HAHD_RFP Attach 5 - Construction Spec TOC.pdf
PDF 1 MB Posted
- Attached to
- Draft RFP for Howard A. Hanson Dam Fish Passage Facility Federal contract opportunity
- Solicitation number
- W912DW24R0004
About this file
This announcement provides information for a draft request for proposal for the Howard A. Hanson Dam Fish Passage Facility project. The U.S. Army Corps of Engineers Engineering District Seattle is seeking industry feedback on draft RFP documents and plans to use an Early Contractor Involvement-Integrated Design and Construction delivery method. A virtual industry day will take place on November 29, 2023, from 10:00 AM to 12:00 PM Pacific Time, and an in-person site visit is scheduled for December 13, 2023. Questions regarding the draft RFP must be submitted through ProjNet by January 5, 2023. One-on-one sessions between contractors and the government will also be held in early 2024 to discuss written questions and comments. The selected contractor will work with the government during design and agree to a firm fixed price for construction once design is complete.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
g3endllg Text Box Howard A. Hanson Dam - Fish Passage Facility 35% DDR ATR-BCOES Submittal g3endllg Text Box Attachment 5 g3endllg Text Box
CONSTRUCTION SPECIFICATIONS
TABLE OF CONTENTS
g3endllg Text Box
THIS PAGE INTENTIONALLY BLANK
HHD Fish Passage Facility 23020
W912DW-24-R-0004
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 14 10 SITE SPECIFIC SUPPLEMENTARY
REQUIREMENTS
01 14 50 EMERGENCY DEMOBILIZATION
01 22 00.00 10 08/15 PRICE AND PAYMENT PROCEDURES
01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 33 00 08/18 SUBMITTAL PROCEDURES
01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23 QUALITY CONTROL
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 32 13 02/21 SUBSURFACE DRILLING AND SAMPLING
02 41 00 05/10 DEMOLITION AND DECONSTRUCTION
02 42 00 DISPOSAL OF MATERIALS
DI VI SI ON 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 11 13.00 25 STRUCTURAL CAST-IN-PLACE CONCRETE
FORMING
03 15 00.00 25 CONCRETE ACCESSORIES
03 20 00.00 25 CONCRETE REINFORCING
03 31 01.00 25 CAST-IN-PLACE STRUCTURAL CONCRETE FOR
CIVIL WORKS
03 37 13 02/18 SHOTCRETE
DI VI SI ON 05 - METALS
05 05 20.00 25 05/22 POST-INSTALLED CONCRETE ANCHORS
05 05 23.16 25 08/18 STRUCTURAL WELDING
05 12 00.00 25 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 50 13.00 25 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
05 50 15 08/18 CIVIL WORKS FABRICATIONS
05 51 00.00 25 08/23 METAL STAIRS, PLATFORMS, AND WALKWAYS
05 51 33.00 25 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00.00 25 08/23 METAL RAILINGS
05 59 20 08/18 FABRICATION OF HYDRAULIC STEEL
STRUCTURES
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
PROJECT TABLE OF CONTENTS Page 1 Draft IDAC RFP (SUBJECT TO CHANGE)
07 14 00 08/23 FLUID-APPLIED WATERPROOFING
07 19 00 08/23 WATER REPELLENTS
07 22 00 08/23 ROOF AND DECK INSULATION
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 08/23 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 97 02 02/20, CHG 1: 11/21 PAINTING: HYDRAULIC STRUCTURES
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 23 05/16, CHG 1: 05/18 ELECTRIC TRACTION PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
22 14 29.00 02/23 SUMP PUMPS
22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR
SYSTEMS, LOW PRESSURE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
PROJECT TABLE OF CONTENTS Page 2
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 05/22 VIBRATION AND SEISMIC CONTROLS FOR
HVAC PIPING AND EQUIPMENT
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23 COMMISSIONING OF MECHANICAL[ AND
PLUMBING] SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.01 02/19, CHG 1: 02/20 LONWORKS DIRECT DIGITAL CONTROL FOR
HVAC AND OTHER BUILDING CONTROL SYSTEMS
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 09 93 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 05 11.00 28 05/21, CHG 1: 08/23 CYBERSECURITY
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 05 00.00 25 11/20 COMMON WORK RESULTS FOR ELECTRICAL
26 05 13.00 25 05/20 MEDIUM-VOLTAGE CABLES
26 05 19.10 25 11/22 INSULATED WIRE AND CABLE
26 05 36.00 25 CABLE BUS AND CABLE TRAYS FOR
ELECTRICAL SYSTEMS
26 05 48.00 25 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00.00 25 11/22 APPARATUS INSPECTION AND TESTING
26 11 16.00 25 11/21 SECONDARY UNIT SUBSTATIONS
26 12 16.00 25 DRY-TYPE SERVICE TRANSFORMERS
26 23 10.10 25 05/15, CHG 2: 11/19 480 VOLT SWITCHGEAR
26 28 00.00 25 08/19 PANELBOARDS
26 28 21.00 25 08/23 AUTOMATIC TRANSFER SWITCHES
26 29 23.00 25 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 42 13.00 20 04/06 CATHODIC PROTECTION BY GALVANIC ANODES
26 51 00.00 25 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 52 00.00 25 08/23 EMERGENCY LIGHTING
26 56 00.00 25 08/21 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00.00 25 08/11 BUILDING TELECOMMUNICATIONS CABLING
PROJECT TABLE OF CONTENTS Page 3
SYSTEM
27 21 10.00 25 11/20 FIBER OPTIC DATA TRANSMISSION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 08/08, CHG 2: 02/21 EARTHWORK
31 05 19.16 GEOTEXTILE SOIL STABILIZATION
31 10 00 08/08 CLEARING FOR CIVIL WORKS
31 23 00.00 11/21 TUNNEL EXCAVATION - BLASTING
31 23 06.00 02/21, CHG 1: 11/21 BLASTING - SURFACE
31 36 00 02/21 GABIONS
31 43 13.13 02/21 CONCRETE PRESSURE GROUTING
31 63 29 11/19 DRILLED CONCRETE PIERS AND SHAFTS
31 66 10 02/21 ROCK FOUNDATION PREPARATION
31 68 13 11/20 SOIL AND ROCK ANCHORS
31 72 00 TUNNEL GROUND SUPPORT SYSTEMS
31 73 19 02/21 TUNNEL AND SHAFT GROUTING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 23 05/22 AGGREGATE BASE COURSE
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
DI VI SI ON 33 - UTI LI TI ES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 26 00.00 10 04/08 RELIEF WELLS
33 40 00 11/21 STORMWATER UTILITIES
33 51 43 05/22 INSTRUMENTATION AND PERFORMANCE
MONITORING OF STRUCTURES
33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT IN VALVE
MANHOLES
33 71 02.00 25 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 01 41.00 10 11/14 ELECTROMECHANICAL OPERATING MACHINERY
FOR LOCKS AND DAMS
35 01 70.13 05/14 WIRE ROPE FOR GATE OPERATING DEVICES
35 05 40.14 10 08/20 HYDRAULIC POWER SYSTEMS FOR CIVIL
WORKS STRUCTURES
35 20 16.47 REGULATING OUTLET GATE MECHANICAL
EQUIPMENT
35 20 16.53 08/22 HYDRAULIC VERTICAL LIFT GATES
35 20 16.54 05/21 SLIDE GATES AND ACTUATORS
35 20 20 01/08 ELECTRICAL EQUIPMENT FOR GATE HOIST
35 31 19 01/08, CHG 1: 11/14 STONE, CHANNEL, SHORELINE/COASTAL
PROTECTION FOR STRUCTURES
35 45 01 02/21, CHG 3: 08/23 VERTICAL PUMPS, AXIAL-FLOW AND
MIXED-FLOW IMPELLER-TYPE
35 45 03.00 10 05/22 SPEED REDUCERS FOR STORM WATER PUMPS
DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS
40 05 13 10/07, CHG 2: 02/20 PIPELINES, LIQUID PROCESS PIPING
40 05 13.96 05/10 WELDING PROCESS PIPING
PROJECT TABLE OF CONTENTS Page 4
40 17 30.00 40 02/23 WELDING GENERAL PIPING
40 60 00.00 25 05/20 PROCESS CONTROL
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 65 10.00 10 05/09 DIESEL FUELED ENGINE PUMP DRIVES
DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT
46 25 14 02/11, CHG 1: 11/13 COALESCING OR VERTICAL TUBE OIL-WATER
SEPARATORS
-- End of Project Table of Contents --