Price Schedule_EPA Items (Draft).docx
DOCX document 39 KB Posted
- Attached to
- Draft RFP for Howard A. Hanson Dam Fish Passage Facility Federal contract opportunity
- Solicitation number
- W912DW24R0004
About this file
This announcement provides information for a draft request for proposal for the Howard A. Hanson Dam Fish Passage Facility project. The U.S. Army Corps of Engineers seeks industry feedback on draft documents and plans to use an Early Contractor Involvement integrated design and construction delivery method. A virtual industry day will take place on November 29, 2023, from 10:00 AM to 12:00 PM Pacific Time for contractors to learn more and provide input. A site visit is also scheduled for December 13, 2023, with registration required by November 28. One-on-one sessions between contractors and the government will be held in early 2024 to clarify questions. Contractors should submit any questions on the draft RFP through ProjNet by January 5, 2023. No proposals are being requested at this time.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| AWSP Fish Passage Facility | 23020 | |
| Howard A. Hanson Dam, WA | W912DW-24-R-0004 |
PRICE SCHEDULE
| CLIN |
| Description of Item |
| Firm Fixed Price |
BASE ITEMS
| 0001 |
| Pre-Construction Services (Firm Fixed Price) |
| OPTIONAL ITEMS |
| Ceiling Price |
| CLIN Price ** |
| Initial Target Cost (ITC) |
| Initial Target Profit (ITP) |
| 0002 |
| Construct Fish Passage Facility and Supporting Facilities |
| $_______ |
| $_______ |
| $__________ |
| $_______ |
| ___% |
TOTAL EVALUATED PRICE * $_____________________
*Total Evaluated Price = CLIN 0001 Firm Fixed Price + CLINs 0002 Ceiling Price **CLIN Price = ITC + ITP; ITC will be evaluated for reasonableness
CLIN 0002 Scope of Work Price Breakdown
| Item |
| Description |
| Quantity |
| UOM |
| Initial Target Cost |
| 0002A |
| Mobilization and Demobilization |
| 1 |
| JOB |
| $_______________ |
| 0002B |
| Site Improvements |
| 1 |
| JOB |
| $_______________ |
| 0002C |
| Excavation |
| 1 |
| JOB |
| $_______________ |
| 0002D |
| Intake |
| 1 |
| JOB |
| $_______________ |
| 0002E |
| Bulkhead |
| 1 |
| JOB |
| $_______________ |
| 0002F |
| Multi-port Collector |
| 1 |
| JOB |
| $_______________ |
| 0002G |
| Steep Slope Bypass |
| 1 |
| JOB |
| $_______________ |
| 0002H |
| Tower |
| 1 |
| JOB |
| $_______________ |
| 0002I |
| Tunnel |
| 1 |
| JOB |
| $_______________ |
| 0002J |
| Outfall Structure |
| 1 |
| JOB |
| $_______________ |
| 0002K |
| Emergency Mobilization and Demobilization |
| 1 |
| EA |
| $_______________ |
| 0002L |
| Operations and Maintenance (O&M) Manuals |
| 1 |
| JOB |
| $ 500,000 |
| 0002M |
| Record Drawings |
| 1 |
| JOB |
| $ 250,000 |
| 0002 |
| Initial Target Cost TOTAL |
SCOPE OF WORK PRICE BREAKDOWN NOTES:
1) Initial Target Cost TOTAL for CLIN 0002 (Must equal Initial Target Cost amount for CLIN 0002).
2) The CLIN 0002 Scope of Work Breakdown items identified in the above tables are for proposal evaluation purposes and shall be used by the Government to determine if the proposed Initial Target Cost is fair and reasonable. The final bid schedule is subject to revisions prior to establishing the final construction price exercised as an option.
3) Proposal shall include a supporting price breakdown for each Items in the above schedule. Breakdown shall cover all anticipated work involved and a list of assumptions made to develop the Initial Target Cost. Target Profit shall be calculated separately. The breakdown of your proposal shall be in sufficient detail to permit an analysis of all material quantities and pricing by submitted invoices/quotes. Additional breakdown of your proposal in sufficient detail to permit an analysis of all labor, equipment, subcontract, production rates, parametric estimates (if used), job office overhead, overhead costs, to include General and Administrative expenses, and bond may be requested (as other than certified cost and pricing data) after the initial submission to facilitate the determination of fair and reasonable.
4) Refer to Section 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES for descriptions of each CLIN Item.
5) The dollar amount established in Items 0002L and 0002M shall not be revised by offerors.
6) Labor shall not be adjusted. Only the materials identified for base CLIN 0001 and option CLIN 0002 are subject to Economic Price Adjustment (EPA) in accordance with FAR Clause 52.216-4 Economic Price Adjustment – Labor and Material. Please see the Table below for additional information on the schedule of materials. The EPA Table price per pound shall only account for the actual cost of material and shall not be burdened by other associated costs.
a. This is not to exceed (NTE) quantity. EPA will be based on actual quantity performed. The total quantity for EPA will not exceed the amount as specified in the Table below. When submitted for EPA consideration, the quantity shall be rounded to the nearest pound.
b. The CLIN schedule shall be submitted fully completed and error free. The offeror shall input a two (2) decimal price in the “Price Per Pound.” All final monetary extensions in two decimal positions only. Example: $0.27, not $0.27458.
| CLIN |
| ITEM |
| MATERIAL |
| NOT-TO-EXCEED QUANTITY (IN U.S. POUNDS) (1) |
| PRICE PER POUND (IN USD) (2) |
Misc Steel
| Structural Steel |
| Steel (Rebar) |
| Stainless Steel |
| Concrete Aggregate |
| Fly Ash |
| Cement |
Unit Price
Quantities
CLIN 0002B Site Improvements
CLIN 0002C Excavation
CLIN 0002D Intake
CLIN 0002E Bulkhead
CLIN 0002F Multi-port Collector
CLIN 0002G Steep Slope Bypass
CLIN 0002H Tower
CLIN 0002I Tunnel
CLIN 0002J Outfall Structure
The price proposal must include completed CLIN 0002 Onetime initial target cost and ceiling price EPA Clause tables:
CLIN 0002 ONETIME INITIAL TARGET COST AND CEILING PRICE ADJUSTMENT TABLES
Initial Target Cost UNIT PRICE TABLE; TO BE INCLUDED WITH PRICE PROPOSAL
Ceiling Price UNIT PRICE TABLE; TO BE INCLUDED WITH PRICE PROPOSAL
| Misc Steel |
| Structural Steel |
| Steel (Rebar) |
| Stainless Steel |
| Aggregate (Concrete & Fill) |
| Fly Ash |
| Cement |
Unit Price
CLIN 0002B Site Improvements
CLIN 0002C Excavation
CLIN 0002D Intake
CLIN 0002E Bulkhead
CLIN 0002F Multi-port Collector
CLIN 0002G Steep Slope Bypass
CLIN 0002H Tower
CLIN 0002I Tunnel
CLIN 0002J Outfall Structure
*Estimated quantities are strictly for the purpose of administrating this clause. This is not for the purpose of variation of estimated quantities, or any other cost/quantity related data as applies to this contract. However, price adjustments to the CLIN 0002 Initial Target Cost and Ceiling Price are limited to, at a maximum, the estimated quantities identified here.
END PRICE SCHEDULE
00 11 00 - 7