Attachment_07_DLA_SO_Form.xls

XLS spreadsheet 197 KB Posted

Attached to
OFFICIAL Navy Phase 6 Solicitation
Solicitation number
W912DY-17-R-0003
Issued by

About this file

SO Form

View the file

Other files

File Type Posted
DRAFT_RFP_ProjNet_FINAL.pdf PDF
OFFICIAL_RFP_ProjNet_FINAL.pdf PDF
AMEND_01_CONFORMED_Navy_Ph6_Solicitation_FINAL.doc DOC document
AMENDMENT_01_Navy_Ph6_Solicitation_FINAL.doc DOC document
DRAFT_RFP_ProjNet_FINAL.pdf PDF
Attachment_06_Navy_Phase_6_Pricing_Worksheet_Template_FINAL.xls XLS spreadsheet
Attachment_08_Japan_-_DBA_Waiver.pdf PDF
Attachment_11_Japan_SOFA_Agreements.pdf PDF
Attachment_04_Eng_Form_4025-R.pdf PDF
Attachment_02_2016_07_08_-_Navy_Phase_6_QASP.pdf PDF
Attachment_05_SB_Participation_Plan_Format.doc DOC document
Attachment_07_DLA_SO_Form.xls XLS spreadsheet
Attachment_09-Wage_Determinations_24Jan17.pdf PDF
Attachment_03_20160923_N6_BLANK_PPQ_Fillable.pdf PDF
OFFICIAL_Solicitation_Navy_Ph6_Solicitation_25JAN2017.pdf PDF
Attachment_10_BOA_W912DY-12-R-0052_25_Mar_2016.pdf PDF
Attachment_12_Agreement_UK_BIOT_(Diego_Garcia).pdf PDF
Attachment_01_PWS_20170125_Navy_6_Binder.pdf PDF
Attachment_02_2016_07_08_-_Navy_Phase_6_QASP.pdf PDF
Attachment_06_Navy_Phase_6_Pricing_Worksheet_Template.xls XLS spreadsheet
Attachment_04_Eng_Form_4025-R.pdf PDF
Attachment_11_Japan_SOFA_Agreements.pdf PDF
Attachment_01_PWS_20161219_Navy_6_Binder.pdf PDF
Attachment_12_Agreement_UK_BIOT_(Diego_Garcia).pdf PDF
Attachment_03_20160923_N6_BLANK_PPQ_Fillable.pdf PDF
Attachment_08_Japan_-_DBA_Waiver.pdf PDF
Attachment_10_BOA_W912DY-12-R-0052_25_Mar_2016.pdf PDF
Attachment_05_SB_Participation_Plan_Format.doc DOC document
Attachment_09-Wage_Determinations_18Nov16doc.pdf PDF
Draft_Solicitation_W912DY-17-R-0003_(Navy_PH_6_Project).pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

QAE Form:
All service order information should be put into this sheet. All other sheets will be populated from this sheet
Once sheet is filled out it must be converted to stand alone PDF document
The PDF QAE sheet needs to have text boxes, check boxes, and Digital signature fields added to the appropriate area
The QAE must digitally sign the form twice - once for initial validation and a second time for Final Validation
The QAE Form is the only for to be sent to the QAE
KO Form:
All labor rates shall be fully burdened labor rates (IAW contractor accepted proposal documents)
Once all pricing data is input into this sheet and the Sub sheet (if used) this sheet must be converted to a standalone PDF Document
Digital signature fields will be placed in the appropriate blocks
When ready to submit for approval the Contractor's authorized representative will digitally sign the form
Contractor will place the service order fee (%) in the block provided - Fee is calculated on Subcontractor costs and Materials only
For Emergencies the Appropriate Fee will be entered (IAW the accepted proposal)
SUB Form:
If using a sub, prior to inputting Prime Contractor pricing information this form can be sent to the sub
The Sub will input their company name in the block provided
The sub will input fully burdened labor rates in the appropriate blocks
The sub will input AT COST parts and materials in the appropriate section
The sub will put Markup (%) in the block provided (Markup is calculated on material costs only. Labor costs are fully burdened.)
When complete, the Prime contractor will convert this to a pdf document (if used) to be included with the service order
Complexity Matrix:
This is a guide to help the contractor determine the amount of supporting information that will be required as part of the SO
When form is complete it will be converted to a pdf document to be included with the service order
AHA:
Every Service order submitted must have a AHA tailored to the service order on this form
This form can be edited to add/remove lines as needed.
It will pull other information from other sheets as needed
When complete this AHA will be converted to a PDF to be included with the service order
SUBMITTING THE SERVICE ORDER:
The contractor will make a PDF Portfolio and add the following PDF documents to the portfolio:
QAE sheet with initial validation signature
KO Form with Contractors signature
Sub Form (If used)
Complexity matrix
AHA Sheet
This Excel file will also be included in its raw filled out state
Work Plan

QAE Form

SERVICE ORDER FORM
PART I - SERVICE ORDER INFORMATION
SERVICE ORDER NUM.:XYZ-KTR-001SERVICE ORDER TYPE:Mobilization
CONTRACTOR:Contractor NameCONTRACT NUMBER:W912DY-13-G-XXXX
FACILITY NAME/NUM.:Fuel Station 1FS1TASK ORDER NUMBER:0004
SITE CODE:XYZSERVICE & PHASE:Army1
SERVICE ORDER DATE:7/14/14FUNDING CLIN:XXXXX
SO DESCRIPTION:
Input service order Scope of Work in this block on the QAE Form sheet. All other sheets will be filled based on input on QAE Form sheet. Contractor shall fill out all available cells in Part I, II, and III on QAE Form sheet. Other sheets will auto fill based on input. Selecting service order type will grey out certain sections that aren't required.

The SUB sheet is only required if subcontractor is utilized. Subcontractor shall use fee/markup for his overhead and profit. Material/Equipment costs listed on SO shall match invoice from manufacturer.

PART II - AUTHORIZATION
QAE NAME (First and Last):
QAE INITIAL VALIDATION:
E-SIGNED & DATED
By signing below, I certify that the services under the above Service Order have been satisfactorily completed.
QAE FINAL VALIDATION:
E-SIGNED & DATED
PART III - QUALITY OF WORK
Was work performed in a quality manner?YESNO
Was work performed safely?YESNO
Was work performed in a timely manner?YESNO
Did the prime contractor successfully manage the subcontractor?YESNO
Did contractor have all necessary certifications?YESNO
Were there any issues with the work performed?YESNO
QAE COMMENTS: Any box checked "NO" requires a comment, other comments encouraged. If contractor performed in a manner worth noting (positive or negative), please provide comments.
Provide Comments Here

KO Form

PRIME CONTRACTOR
PART I - SERVICE ORDER INFORMATION
SERVICE ORDER NUM.:XYZ-KTR-001SERVICE ORDER TYPE:Mobilization
CONTRACTOR:Contractor NameCONTRACT NUMBER:W912DY-13-G-XXXX
FACILITY NAME/NUM.:Fuel Station 1FS1TASK ORDER NUMBER:0004
SITE CODE:XYZSERVICE & PHASE:Army1
SERVICE ORDER DATE:7/14/14FUNDING CLIN:XXXXX
SO DESCRIPTION:
Input service order Scope of Work in this block on the QAE Form sheet. All other sheets will be filled based on input on QAE Form sheet. Contractor shall fill out all available cells in Part I, II, and III on QAE Form sheet. Other sheets will auto fill based on input. Selecting service order type will grey out certain sections that aren't required.

The SUB sheet is only required if subcontractor is utilized. Subcontractor shall use fee/markup for his overhead and profit. Material/Equipment costs listed on SO shall match invoice from manufacturer.

PART IV - Proposal Pricing
CUSTOMER:
E-SIGNED & DATED
CONTRACTOR:
E-SIGNED & DATED
CONTRACTING OFFICER OR OO:
E-SIGNED & DATED
TOTAL COST OF SERVICE ORDER:$ 5,273.68
FULLY BURDENED LABOR
TOTAL MHHOURLY RATETOTAL COST
DESCRIPTION:
0.00$ 500.00$ - 0
Labor Sub-Totals$ - 0
MATERIAL/EQUIPMENT/OTHER
QTY.UNIT COSTTOTAL COST
DESCRIPTION:
50.00$32.00$1,600.00
Material/Equipment Sub-Totals$1,600.00
TRAVEL/PER DIEM
QTY.UNIT COSTTOTAL COST
DESCRIPTION
20.00$ 30.00$ 600.00
$ - 0
Other/Travel Sub-Totals$ 600.00
Prime Subtotal$ 1,600.00
Subcontractor Subtotal$ 2,488.80
Subtotal$ 4,088.80
Service Order Fee10%$ 408.88
Tax10%$ 176.00
Travel$ 600.00
Labor$ - 0
Emergency Fee$ - 0
TOTAL$ 5,273.68

Add Row Add Row Add Row Delete Row Delete Row Delete Row

Subs

SUBCONTRACTOR
PART I - SERVICE ORDER INFORMATION
SERVICE ORDER NUM.:XYZ-KTR-001SERVICE ORDER TYPE:Mobilization
CONTRACTOR:Contractor NameCONTRACT NUMBER:W912DY-13-G-XXXX
FACILITY NAME/NUM.:Fuel Station 1FS1TASK ORDER NUMBER:0004
SITE CODE:XYZSERVICE & PHASE:Army1
SERVICE ORDER DATE:7/14/14FUNDING CLIN:XXXXX
SO DESCRIPTION:SUBCONTRACTOR:Subcontractor Name
Input service order Scope of Work in this block on the QAE Form sheet. All other sheets will be filled based on input on QAE Form sheet. Contractor shall fill out all available cells in Part I, II, and III on QAE Form sheet. Other sheets will auto fill based on input. Selecting service order type will grey out certain sections that aren't required.

The SUB sheet is only required if subcontractor is utilized. Subcontractor shall use fee/markup for his overhead and profit. Material/Equipment costs listed on SO shall match invoice from manufacturer.

PART IV - Proposal Pricing
TOTAL COST OF SUBCONTRACTOR WORK:$ 2,488.80
FULLY BURDENED LABOR
TOTAL MHHOURLY RATETOTAL COST
DESCRIPTION:
1.50$ 100.00$ 150.00
1.00$ 10.00$ 10.00
2.00$ 20.00$ 40.00
Labor Sub-Totals$ 200.00
MATERIAL/EQUIPMENT/OTHER
QTY.UNIT COSTTOTAL COST
DESCRIPTION:
1.00$ 50.00$50.00
20.00$ 50.00$1,000.00
1.00$ 50.00$50.00
2.00$ 50.00$100.00
Material/Equipment Sub-Totals$1,200.00
TRAVEL/PER DIEM
QTY.UNIT COSTTOTAL COST
DESCRIPTION
Airfare (Each)1.00$ 500.00$ 500.00
Rental Car1.00$ 350.00$ 350.00
$ - 0
Other/Travel Sub-Totals$ 850.00
Subtotal$1,200.00
Fee/Markup10%$120.00
Tax9%$118.80
Travel$850.00
Labor$200.00
TOTAL$2,488.80

Add Row Add Row Add Row Delete Row Delete Delete Row

Complexity Matrix

COMPLEXITY DETERMINATION SHEET
Instructions: Contractor should initially estimate the complexity of the service order. PLACE AN "X" IN THE BOX FOR LOW, MEDIUM, OR HIGH FOR EACH FACTOR. Depending on complexity, ensure the cooresponding required content is submitted with service order.

This is meant to be a guide only. Final determination of complexity as well as what is required to be included with each service order will be determined by USACE.

TASK COMPLEXITY DETERMINATION MATRIX
FACTORLOWMEDIUMHIGH
Coordination with other trades, other contractors, customer, or owner/operatorsX
Likelihood of outage of utilities and/or systemsX
Level of unknowns or undefined conditionsX
Level of interaction with regulatory entitiesX
Level of urgencyX
Logistical difficultyX
OVERALL COMPLEXITY OF TASKX
Required Content*Complexity
LowMediumHigh
Scope of WorkYesYesYes
PicturesA/RYesYes
Cost ProposalsYesYesYes
SSAPPYesYesYes
AHAYesYesYes
WORK PLAN REQUIRED FOR MEDIUM AND HIGH COMPLEXITY
Table of ContentsYesYes
Work Plan NarrativeYesYes
Manufacturers DataA/RYesYes
SketchesYesYes
Detailed DrawingsA/RYes
Project Specific ScheduleA/RYes
SpecificationsA/RYes
Project Specific Quality Control PlanYes
Work Plan Review Meeting/Pre-ConYes
Site Investigation ReportYes

AHA

Activity Hazard Analysis (AHA)
AHA NumberOverall Risk Assessment Code (RAC) - Use Highest RAC from Tasks BelowM
SERVICE ORDER NUMBERXYZ-KTR-001Risk Assessment Code (RAC) Matrix
NAME & DATE ACCEPTED BY GDA:
CONTRACT NUMBER:W912DY-13-G-XXXXSeverityProbability
TASK ORDER/DELIVERY #:0004
PRIME CONTRACTOR:Contractor NameFrequentLikelyOccasionalSeldomUnlikely
SUBCONTRACTOR:Subcontractor Name
DATE OF PREPARATORY MEETING:CatastrophicEEHHM
DATE OF INITIAL INSPECTION:CriticalEHHML
CONTRACTOR COMPETENT PERSON:MarginalHMMLL
SITE SAFETY and HEALTH OFFICERNegligibleMLLLL
RAC CHART and ACCEPTANCE BY GOVERNMENT DESIGNATED AUTHORITYReview each “Hazard” with identified safety “Controls” and determine (RAC)
E = EXTREMELY HIGH (PWO/OICC/ROICC)Identify the RAC (Probability/Severity) as E, H, M, or L for each “Hazard”. Place the highest RAC at the top of AHA. This is the overall risk assessment code for this activity
H = HIGH RISK (FEAD DIRECTOR)“Severity” is the outcome/degree if an incident, near miss, or accident did occur and identified as: Catastrophic, Critical, Marginal, or Negligible after controls are in place
M = MODERATE RISK (CM or ET or PAR)“Probability” is the likelihood to cause an incident, near miss, or accident did occur and identified as: Frequent, Likely, Occasional, Seldom, or Unlikely after controls are put in place.
L = LOW RISK (ET or PAR)
Job StepsHazardsControlsRAC
E
H
M
L