Section 00100 - Bidding Schedule/Instructions to Bidders: Original Bid Schedule, WORD file

BID SCHEDULE

Walla Walla District Corps of Engineers Ice Harbor Turbine Installation and Rewind Units 1-3 The magnitude of construction is estimated to be between $25,000,000 and $100,000,000

ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT

BASE ITEMS APPLICABLE TO ALL UNITS

1001
Mobilization And Demobilization
1
JOB
XXXXX
$________
1002
Furnish Special Tools, Equipment And Scaffolding
1
JOB
XXXXX
$________
1003
Furnish Spare RTDs And Relays
1
JOB
XXXXX
$________
1004
Furnish Turbine Maintenance Platform
1
JOB
XXXXX
$________
1005
Drain and Dispose of Dirty Oil from Tanks and Piping
Est. 17,500
GAL
$________
$________
1006
Supply Clean Oil for Tank and Piping
Est. 9,500
GAL
$________
$________
1007
Manufacture Prototype Coils And Perform Accelerated Life Test
1
JOB
XXXXX
$________
1008
Manufacture Prototype Coils And Perform Thermal Cycling Test
1
JOB
XXXXX
$________
1009
Furnish Generator Spare Parts
1
JOB
XXXXX
$________
1010
Furnish Stator Core Materials And Accessories for One Generating Unit Including Factory Tests
1
JOB
XXXXX
$________
1011
Perform Minor Stator Core Iron Repair
NTE 480
HR
$________
$________
1012
Perform Special Field Tests
1
JOB
XXXXX
$________
1013
Disposal of Hydraulic and Lubricating Oil Units 4, 5 and 6
Est. 24,000
GAL
$________
$________
1014
Provision of Hydraulic and Lubricating Oil Units 4, 5 and 6
Est. 24,000
GAL
$________
$________
1015
Furnish Unit 2 Makup Oil
Est. 750
GAL
$________
$________
TOTAL BASE ITEMS APPLICABLE TO ALL UNITS
$___________
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT

BASE ITEMS APPLICABLE TO UNIT 2

2001
Phase 1 Thrust Bearing Inspection Unit 2 (Shoes, Runner, & Other)
1
JOB
XXXXX
$________
2002
Inspection Of Turbine And Generator Guide Bearings Unit 2
1
JOB
XXXXX
$________
2003
Replace Generator Air Coolers, Piping And Valves Unit 2
1
JOB
XXXXX
$________
2004
Replace Generator Cooling Water Air Operated Valves Unit 2
1
JOB
XXXXX
$________
2005
Construct Draft Tube Roof Fill Unit 2
1
JOB
XXXXX
$________
2006
Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 2
1
JOB
XXXXX
$________
2007
Remove Existing Stator Winding, Install And Test New Stator Winding Unit 2
1
JOB
XXXXX
$________
2008
Inspect, Clean And Test Stator Core Unit 2
1
JOB
XXXXX
$________
2009
Inspect, Clean And Test Rotor Unit 2
1
JOB
XXXXX
$________
2010
Lead Based Paint Removal Including Disposal Unit 2
Est. 1,500
SF
$________
$________
2011
Painting Unit 2
1
JOB
XXXXX
$________
2012
Disposal of Hydraulic and Lubricating Oil Unit 2
Est. 4,500
GAL
$________
$________
2013
Disposal of Hub/Shafting Water Unit 2
Est. 2,000
GAL
$________
$________
2014
Provision of Hydraulic and Lubricating Oil Unit 2
Est. 4,500
GAL
$________
$________
2015
Pre-Disassembly Watered Operational Testing Unit 2
1
JOB
XXXXX
$________
2016
Generating Unit Disassembly Unit 2
1
JOB
XXXXX
$________
2017
Generating Unit Reassembly Unit 2
1
JOB
XXXXX
$________
2018
Commissioning for Turbine Replacement and Generator Rewind Unit 2
1
JOB
XXXXX
$________
2019
Refurbish Wicket Gates Unit 2
1
JOB
XXXXX
$________
2020
Stay Vane/Ring

Refurbishment and Extension Installation Unit 2

1
JOB
XXXXX
$________
2021
Refurbish Bottom Ring Unit 2
1
JOB
XXXXX
$________
2022
Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 2
1
JOB
XXXXX
$________
2023
Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 2
1
JOB
XXXXX
$________
2024
Line Boring and Installation of Wicket Gate Stem Bushings Unit 2
1
JOB
XXXXX
$________
2025
Refurbish/Replace Turbine Air Admission Valves Unit 2
1
JOB
XXXXX
$________
2026
Refurbish Operating Ring Unit 2
1
JOB
XXXXX
$________
2027
Refurbish Wicket Gate Servomotors Unit 2
1
JOB
XXXXX
$________
2028
Modification of Unit 2 For Fixed Blade Operation
1
JOB
XXXXX
$________
2029
Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 2
1
JOB
XXXXX
$________
2030
Install Discharge Ring and Draft Tube Liner Transition Unit 2
1
JOB
XXXXX
$________
2031
Provide Electrical Equipment, Wiring, Removal, Installation Unit 2
1
JOB
XXXXX
$________
2032
Refurbish/Modify Intermediate Headcover Unit 2
1
JOB
XXXXX
$________
2033
Refurbish Outer Headcover Unit 2
1
JOB
XXXXX
$________
2034
Refurbish Turbine Shaft Unit 2
1
JOB
XXXXX
$________
2035
Refurbish Intermediate and Generator Shafts Unit 2
1
JOB
XXXXX
$________
TOTAL BASE ITEMS APPLICABLE TO UNIT 2
$___________
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT

BASE ITEMS APPLICABLE TO UNIT 3

3001
Phase 1 Thrust Bearing Inspection Unit 3 (Shoes, Runner, & Other)
1
JOB
XXXXX
$________
3002
Inspection Of Turbine And Generator Guide Bearings Unit 3
1
JOB
XXXXX
$________
3003
Replace Generator Air Coolers, Piping And Valves Unit 3
1
JOB
XXXXX
$________
3004
Replace Generator Cooling Water Air Operated Valves Unit 3
1
JOB
XXXXX
$________
3005
Construct Draft Tube Roof Fill Unit 3
1
JOB
XXXXX
$________
3006
Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 3
1
JOB
XXXXX
$________
3007
Remove Existing Stator Winding, Install And Test New Stator Winding Unit 3
1
JOB
XXXXX
$________
3008
Inspect, Clean And Test Stator Core Unit 3
1
JOB
XXXXX
$________
3009
Inspect, Clean And Test Rotor Unit 3
1
JOB
XXXXX
$________
3010
Lead Based Paint Removal Including Disposal Unit 3
Est. 1,500
SF
$________
$________
3011
Painting Unit 3
1
JOB
XXXXX
$________
3012
Disposal of Hydraulic and Lubricating Oil Unit 3
Est. 4,500
GAL
$________
$________
3013
Disposal of Hub/Shafting Water Unit 3
Est. 2,000
GAL
$________
$________
3014
Provision of Hydraulic and Lubricating Oil Unit 3
Est. 6,900
GAL
$________
$________
3015
Pre-Disassembly Watered Operational Testing Unit 3
1
JOB
XXXXX
$________
3016
Generating Unit Disassembly Unit 3
1
JOB
XXXXX
$________
3017
Generating Unit Reassembly Unit 3
1
JOB
XXXXX
$________
3018
Commissioning for Turbine Replacement and Generator Rewind Unit 3
1
JOB
XXXXX
$________
3019
Refurbish Wicket Gates Unit 3
1
JOB
XXXXX
$________
3020
Stay Vane/Ring Refurbishment and Extension Installation Unit 3
1
JOB
XXXXX
$________
3021
Refurbish Bottom Ring Unit 3
1
JOB
XXXXX
$________
3022
Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 3
1
JOB
XXXXX
$________
3023
Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 3
1
JOB
XXXXX
$________
3024
Line Boring and Installation of Wicket Gate Stem Bushings Unit 3
1
JOB
XXXXX
$________
3025
Refurbish/Replace Turbine Air Admission Valves Unit 3
1
JOB
XXXXX
$________
3026
Refurbish Operating Ring Unit 3
1
JOB
XXXXX
$________
3027
Refurbish Wicket Gate Servomotors Unit 3
1
JOB
XXXXX
$________
3028
Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 3
1
JOB
XXXXX
$________
3029
Install Discharge Ring and Draft Tube Liner Transition Unit 3
1
JOB
XXXXX
$________
3030
Refurbish/Modify Intermediate Headcover Unit 3
1
JOB
XXXXX
$________
3031
Provide Electrical Equipment, Wiring, Removal, Installation Unit 3
1
JOB
XXXXX
$________
3032
Refurbish Turbine Shaft Unit 3
1
JOB
XXXXX
$________
3033
Refurbish Intermediate and Generator Shafts Unit 3
1
JOB
XXXXX
$________
3034
Refurbish Blade Operating Mechanism Components Unit 3
1
JOB
XXXXX
$________
TOTAL BASE ITEMS APPLICABLE TO UNIT 3
$___________
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT

OPTIONAL BASE ITEMS APPLICABLE TO UNIT 1

4001
Phase 1 Thrust Bearing Inspection Unit 1 (Shoes, Runner, & Other) (Optional)
1
JOB
XXXXX
$________
4002
Inspection Of Turbine And Generator Guide Bearings Unit 1 (Optional)
1
JOB
XXXXX
$________
4003
Replace Generator Air Coolers, Piping And Valves Unit 1 (Optional)
1
JOB
XXXXX
$________
4004
Replace Generator Cooling Water Air Operated Valves Unit 1 (Optional)
1
JOB
XXXXX
$________
4005
Construct Draft Tube Roof Fill Unit 1 (Optional)
1
JOB
XXXXX
$________
4006
Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 1 (Optional)
1
JOB
XXXXX
$________
4007
Remove Existing Stator Winding, Install And Test New Stator Winding Unit 1 (Optional)
1
JOB
XXXXX
$________
4008
Inspect, Clean And Test Stator Core Unit 1 (Optional)
1
JOB
XXXXX
$________
4009
Inspect, Clean And Test Rotor Unit 1 (Optional)
1
JOB
XXXXX
$________
4010
Lead Based Paint Removal Including Disposal Unit 1 (Optional)
Est. 1,500
SF
$________
$________
4011
Painting Unit 1 (Optional)
1
JOB
XXXXX
$________
4012
Disposal of Hydraulic and Lubricating Oil Unit 1 (Optional)
Est. 6,500
GAL
$________
$________
4013
Provision of Hydraulic and Lubricating Oil Unit 1 (Optional)
Est. 6,900
GAL
$________
$________
4014
Pre-Disassembly Watered Operational Testing Unit 1 (Optional)
1
JOB
XXXXX
$________
4015
Generating Unit Disassembly Unit 1 (Optional)
1
JOB
XXXXX
$________
4016
Generating Unit Reassembly Unit 1 (Optional)
1
JOB
XXXXX
$________
4017
Commissioning for Turbine Replacement and Generator Rewind Unit 1 (Optional)
1
JOB
XXXXX
$________
4018
Refurbish Wicket Gates Unit 1 (Optional)
1
JOB
XXXXX
$________
4019
Stay Vane/Ring Refurbishment and Extension Installation Unit 1 (Optional)
1
JOB
XXXXX
$________
4020
Refurbish Bottom Ring Unit 1 (Optional)
1
JOB
XXXXX
$________
4021
Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 1 (Optional)
1
JOB
XXXXX
$________
4022
Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 1 (Optional)
1
JOB
XXXXX
$________
4023
Line Boring and Installation of Wicket Gate Stem Bushings Unit 1 (Optional)
1
JOB
XXXXX
$________
4024
Refurbish/Replace Turbine Air Admission Valves Unit 1 (Optional)
1
JOB
XXXXX
$________
4025
Refurbish Operating Ring Unit 1 (Optional)
1
JOB
XXXXX
$________
4026
Refurbish Wicket Gate Servomotors Unit 1 (Optional)
1
JOB
XXXXX
$________
4027
Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 1 (Optional)
1
JOB
XXXXX
$________
4028
Install Discharge Ring and Draft Tube Liner Transition Unit 1 (Optional)
1
JOB
XXXXX
$________
4029
Refurbish/Modify Intermediate Headcover Unit 1 (Optional)
1
JOB
XXXXX
$________
4030
Provide Electrical Equipment, Wiring, Removal, Installation Unit 1 (Optional)
1
JOB
XXXXX
$________
4031
Refurbish Turbine Shaft Unit 1 (Optional)
1
JOB
XXXXX
$________
4032
Refurbish Intermediate and Generator Shafts Unit 1 (Optional)
1
JOB
XXXXX
$________
4033
Refurbish Blade Operating Mechanism Components Unit 1 (Optional)
1
JOB
XXXXX
$________
TOTAL BASE ITEMS APPLICABLE TO UNIT 1 (OPTIONAL)
$___________
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT

OPTIONAL ITEMS APPLICABLE TO ALL UNITS

5001
Miscellaneous Parts And Materials (Optional)
NTE $80,000
____
XXXXX
$________
5002
Miscellaneous Welding (Optional)
NTE

LB

$________
$________
5003
T&M: Provide Skilled Welding Hire (Optional)
NTE

HR

$________
$________
5004
T&M: Provide Skilled Machinist Hire (Optional)
NTE

HR

$________
$________
5005
T&M: Provide Skilled Electrician Hire (Optional)
NTE

HR

$________
$________
5006
T&M: Provide Skilled Painter Hire (Optional)
NTE

HR

$________
$________
5007
T&M: Provide Skilled Millwright/Mechanic Hire (Optional)
NTE

HR

$________
$________
5008
T&M: Provide Skilled General Laborer Hire (Optional)
NTE

HR

$________
$________
5009
T&M: Provide Skilled Liquid Penetrant Testing (Optional)
NTE

HR

$________
$________
5010
T&M: Provide Skilled Magnetic Particle Testing (Optional)
NTE

HR

$________
$________
5011
T&M: Provide Skilled Ultrasonic Testing (Optional)
NTE

HR

$________
$________
5012
Furnish Stator Core Materials and Accessories for One Generating Unit (Optional)
NTE

EA

$________
$________
5013
Perform Additional Interlaminar Insulation Test (Optional)
1
JOB
XXXXX
$________
TOTAL OPTIONAL ITEMS APPLICABLE TO ALL UNITS
$___________
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT

ADDITIONAL OPTIONAL ITEMS APPLICABLE TO UNIT 1

6001
Phase 2 Inspection of Thrust Shoes for Unit 1 (Optional)
1
JOB
XXXXX
$________
6002
Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 1 (Optional)
1
JOB
XXXXX
$________
6003
Refurbish Thrust Bearing Runner Unit 1 (Optional)
1
JOB
XXXXX
$________
6004
Machine Backside of Thrust Bearing Shoes for Unit 1 (Optional)
1
JOB
XXXXX
$________
6005
Machine Babbitted Face of Thrust Bearing Shoes for Unit 1 (Optional)
1
JOB
XXXXX
$________
6006
Refurbish Thrust Bearing Shoes Including Babbitting for Unit 1 (Optional)
1
JOB
XXXXX
$________
6007
Refurbish Thrust Bearing Collar for Unit 1 (Optional)
1
JOB
XXXXX
$________
6008
Refurbish Turbine Guide Bearing for Unit 1 (Optional)
1
JOB
XXXXX
$________
6009
Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 1 (Optional)
1
JOB
XXXXX
$________
6010
Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 1 (Optional)
1
JOB
XXXXX
$________
6011
Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 1 (Optional)
1
JOB
XXXXX
$________
6012
Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 1 (Optional)
1
JOB
XXXXX
$________
6013
Wicket Gate Additional Painting for Unit 1

(Optional)

2
EA
$________
$________
6014
Stay Vane Additional Painting for Unit 1

(Optional)

2
EA
$________
$________
6015
Generator Rotor Balancing for Unit 1 (Optional)
1
JOB
XXXXX
$________
6016
Remove Existing Stator Core, Install and Test New Stator Core for Unit 1 (Optional)
1
JOB
XXXXX
$________
6017
Refurbish Rotor Poles Unit 1 (Optional)
1
JOB
XXXXX
$________
6018
Machine Stay Ring Flange Unit 1 (Optional)
1
JOB
$________
$________
6019
Bore Wicket Gate Servomotor Cylinder Unit 1 (Optional)
2
EA
$________
$________
6020
Chrome Plate Wicket Gate Servomotor Piston Rod Unit 1 (Optional)
2
EA
$________
$________
TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 1
$___________
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT

OPTIONAL ITEMS APPLICABLE TO UNIT 2

7001
Phase 2 Inspection of Thrust Shoes for Unit 2 (Optional)
1
JOB
XXXXX
$________
7002
Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 2 (Optional)
1
JOB
XXXXX
$________
7003
Refurbish Thrust Bearing Runner Unit 2 (Optional)
1
JOB
XXXXX
$________
7004
Machine Backside of Thrust Bearing Shoes for Unit 2 (Optional)
1
JOB
XXXXX
$________
7005
Machine Babbitted Face of Thrust Bearing Shoes for Unit 2 (Optional)
1
JOB
XXXXX
$________
7006
Refurbish Thrust Bearing Shoes Including Babbitting for Unit 2 (Optional)
1
JOB
XXXXX
$________
7007
Refurbish Thrust Bearing Collar for Unit 2 (Optional)
1
JOB
XXXXX
$________
7008
Refurbish Turbine Guide Bearing for Unit 2 (Optional)
1
JOB
XXXXX
$________
7009
Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 2 (Optional)
1
JOB
XXXXX
$________
7010
Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 2 (Optional)
1
JOB
XXXXX
$________
7011
Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 2 (Optional)
1
JOB
XXXXX
$________
7012
Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 2 (Optional)
1
JOB
XXXXX
$________
7013
Wicket Gate Additional Painting for Unit 2

(Optional)

2
EA
$________
$________
7014
Stay Vane Additional Painting for Unit 2

(Optional)

2
EA
$________
$________
7015
Generator Rotor Balancing for Unit 2 (Optional)
1
JOB
XXXXX
$________
7016
Remove Existing Stator Core, Install and Test New Stator Core for Unit 2 (Optional)
1
JOB
XXXXX
$________
7017
Refurbish Rotor Poles Unit 2 (Optional)
1
JOB
XXXXX
$________
7018
Machine Stay Ring Flange Unit 2 (Optional)
1
JOB
XXXXX
$________
7019
Bore Wicket Gate Servomotor Cylinder Unit 2 (Optional)
2
EA
$________
$________
7020
Chrome Plate Wicket Gate Servomotor Piston Rod Unit 2 (Optional)
2
EA
$________
$________
TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 2
$___________
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT

OPTIONAL ITEMS APPLICABLE TO UNIT 3

8001
Phase 2 Inspection of Thrust Shoes for Unit 3 (Optional)
1
JOB
XXXXX
$________
8002
Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 3 (Optional)
1
JOB
XXXXX
$________
8003
Refurbish Thrust Bearing Runner Unit 3 (Optional)
1
JOB
XXXXX
$________
8004
Machine Backside of Thrust Bearing Shoes for Unit 3 (Optional)
1
JOB
XXXXX
$________
8005
Machine Babbitted Face of Thrust Bearing Shoes for Unit 3 (Optional)
1
JOB
XXXXX
$________
8006
Refurbish Thrust Bearing Shoes Including Babbitting for Unit 3 (Optional)
1
JOB
XXXXX
$________
8007
Refurbish Thrust Bearing Collar for Unit 3 (Optional)
1
JOB
XXXXX
$________
8008
Refurbish Turbine Guide Bearing for Unit 3 (Optional)
1
JOB
XXXXX
$________
8009
Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 3 (Optional)
1
JOB
XXXXX
$________
8010
Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 3 (Optional)
1
JOB
XXXXX
$________
8011
Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 3 (Optional)
1
JOB
XXXXX
$________
8012
Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 3 (Optional)
1
JOB
XXXXX
$________
8013
Wicket Gate Additional Painting for Unit 3

(Optional)

2
EA
$________
$________
8014
Stay Vane Additional Painting for Unit 3

(Optional)

2
EA
$________
$________
8015
Generator Rotor Balancing for Unit 3 (Optional)
1
JOB
XXXXX
$________
8016
Remove Existing Stator Core, Install and Test New Stator Core for Unit 3 (Optional)
1
JOB
XXXXX
$________
8017
Refurbish Rotor Poles Unit 3 (Optional)
1
JOB
XXXXX
$________
8018
Machine Stay Ring Flange Unit 3 (Optional)
1
JOB
$________
$________
8019
Bore Wicket Gate Servomotor Cylinder Unit 3 (Optional)
2
EA
$________
$________
8020
Chrome Plate Wicket Gate Servomotor Piston Rod Unit 3 (Optional)
2
EA
$________
$________
TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 3
$___________
OPTIONAL ITEMS TOTAL
$___________
SCHEDULE TOTAL
$___________

IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.

NTE = Not To Exceed Est = Estimated

Quantities identified as Estimated (“Est”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN ESTIMATED QUANTITY, located in Section 00700.

LABOR HOUR AND TIME & MATERIALS LINE ITEMS: Contract Line Items # 1011, and 5001 through 5011 are labor hour or time-and-materials line items. The extended amount for each of these items is the established ceiling price. Without a modification pursuant to FAR Clause 52.243-3, Changes -- Time-and-Materials or Labor-Hours (Sep 2000), the Contractor exceeds the ceiling at his own risk.