202-
01319673 TM-147
ADJUSTABLE BLADE UPPER - TAPERED
DOWEL
A 09-25-15
2TKV01-0202-
01319677 TM-148 ADJUSTABLE BLADE DOWEL CAP
A 09-25-15
2TKV01-0202-
01319684 TM-149
ADJUSTABLE BLADE LOWER TAPER
DOWEL
A 09-25-15
2TKV1-0202-
01339325 TM-150
ADJUSTABLE BLADE - DOWEL SLEEVE
REMOVAL PLATE
A 09-25-15
2TKV01-0202-
01612461 TM-151
ADJ BLADE CROSSHEAD KEY SHIM
01617140 TM-151-1 ADJ. BLADE DRAIN PIPE
A 09-25-15
2TKV01-0203-
01321059 TM-152 ADJ BLD. CROSSHEAD OPER. ROD STUD
01321062 TM-152-1
ADJ. BLADE OPERATING - ROAD
01627139 TM-152-2 ADJ. BLADE SERVOMOTOR - ASSEMBLY
01637666 TM-152-3 ADJ. BLADE UPPER - STROKE LIMITER
01637672 TM-152-4 ADJ. BLADE PISTON SPACER
01637675 TM-152-5
ADJ. BLADE PISTON - OPERATING ROD
STUD
01645029 TM-152-6
ADJ. BLADE CHECKSHEET - - SERVO
MECHANISM
01646992 TM-152-7
ADJ. BLADE SERVOMOTOR - PISTON
CHECKSHEET
01320112 TM-153
ADJUSTABLE BLADE DEFLECTOR
DOWEL PIN
01320116 1/2 TM-154
ADJUSTABLE BLADE UPPER DEFLECTOR
- MACHINE
A 09-25-15
2TKV01-0204-
01320116 2/2 TM-155
ADJUSTABLE BLADE UPPER DEFLECTOR
- MACHINE
A 09-25-15
2TKV01-0204-
01320118 TM-156
ADJ BLD TRUNNION SEAL RETAINING
RING
A 09-25-15
2TKV01-0204-
01320124 TM-157 ADJUSTABLE BLADE HUB MACHINE
A 09-25-15
2TKV01-0204-
01320124 TM-157-1 ADJUSTABLE BLADE HUB MACHINE
A 09-25-15
2TKV01-0204-
01320656 TM-158
ADJUSTABLE LOWER DEFLECTOR
MACHINE
A 09-25-15
2TKV01-0204-
01344985 TM-159
ADJ BLADE TRUNNION SEAL
SPECIFICATION
01370895 TM-160
ADJUSTABLE BLADE HUB DEFLECTOR -
ALIGNMENT KEY
01611981 TM-160-1
ADJUSTABLE BLADE - LOWER VALVE
COVER
A 09-25-15
2TKV01-0257-
01645760 TM-160-10
ADJUSTABLE BLADE - ERECTION PLATE
2TKV01-0257- TM-160-10-3 ADJUSTABLE BLADE SUPER BOLT -
01666425 LIFTING PLATE
01662489 TM-160-10-6
ADJUSTABLE BLADE OPERATING ROD -
ALIGNMENT TOOL
01621857 TM-160-2
ADJUSTABLE BLADE - STUD INSERT -
UPPER DEFLECTOR
01621860 TM-160-3
ADJUSTABLE BLADE - LOWER
DEFLECTOR STUD INSERT
01372730 TM-160-4
ADJUSTABLE BLADE - HUB ASSY
ERECTION STANDS
01373260 TM-160-5
ADJUSTABLE BLADE - LEVER
TRANSPORTATION CART
01373590 TM-160-6
ADJUSTABLE BLADE - DEFLECTOR ASSY
- ERECTION STANDS
01373590 TM-160-6-5
ADJUSTABLE BLADE - REMOVABLE
DISCHARGE RING STAND
01629543 TM-160-7
ADJUSTABLE BLADE - FIELD ASSEMBLY -
TAPERED ROD
01630064 TM-160-8
ADJUSTABLE BLADE - LEVER UPPER
LIFTING PLATE
01630064 TM-160-8-1 ADJUSTABLE BLADE - PIPE EXTENSION
01639910 TM-160-8-2
ADJUSTABLE BLADE - UPPER SLEEVE
AND PLATE - INSTALLATION
01639911 TM-160-8-4
ADJUSTABLE BLADE - DOWEL PIN
INSTALLATION PIECE
01639911 TM-160-8-6
ADJUSTABLE BLADE - DOWEL SLEEVE
INSTALLATION - PIECE
01639915 TM-160-8-7
ADJUSTABLE BLADE - CROSSHEAD
ALIGNMENT ROD
01639917 TM-160-9
ADJUSTABLE BLADE - CROSSHEAD
LIFTING PLATE
01639918 TM-160-9-2
ADJUSTABLE BLADE LOWER
HEADCOVER - LIFTING PLUG
01641633 TM-160-9-4
ADJUSTABLE BLADE SPACER
INSTALLATION - PIECE
2TKV01-0261-
01303875 1/5 TM-161
ADJUSTABLE BLADE RUNNER
ASSEMBLY
A 09-25-15
2TKV01-0261-
01303875 2/5 TM-162
ADJUSTABLE BLADE RUNNER
ASSEMBLY
A 09-25-15
2TKV01-0261-
01303875 3/5 TM-163
ADJUSTABLE BLADE RUNNER
ASSEMBLY
A 09-25-15
2TKV01-0261-
01303875 4/5 TM-164
ADJUSTABLE BLADE RUNNER
ASSEMBLY
A 09-25-15
2TKV01-0261-
01303875 5/5 TM-165
ADJUSTABLE BLADE RUNNER
ASSEMBLY
A 09-25-15
2TKV02-0111-
01647000 TM-165-1
ADJUSTABLE BLADE - TURBINE SHAFT
CHECKSHEET
2TKV02-0111-
01647016 TM-165-2
ADJUSTABLE BLADE - INTERMEDIATE
SHAFT CHECKSHEET
01617281 TM-166
ADJUSTABLE BLD SHAFT RUNNER -
COUPLILNG STUD
01621925 TM-167
ADJ BLADE TURBINE SHAFT SHEAR
SLEEVE
01337670 1/3 TM-168 OUTER HEADCOVER - MACHINE
01337670 2/3 TM-169
ADJUSTABLE BLADE OUTER
HEADCOVER - MACHINE
01337670 3/3 TM-170
ADJUSTABLE BLADE OUTER
HEADCOVER - MACHINE
01344414 TM-171 ADJ BLADE HEAD COVER INSTALLATION
01343476 TM-172 WICKET GATE STEM PACKING GLAND
01343481 TM-173 WICKET GATE STEM PACKING RING
01343481 TM-173-3 ADJUSTABLE BLADE DRAINAGE PIPE
01343481 TM-173-6 ADJUSTABLE BLADE PIPE SLEEVE
01332626 1/3 TM-174
ADJ. BLADE INTERM HEAD COVER -
01332627 2/3 TM-175
01332628 3/3 TM-176
2TKV04-0733-
01343581 1/2 TM-177
INNER HEADCOVER ADJ. BLADE -
RUNNER
2TKV04-0733-
01343581 2/2 TM-178
INNER HEADCOVER ADJ. BLADE -
RUNNER
01633069 TM-179
ADJUSTABLE BLADE PACKING BOX -
ASSEMBLY
01312725 1/2 TM-180
ADJ BLADE DISCHARGE RING LOWER -
01312725 2/2 TM-181
ADJ BLADE DISCHARGE RING LOWER -
01312842 TM-182
ADJ. BLADE DISCHARGE RING UPPER -
01319548 1/7 TM-183
ADJ. BLADE DISCHARGE RING -
01319548 2/7 TM-184
01319548 3/7 TM-185
01319548 4/7 TM-186
01319548 5/7 TM-187
01319548 6/7 TM-188
01319548 7/7 TM-189
01319549 TM-190 ERECTION STAND DISCHARGE RING
01319557 TM-191 ANCHOR BLOCK KAPLAN
2TKV06-0101- TM-192 ANCHOR BLOCK KAPLAN
01319560
01319576 TM-193 ANCHOR SCREW KAPLAN
01319582 TM-194 ANCHOR SCREW KAPLAN
01320123 TM-194-5
ADJUSTABLE BLADE CAP PLATE
SEGMENT
01320696 TM-195
ADJ BLADE DRAFT TUBE - TRANSITION
01589370 TM-195-3
ADJ BLADE DISCHARGE RING HOLD
DOWN SEGMENT
01589374 TM-195-6
ADJ BLADE DISCHARGE RING - HOLD
DOWN SEGMENT
01592383 TM-196
ADJ. BLADE DISCHARGE - RING
REMOVABLE MACHINE
01644485 TM-197 ADJ. BLADE WEDGE
01644501 TM-198 ADJ. BLADE DOG
01644506 TM-199 ADJ. BLADE ANGLE BRACKET
2TKV06-0111-
01649516 TM-200
ADJ. BLADE POSITION INDICATING
SCALE
2TKV06-0100-
01649523 TM-201
ADJ. BLADE OIL SUPPLY HEAD
ASSEMBLY
2TKV06-0100-
01649523 TM-202 ADJUSTABLE BLADE - BLIND FLANGE
FOR INFORMATION ONLY (FIO)
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
I-001
47 1/2" BABBITED BEARING - 47 1/2" DIA.
BABBITED BEARING
I-002
COVER AND OIL BAFFLES - FOR 47 1/2" DIA.
BEARING
I-003
47 1/2" DIA. BABBITTED BEARING - AND
PACKING BOX - ASSEMBLY
I-004 GATE LEVER
I-005 SHEAR LEVER
I-006
AUTOMATIC DUAL LINE LUBRICATION -
SYSTEM FOR GATE OPENING - MECHANISM
I-007
AUTOMATIC DUAL LUBRICATION - SYSTEM
FOR GATE OPERATING - MECHANISM
I-008
LUBRICATING PUMPS & PIPING - FOR MAIN
BEARING
I-009 Sheet Title 1 - STRAIGHT PIN
I-010 STRAIGH PIN & - PIN EXTENSION
I-011 THRUST CAP PIN
I-012 SHEAR PIN
I-013 SHOULDER PIN
I-014 ECCENTRIC PIN
I-015 STRAIGHT PIN
I-016
INSTALLATION DIAGRAM - ROTARY GEAR
PUMPS
I-017
MOTOR DRIVEN ROTORY GEAR - PUMPS
LARGE FRAME - CRANK IN HUB
I-018 VANE DETAIL STAY RING
I-019 STAY RING - MACH. DETAIL ELEVATION
I-020 STAY RING - MACH. DETAIL PLAN
I-021 BUSHING
I-022 BUSHING FOR GATE STEM
I-023 BUSHING SHEAR LEVER & - GATE OPER.
I-024 BUSHING
I-025 BUSHING
I-026 BUSHING
I-027 GATE STEM BUSHING
I-028 GATE STEM BUSHING
I-029 BUSHING GATE THRUST
I-030 BUSHING
I-031
HEAD COVER OUTER MACH. - DETAILS -
ELEVATION
I-032 HEAD COVER OUTER MACH. - PLAN
I-033 LOWER HEAD COVER
I-034
LOWER HEAD INTERMEDIATE - WELD &
MACH. ELEVATION
I-035
LOWER HEAD INTERMEDIATE - WELD &
MACH. ASSEMBLY PLAN
I-036 SEAL RING FOR - 3" TOP PLATE DRAIN
I-037
BOTTOM RING DETAIL OF - CAST STEEL TOP
SECTION - OF DISCHARGE RING
I-038
GATE OPERATING RING - MACHINING
DETAILS
I-039 49: DIA. PACKING GLAND
I-040 49" PACKING BOX
I-041 15 3/4" & 10 1/2" PACKING BOVES - & GLANDS
I-042 15 3/4" & 10 1/2" PACKING BOVES - GATE LINK
I-043 15 3/4" & 10 1/2" PACKING BOVES - LINK
I-044 PACKING GLAND - FOR GATE STEM
I-045
GUIDE BAR & BEARING PL - FOR GATE
OPERATIONS
I-046 GUIDE BAR & BEARING PL - GATE DETAIL
I-047
GUIDE BAR & BEARING PL - SLEEVE FOR
GATE STEM
I-048
GUIDE BAR & BEARING PL - SLEEVE FOR
GATE STEM
I-049 PROPOSED METHOD OF - GATE ASSEMBLY
I-050 OIL BASIN - AT BLADE SERVOMOTOR
I-051
I-052
MET. OF ASS. FOR ROCKER - ARM, LINKS &
BELL - CRANK IN HUB
I-053 MET. OF ASS. FOR ROCKER - LIFTING DEVICE
- CRANK IN HUB
I-054
INNER HEAD COVER - LIFTING DEVICE -
CRANK IN HUB
I-055
INNER HEAD COVER - RUNNER WEAR RINGS
I-056
RUNNER HUB ASS'Y - 280"-6 X A - CRANK IN
HUB
I-057
RUNNER HUB ASS'Y - 2 RUNNER BUSHINGS -
I-058
RUNNER HUB PLAN - 280"-6 X A - CRANK IN
I-059
RUNNER HUB PLAN - 3 SEAL RING - CRANK IN
I-060
I-061
RUNNER HUB PLAN - RUNNER BLADE -
I-062
RUNNER HUB PLAN - 6 RUNNER BLADE
RINGS - CRANK IN HUB
I-063 RUNNER HUB-280" - 6XA RH - CRANK IN HUB
I-064
RUNNER HUB-280" - ROCKER ARM - CRANK
IN HUB
I-065
RUNNER HUB-280" - LOCK RING - CRANK IN
I-066
LINK, PINS & BELLCRANK - 280" 6XA RUNNER
RH. - CRANK IN HUB
I-067
LINK, PINS & BELLCRANK - CROSSHEAD 280"
6XA RUNNER - CRANK IN HUB
I-068
UPPER GUIDE BEARING - 280" 6XA RUNNER -
I-069
RUNNER CONE - & EXTENSION - CRANK IN
I-070 RESERVED
I-071
70" DIA. BLADE OPERATING - SERVOMOTOR
ASSEMBLY - CRANK IN HUB
I-072
70" DIA. BLADE OPERATING - OPERATING
ROD - CRANK IN HUB
I-073
BY-PASS DETAILS - 10" OIL HEAD - CRANK IN
I-074
BY-PASS DETAILS - TOP FOR OIL SUPPLY
HEAD - CRANK IN HUB
I-075
DETAILS FOR TOP - OF OIL SUPPLY HEAD -
I-076
10" OILL SUPPLY HEAD - ASSEMBLY - CRANK
I-077
10" OILL SUPPLY HEAD - OIL SUPPLY PIPING -
I-078
DISTRIBUTOR SECTION - 280" - 6XA - RH. -
I-079
DISTRIBUTOR PLAN - 280" - 6XA - RH. -
I-080
CONNECTION ROD - GATE OPERATING
CYLINDERS - CRANK IN HUB
I-081
CONNECTION ROD - PACKING GLAND -
I-082
PISTON ROD - GATE OPERATING CYLINDER -
I-083
PISTON ROD - GATE OPERATING CYLINDER -
I-084
PISTON ROD - SLOW CLOSURE DETAILS -
I-085
GATE OPERATING - CYLINDER HEAD - CRANK
I-086
26 1/16" DIA. SERVOMOTOR - CYLINDER -
I-087
26 1/16" DIA. SERVOMOTOR - CYLINDER -
I-088
GENERAL ARRANGEMENT - AT GATE OPEN
CYLINDER - CRANK IN HUB
I-089
ASSEMBLY FOR GATE - LIMIT MECHANISM -
I-090
ASSEMBLY FOR GATE - THRUST COLLAR -
I-091
ASSEMBLY GATE & - GATE OPERATING
MECHANISM - CRANK IN HUB
I-092
ASSEMBLY GATE & - DISCHARGE RING -
ELEVATION - CRANK IN HUB
I-093
ASSEMBLY GATE & - DISCHARGE RING -
PLAN - CRANK IN HUB
I-094
PULLING AND JACKING DEVICES - FOR
RUNNER BLADE ASSEMBLY - CRANK IN HUB
I-095
JACKING DEVICES FOR - PISTON &
CROSSHEAD - CRANK IN HUB
I-096
JACKING DEVICES FOR - RUNNER SUPPORT -
I-097
JACKING DEVICES FOR - 1 1/4" JACK - CRANK
I-098
JACKING DEVICES FOR - 30 TON JACK -
I-099
JACKING DEVICES FOR - RUNNER COUPLING
STUD - CRANK IN HUB
I-100
JACKING DEVICES FOR - COUPLING BOLT -
I-101
JACKING DEVICES FOR - COUPLING STUD
BOLT - CRANK IN HUB
I-102
SPIRAL CASE - & INTAKE SECTION ELEV. -
I-103
SPIRAL CASE - & INTAKE PLAN - CRANK IN
I-104
SPIRAL CASE - INTERMEDIATE SHAFT -
I-105
SPIRAL CASE - TURBINE SHAFT - CRANK IN
I-106
SLEEVE FOR 47 1/2" DIA. SHAFT - CRANK IN
I-107 DRAFT TUBE ELEVATION - & SECTION -
I-108
DRAFT TUBE ELEVATION - DRAFT TUBE PLAN
I-109
DRAFT TUBE ELEVATION - DRAFT TUBE
LINER - CRANK IN HUB
I-110
DRAFT TUBE ELEVATION - DRAFT TUBE PIER
NOSE - CRANK IN HUB
I-111
WEIGHT, WIDTH & AREA CURVES - FOR
ELBOW DRAFT TUBE - CRANK IN HUB
I-112
WEIGHT, WIDTH & AREA CURVES - 70"
PISTON - CRANK IN HUB
I-113
VERT. KAPLAN TURB. - DIR. CONN. TO
GENERATOR - CRANK IN HUB
I-114
VERT. SETTING DIR. - CONNECTED TO
I-115
VERT. SETTING DIR. - TURBINE ERECTION
SURFACE PLATE - CRANK IN HUB
I-116
VERT. SETTING DIR. - PACKING BOX - CRANK
I-117
SPECIAL BOLT FOR LIFTING ROCKER - ARM &
LINKAGE AT ASSEMBLY - CRANK IN HUB
I-118
SPECIAL BOLT FOR LIFTING ROCKER - "M"
RING - 49" DIA. SHAFT - CRANK IN HUB
I-119
I-120
SUMP PUMP & FLOAT SWITCH - FOR HEAD
COVER DRAIN
I-121
LUBRICATING PUMPS AND - PIPING FOR
MAIN BEARING - CRANK IN HUB
I-122
LUBRICATING PUMPS AND - PIPING
ARRANGEMENT - CRANK IN HUB
I-123
FOUNDATION LAYOUT - ICE HARBOR DAM -
I-124
FOUNDATION LAYOUT - STRAIGHT PIN -
I-125
FOUNDATION LAYOUT - 10" OIL SUPPLY
HEAD - CRANK IN HUB
I-126
DRAIN PIPE - FOR 12" AIR VALVE - CRANK IN
I-126-1
DRAIN PIPE - 12" AIR VALVE ASSEMBLY -
I-126-10
DRAIN PIPE - 1 1/4 EYE BOLT - AND BOTTOM
I-126-11 DRAIN PIPE - NUT GUARD - CRANK IN HUB
I-126-2
DRAIN PIPE - 12" AIR VALVE DETAILS - CRANK
I-126-3
DRAIN PIPE - BOTTOM RING PLATE SKETCH -
I-126-4
DRAIN PIPE - HEADCOVER OUTER PLATE
DETAILS - CRANK IN HUB
I-126-5
DRAIN PIPE - RAILING & LADDER OIL HEAD -
PLATFORM
I-126-6 DRAIN PIPE - 70" PISTON CAP & NUT -
PLATFORM
I-126-7 DRAIN PIPE - PIPE HEAD & NUT - PLATFORM
I-126-8
DRAIN PIPE - OIL BASIN AT BLADE
SERVOMOTOR - PLATFORM
I-126-9
DRAIN PIPE - SHACKLE BOLT TO LIFT TOP -
AND BOTTOM PLATE
I-127
DRAIN PIPE - PROJECT LOCATION - CRANK IN
I-128
DRAIN PIPE - VERTICAL LIFT DOOR - CRANK
I-129
DRAIN PIPE - POWERHOUSE PLAN - EL. 368.5
I-130
DRAIN PIPE - POWERHOUSE PLAN - EL. 349.5
I-131
POWERHOUSE - TRANSVERSE SECTIONS -
I-132
GENERATOR BAYS - TRANSVERSE SECTION -
I-133
GENERATOR BAYS - PLAN - EL. 349.50 -
I-134
GENERATOR COOLING WATER - PLAN - EL.
349.50 SECT'S. & DET'S - CRANK IN HUB
I-135
GOVERNORS 1 - 3 - TERMINAL
CONNECTIONS - CRANK IN HUB
I-136
MAIN UNITS 1 - 3 - UPPER GUIDE BEARING 12
EACH - CRANK IN HUB
I-137
MAIN UNITS 1 - 3 - LOWER GUIDE BEARING 12
EACH - CRANK IN HUB
I-138
TRANSVERSE SECTION - MAIN UNIT BAY -
I-139
SPIRAL CASE NEAT LINES - PLAN &
SECTIONS - CRANK IN HUB
I-140
SPIRAL CASE NEAT LINES - DRAFT TUBE -
PLAN - CRANK IN HUB
I-141
I-142
TRANSFORMER CANYON - TRANSVERSE
SECTION - CRANK IN HUB
I-143
TRANSFORMER CANYON - 500 TON BRIDGE
CRANE - CRANK IN HUB
I-144
TURBINE PIT SCAFFOLD - TYPE 1 - CRANK IN
I-145
TURBINE PIT SCAFFOLD - TYPE 2 - CRANK IN
I-145-1
TURBINE PIT SCAFFOLD - MODIFICATIONS -
I-145-10
POWERHOUSE CONCRETE OUTLINE - 500
TON BRIDGE CRANE - COVERAGE DIGRAM
I-145-11
POWERHOUSE CONCRETE OUTLINE -
ERECTION BAY PLAN - EL. 368.5 - SECTIONS
REINFORCEMENT
I-145-12
STORAGE BUILDING FLOOR PLAN -
SECTIONS REINFORCEMENT
I-145-13
STORAGE BUILDING BUILDING - ELEVATIONS
I-145-14
STORAGE BUILDING BUILDING - SECTIONS
I-145-15
GENERATOR BAYS DRAFT - TUBE FLOOR
I-145-16
GENERATOR BAYS DRAFT - TUBE ROOF
I-145-17
GENERATOR BAYS DRAFT - TUBE INTER.
PIER
I-145-18
GENERATOR BAYS TYPICAL - TRANSVERSE
I-145-19
GENERATOR BAYS SUBSTRUCTURE - - END
PIERS
I-145-2
TURBINE PIT SCAFFOLD - MODIFICATIONS -
I-145-20
GENERATOR BAYS SUBSTRUCTURE - - END
AND INTERMEDIATE PIERS
I-145-21
GENERATOR BAYS TAILRACE - - TYPICAL
TRANSVERSE SECTION
I-145-22
GENERATOR BAYS DRAFT TUBE - BULKHEAD
BLOCKOUTS
I-145-23
GENERATOR BAYS MAIN PIERS - BELOW
INTAKE SLAB
I-145-24 GENERATOR BAYS DRAFT TUBE - BASE SLAB
I-145-25
GENERATOR BAYS SUBSTRUCTURE - END
I-145-26
I-145-27
I-145-28
GENERATOR BAYS DRAFT TUBE -
INTERMEDIATE PIERS
I-145-29
PIERS - SECTIONS
I-145-3
TRANSVERSE - & LONGITUDINAL SECTIONS -
I-145-30
GENERATOR BAYS DRAFT TUBE - - ROOF OF
WATERWAY
I-145-31
GOVERNOR LUB & CIRCUIT BKR - OIL
TRANSFER SYSTEM
I-145-32
POWERHOUSE PIPING DIAGRAM - HIGH ,
TRANS, GOV-LUB & DIRTY OIL - STORAGE
ROOM - FLOW SYSTEM
I-145-34
POWERHOUSE PIPING DIAGRAM -
GOVERNOR & LUBRICATION OIL - TORAGE
ROOM - FLOW SYSTEM
I-145-4
EMBEDDED TURBINE PARTS - ERECTION
DETAILS - CRANK IN HUB
I-145-5 POWERHOUSE CONCRETE OUTLINE -
GENERATOR BAYS - DRAFT TUBE OUTLINE
I-145-6
GENERATOR BAYS DRAFT TUBE - BASE SLAB
OUTLINE
I-145-7
GENERATOR BAYS DRAFT TUBE - BAYS 4,5
AND 6
I-145-8
GENERATOR BAYS DRAFT TUBE - SECTIONS
- REINFORCEMENT
I-145-9
POWERHOUSE CONCRETE OUTLINE - Plan Generator Floor El. 368.50 - SECTIONS
REINFORCEMENT
I-146
LIFTING DEVICE - (FOR GENERATOR SHAFT) -
I-147
LIFTING DEVICE - STAIRWAY AND RAILING
(CIRCULAR) - CRANK IN HUB
I-148
OUTLINE HYDRAULIC - TURBINE-DRIVEN
I-149
OUTLINE HYDRAULIC - PIPING PLAN - CRANK
I-150
TEST CONNECTIONS - AND INTRUMENTS IN
THRUST - AND GUIDE BEARINGS
I-151
INSTRUMENTS & ACCESORIES, - CONDUIT
CONNECTIONS, SH.1 - AND GUIDE BEARINGS
I-152
CONNECTIONS, SH. 2 - AND GUIDE
BEARINGS
I-153
CONNECTIONS, SH. 3 - AND GUIDE
I-154
CONNECTIONS, SH. 4 - AND GUIDE
I-155
HIGH PRESSURE PIPING - FOR SHAFTING -
AND GUIDE BEARINGS
I-156
ARRANGEMENT OF MAIN - AND NEUTRAL
LEADS - AND GUIDE BEARINGS
I-157
ASSEMBLY HYDRAULIC - TURBINE DRIVEN
GENERATOR - AND GUIDE BEARINGS
I-158
ASSEMBLY HYDRAULIC - STAIRWAYS AND
RAILINGS - AND GUIDE BEARINGS
I-159
ASSEMBLY HYDRAULIC - GRILL (FOR MAIN
LEADS) - AND GUIDE BEARINGS
I-160
ASSEMBLY HYDRAULIC - BRAKE AND JACK -
I-161
ASSEMBLY HYDRAULIC - STATOR COIL
DIAGRAM - AND GUIDE BEARINGS
I-162
ROTOR ERECTION - AND SHAFT DIMENSIONS
- AND GUIDE BEARINGS
I-163
LIFTING ASSEMBLY, SHAFT ONLY - & ROTOR
WITH SHAFT - AND GUIDE BEARINGS
I-164 LIFTING ASSEMBLY, - UPPER BEARING
BRACKET - AND GUIDE BEARINGS
I-165
LIFTING ASSEMBLY, - BRAKE AND JACK
PIPING - AND GUIDE BEARINGS
I-166
LIFTING ASSEMBLY, - CO2 FIRE
EXTINGUISHER PIPING - AND GUIDE
I-167
LIFTING ASSEMBLY, - LIFTING DEVICES - AND
GUIDE BEARINGS
I-168
LIFTING ASSEMBLY, - R.T.D. & ACCESSORIES
- AND GUIDE BEARINGS
I-169
LIFTING ASSEMBLY, - SLINGS &
ACCESSORIES - AND GUIDE BEARINGS
I-170
LIFTING ASSEMBLY, - BEARING OIL COOLER
(ASSEMBLY) - AND GUIDE BEARINGS
I-171
LIFTING ASSEMBLY, - THRUST BEARING 44" X
114" - AND GUIDE BEARINGS
I-172
LIFTING ASSEMBLY, - SURFACE AIR COOLER
OUTLINE - AND GUIDE BEARINGS
I-173
LIFTING ASSEMBLY, - AIR COOLER PIPING -
I-174
SHIPPING WEIGHTS & DIMENSIONS - OF
GENERATOR MAIN PARTS - AND GUIDE
I-175
MAIN UNIT TURBINE PIT - CONNECTION
DIAGRAM
I-176
POWERHOUSE - ELECTRICAL WIRING -
AROUND UNIT 1
I-177
POWERHOUSE - ELECTRICAL WIRING -
AROUND UNIT 2
I-178
SHIPPING WEIGHTS & DIMENSIONS -
THERMOMETER - AND GUIDE BEARINGS
I-179
TERMINAL BOARD ARRANGEMENT - AND
I-180
INSTRUMENTS & ACCESSORIES - CONDUIT
CONNECTIONS SHEET 5
I-180-1
INSTRUMENTS & - ACCESSORIES CONDUIT -
CONNECTIONS SHEET 6
I-180-10 FLOWMETER - PIPING ARRANGEMENT
I-180-11 OUTLINE BARTON - FLOWMETER #21
I-180-12 DIAGRAM OF - CONNECTIONS
I-180-13
NOTES & SPECIFICATIONS - FOR AIR
COOLER PIPING - SHEET 1
I-180-14
NOTES & SPECIFICATIONS - FOR AIR
COOLER PIPING - SHEET 2
I-180-15
FLOATMETER - (THRUST BEARING OIL
COOLER)
I-180-16 FLOATMETER - (AIR COOLER)
I-180-17 ORIFICE - FLANGE ASSEMBLY
I-180-18 LIST OF MATERIALS
I-180-19 UPPER BEARING - BRACKET PIPING
I-180-2
CONNECTIONS SHEET 7
I-180-20 BEARING - BRACKET PIPING
I-180-3
CONNECTIONS SHEET 8
I-180-4
GRILLE (FOR NEUTRAL LEADS) -
ACCESSORIES CONDUIT - CONNECTIONS
SHEET 8
I-180-5
KAPLAN PIPE AIR - COOLER COVER PLATE -
& HOUSING HANDRAIL
I-180-6 CYLINDER - (FOR AIR DEFLECTOR)
I-180-7 THERMOMETER - (FOR BEARING)
I-180-8 DOOR & FRAME - (FOR HOUSING)
I-180-9 THERMOMETER - PANEL ASSEMBLY
I-181
GENERAL BRIDGE SIDE VIEW - AND GUIDE
I-182
GENERAL TROLLEY (SIDE ELEVATION) - AND
I-183
SHIPPING WEIGHTS & DIMENSIONS - LIFTING
BEAM - AND GUIDE BEARINGS
I-184
250 TON BOTTOM BLOCK, - MAIN HOIST - AND
I-185
250 TON BOTTOM BLOCK, - HOOK 250 TON
CAPACITY - AND GUIDE BEARINGS
I-245
ARRANGEMENT OF GOV. - ASSEMBLIES
(PLAN VIEW) - AND GUIDE BEARINGS
I-246
GOVERNOR CABINET - WIRING DIAGRAM -
I-247
PMG DRIVE & GOVERNOR - RESTORING AT
OIL HEAD - AND GUIDE BEARINGS
I-248
PMG DRIVE & GOVERNOR - BLADE SERVO
PIPING - AND GUIDE BEARINGS
I-249
ASSEMBLY OF BLADE B - GATE RESTORING
LINKAGE - AND GUIDE BEARINGS
I-249-1
GOVERNOR GENERATOR UNIT - ASSEMBLY
20" HOUSING - AND GUIDE BEARINGS
I-249-2
GOVERNOR GENERATOR UNIT - PMG DOME
LIGHT ASSEMBLY - AND GUIDE BEARINGS
I-249-3
TERMINAL COMPARTMENT COVER - SUB-
ASSEMBLY FOR PMG UNIT - AND GUIDE
I-249-4
47 1/2" BABBITED BEARING - Servomotor Oil Pressure Piping - Sheet Title 3
I-249-5
Interconnecting Piping for Governor - Oil Pressure Set - Sheet Title 3
I-250
GENERATOR COOLING WATER - AND
THRUST BEARING - CONTROL PANEL
I-256
GOVERNOR ACTUATOR CABINET - - NEW
EQUIPMENT - INSTALL
I-257
BLADE POSITION TRANSDUCER - - UNITS 1 &
3 GENERAL ARRANGEMENT
I-258
GATE POSITION TRANSDUCER - - GENERAL
ARRANGEMENT
I-259 NEW RELAY VALVE - COVER PLATES
I-260
GOVERNOR ACTUATOR - - ELECTRICAL
EQUIPMENT PLANS
I-261
ELECTRICAL EQUIPMENT PLAN - - TURBINE
PIT
I-262
UNIT 1 -- 3 GENERATOR BAY - - EQUIPMENT
PLAN EL. 349.5
I-263
TURBINE PIT - - ELECTRICAL CONDUIT -
DETAILS
(End of drawing list)
(End of clause)
Contract drawings created on CADD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CADD. The Contractor assumes all risks associated in using electronic CADD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CADD drawing. If contract modifications are issued, the associated electronic CADD drawings will not be available to the Contractor. Electronic copies of CADD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.
(End of Summary of Changes)
Ice Harbor Turbine Installation and Rewind Units 1 - 3 W912EF-15-R-0044 Amend-0003
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 45 04.00 28
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 REFERENCES
1.2 PAYMENT
1.3 SUBMITTALS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 GENERAL
3.2 CONTRACTOR QUALITY CONTROL (CQC) PLAN
3.2.1 General
3.2.2 Content of the CQC Plan
3.2.3 Acceptance of Plan
3.2.4 Notification of Changes
3.3 COORDINATION MEETING
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
3.4.2 CQC System Manager
3.4.3 CQC Personnel
3.4.3.1 Experience
3.4.4 Additional Requirement
3.5 SUBMITTALS
3.6 CONTROL
3.6.1 Preparatory Phase
3.6.2 Initial Phase
3.6.3 Follow-up Phase
3.6.4 Additional Preparatory and Initial Phases
3.7 TESTS
3.7.1 Testing Procedure
3.7.2 Testing Laboratories
3.7.2.1 Capability Check
3.7.3 Onsite Laboratory
3.7.4 Furnishing or Transportation of Samples for Testing
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
3.8.2 Pre-Final Inspection
3.8.3 Final Acceptance Inspection
3.9 DOCUMENTATION
3.10 NOTIFICATION OF NONCOMPLIANCE
3.11 PROJECT CLOSE OUT
ATTACHMENTS:
SECTION 01 45 04.00 28
G4EDDRJR
Line
Sample of Quality Control Report, WWD-QCR (Rev Sep 85)
-- End of Section Table of Contents --
SECTION 01 45 04.00 28
SECTION 01 45 04.00 28
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D 3740 (2004a) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction
ASTM E 329 (2007) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction
1.2 PAYMENT
Separate payment will not be made for providing and maintaining an effective Quality Control program, and all costs associated therewith shall be included in the applicable unit prices or lump-sum prices contained in The Schedule.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. Designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Contractor Quality Control (CQC) Plan; G, C
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 GENERAL
The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the clause entitled INSPECTION OF CONSTRUCTION of the CONTRACT CLAUSES. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements. The system shall cover all on-site construction operations and shall be keyed to the proposed construction sequence. The Contractor shall utilize established in-house quality control procedures to assure full compliance with all off-site work. The Contractor shall submit daily reports in compliance with paragraph DOCUMENTATION for all on-site work and for all off-site work.
3.2 CONTRACTOR QUALITY CONTROL (CQC) PLAN
3.2.1 General
The Contractor shall furnish for review by the Government, not later than 15 calendar days after receipt of Notice to Proceed, the Contractor Quality Control Plan proposed to implement the requirements of the clause entitled INSPECTION OF CONSTRUCTION of the CONTRACT CLAUSES. The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. Construction will be permitted to begin only after acceptance of the CQC Plan.
3.2.2 Content of the CQC Plan
The CQC Plan shall include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and purchasing agents:
a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff shall implement the three phase control system for all aspects of the work specified. The CQC System Manager shall report directly to the owner of the firm or a senior manager not responsible for executing the work. The CQC can not work directly for the Project Manager or manager responsible for the execution of the work.
b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a QC function.
c. A copy of the letter to the CQC System Manager signed by the owner of the firm, or an equivalent individual within the company who is not responsible for managing this project, which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work and rework of any nonconformance work which is not in compliance with the contract. The CQC System Manager shall issue letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities.
Copies of these letters shall also be furnished to the Government.
d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures shall be in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES.
e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities will be subject to approval by the Contracting Officer.)
f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.
g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. These procedures shall establish verification that identified deficiencies have been corrected.
h. Reporting procedures, including proposed reporting formats.
i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks and has separate control requirements. It could be identified by different trades or disciplines, or it could be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable feature under a particular section. This list will be agreed upon during the coordination meeting.
3.2.3 Acceptance of Plan
Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his CQC plan and operations including removal of personnel, as necessary, to obtain the quality specified.
3.2.4 Notification of Changes
After acceptance of the CQC plan, the Contractor shall notify the Contracting Officer in writing a minimum of seven (7) calendar days prior to any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.
3.3 COORDINATION MEETING
After the Preconstruction Conference, before start of construction, and prior to acceptance by the Government of the Quality Control Plan, the Contractor shall meet with the Contracting Officer and discuss the Contractor's quality control system. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both on-site and off-site work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance inspection. Minutes of the meeting will be prepared by the Contractor. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure safety and contract compliance. The Safety and Health ManagerSite Safety and Health Officer (SSHO) shall serve as a member of the CQC staff. Personnel identified in the technical provisions as requiring specialized skills to
SECTION 01 45 04.00 28
assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff shall maintain a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure contract compliance. The CQC staff shall be subject to acceptance by the Contracting Officer. The Contractor shall provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Complete records of all letters, material submittals, shop drawing submittals, schedules and all other project documentation shall be promptly furnished to the CQC organization by the Contractor. The CQC organization shall be responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.
3.4.2 CQC System Manager
This CQC System Manager shall be on the site at all times during construction and shall be employed by the prime Contractor. The CQC System Manager shall be a construction person with a minimum of 10 years in related work. The CQC System Manager shall be assigned no other duties and be on site at all times during construction.
3.4.3 CQC Personnel
In addition to CQC personnel specified elsewhere in the contract, the Contractor shall provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas:
Disassembly and Reassembly, Turbine Installation and associated work, Draft Tube modification work, and Rewind of Generator. These individuals shall be directly employed by the prime Contractor and may not be employed by a supplier or sub-Contractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on their areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals shall have no other duties other than quality control.
3.4.3.1 Experience
10 years construction experience and 5 years QC experience specific to similar size unit.
3.4.4 Additional Requirement
In addition to the above experience, the CQC System Manager shall have completed the course entitled "Construction Quality Management for Contractors" within the last five (5) years. This course will periodically be offered at various locations throughout the Pacific Northwest. For information concerning this course call your local Associated General Contractor's Plan Room.
3.5 SUBMITTALS
Submittals shall be as specified in SECTION 01 33 00 SUBMITTAL PROCEDURES.
The CQC System Manager shall be responsible for certifying that all submittals are in compliance with the contract requirements.
3.6 CONTROL
Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. The controls shall be adequate to cover all construction operations, including on-site fabrication, and shall be keyed to the proposed construction sequence. The controls shall include at least three phases of control to be conducted by the CQC system manager for all definable features of work, as follows:
3.6.1 Preparatory Phase
This phase shall be performed prior to beginning work on each definable feature of work and shall include:
a. A review of each paragraph of applicable specifications.
b. A review of the contract plans.
c. A check to assure that all materials and/or equipment have been tested, submitted, and approved.
d. A check to assure that provisions have been made to provide required control inspection and testing.
e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.
f. A physical examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawing or submitted data, and are properly stored.
g. A review of the appropriate activity hazard analysis to assure safety requirements are met.
h. Discussion of procedures for constructing the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that phase of work.
i. A check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.
j. The Government shall be notified at least 48 hours in advance of beginning any of the required action of the preparatory phase.
This phase shall include a meeting conducted by the CQC system manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. The results of the preparatory phase actions shall be documented by separate minutes prepared by the CQC system manager and attached to the daily QC report. The Contractor shall instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.
3.6.2 Initial Phase
This phase shall be accomplished at the beginning of a definable feature of work. The following shall be accomplished:
a. A check of preliminary work to ensure that it is in compliance with contract requirements. Review minutes of the preparatory meeting.
b. Verification of full contract compliance. Verify required control inspection and testing.
c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with sample panels as appropriate.
d. Resolve all differences.
e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.
f. The Government shall be notified at least 24 hours in advance of beginning the initial phase. Separate minutes of this phase shall be prepared by the CQC system manager and attached to the daily CQC report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.
g. The initial phase shall be repeated for each new crew to work on-site, or any time acceptable specified quality standards are not being met.
3.6.3 Follow-up Phase
Daily inspections shall be performed to assure continuing compliance with contract requirements, including control testing, until completion of the particular feature of work. The inspections shall be made a matter of record in the CQC documentation. Final follow-up inspections shall be conducted and all deficiencies corrected prior to the start of additional features of work which may be affected by the deficient work. The Contractor shall not build upon or conceal non-conforming work. The Contractor shall maintain working "as-built" contract drawings as required in SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS.
3.6.4 Additional Preparatory and Initial Phases
Additional preparatory and initial phases shall be conducted on the same definable features of work as determined by the Government if the quality of on-going work is unacceptable; or if there are changes in the applicable QC staff or in the on-site production supervision or work crew; or if work on a definable feature is resumed after a substantial period of inactivity, or if other problems develop.
3.7 TESTS
3.7.1 Testing Procedure
The Contractor shall perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements. Upon request, the Contractor shall furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and/or acceptance tests when specified. The Contractor shall procure the services of a Corps of Engineers approved testing laboratory or establish an approved testing laboratory at the project site. The Contractor shall perform the following activities and record and provide the following data:
a. Verify that testing procedures comply with contract requirements.
b. Verify that facilities and testing equipment are available and comply with testing standards.
c. Check test instrument calibration data against certified standards.
d. Verify that recording forms and…