BID SCHEDULE
Walla Walla District Corps of Engineers Ice Harbor Turbine Installation and Rewind Units 1-3 The magnitude of construction is estimated to be between $25,000,000 and $100,000,000
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
BASE ITEMS APPLICABLE TO ALL UNITS
| 1001 |
| Mobilization And Demobilization |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1002 |
| Furnish Special Tools, Equipment And Scaffolding |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1003 |
| Furnish Spare RTDs And Relays |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1004 |
| Furnish Turbine Maintenance Platform |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1005 |
| Drain and Dispose of Dirty Oil from Tanks and Piping |
| Est. 17,500 |
| GAL |
| $________ |
| $________ |
| 1006 |
| Supply Clean Oil for Tank and Piping |
| Est. 9,500 |
| GAL |
| $________ |
| $________ |
| 1007 |
| Manufacture Prototype Coils And Perform Accelerated Life Test |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1008 |
| Manufacture Prototype Coils And Perform Thermal Cycling Test |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1009 |
| Furnish Generator Spare Parts |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1010 |
| Furnish Stator Core Materials And Accessories for One Generating Unit Including Factory Tests |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1011 |
| Perform Minor Stator Core Iron Repair |
| NTE 480 |
| HR |
| $________ |
| $________ |
| 1012 |
| Perform Special Field Tests |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 1013 |
| Disposal of Hydraulic and Lubricating Oil Units 4, 5 and 6 |
| Est. 24,000 |
| GAL |
| $________ |
| $________ |
| 1014 |
| Provision of Hydraulic and Lubricating Oil Units 4, 5 and 6 |
| Est. 24,000 |
| GAL |
| $________ |
| $________ |
| 1015 |
| Furnish Unit 2 Makup Oil |
| Est. 750 |
| GAL |
| $________ |
| $________ |
| TOTAL BASE ITEMS APPLICABLE TO ALL UNITS |
| $___________ |
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
BASE ITEMS APPLICABLE TO UNIT 2
| 2001 |
| Phase 1 Thrust Bearing Inspection Unit 2 (Shoes, Runner, & Other) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2002 |
| Inspection Of Turbine And Generator Guide Bearings Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2003 |
| Replace Generator Air Coolers, Piping And Valves Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2004 |
| Replace Generator Cooling Water Air Operated Valves Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2005 |
| Construct Draft Tube Roof Fill Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2006 |
| Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2007 |
| Remove Existing Stator Winding, Install And Test New Stator Winding Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2008 |
| Inspect, Clean And Test Stator Core Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2009 |
| Inspect, Clean And Test Rotor Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2010 |
| Lead Based Paint Removal Including Disposal Unit 2 |
| Est. 1,500 |
| SF |
| $________ |
| $________ |
| 2011 |
| Painting Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2012 |
| Disposal of Hydraulic and Lubricating Oil Unit 2 |
| Est. 4,500 |
| GAL |
| $________ |
| $________ |
| 2013 |
| Disposal of Hub/Shafting Water Unit 2 |
| Est. 2,000 |
| GAL |
| $________ |
| $________ |
| 2014 |
| Provision of Hydraulic and Lubricating Oil Unit 2 |
| Est. 4,500 |
| GAL |
| $________ |
| $________ |
| 2015 |
| Pre-Disassembly Watered Operational Testing Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2016 |
| Generating Unit Disassembly Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2017 |
| Generating Unit Reassembly Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2018 |
| Commissioning for Turbine Replacement and Generator Rewind Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2019 |
| Refurbish Wicket Gates Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
Refurbishment and Extension Installation Unit 2
| 2021 |
| Refurbish Bottom Ring Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2022 |
| Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2023 |
| Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2024 |
| Line Boring and Installation of Wicket Gate Stem Bushings Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2025 |
| Refurbish/Replace Turbine Air Admission Valves Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2026 |
| Refurbish Operating Ring Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2027 |
| Refurbish Wicket Gate Servomotors Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2028 |
| Modification of Unit 2 For Fixed Blade Operation |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2029 |
| Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2030 |
| Install Discharge Ring and Draft Tube Liner Transition Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2031 |
| Provide Electrical Equipment, Wiring, Removal, Installation Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2032 |
| Refurbish/Modify Intermediate Headcover Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2033 |
| Refurbish Outer Headcover Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2034 |
| Refurbish Turbine Shaft Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 2035 |
| Refurbish Intermediate and Generator Shafts Unit 2 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| TOTAL BASE ITEMS APPLICABLE TO UNIT 2 |
| $___________ |
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
BASE ITEMS APPLICABLE TO UNIT 3
| 3001 |
| Phase 1 Thrust Bearing Inspection Unit 3 (Shoes, Runner, & Other) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3002 |
| Inspection Of Turbine And Generator Guide Bearings Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3003 |
| Replace Generator Air Coolers, Piping And Valves Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3004 |
| Replace Generator Cooling Water Air Operated Valves Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3005 |
| Construct Draft Tube Roof Fill Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3006 |
| Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3007 |
| Remove Existing Stator Winding, Install And Test New Stator Winding Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3008 |
| Inspect, Clean And Test Stator Core Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3009 |
| Inspect, Clean And Test Rotor Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3010 |
| Lead Based Paint Removal Including Disposal Unit 3 |
| Est. 1,500 |
| SF |
| $________ |
| $________ |
| 3011 |
| Painting Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3012 |
| Disposal of Hydraulic and Lubricating Oil Unit 3 |
| Est. 4,500 |
| GAL |
| $________ |
| $________ |
| 3013 |
| Disposal of Hub/Shafting Water Unit 3 |
| Est. 2,000 |
| GAL |
| $________ |
| $________ |
| 3014 |
| Provision of Hydraulic and Lubricating Oil Unit 3 |
| Est. 6,900 |
| GAL |
| $________ |
| $________ |
| 3015 |
| Pre-Disassembly Watered Operational Testing Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3016 |
| Generating Unit Disassembly Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3017 |
| Generating Unit Reassembly Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3018 |
| Commissioning for Turbine Replacement and Generator Rewind Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3019 |
| Refurbish Wicket Gates Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3020 |
| Stay Vane/Ring Refurbishment and Extension Installation Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3021 |
| Refurbish Bottom Ring Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3022 |
| Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3023 |
| Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3024 |
| Line Boring and Installation of Wicket Gate Stem Bushings Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3025 |
| Refurbish/Replace Turbine Air Admission Valves Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3026 |
| Refurbish Operating Ring Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3027 |
| Refurbish Wicket Gate Servomotors Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3028 |
| Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3029 |
| Install Discharge Ring and Draft Tube Liner Transition Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3030 |
| Refurbish/Modify Intermediate Headcover Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3031 |
| Provide Electrical Equipment, Wiring, Removal, Installation Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3032 |
| Refurbish Turbine Shaft Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3033 |
| Refurbish Intermediate and Generator Shafts Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 3034 |
| Refurbish Blade Operating Mechanism Components Unit 3 |
| 1 |
| JOB |
| XXXXX |
| $________ |
| TOTAL BASE ITEMS APPLICABLE TO UNIT 3 |
| $___________ |
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
OPTIONAL BASE ITEMS APPLICABLE TO UNIT 1
| 4001 |
| Phase 1 Thrust Bearing Inspection Unit 1 (Shoes, Runner, & Other) (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4002 |
| Inspection Of Turbine And Generator Guide Bearings Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4003 |
| Replace Generator Air Coolers, Piping And Valves Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4004 |
| Replace Generator Cooling Water Air Operated Valves Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4005 |
| Construct Draft Tube Roof Fill Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4006 |
| Furnish Complete Set Of Stator Coils, Supplies And Accessories for a Complete New Winding Including Factory Testing Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4007 |
| Remove Existing Stator Winding, Install And Test New Stator Winding Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4008 |
| Inspect, Clean And Test Stator Core Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4009 |
| Inspect, Clean And Test Rotor Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4010 |
| Lead Based Paint Removal Including Disposal Unit 1 (Optional) |
| Est. 1,500 |
| SF |
| $________ |
| $________ |
| 4011 |
| Painting Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4012 |
| Disposal of Hydraulic and Lubricating Oil Unit 1 (Optional) |
| Est. 6,500 |
| GAL |
| $________ |
| $________ |
| 4013 |
| Provision of Hydraulic and Lubricating Oil Unit 1 (Optional) |
| Est. 6,900 |
| GAL |
| $________ |
| $________ |
| 4014 |
| Pre-Disassembly Watered Operational Testing Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4015 |
| Generating Unit Disassembly Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4016 |
| Generating Unit Reassembly Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4017 |
| Commissioning for Turbine Replacement and Generator Rewind Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4018 |
| Refurbish Wicket Gates Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4019 |
| Stay Vane/Ring Refurbishment and Extension Installation Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4020 |
| Refurbish Bottom Ring Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4021 |
| Furnish Wicket Gate Operating Mechanism Bushings and Bearing Plate Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4022 |
| Refurbish Miscellaneous Wicket Gate Operating Mechanism Components Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4023 |
| Line Boring and Installation of Wicket Gate Stem Bushings Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4024 |
| Refurbish/Replace Turbine Air Admission Valves Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4025 |
| Refurbish Operating Ring Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4026 |
| Refurbish Wicket Gate Servomotors Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4027 |
| Furnish and Install Turbine Water and Oil Piping Systems and Accessories Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4028 |
| Install Discharge Ring and Draft Tube Liner Transition Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4029 |
| Refurbish/Modify Intermediate Headcover Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4030 |
| Provide Electrical Equipment, Wiring, Removal, Installation Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4031 |
| Refurbish Turbine Shaft Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4032 |
| Refurbish Intermediate and Generator Shafts Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 4033 |
| Refurbish Blade Operating Mechanism Components Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| TOTAL BASE ITEMS APPLICABLE TO UNIT 1 (OPTIONAL) |
| $___________ |
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
OPTIONAL ITEMS APPLICABLE TO ALL UNITS
| 5001 |
| Miscellaneous Parts And Materials (Optional) |
| NTE $80,000 |
| ____ |
| XXXXX |
| $________ |
| 5002 |
| Miscellaneous Welding (Optional) |
| NTE |
LB
| 5003 |
| T&M: Provide Skilled Welding Hire (Optional) |
| NTE |
HR
| 5004 |
| T&M: Provide Skilled Machinist Hire (Optional) |
| NTE |
HR
| 5005 |
| T&M: Provide Skilled Electrician Hire (Optional) |
| NTE |
HR
| 5006 |
| T&M: Provide Skilled Painter Hire (Optional) |
| NTE |
HR
| 5007 |
| T&M: Provide Skilled Millwright/Mechanic Hire (Optional) |
| NTE |
HR
| 5008 |
| T&M: Provide Skilled General Laborer Hire (Optional) |
| NTE |
HR
| 5009 |
| T&M: Provide Skilled Liquid Penetrant Testing (Optional) |
| NTE |
HR
| 5010 |
| T&M: Provide Skilled Magnetic Particle Testing (Optional) |
| NTE |
HR
| 5011 |
| T&M: Provide Skilled Ultrasonic Testing (Optional) |
| NTE |
HR
| 5012 |
| Furnish Stator Core Materials and Accessories for One Generating Unit (Optional) |
| NTE |
EA
| 5013 |
| Perform Additional Interlaminar Insulation Test (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| TOTAL OPTIONAL ITEMS APPLICABLE TO ALL UNITS |
| $___________ |
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
ADDITIONAL OPTIONAL ITEMS APPLICABLE TO UNIT 1
| 6001 |
| Phase 2 Inspection of Thrust Shoes for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6002 |
| Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6003 |
| Refurbish Thrust Bearing Runner Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6004 |
| Machine Backside of Thrust Bearing Shoes for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6005 |
| Machine Babbitted Face of Thrust Bearing Shoes for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6006 |
| Refurbish Thrust Bearing Shoes Including Babbitting for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6007 |
| Refurbish Thrust Bearing Collar for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6008 |
| Refurbish Turbine Guide Bearing for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6009 |
| Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6010 |
| Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6011 |
| Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6012 |
| Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6013 |
| Wicket Gate Additional Painting for Unit 1 |
(Optional)
| 6014 |
| Stay Vane Additional Painting for Unit 1 |
(Optional)
| 6015 |
| Generator Rotor Balancing for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6016 |
| Remove Existing Stator Core, Install and Test New Stator Core for Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6017 |
| Refurbish Rotor Poles Unit 1 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 6018 |
| Machine Stay Ring Flange Unit 1 (Optional) |
| 1 |
| JOB |
| $________ |
| $________ |
| 6019 |
| Bore Wicket Gate Servomotor Cylinder Unit 1 (Optional) |
| 2 |
| EA |
| $________ |
| $________ |
| 6020 |
| Chrome Plate Wicket Gate Servomotor Piston Rod Unit 1 (Optional) |
| 2 |
| EA |
| $________ |
| $________ |
| TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 1 |
| $___________ |
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
OPTIONAL ITEMS APPLICABLE TO UNIT 2
| 7001 |
| Phase 2 Inspection of Thrust Shoes for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7002 |
| Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7003 |
| Refurbish Thrust Bearing Runner Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7004 |
| Machine Backside of Thrust Bearing Shoes for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7005 |
| Machine Babbitted Face of Thrust Bearing Shoes for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7006 |
| Refurbish Thrust Bearing Shoes Including Babbitting for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7007 |
| Refurbish Thrust Bearing Collar for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7008 |
| Refurbish Turbine Guide Bearing for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7009 |
| Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7010 |
| Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7011 |
| Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7012 |
| Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7013 |
| Wicket Gate Additional Painting for Unit 2 |
(Optional)
| 7014 |
| Stay Vane Additional Painting for Unit 2 |
(Optional)
| 7015 |
| Generator Rotor Balancing for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7016 |
| Remove Existing Stator Core, Install and Test New Stator Core for Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7017 |
| Refurbish Rotor Poles Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7018 |
| Machine Stay Ring Flange Unit 2 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 7019 |
| Bore Wicket Gate Servomotor Cylinder Unit 2 (Optional) |
| 2 |
| EA |
| $________ |
| $________ |
| 7020 |
| Chrome Plate Wicket Gate Servomotor Piston Rod Unit 2 (Optional) |
| 2 |
| EA |
| $________ |
| $________ |
| TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 2 |
| $___________ |
| ITEM |
| DESCRIPTION |
| QUANTITY |
| U/M |
| U/P |
| AMOUNT |
OPTIONAL ITEMS APPLICABLE TO UNIT 3
| 8001 |
| Phase 2 Inspection of Thrust Shoes for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8002 |
| Phase 2 Inspection of Thrust Bearing Runner and Thrust Collar for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8003 |
| Refurbish Thrust Bearing Runner Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8004 |
| Machine Backside of Thrust Bearing Shoes for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8005 |
| Machine Babbitted Face of Thrust Bearing Shoes for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8006 |
| Refurbish Thrust Bearing Shoes Including Babbitting for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8007 |
| Refurbish Thrust Bearing Collar for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8008 |
| Refurbish Turbine Guide Bearing for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8009 |
| Refurbish Generator Lower Guide Bearing Pads by Machining for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8010 |
| Refurbish Generator Lower Guide Bearing Pads Including Babbitting for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8011 |
| Refurbish Generator Upper Guide Bearing Pads by Machining for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8012 |
| Refurbish Generator Upper Guide Bearing Pads Including Babbitting for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8013 |
| Wicket Gate Additional Painting for Unit 3 |
(Optional)
| 8014 |
| Stay Vane Additional Painting for Unit 3 |
(Optional)
| 8015 |
| Generator Rotor Balancing for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8016 |
| Remove Existing Stator Core, Install and Test New Stator Core for Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8017 |
| Refurbish Rotor Poles Unit 3 (Optional) |
| 1 |
| JOB |
| XXXXX |
| $________ |
| 8018 |
| Machine Stay Ring Flange Unit 3 (Optional) |
| 1 |
| JOB |
| $________ |
| $________ |
| 8019 |
| Bore Wicket Gate Servomotor Cylinder Unit 3 (Optional) |
| 2 |
| EA |
| $________ |
| $________ |
| 8020 |
| Chrome Plate Wicket Gate Servomotor Piston Rod Unit 3 (Optional) |
| 2 |
| EA |
| $________ |
| $________ |
| TOTAL OPTIONAL ITEMS APPLICABLE TO UNIT 3 |
| $___________ |
| OPTIONAL ITEMS TOTAL |
| $___________ |
| SCHEDULE TOTAL |
| $___________ |
IMPORTANT See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
NTE = Not To Exceed Est = Estimated
Quantities identified as Estimated (“Est”) in the bid schedule are subject to FAR Clause 52.211-18, VARIATION IN ESTIMATED QUANTITY, located in Section 00700.
LABOR HOUR AND TIME & MATERIALS LINE ITEMS: Contract Line Items # 1011, and 5001 through 5011 are labor hour or time-and-materials line items. The extended amount for each of these items is the established ceiling price. Without a modification pursuant to FAR Clause 52.243-3, Changes -- Time-and-Materials or Labor-Hours (Sep 2000), the Contractor exceeds the ceiling at his own risk.