W68SBV50771656
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0005: Changes are made as indicated on the attached Summary of Changes.
The due date for receipt of proposals is extended as a result of this amendment. Proposals must be received by 4:00pm, Pacif ic Time, on 12 November 2015.
Project: Ice Harbor Turbine Installation and Rew ind Units 1 – 3
1. CONTRACT ID CODE PAGE OF PAGES
J 1 28
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Nov-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0044
X 9B. DATED (SEE ITEM 11)
01-Sep-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Nov-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
PHYLLIS L. BUERSTATTE
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-R-0044
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005
Summary of changes for Amendment 0005 Ice Harbor Turbine Installation and Rewind Units 1 – 3
1. Revised the following Specifications:
a. SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS Revised the following paragraph:
1.16 PROJECT SUPERINTENDENT
b. SECTION 01 22 00.00 28 MEASUREMENT AND PAYMENT
Revised the following paragraphs:
1.6.35 Item 2035 Clean-up And Inspect Intermediate and Generator Shafts Unit 2
1.7.1.32 Item 3033 Clean-up And Inspect Intermediate and Generator Shafts Unit 3
1.8.32 Item 4032 Clean-up and Inspect Intermediate and Generator Shafts Unit 1 (Optional)
c. SECTION 48 13 13.03 26 EXISTING TURBINE COMPONENT REFURBISHMENT, MODIFICATION AND REPLACEMENT
Revised the following paragraph
3.13.6 Refurbishment of Wicket Gate Vertical Contacting Surfaces
d. SECTION 48 13 16.00 26 REWIND OF HYDRAULIC-TURBINE DRIVEN
ALTERNATING CURRENT GENERATOR
Revised the following paragraphs:
1.3 SUBMITTALS
3.27.1 General
2. Revised the bid schedule: See Yellow Highlights
3. Revised Section 00700, FAR Clause 52.217-7, Option for Increased Quantity – Separately Priced Line Items. See Yellow Highlights
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 10-Nov-2015 04:00 PM to 12-Nov-2015 04:00 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
BID SCHEDULE
Walla Walla District Corps of Engineers Ice Harbor Turbine Installation and Rewind Units 1-3
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000 Unrestricted Competition
ITEM DESCRIPTION QUANTITY U/M U/P AMOUNT
BASE ITEMS APPLICABLE TO ALL UNITS
1001 Mobilization And Demobilization 1 JOB XXXXX $________ 1002 Furnish Special Tools, Equipment
And Scaffolding
1 JOB XXXXX $________
1003 Furnish Spare RTDs And Relays 1 JOB XXXXX $________ 1004 Furnish Turbine Maintenance
Platform
1 JOB XXXXX $________
1005 Drain and Dispose of Dirty Oil from Tanks and Piping
Est. 17,500 GAL $________ $________
1006 Supply Clean Oil for Tank and Piping
Est. 9,500 GAL $________ $________
1007 Manufacture Prototype Coils And Perform Accelerated Life Test
1 JOB XXXXX $________
1008 Manufacture Prototype Coils And Perform Thermal Cycling Test
1 JOB XXXXX $________
1009 Furnish Generator Spare Parts 1 JOB XXXXX $________ 1010 Furnish Stator Core Materials And
Accessories for One Generating Unit Including Factory Tests
1 JOB XXXXX $________
1011 Perform Minor Stator Core Iron Repair
NTE 480 HR $________ $________
1012 Perform Special Field Tests 1 JOB XXXXX $________
1013 Disposal of Hydraulic and Lubricating Oil Units 4, 5 and 6
Est. 24,000 GAL $________ $________
1014 Provision of Hydraulic and Lubricating Oil Units 4, 5 and 6
Est. 24,000 GAL $________ $________
1015 Furnish Unit 2 Makup Oil Est. 750 GAL $________ $________
1016 Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 1
1 JOB XXXXX $________
TOTAL BASE ITEMS APPLICABLE TO ALL UNITS $__________
BASE ITEMS APPLICABLE TO UNIT 2
2001 Phase 1 Thrust Bearing Inspection Unit 2 (Shoes, Runner, & Other)
1 JOB XXXXX $________
2002 Inspection Of Turbine And Generator Guide Bearings Unit 2
1 JOB XXXXX $________
2003 Replace Generator Air Coolers, Piping And Valves Unit 2
1 JOB XXXXX $________
2004 Replace Generator Cooling Water Air Operated Valves Unit 2
1 JOB XXXXX $________
2005 Construct Draft Tube Roof Fill Unit
1 JOB XXXXX $________
2006 Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 2
1 JOB XXXXX $________
2007 Remove Existing Stator Winding, Install And Test New Stator Winding Unit 2
1 JOB XXXXX $________
2008 Inspect, Clean And Test Stator Core Unit 2
1 JOB XXXXX $________
2009 Inspect, Clean And Test Rotor Unit
1 JOB XXXXX $________
2010 Lead Based Paint Removal Including Disposal Unit 2
Est. 1,500 SF $________ $________
2011 Painting Unit 2 1 JOB XXXXX $________
2012 Disposal of Hydraulic and Lubricating Oil Unit 2
Est. 4,500 GAL $________ $________
2013 Disposal of Hub/Shafting Water Unit 2
Est. 2,000 GAL $________ $________
2014 Provision of Hydraulic and Lubricating Oil Unit 2
Est. 4,500 GAL $________ $________
2015 Pre-Disassembly Watered Operational Testing Unit 2
1 JOB XXXXX $________
2016 Generating Unit Disassembly Unit 2 1 JOB XXXXX $________
2017 Generating Unit Reassembly Unit 2 1 JOB XXXXX $________
2018 Commissioning for Turbine Replacement and Generator Rewind Unit 2
1 JOB XXXXX $________
2019 Refurbish Wicket Gates Unit 2 1 JOB XXXXX $________
2020 Stay Vane/Ring Refurbishment and Extension Installation Unit 2
1 JOB XXXXX $________
2021 Refurbish Bottom Ring Unit 2 1 JOB XXXXX $________
2022 Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 2
1 JOB XXXXX $________
2023 Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 2
1 JOB XXXXX $________
2024 Line Boring and Installation of Wicket Gate Stem Bushings Unit 2
1 JOB XXXXX $________
2025 Refurbish/Replace Turbine Air Admission Valves Unit 2
1 JOB XXXXX $________
2026 Refurbish Operating Ring Unit 2 1 JOB XXXXX $________
2027 Refurbish Wicket Gate Servomotors Unit 2
1 JOB XXXXX $________
2028 Modification of Unit 2 For Fixed Blade Operation
2029 Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 2
1 JOB XXXXX $________
2030 Install Discharge Ring and Draft Tube Liner Transition Unit 2
1 JOB XXXXX $________
2031 Provide Electrical Equipment, Wiring, Removal, Installation Unit 2
1 JOB XXXXX $________
2032 Refurbish/Modify Intermediate Headcover Unit 2
1 JOB XXXXX $________
2033 Refurbish Outer Headcover Unit 2 1 JOB XXXXX $________
2034 Refurbish Turbine Shaft Unit 2 1 JOB XXXXX $________
2035 Refurbish Clean and Inspect Intermediate and Generator Shafts Unit 2
TOTAL BASE ITEMS APPLICABLE TO UNIT 2 $___________
BASE ITEMS APPLICABLE TO UNIT 3
3001 Phase 1 Thrust Bearing Inspection Unit 3 (Shoes, Runner, & Other)
3002 Inspection Of Turbine And Generator Guide Bearings Unit 3
1 JOB XXXXX $________
3003 Replace Generator Air Coolers, Piping And Valves Unit 3
1 JOB XXXXX $________
3004 Replace Generator Cooling Water Air Operated Valves Unit 3
1 JOB XXXXX $________
3005 Construct Draft Tube Roof Fill Unit
1 JOB XXXXX $________
3006 Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 3
1 JOB XXXXX $________
3007 Remove Existing Stator Winding, Install And Test New Stator Winding Unit 3
1 JOB XXXXX $________
3008 Inspect, Clean And Test Stator Core Unit 3
1 JOB XXXXX $________
3009 Inspect, Clean And Test Rotor Unit
1 JOB XXXXX $________
3010 Lead Based Paint Removal Including Disposal Unit 3
Est. 1,500 SF $________ $________
3011 Painting Unit 3 1 JOB XXXXX $________
3012 Disposal of Hydraulic and Lubricating Oil Unit 3
Est. 4,500 GAL $________ $________
3013 Disposal of Hub/Shafting Water Unit 3
Est. 2,000 GAL $________ $________
3014 Provision of Hydraulic and Lubricating Oil Unit 3
Est. 6,900 GAL $________ $________
3015 Pre-Disassembly Watered Operational Testing Unit 3
1 JOB XXXXX $________
3016 Generating Unit Disassembly Unit 3 1 JOB XXXXX $________
3017 Generating Unit Reassembly Unit 3 1 JOB XXXXX $________
3018 Commissioning for Turbine Replacement and Generator Rewind Unit 3
1 JOB XXXXX $________
3019 Refurbish Wicket Gates Unit 3 1 JOB XXXXX $________
3020 Stay Vane/Ring Refurbishment and Extension Installation Unit 3
3021 Refurbish Bottom Ring Unit 3 1 JOB XXXXX $________
3022 Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 3
1 JOB XXXXX $________
3023 Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 3
1 JOB XXXXX $________
3024 Line Boring and Installation of Wicket Gate Stem Bushings Unit 3
1 JOB XXXXX $________
3025 Refurbish/Replace Turbine Air Admission Valves Unit 3
1 JOB XXXXX $________
3026 Refurbish Operating Ring Unit 3 1 JOB XXXXX $________
3027 Refurbish Wicket Gate Servomotors Unit 3
1 JOB XXXXX $________
3028 Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 3
1 JOB XXXXX $________
3029 Install Discharge Ring and Draft Tube Liner Transition Unit 3
1 JOB XXXXX $________
3030 Refurbish/Modify Intermediate Headcover Unit 3
1 JOB XXXXX $________
3031 Provide Electrical Equipment, Wiring, Removal, Installation Unit 3
1 JOB XXXXX $________
3032 Refurbish Turbine Shaft Unit 3 1 JOB XXXXX $________
3033 Refurbish Clean and Inspect Intermediate and Generator Shafts Unit 3
1 JOB XXXXX $________
3034 Refurbish Blade Operating Mechanism Components Unit 3
TOTAL BASE ITEMS APPLICABLE TO UNIT 3 $___________
BASE ITEMS APPLICABLE TO UNIT 1 (OPTIONAL)
4001 Phase 1 Thrust Bearing Inspection Unit 1 (Shoes, Runner, & Other) (Optional)
1 JOB XXXXX $________
4002 Inspection Of Turbine And Generator Guide Bearings Unit 1 (Optional)
1 JOB XXXXX $________
4003 Replace Generator Air Coolers, Piping And Valves Unit 1 (Optional)
1 JOB XXXXX $________
4004 Replace Generator Cooling Water Air Operated Valves Unit 1 (Optional)
1 JOB XXXXX $________
4005 Construct Draft Tube Roof Fill Unit 1 (Optional)
1 JOB XXXXX $________
4006 RESERVED
4007 Remove Existing Stator Winding, Install And Test New Stator Winding Unit 1 (Optional)
1 JOB XXXXX $________
4008 Inspect, Clean And Test Stator Core Unit 1 (Optional)
1 JOB XXXXX $________
4009 Inspect, Clean And Test Rotor Unit 1 (Optional)
1 JOB XXXXX $________
4010 Lead Based Paint Removal Including Disposal Unit 1 (Optional)
Est. 1,500 SF $________ $________
4011 Painting Unit 1 (Optional) 1 JOB XXXXX $________
4012 Disposal of Hydraulic and Lubricating Oil Unit 1 (Optional)
Est. 6,500 GAL $________ $________
4013 Provision of Hydraulic and Lubricating Oil Unit 1 (Optional)
Est. 6,900 GAL $________ $________
4014 Pre-Disassembly Watered Operational Testing Unit 1 (Optional)
1 JOB XXXXX $________
4015 Generating Unit Disassembly Unit 1 (Optional)
1 JOB XXXXX $________
4016 Generating Unit Reassembly Unit 1
4017 Commissioning for Turbine Replacement and Generator Rewind Unit 1 (Optional)
1 JOB XXXXX $________
4018 Refurbish Wicket Gates Unit 1 (Optional)
1 JOB XXXXX $________
4019 Stay Vane/Ring Refurbishment and Extension Installation Unit 1 (Optional)
1 JOB XXXXX $________
4020 Refurbish Bottom Ring Unit 1 (Optional)
1 JOB XXXXX $________
4021 Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 1 (Optional)
1 JOB XXXXX $________
4022 Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 1 (Optional)
1 JOB XXXXX $________
4023 Line Boring and Installation of Wicket Gate Stem Bushings Unit 1 (Optional)
1 JOB XXXXX $________
4024 Refurbish/Replace Turbine Air Admission Valves Unit 1 (Optional)
1 JOB XXXXX $________
4025 Refurbish Operating Ring Unit 1 (Optional)
1 JOB XXXXX $________
4026 Refurbish Wicket Gate Servomotors Unit 1 (Optional)
1 JOB XXXXX $________
4027 Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 1 (Optional)
1 JOB XXXXX $________
4028 Install Discharge Ring and Draft Tube Liner Transition Unit 1 (Optional)
1 JOB XXXXX $________
4029 Refurbish/Modify Intermediate Headcover Unit 1 (Optional)
1 JOB XXXXX $________
4030 Provide Electrical Equipment, Wiring, Removal, Installation Unit 1
4031 Refurbish Turbine Shaft Unit 1 (Optional)
1 JOB XXXXX $________
4032 Refurbish Clean and Inspect Intermediate and Generator Shafts Unit 1 (Optional)
1 JOB XXXXX $________
4033 Refurbish Blade Operating Mechanism Components Unit 1
TOTAL BASE ITEMS APPLICABLE TO UNIT 1 (OPTIONAL) $___________
OPTIONAL ITEMS APPLICABLE TO ALL UNITS
5001 Miscellaneous Parts And Materials (Optional)
NTE
$80,000
____ XXXXX $________
5002 Miscellaneous Welding (Optional) NTE
LB $________ $________
5003 T&M: Provide Skilled Welding Hire (Optional)
NTE
HR $________ $________
5004 T&M: Provide Skilled Machinist Hire (Optional)
NTE
HR $________ $________
5005 T&M: Provide Skilled Electrician Hire (Optional)
NTE
HR $________ $________
5006 T&M: Provide Skilled Painter Hire (Optional)
NTE
HR $________ $________
5007 T&M: Provide Skilled
Millwright/Mechanic Hire (Optional)
NTE
HR $________ $________
5008 T&M: Provide Skilled General Laborer Hire (Optional)
NTE
HR $________ $________
5009 T&M: Provide Skilled Liquid Penetrant Testing (Optional)
NTE
HR $________ $________
5010 T&M: Provide Skilled Magnetic Particle Testing (Optional)
NTE
HR $________ $________
5011 T&M: Provide Skilled Ultrasonic Testing (Optional)
NTE
HR $________ $________
5012 Furnish Stator Core Materials and Accessories for One Generating Unit (Optional)
NTE
EA $________ $________
5013 Perform Additional Interlaminar Insulation Test (Optional)
TOTAL OPTIONAL ITEMS APPLICABLE TO ALL UNITS $___________
OPTIONAL ITEMS APPLICABLE TO UNIT 1
6001 Phase 2 Inspection of Thrust Shoes for Unit 1 (Optional)
1 JOB XXXXX $________
6002 Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 1 (Optional)
1 JOB XXXXX $________
6003 Refurbish Thrust Bearing Runner Unit 1 (Optional)
1 JOB XXXXX $________
6004 Machine Backside of Thrust Bearing Shoes for Unit 1 (Optional)
1 JOB XXXXX $________
6005 Machine Babbitted Face of Thrust Bearing Shoes for Unit 1 (Optional)
1 JOB XXXXX $________
6006 Refurbish Thrust Bearing Shoes Including Babbitting for Unit 1 (Optional)
1 JOB XXXXX $________
6007 Refurbish Thrust Bearing Collar for Unit 1 (Optional)
1 JOB XXXXX $________
6008 Refurbish Turbine Guide Bearing for Unit 1 (Optional)
1 JOB XXXXX $________
6009 Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 1 (Optional)
1 JOB XXXXX $________
6010 Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 1 (Optional)
1 JOB XXXXX $________
6011 Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 1 (Optional)
1 JOB XXXXX $________
6012 Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 1 (Optional)
1 JOB XXXXX $________
6013 Wicket Gate Additional Painting for Unit 1 (Optional)
2 EA $________ $________
6014 Stay Vane Additional Painting for Unit 1 (Optional)
2 EA $________ $________
6015 Generator Rotor Balancing for Unit 1 (Optional)
1 JOB XXXXX $________
6016 Remove Existing Stator Core, Install and Test New Stator Core for Unit 1 (Optional)
1 JOB XXXXX $________
6017 Refurbish Rotor Poles Unit 1
6018 Machine Stay Ring Flange Unit 1
(Optional)
1 JOB $________ $________
6019 Bore Wicket Gate Servomotor Cylinder Unit 1 (Optional)
2 EA $________ $________
6020 Chrome Plate Wicket Gate Servomotor Piston Rod Unit 1
2 EA $________ $________
TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 1 $___________
OPTIONAL ITEMS APPLICABLE TO UNIT 2
7001 Phase 2 Inspection of Thrust Shoes for Unit 2 (Optional)
1 JOB XXXXX $________
7002 Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 2 (Optional)
1 JOB XXXXX $________
7003 Refurbish Thrust Bearing Runner Unit 2 (Optional)
1 JOB XXXXX $________
7004 Machine Backside of Thrust Bearing Shoes for Unit 2 (Optional)
1 JOB XXXXX $________
7005 Machine Babbitted Face of Thrust Bearing Shoes for Unit 2 (Optional)
1 JOB XXXXX $________
7006 Refurbish Thrust Bearing Shoes Including Babbitting for Unit 2 (Optional)
1 JOB XXXXX $________
7007 Refurbish Thrust Bearing Collar for Unit 2 (Optional)
1 JOB XXXXX $________
7008 Refurbish Turbine Guide Bearing for Unit 2 (Optional)
1 JOB XXXXX $________
7009 Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 2 (Optional)
1 JOB XXXXX $________
7010 Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 2 (Optional)
1 JOB XXXXX $________
7011 Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 2 (Optional)
1 JOB XXXXX $________
7012 Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 2 (Optional)
1 JOB XXXXX $________
7013 Wicket Gate Additional Painting for Unit 2 (Optional)
2 EA $________ $________
7014 Stay Vane Additional Painting for Unit 2 (Optional)
2 EA $________ $________
7015 Generator Rotor Balancing for Unit 2 (Optional)
1 JOB XXXXX $________
7016 Remove Existing Stator Core, Install and Test New Stator Core for Unit 2 (Optional)
1 JOB XXXXX $________
7017 Refurbish Rotor Poles Unit 2
7018 Machine Stay Ring Flange Unit 2
(Optional)
1 JOB XXXXX $________
7019 Bore Wicket Gate Servomotor Cylinder Unit 2 (Optional)
2 EA $________ $________
7020 Chrome Plate Wicket Gate Servomotor Piston Rod Unit 2
TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 2 $___________
OPTIONAL ITEMS APPLICABLE TO UNIT 3
8001 Phase 2 Inspection of Thrust Shoes for Unit 3 (Optional)
1 JOB XXXXX $________
8002 Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 3 (Optional)
1 JOB XXXXX $________
8003 Refurbish Thrust Bearing Runner Unit 3 (Optional)
1 JOB XXXXX $________
8004 Machine Backside of Thrust Bearing Shoes for Unit 3 (Optional)
1 JOB XXXXX $________
8005 Machine Babbitted Face of Thrust Bearing Shoes for Unit 3 (Optional)
1 JOB XXXXX $________
8006 Refurbish Thrust Bearing Shoes Including Babbitting for Unit 3 (Optional)
1 JOB XXXXX $________
8007 Refurbish Thrust Bearing Collar for Unit 3 (Optional)
1 JOB XXXXX $________
8008 Refurbish Turbine Guide Bearing for Unit 3 (Optional)
1 JOB XXXXX $________
8009 Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 3 (Optional)
1 JOB XXXXX $________
8010 Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 3 (Optional)
1 JOB XXXXX $________
8011 Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 3 (Optional)
1 JOB XXXXX $________
8012 Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 3 (Optional)
1 JOB XXXXX $________
8013 Wicket Gate Additional Painting for Unit 3 (Optional)
2 EA $________ $________
8014 Stay Vane Additional Painting for Unit 3 (Optional)
2 EA $________ $________
8015 Generator Rotor Balancing for Unit 3 (Optional)
1 JOB XXXXX $________
8016 Remove Existing Stator Core, Install and Test New Stator Core for Unit 3 (Optional)
1 JOB XXXXX $________
8017 Refurbish Rotor Poles Unit 3
8018 Machine Stay Ring Flange Unit 3
(Optional)
1 JOB $________ $________
8019 Bore Wicket Gate Servomotor Cylinder Unit 3 (Optional)
2 EA $________ $________
8020 Chrome Plate Wicket Gate Servomotor Piston Rod Unit 3
TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 3 $__________
OPTIONAL ITEMS TOTAL $__________
SCHEDULE TOTAL $__________
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
NTE = Not To Exceed Est = Estimated
Quantities identified as Estimated (“Est”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN ESTIMATED QUANTITY, located in Section 00700.
LABOR HOUR AND TIME & MATERIALS LINE ITEMS: Contract Line Items # 1011, and 5001 through 5011 are labor hour or time-and-materials line items. The extended amount for each of these items is the established ceiling price. Without a modification pursuant to FAR Clause 52.243-3, Changes -- Time-and-Materials or Labor-Hours (Sep 2000), the Contractor exceeds the ceiling at his own risk.
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the time periods stated below
CLIN DESCRIPTION TIMEFRAME WHEN OPTIONAL
ITEM MAY BE EXERCISED
IF EXERCISED, TIME
EXTENSION TO
COMPLETE WORK
FOR ITEM
4001 Phase 1 Thrust Bearing Inspection Unit 1 (Shoes, Runner, & Other) (Optional)
Prior to completion of Unit 3 Installation.
15 Months (15) from date of exercising the option.
4002 Inspection Of Turbine And Generator Guide Bearings Unit 1 (Optional) option.
4003 Replace Generator Air Coolers, Piping And Valves Unit (Optional) option.
4004 Replace Generator Cooling Water Air Operated Valves Unit 1 (Optional) option.
4005 Construct Draft Tube Roof Fill Unit 1 (Optional) option.
4006 RESERVED
4007 Remove Existing Stator Winding, Install And Test New Stator Winding Unit 1 (Optional) option.
4008 Inspect, Clean And Test Stator Core Unit 1 (Optional) option.
4009 Inspect, Clean And Test Rotor Unit 1 (Optional) option.
4010 Lead Based Paint Removal Including Disposal Unit 1 (Optional) option.
4011 Painting Unit 1 (Optional) Prior to completion of Unit 3 option.
4012 Disposal of Hydraulic and Lubricating Oil Unit 1 (Optional) option.
4013 Provision of Hydraulic and Lubricating Oil Unit 1 (Optional) option.
4014 Pre-Disassembly Watered Operational Testing Unit 1 (Optional) option.
4015 Generating Unit Disassembly Unit 1 (Optional) option.
4016 Generating Unit Reassembly Unit 1 (Optional) option.
4017 Commissioning for Turbine Replacement and Generator Rewind Unit 1 (Optional) option.
4018 Refurbish Wicket Gates Unit 1 (Optional) option.
4019 Stay Vane/Ring Refurbishment and Extension Installation Unit 1 (Optional) option.
4020 Refurbish Bottom Ring Unit 1 (Optional) option.
4021 Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 1 (Optional) option.
4022 Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 1 (Optional) option.
4023 Line Boring and Installation of Wicket Gate Stem Bushings Unit 1 (Optional) option.
4024 Refurbish/Replace Turbine Air Admission Valves Unit 1 (Optional)
4025 Refurbish Operating Ring Unit 1 option.
4026 Refurbish Wicket Gate Servomotors Unit 1 (Optional) option.
4027 Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 1 (Optional) option.
4028 Install Discharge Ring and Draft Tube Liner Transition Unit 1 (Optional) option.
4029 Refurbish/Modify Intermediate Headcover Unit 1 (Optional) option.
4030 Provide Electrical Equipment, Wiring, Removal, Installation Unit 1 (Optional) option.
4031 Refurbish Turbine Shaft Unit 1 option.
4032 Refurbish Intermediate and Generator Shafts Unit 1 (Optional) option.
4033 Refurbish Blade Operating Mechanism Components Unit 1 (Optional)
ITEM DESCRIPTION TIMEFRAME WHEN OPTIONAL
ITEM WILL BE EXERCISED
IF EXERCISED, TIME
EXTENSION TO
COMPLETE WORK
FOR ITEM
5001 Miscellaneous Parts, Materials and Services (Optional)
Available until completion of onsite work
No additional time will be allowed
5002 Miscellaneous Welding (Optional) Available until completion of onsite work
No additional time will be allowed
5003 T&M: Provide Skilled Welding Hire (Optional)
Available until completion of onsite work
No additional time will be allowed
5004 T&M: Provide Skilled Machinist Hire (Optional)
Available until completion of onsite work
No additional time will be allowed
5005 T&M: Provide Skilled Electrician Hire (Optional)
Available until completion of onsite work
No additional time will be allowed
5006 T&M: Provide Skilled Painter Hire (Optional)
Available until completion of onsite work
No additional time will be allowed
5007 T&M: Provide Skilled Millwright/Mechanic Hire (Optional)
Available until completion of onsite work
No additional time will be allowed
5008 T&M: Provide Skilled General Laborer Hire (Optional)
Available until completion of onsite work
No additional time will be allowed
5009 T&M: Provide Skilled Liquid Penetrant Testing (Optional)
Available until completion of onsite work
No additional time will be allowed
5010 T&M: Provide Skilled Magnetic Particle Testing (Optional)
Available until completion of onsite work
No additional time will be allowed
5011 T&M: Provide Skilled Ultrasonic Testing (Optional)
Available until completion of onsite work
No additional time will be allowed
5012 Furnish Stator Core Materials and Accessories for One Generating Unit (Optional)
Within Fifteen (15) days after Government Approval of the Stator Inspection Report
No additional time will be allowed
5013 Perform Additional Interlaminar Insulation Test (Optional)
Within Fifteen (15) days after Government Approval of the Interlaminar Insulation Test
Fourteen (14) calendar days from date of exercising the option.
6001 Phase 2 Inspection of Thrust Shoes for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes As-Found Inspection Report
No additional time will be allowed
6002 Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Collar As-Found Inspection Report and Thrust Runner As-Found Inspection Report
No additional time will be allowed
6003 Refurbish Thrust Bearing Runner Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Runner Phase 2 Inspection Report
No additional time will be allowed
6004 Machine Backside of Thrust Bearing Shoes for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
No additional time will be allowed
6005 Machine Babbitted Face of Thrust Bearing Shoes for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
No additional time will be allowed
6006 Refurbish Thrust Bearing Shoes Including Babbitting for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
6007 Refurbish Thrust Bearing Collar for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Collar Phase 2 Inspection Report
No additional time will be allowed
6008 Refurbish Turbine Guide Bearing for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Turbine Guide Bearing Site Inspection Report
No additional time will be allowed
6009 Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
6010 Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
6011 Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
6012 Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
6013 Wicket Gate Additional Painting for Unit 1 (Optional)
Within Ten (10) days of previous contract paint application
No additional time will be allowed
6014 Stay Vane Additional Painting for Unit 1 (Optional)
Within Forty Eight (48) hours of previous contract paint coat application
No additional time will be allowed
6015 Generator Rotor Balancing for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Pre-Disassembly Watered Operational Testing Report
Five (5) calendar days from date of exercising the option.
6016 Remove Existing Stator Core, Install and Test New Stator Core for Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Interlaminar Insulation Test
An additional 15 45 days will be added to the schedule.
6017 Refurbish Rotor Poles Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Rotor Test Report
No additional time will be allowed
6018 Machine Stay Ring Flange Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Stay Ring As-Found Inspection Report
No additional time will be allowed An additional 5 days will be added to the schedule
6019 Bore Wicket Gate Servomotor Cylinder Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Wicket Gate As-Found Inspection Report
No additional time will be allowed
6020 Chrome Plate Wicket Gate Servomotor Piston Rod Unit 1 (Optional)
Within Fifteen (15) days after Government Approval of the Wicket Gate As-Found Inspection Report
No additional time will be allowed
7001 Phase 2 Inspection of Thrust Shoes for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes As-Found Inspection Report
No additional time will be allowed
7002 Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Collar As-Found Inspection Report and Thrust Runner As-Found Inspection Report
No additional time will be allowed
7003 Refurbish Thrust Bearing Runner Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Runner Phase 2 Inspection Report
No additional time will be allowed
7004 Machine Backside of Thrust Bearing Shoes for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
No additional time will be allowed
7005 Machine Babbitted Face of Thrust Bearing Shoes for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
No additional time will be allowed
7006 Refurbish Thrust Bearing Shoes Including Babbitting for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
No additional time will be allowed
7007 Refurbish Thrust Bearing Collar for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Collar Phase 2 Inspection Report
No additional time will be allowed
7008 Refurbish Turbine Guide Bearing for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Turbine Guide Bearing Site Inspection Report
No additional time will be allowed
7009 Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
7010 Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
7011 Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
7012 Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
7013 Wicket Gate Additional Painting for Unit 2 (Optional)
Within Ten (10) days of previous contract paint application
No additional time will be allowed
7014 Stay Vane Additional Painting for Unit 2 (Optional)
Within Forty Eight (48) hours of previous contract paint coat application
No additional time will be allowed
7015 Generator Rotor Balancing for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Pre-Disassembly Watered Operational Testing Report
Five (5) calendar days from date of exercising the option.
7016 Remove Existing Stator Core, Install and Test New Stator Core for Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Interlaminar Insulation Test
An additional 15 45 days will be added to the schedule.
7017 Refurbish Rotor Poles Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Rotor Test Report
No additional time will be allowed
7018 Machine Stay Ring Flange Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Stay Ring As-Found Inspection Report
No additional time will be allowed An additional 5 days will be added to the schedule
7019 Bore Wicket Gate Servomotor Cylinder Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Wicket Gate As-Found Inspection Report
No additional time will be allowed
7020 Chrome Plate Wicket Gate Servomotor Piston Rod Unit 2 (Optional)
Within Fifteen (15) days after Government Approval of the Wicket Gate As-Found Inspection Report
No additional time will be allowed
8001 Phase 2 Inspection of Thrust Shoes for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes As-Found Inspection Report
8002 Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Collar As-Found Inspection Report and Thrust Runner As-Found Inspection Report
No additional time will be allowed
8003 Refurbish Thrust Bearing Runner Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Runner Phase 2 Inspection Report
No additional time will be allowed
8004 Machine Backside of Thrust Bearing Shoes for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
No additional time will be allowed
8005 Machine Babbitted Face of Thrust Bearing Shoes for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
No additional time will be allowed
8006 Refurbish Thrust Bearing Shoes Including Babbitting for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Shoes Phase 2 Inspection Report
No additional time will be allowed
8007 Refurbish Thrust Bearing Collar for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Thrust Bearing Collar Phase 2 Inspection Report
No additional time will be allowed
8008 Refurbish Turbine Guide Bearing for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Turbine Guide Bearing Site Inspection Report
No additional time will be allowed
8009 Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
8010 Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
8011 Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
No additional time will be allowed
8012 Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Generator Guide Bearing Site Inspection Report
8013 Wicket Gate Additional Painting for Unit 3 (Optional)
Within Ten (10) days of previous contract paint application
No additional time will be allowed
8014 Stay Vane Additional Painting for Unit 3 (Optional)
Within Forty Eight (48) hours of previous contract paint coat application
No additional time will be allowed
8015 Generator Rotor Balancing for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Pre-Disassembly Watered Operational Testing Report
Five (5) calendar days from date of exercising the option.
8016 Remove Existing Stator Core, Install and Test New Stator Core for Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Interlaminar Insulation Test
An additional 15 45 days will be added to the schedule.
8017 Refurbish Rotor Poles Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Rotor Test Report
No additional time will be allowed
8018 Machine Stay Ring Flange Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Stay Ring As-Found Inspection Report
No additional time will be allowed An additional 5 days will be added to the schedule
8019 Bore Wicket Gate Servomotor Cylinder Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Wicket Gate As-Found Inspection Report
No additional time will be allowed
8020 Chrome Plate Wicket Gate Servomotor Piston Rod Unit 3 (Optional)
Within Fifteen (15) days after Government Approval of the Wicket Gate As-Found Inspection Report
(End of clause)
(End of Summary of Changes)
Ice Harbor Turbine Installation and Rewind Units 1 - 3 W912EF-15-R-0044 Amend-0005
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 01.00 28
SUPPLEMENTARY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 FIELD VERIFICATION OF SITE CONDITIONS
1.4 DEFINITIONS
1.5 REGULAR CLEANUP AND DEBRIS DISPOSAL
1.6 EQUIPMENT LIST
1.7 TESTING OF EQUIPMENT
1.8 DISPOSITION OF REMOVED EQUIPMENT
1.9 Pre-Work And Post Work Surveys
1.10 CARE OF DRAINS
1.10.1 Powerhouse Floor Drains
1.10.2 Draft Tube Floor Drains
1.10.3 Pressure Relief Holes
1.10.4 Protection Plan
1.11 PROTECTION OF POWERHOUSE FLOORS
1.12 AIR PURITY CONTROL IN THE POWERHOUSE
1.13 FIRE CONTROL
1.14 PROJECT MANAGER
1.15 INSTALLATION SUPERVISOR
1.16 PROJECT SUPERINTENDENT
1.17 KEY PERSONNEL SUBSTITUTION
1.18 POST AWARD MEETINGS
1.18.1 Pre-Work Meeting
1.18.2 Pre-Construction Meeting
1.18.2.1 Minutes
1.18.2.2 Demobilizing And Remobilizing
1.19 WEEKLY PRODUCTION MEETINGS
1.19.1 Minutes
1.20 ADDITIONAL MEETINGS
1.21 PARTNERING
1.21.1 General
1.21.2 Partnering Meetings
1.22 RED ZONE MEETING
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
ATTACHMENTS:
Weekly Meeting Agenda Template
SECTION 01 11 01.00 28
G4EDDRJR
Line
Look-Ahead
-- End of Section Table of Contents --
SECTION 01 11 01.00 28
SECTION 01 11 01.00 28
SUPPLEMENTARY REQUIREMENTS
PART 1 GENERAL
The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. Designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Equipment List; I, C
Pre-Work Survey Photos And Report; I, C
Air Purity Control Program; G, C
Project Superintendent; I, C
Draft Tube Floor Drain And Pressure Relief Hole Protection Plan;
I, C
SD-07 Certificates
Installation Supervisor; G, C
Key Personnel Substitution; G, C
SD-11 Closeout Submittals
Post-Work Survey Photos And Report; I, C
1.3 FIELD VERIFICATION OF SITE CONDITIONS
The Contractor shall field verify all elevations, dimensions, and coordinates of existing features indicated on the contract drawings that affect new construction. Any deviations shall be updated as per Section
01 78 00.00 28, CLOSEOUT SUBMITTALS, paragraph MAINTAIN WORKING AS-BUILT
CONTRACT DRAWINGS AND FIO DRAWINGS.
1.4 DEFINITIONS
a. Wherever in these specifications the word "GQAR" is used, it shall be understood to mean "Government Quality Assurance Representative", unless otherwise stated.
b. Wherever in these specifications the word "weekend(s)" is used, it shall be understood to mean "Friday, Saturday, Sunday and Federal Holidays", unless otherwise expressly stated.
c. Wherever in these specifications the phrase "Turbine Manufacturer"is used it shall be understood to mean "Turbine design and supplier".
d. Wherever in these specifications the word "furnish" is used, it shall be understood to mean "Design, procure and/or fabricate, and deliver to the project site", unless otherwise expressly stated.
e. Wherever in these specifications the word "provide" is used, it shall be understood to mean "furnish and install", unless otherwise expressly stated.
f. Wherever in these specifications the word "install" is used, it shall be understood to mean "assembly a component, part, goods, hardware or concrete into the completed works", unless otherwise expressly stated.
g. Qualified Person; As defined in EM 385-1-1; "DEFINITIONS", unless otherwise specified.
1.5 REGULAR CLEANUP AND DEBRIS DISPOSAL
With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all waste and demolished materials shall become the property of the Contractor and shall be removed from the job site in accordance with Federal, State, and local regulations. The Contractor shall furnish waste containers. All small waste containers provided by the contractor shall be emptied daily, large bin containers shall be emptied when full or once a week.
1.6 EQUIPMENT LIST
The Contractor shall furnish a complete list of all equipment to be used on the project 30 days prior to commencement of on-site work. The Contractor shall submit a revised list in the event of change of equipment. Lists shall include rented equipment as well as lease-purchase or sale-leaseback equipment. The initial list and the revised lists shall indicate dates equipment is assigned to or removed from the project and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.
1.7 TESTING OF EQUIPMENT
Before any machinery or mechanized equipment is put to use on the job, it shall be inspected and tested by a qualified person and determined to be in safe operating condition. Cranes or derricks shall be tested by the
Contractor or a qualified testing agency in accordance with EM 385-1-1.
Equipment shall be large enough to safely handle proposed picks or tasks without exceeding the crane rating established by these tests.
1.8 DISPOSITION OF REMOVED EQUIPMENT
Unless otherwise specified in other sections of the specifications, all existing equipment removed and not reinstalled shall become the property of the Contractor, removed from the Project site, and disposed of in a legal manner. Materials that cannot be removed daily may be temporarily stored on-site at an approved area. Salvaged materials shall not be sold on the project site.
PROTECTION AND RESTORATION OF EXISTING FACILITIES
Reference FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984).
1.9 Pre-Work And Post Work Surveys
The Contractor shall conduct a pre-work survey prior to start of on-site work and a post-work survey following physical completion of the work and prior to demobilizing from the work site. The surveys shall be conducted in the presence of the Contracting Officer's Representative or other designated Government representative. The results of the surveys shall be documented by digital photographs and descriptive narrative reports. A color copy of the survey photographs and narrative reports shall be submitted to the Contracting Officer within 5 days after survey has been completed.
1.10 CARE OF DRAINS
1.10.1 Powerhouse Floor Drains
Existing powerhouse floor drains shall not be used for disposal of any solid material or any liquids other than clear water. The Contractor shall demonstrate that the pipes and drains are unobstructed when so directed.
1.10.2 Draft Tube Floor Drains
Protect the draft tube floor drains from damage during construction. Only water is allowed to go into the draft tube floor drains. No construction material, especially shot crete, is allowed on or in the drains.
1.10.3 Pressure Relief Holes
Protect the pressure relief holes from damage during construction. Water may come out of the pressure relief holes. The volume of water coming out of the holes can change seasonally. No construction material, especially shotcrete, is allowed on or in the pressure relief holes.
1.10.4 Protection Plan
Submit a draft tube floor drain and pressure relief hole protection plan for approval by the Contracting Officer 60 days prior to on-site work in the draft tube.
1.11 PROTECTION OF POWERHOUSE FLOORS
a. Care shall be taken to prevent damage to floors (tile and non-tile) and curbs within the Powerhouse. Protection shall include a continuous layer of oil-impervious craft paper over the existing floor surface with joints of the craft paper joined with an appropriate tape. In addition, tongue and groove 3/4-inch-thick plywood shall be installed over the craft paper at all work and storage areas. Plywood joints shall be fastened to ensure edges of plywood sheets are, and remain, flush with each other and do not pose a tripping hazard during execution of this work. Minimum 4-inch x 4-inch wood timbers shall be installed along existing curb features within the Contractor work areas and along perimeters of the work areas. Wood timbers used for curb protection shall be secured in place without anchoring into the existing floors or curbs. Any tiles that are damaged or loose adhesion (partial or complete) to the floor or curbs shall be replaced.
b. Pipe trenches shall remain accessible even if covered. All designations relating to fire protection equipment that get covered shall be remarked after covering. Provide additional blocking and timbers when required. Also suitably protect other surfaces of work.
Damage to floors or curbs caused by Contractor's operation shall be repaired at no additional cost to Government. Repairs shall match surrounding area in color, texture, and surface finish and are subject to approval.
1.12 AIR PURITY CONTROL IN THE POWERHOUSE
The Contractor shall take all necessary precautions to maximize the control, and prevention, of all dust and fumes created by operations under this contract from escaping into the powerhouse. To the maximum extent possible, all dust and dirt shall be removed by vacuum cleaning. At least
10 working days prior to commencement of work in the powerhouse, the
Contractor shall submit for approval, in writing, a proposed Air Purity
Control Program. Air Purity Control Program shall include, but not necessarily be limited to, the following:
(1) Adequate isolation and ventilation of air arcing, welding, burning, and grinding operations.
(2) Provision of exhaust ducts that shall discharge outside the powerhouse structure where mechanical ventilation is used.
(3) Controlled operation of power driven tools.
(4) Furnishing and removing of oiled sawdust or other dust preventatives in areas that cannot be properly rendered free from excessive dusting by vacuum…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .