UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: Navy Phase 6 Review: ProjNet Q&A (00001) (sorted by CommentID ) Displaying 46 inquiries.
Id Discipline Sheet Detail Spec
6778108 Contracting
SF1499 Box 8 and ADDENDUM TO FAR
52.212-1 INSTRUCTIONS TO OFFERORS
Item 1 Page 33 of 85 of the Draft Soliciation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The dates in this box in conflict with the Instructions to Offerors. Please confirm that the correct date is January 23, 2017 for submission of the proposal.
On: Jan 04 2017.
Government Response. . This has been corrected. See revised RFP On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778117 Program Management
RFP Section 00800 7. Key Personnel and Subcontractors
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Clarify that this section and the subsequent paragraph is in reference to Key Personnel and Key Subcontractors and not to any subcontractor that may be needed to execute minor repairs.
On: Jan 04 2017.
Government Response. . The RFP Section 00800 7. Key Personnel and Subcontractors is referring to Key Personnel and Key Subcontractors. The RFP has been updated to reflect this clarification. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778119 Program Management
Attach 1 - PWS - Section 1.5 Personnel Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Project Manager, Safety Manager, and QC Manager can have no other duties outside of this task order. Confirm that they also cannot be the same person within the task order if they meet the minimum experience requirements. For Example, the Project Manager can or can not also be the QC Manager for this task order.
On: Jan 04 2017.
Government Response. . The PWS requirement is that the Offeror provide these three separate and distinct full time positions (three positions equal three separate people) and that they have no other duties outside this task order. It is the Offeror's responsibility to determine their approach for pricing this requirement. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778120 Program Management
Attach 1 - PWS - Section 1.5 Personnel Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that the Project Manager, Safety Manager, and QC Manager can or can not also be the designated Project Engineer or Site Manager.
On: Jan 04 2017.
Government Response. . The PWS requirement is that the Offeror provide these separate and distinct full time positions (five positions equal five separate people) and that they have no other duties outside this task order. It is the Offeror's responsibility to determine their approach for pricing this requirement. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778122 Program Management Appendix I
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1/25/2017ProjNet: Logged In User
What is the proper name for the location EWA? Where is this located?
On: Jan 04 2017.
Government Response. . Ewa Beach, Oahu, Hawaii On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778123 Program Management Appendix I
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Where are sites WWH, WNH, MAK located?
On: Jan 04 2017.
Government Response. . The site names are listed in Appendix I of the PWS. WWH and WNH are located on Oahu. MAK is located on Kauai. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778125 Mechanical Attach 1 - PWS - Section 3.2.17 Automatic Control Valves
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify statement "Any Automatic valves not listed will have a Quarterly RWP frequency." Does this imply automatic valves not part of a hydrant system are to have a Quarterly RWP frequency because all subsequent ACV's listed are all parts of a specific hydrant system.
On: Jan 04 2017.
Government Response. . Yes, this implies all automatic control valves not part of a hydrant system are to have a Quarterly RWP frequency. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778127 Fire
Protection/Life Safety
Attach 1 - PWS - Section 3.2.18, 3.3.7, 3.4.19 Fire
Protection Systems Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Provide further detail on the specific nature, configuration, and construction of all Fire Protection Systems present at each installation, specifically in Japan. Provide a description of the FPS relative to types of FPS listed in UFC 03-601-02. A number of the large sea-water pumping systems, remote cannon and video systems and complex PLC controls in Japanese FPS are not covered in any of the requirements of UFC 03-601-02. If they are not listed in the UFC, then specific ITM requirements for each FPS are needed along with their frequency.
On: Jan 04 2017.
Government Response. . Information is provided in updated PWS. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778128 Facilities Maintenance
Attach 1 - PWS - Section
3.2.21 Vapor Recovery
Systems Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that the only installations with Vapor Recovery Systems are located at HAS, HAK, and RHL. At present, MAK, WHS, WWH, and EWA have no specific equipment listed, only real property as service stations.
On: Jan 04 2017.
Government Response. . All available information has been provided. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778130 Facilities Maintenance
Attach 1 - PWS - Section 3.3.8 and 3.4.24 Flow Meters
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that ALL locations in Navy Phase 6 are to meet the 3.3.8 Flow meter calibration frequency for Navy/Marine installations. If this is not the case, please specify which installations (e.g. HCK) that may be required to meet the 3.4.24 frequency for Flow meter calibration at Air Force installations.
On: Jan 04 2017.
Government Response. . Yes, all sites are to meet the 3.3.8 Flow meter calibration frequency for Navy/Marine installations. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778131 Facilities Maintenance
Attach 1 - PWS - Section 3.3.9 Fuel Piers and Wharfs
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The PWS states that the photos and findings are to be incorporated into the "Annual" report, although the inspection paragraph (3.3.9) is in the semi-annual section. Please confirm if this is an annual or semi-annual requirement.
On: Jan 04 2017.
Government Response. . See updated PWS. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778132 Facilities Maintenance
Attach 1 - PWS - Section 3.4.9 Vapor Recovery
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
A number of the sub-sections state to "Inspect, overhaul, and calibrate...through a service order." Are these Service orders to occur every year or as needed?
On: Jan 04 2017.
Government Response. . The service orders are to occur as required in the PWS (follow the section requirements for frequency). On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778133 Facilities Maintenance
Attach 1 - PWS - Section
3.4.9.2.6 Vapor Recovery-
Safety Valves Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that the safety valves are be "inspect[ed] and overhaul[ed]" every year regardless of need. Also please confirm that the standard statement to complete "through a service order" is not applicable to this sub-section
On: Jan 04 2017.
Government Response. . No, safety valves are be inspected and overhauled every two years per the PWS. This is to be completed through a service order. See updated PWS. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778136 Facilities Maintenance
Attach 1 - PWS - Section
3.4.9.2.3 Vapor Recovery-
Regeneration Drum Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that a sample must be collected every year regardless of need. Also please confirm that the standard statement to complete "through a service order" is not applied to this sub-section.
On: Jan 04 2017.
Government Response. . This is to be completed every two years per the PWS. This is to be completed through a service order. See revised PWS. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778138 Program Management
Appendix A - Service Orders -
3.5 Facility Number
Requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that multiple facility numbers may be provided on a single Service Order. This has been an ever changing requirement by
DLA-E.
On: Jan 04 2017.
Government Response. . Multiple facility numbers can be utilized at the discretion of the USACE PM. See updated PWS.
On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778139 Program Management
Appendix A - Service Orders -
3.6. Work Plan Preparation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that a Work Plan is required for ALL service orders as implied here. In section 3.6.2 stated they are to be submitted in accordance with 01 33 00 Submittal Procedures. Does this mean that each Work Plan is to be submitted as a formal submittal with separate cover and tracked on the register?
On: Jan 04 2017.
Government Response. . A work plan is required per the PWS requirements in Appendix A - Service Orders - 5.0 Complexity. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778142 Program Management
Appendix A - Service Orders -
4.5 Travel Costs/Mobilization
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is it the Government's intent to have a local crew for 100% of routine service orders as no travel costs are allowed to be charged for these service orders. Local means at each installation as a single site manager for Japan would still require travel to relocate to a number of the installations as SOs develop.
On: Jan 04 2017.
Government Response. . Instructions for travel costs are provided in Appendix A - Service Orders - 4.5.3 which applies to Routine Service Orders. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778143 Contracting Appendix A - Service Orders -
4.7 Competition Requirements
- NOTE
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The NOTE indicates that the prime must compete any subcontracted work. Please clarify how, or if, this applies to bids to Key Subcontractors that submitted with the prime's proposal.
On: Jan 04 2017.
Government Response. . The Appendix A - Service Orders - 4.7 Competition Requirements - NOTE does apply to bids that include Key Subcontractors. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778144 Contracting PWS, Appendix A, 4.7 .1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that the intent for paragraph (a) is that all routine service orders which have a subcontracted effort greater than $3,500 should include evidence that the contractor attempted to solicit a minimum of 3 quotes (whether or not 3 quotes were successfully received IAW paragraph b).
On: Jan 04 2017.
Government Response. . Per Appendix A - Service Orders - 4.7 Competition Requirements, it is confirmed that all routine service orders must include evidence that the contractor attempted to solicit a minimum of 3 quotes(whether or not 3 quotes were successfully received IAW paragraph b). On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778147 Program Management PWS, Appendix A, 3.4
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm whether Hawaii will require response times and service order completion times under CONUS or OCONUS guidelines.
On: Jan 04 2017.
Government Response. . Per Appendix A - 3.4, Hawaii will require OCONUS response times. However, completion times remain the same for all Service Orders. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778148 Contracting RFP, Japan Specific Local Clauses, I Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide which certain form of documentation is required as proof that contractor's employees are United States nationals ordinarily resident in the United States.
On: Jan 04 2017.
Government Response. . This information will be provided upon award. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778150 Contracting Attach 6 - Bid Sheet SUMMARY Tab Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that additional lines may be added for Subcontractor Fee and Markup if more than one Key Subcontractor is selected for this
RFP.
On: Jan 04 2017.
Government Response. . Yes, additional lines may be added for additional Key Subcontractors. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778155 Other
ADDENDUM TO FAR 52.212-2
EVALUATION--COMMERCIAL ITEMS
Section 2. Factor II-Past Performance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 40 or 85 says to, "Please forward the PPQs (see RFP Attachment 2: Past Performance Questionnaire form) to your customer POC, as well as the government POC, after completing section one (1). Please request that the customer POC email the completed questionnaire directly to the Government POC...Include copies of CPARS reports and/or page one (1) of each PPQ into your proposal."
However, page 42 of 85 states, "Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 3), which will provide contract and client information for the respective project (s)."
Please confirm that PPQs requested by our clients be sent directly to the Government POC and that Section 1/Page 1/Part I of the PPQ needs to be included as part of the proposal submission.
On: Jan 04 2017.
Government Response. . Yes, PPQs from offeror's clients should be sent to the Government POC (listed on PPQ).
Offeror shall submit all page ones with their proposal. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778157 Facilities Maintenance
Appendix H - Real Property/Equipment List and Site Asset Inventory List.
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Real Property List provides one hydrant system at MCAS Futenma. The related equipment list for FUT provides Automated Control Valves that are part of four different types of hydrant systems, each ACV with different quantity. This information is in conflict and does not make sense. Please confirm which information is correct.
Similar issues (i.e. no hydrants listed in the real property, but hydrant ACVs provided in equipment list) also appear at Camp Butler, Camp Hansen, Camp Schwab, NAF Atsugi, DFSP Hakozaki, DFSP Tsurumi, DFSP Iorizaki, DFSP Akasaki, & DFSP Yokose.
On: Jan 04 2017.
Government Response. . The equipment list provided is for information only. If the information is in conflict, the Real Property List shall be utilized. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778159 Facilities Maintenance
Appendix H - Real Property/Equipment List and Site Asset Inventory List
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Real Property List does not list hoses referenced in the PWS Section 3.4.15. The equipment list for Camp Butler indicates there are 8 hoses. However, there are no fill stands, no off load stands, no hydrants or other type of primary facilities on the Real Property List that would have hoses requiring pressure testing. Thus, the 8 hoses referenced seems to be referring to the dispenser hoses.
These types of hoses are not under the PWS requirement for regular pressure testing. Please confirm the number listed in the equipment list is referencing dispenser hoses rather than the hoses referenced in the PWS.
This issue is the same at Camp Courtney, Camp Gonslaves, Camp Schwab, Camp Kinser, and Camp Hansen.
On: Jan 04 2017.
Government Response. . The equipment list provided is for information only. If the information is in conflict, the Real Property List shall be utilized. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778160 Fire
Protection/Life Safety
Attach 1 - PWS - Section 3.2.18, 3.3.7, 3.4.19 Fire
Protection Systems Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Confirm that no building fire protection systems are to be incorporated into the proposal. The FPS to be inspected are only those that directly protect fueling systems (e.g. tanks, pipe, etc.).
On: Jan 04 2017.
Government Response. . The FPS to be inspected are only those that directly protect fueling systems (e.g. tanks, pipe, etc.). On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778164 Contracting 52.0000-4140 497 Japanese Consumption Tax
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is an SF 1449 an acceptable instrument of 'Proof of Purchase by U.S. Forces in Japan,' or will one of the other 4 acceptable forms listed be provided as 'proof'?
On: Jan 04 2017.
Government Response. . No. Per clause, use Voucher ENG Form 93. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778167 Program Management
Attach 1 - PWS Section 1.10.6
- Contract Schedule
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The effort to maintain a cost loaded schedule showing float is an excessive management tool relative to the work being performed for the various service orders and overall RM tasks. In general, Service order scopes are not complex enough to warrant that level of detail. Please confirm that a Project or Primavera schedule provided weekly in addition to the other 3-week look ahead and maintenance schedules is necessary for tracking under this program.
On: Jan 04 2017.
Government Response. . The cost loaded schedule is required for Maintenance activities and Independent Project Service Orders only. See revised PWS. The 3-week look ahead is still required per the PWS. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778168 Program Management
Attach 1 - PWS Section 1.5.3 - Site Manager
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
For this Phase, the Site Managers for HI and Japan are to be an employee of the prime contractor. In addition, the Site Manager shall be on-site during maintenance and repair work. Please confirm that this is the intent of the Government for the site manager as these two requirements as stated will greatly constrain the scheduling and execution flexibility of the program in HI and Japan.
On: Jan 04 2017.
Government Response. . This is confirmed per the requirement as identified in the PWS. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778173 Facilities Maintenance
Attach 1 - PWS Section 3.2.22
- Fuel Piers and Wharfs
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Provide the configuration and schematics for all piers and wharfs to ensure that the proper effort and equipment are bid in regards to the entry, cleaning, and inspection of the secondary containment systems at all installations. Specifically, it is understood that one location requires the use of cranes/forklifts to move a large number of concrete blocks (6' to 8' square) to properly access the piers secondary containment. This information is critical to ensure a proper and complete bid for all installations.
On: Jan 04 2017.
Government Response. . All available information is available via AMRDEC upon request to the POC identified in the RFP. Port operations is the point of contact for boat access to piers and wharves. Contact information will be provided at contract award. Generally notification 24 hours before is sufficient for access if no ship conflicts exist. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778177 Facilities Maintenance
Attach 1 - PWS Section 3.3.9 - Fuel Piers and Wharfs
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
For underside inspection of the piers and wharf piping and supports/hangers, provide size, dimensions, configuration and schematics for all structures to ensure the proper effort is understood prior to bidding this RM action. Also, provide the local permitting and access requirements for launching a boat/dingy into the area surrounding the pier as each installation is different and may require additional coordination and effort to perform this new PWS requirement.
On: Jan 04 2017.
Government Response. . All available information is available via AMRDEC upon request to the POC identified in the RFP. Port operations is the point of contact for boat access to piers and wharves. Contact information will be provided at contract award. Generally notification 24 hours before is sufficient for access if no ship conflicts exist. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778180 Facilities Maintenance
Attach 1 - PWS Section 3.2.22
- Fuel Piers and Wharfs
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
It is expected that the spill booms shall be inspected fully open and unwound or can the boom be reeled in and inspected based on use at the time of inspection.
On: Jan 04 2017.
Government Response. . It is expected that the spill booms shall be inspected fully open and unwound per the manufacturer's requirements and as stated in the PWS. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778183 Program Management
Attach 1 - PWS Section 1.5.3 - Site Manager
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can the Key Subcontractor provide a Site Manager that has been vetted by the QC Manager and approved for specific RM activities and/or Service Orders to allow for flexibility in both execution of RM and Service Order (repair) actions?
On: Jan 04 2017.
Government Response. . The Site Manager shall be an employee of the Prime Contractor per the PWS. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778233 Contracting SF1499 Box 8 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to the complex nature of some of the questions, we request consideration of a proposal due date extension equivalent to 3 weeks from date completed responses are provided. This allows for coordination with our Key Subcontractors that are located in Japan and require additional translation and effort to provide the responses for correction or alteration of their bids.
On: Jan 04 2017.
Government Response. . See updated RFP. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778339 General FBO Solicitation Posting
Since the solicitation attachments were just posted on 12/27/16 and due to the appearance that the solicitation was "Draft" in FBO, will CEHNC extend the due date for questions to allow contractors more than 5 business days to thoroughly review the solicitation and all 12 attachments?
On: Jan 04 2017.
Government Response. . See updated RFP. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778341 General FBO Solicitation Posting Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will CEHNC extend the proposal due date since the solicitation was posted as "Draft"?
On: Jan 04 2017.
Government Response. . See updated RFP. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778869 General PWS PGs. 76-77 Appendix A & B Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On the top of the Appendix A & B sheets it has USA Phase 4 Army Installations. Should this be removed or will it be included with the Safety Reports and Photographs?
On: Jan 04 2017.
Government Response. . This is only used as a template. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778896 General Attachment 6 Svs Ordr Labor Rates and Markup (Tab) Rates
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
All rates will be put on this tab, however there are drastic differences in price from Hawaii to Japan. Will there be a separate rate sheet for each or how do you separate?
On: Jan 04 2017.
Government Response. . Yes. Pricing Worksheet has been updated. See updated RFP. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778903 General PWS pg 114-124 Appendix H - Real Property/Equiptment List Real Property
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
There are 25 bases listed but only 23 have information for Real property. Will others be posted?
On: Jan 04 2017.
Government Response. . All available information is provided. Please note that facility numbers for both the Paul Hamilton and Hickam service station are listed in the facility list under PRL since they are located at Joint Base Pearl Harbor Hickam.
They do not have separate three letter site codes. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778909 General Attachment 6 All Pricing Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
There is pricing for all option years and a six (6) month extension. Will this price be determine as a monthly increment or as a full six
(6) month total price?
On: Jan 04 2017.
Government Response. . The pricing will be for a full six month total. See updated RFP. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778928 General 79-82 Attachment 3
Change report format to mirror Marine Loading Arm (MLA) format
On: Jan 04 2017.
Government Response. . Attachment provided will not be updated. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778934 General 5 1.5 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In order for the government to validate that Pond has met the "Personnel Requirements" should the costs be captured within the bid proposal?
On: Jan 04 2017.
Government Response. . It is at the discretion of the offeror to determine how to price these costs. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778937 General 6 1.5.3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Site manager overseas the Site Supervisor; are we to assume that these hours are captured within the bid proposal and how many hours should be programmed?
On: Jan 04 2017.
Government Response. . It is at the discretion of the offeror to determine how to price these costs. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778942 Security 11 1.9.4 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is there a written procedure for acquiring any special badging for entrance into Red Hill?
On: Jan 04 2017.
Government Response. . Yes. Procedure provided in revised RFP attachment. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778947 Security 11 1.9.4 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Shall any costs be associated with outside clearances be submitted as a service order?
On: Jan 04 2017.
Government Response. . No, these costs are to be included in the G&A. On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6778950 Operations Appendix 1 Task Order Site List and Support Level
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Paul Hamilton and Hickam service station is not listed for RM, will any work be performed at these sites under the BOA?
On: Jan 04 2017.
Government Response. . Facility numbers for both Paul Hamilton and Hickam service station are in the provided facility list for PRL as they are located at Joint Base Pearl Harbor Hickam. They do not have separate three letter site codes.
Hickam Service Station
1037AH
1037BH
1037CH
1037DH
1037EH
1037H
Paul Hamilton S169
ST169A
ST169B
ST169C On: Jan 25 2017 Current Request Status: Request Closed
Information for this report is procurement sensitive.
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY