HAHD_RFP Attach 5 - Construction Spec TOC.pdf

PDF 1 MB Posted

Attached to
Draft RFP for Howard A. Hanson Dam Fish Passage Facility Federal contract opportunity
Solicitation number
W912DW24R0004
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

This announcement provides information for a draft request for proposal for the Howard A. Hanson Dam Fish Passage Facility project. The U.S. Army Corps of Engineers Engineering District Seattle is seeking industry feedback on draft RFP documents and plans to use an Early Contractor Involvement-Integrated Design and Construction delivery method. A virtual industry day will take place on November 29, 2023, from 10:00 AM to 12:00 PM Pacific Time, and an in-person site visit is scheduled for December 13, 2023. Questions regarding the draft RFP must be submitted through ProjNet by January 5, 2023. One-on-one sessions between contractors and the government will also be held in early 2024 to discuss written questions and comments. The selected contractor will work with the government during design and agree to a firm fixed price for construction once design is complete.

View the file

Other files for this federal contract opportunity

Other files attached to Draft RFP for Howard A. Hanson Dam Fish Passage Facility, newest first.
File Type Posted
HAHD_RFP Attach 1 - Design Schedule.pdf PDF
HAHD_RFP Attach 2 - Plan Sheet List.pdf PDF
HAHD_RFP Attach 4 - DDR.pdf PDF
Price Schedule_EPA Items (Draft).docx DOCX document
HAHD_RFP Attach 3 - Concept Drawings.pdf PDF
HAHD_RFP Attach 8 - Geotech BDIRs.pdf PDF
HAHD_RFP Attach 10 - USFWS_2022_BIOP.pdf PDF
HAHD_RFP Attach 11 - NMFS 2019 BIOP.pdf PDF
HAHD_RFP Attach 14 - Bulkhead Inspection SOW.pdf PDF
IDaC Profit Formula and Scenario Tool.xlsx XLSX spreadsheet
HAHD_RFP Attach 6 - Draft Div01 Specifications.pdf PDF
HAHD_RFP Attach 12 - 401 Cert.pdf PDF
FY25HAHDFPF One on One Session Instructions (Rev1_Final).pdf PDF
FY25 HAHDFPF- One on One Session Instructions (Final).pdf PDF
FY25-HAHDFPF_00-COMPILATION_35PERCENT_DDR.pdf PDF
W912DW24R0004- HAHD FPF_GOVERNMENT QUESTIONS TO INDUSTRY (19DEC23).docx DOCX document
Attendance of December 13 Site Visit. List.xlsx XLSX spreadsheet
Industry Day Attendance List 29Nov23.xlxs.xlsx XLSX spreadsheet
W912DW24R0004- HAHD FPF_Draft RFP_Revision 1 (Reduced).pdf PDF
Industry Day Attendance List 29Nov23.xlxs.xlsx XLSX spreadsheet
HHD FPF Industry Draft RFP Presentation November 2023.pdf PDF
W912DW24R0004- HAHD FPF_GOVERNMENT QUESTIONS TO INDUSTRY.docx DOCX document
W912DW24R0004- HAHD FPF_Draft RFP_Reduced.pdf PDF
W912DW24R0004- HAHD FPF_PROJNET INQUIRIES INSTRUCTIONS.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

g3endllg Text Box Howard A. Hanson Dam - Fish Passage Facility 35% DDR ATR-BCOES Submittal g3endllg Text Box Attachment 5 g3endllg Text Box

CONSTRUCTION SPECIFICATIONS

TABLE OF CONTENTS

g3endllg Text Box

THIS PAGE INTENTIONALLY BLANK

HHD Fish Passage Facility 23020

W912DW-24-R-0004

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 11/11 WORK RESTRICTIONS

01 14 10 SITE SPECIFIC SUPPLEMENTARY

REQUIREMENTS

01 14 50 EMERGENCY DEMOBILIZATION

01 22 00.00 10 08/15 PRICE AND PAYMENT PROCEDURES

01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 02/15 PROJECT SCHEDULE

01 33 00 08/18 SUBMITTAL PROCEDURES

01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23 QUALITY CONTROL

01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 78 00 05/19 CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 32 13 02/21 SUBSURFACE DRILLING AND SAMPLING

02 41 00 05/10 DEMOLITION AND DECONSTRUCTION

02 42 00 DISPOSAL OF MATERIALS

DI VI SI ON 03 - CONCRETE

03 01 00 02/18 REHABILITATION OF CONCRETE

03 11 13.00 25 STRUCTURAL CAST-IN-PLACE CONCRETE

FORMING

03 15 00.00 25 CONCRETE ACCESSORIES

03 20 00.00 25 CONCRETE REINFORCING

03 31 01.00 25 CAST-IN-PLACE STRUCTURAL CONCRETE FOR

CIVIL WORKS

03 37 13 02/18 SHOTCRETE

DI VI SI ON 05 - METALS

05 05 20.00 25 05/22 POST-INSTALLED CONCRETE ANCHORS

05 05 23.16 25 08/18 STRUCTURAL WELDING

05 12 00.00 25 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 50 13.00 25 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 50 14 08/18 STRUCTURAL METAL FABRICATIONS

05 50 15 08/18 CIVIL WORKS FABRICATIONS

05 51 00.00 25 08/23 METAL STAIRS, PLATFORMS, AND WALKWAYS

05 51 33.00 25 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00.00 25 08/23 METAL RAILINGS

05 59 20 08/18 FABRICATION OF HYDRAULIC STEEL

STRUCTURES

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

PROJECT TABLE OF CONTENTS Page 1 Draft IDAC RFP (SUBJECT TO CHANGE)

07 14 00 08/23 FLUID-APPLIED WATERPROOFING

07 19 00 08/23 WATER REPELLENTS

07 22 00 08/23 ROOF AND DECK INSULATION

07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 08/23 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/23 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL AND DOOR LOUVERS

DI VI SI ON 09 - FI NI SHES

09 90 00 02/21 PAINTS AND COATINGS

09 96 00 11/14 HIGH-PERFORMANCE COATINGS

09 97 02 02/20, CHG 1: 11/21 PAINTING: HYDRAULIC STRUCTURES

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS

EQUIPMENT

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 21 23 05/16, CHG 1: 05/18 ELECTRIC TRACTION PASSENGER ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND

SEISMIC CONTROL

22 14 29.00 02/23 SUMP PUMPS

22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR

SYSTEMS, LOW PRESSURE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

PROJECT TABLE OF CONTENTS Page 2

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 05/22 VIBRATION AND SEISMIC CONTROLS FOR

HVAC PIPING AND EQUIPMENT

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00 05/23 COMMISSIONING OF MECHANICAL[ AND

PLUMBING] SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.01 02/19, CHG 1: 02/20 LONWORKS DIRECT DIGITAL CONTROL FOR

HVAC AND OTHER BUILDING CONTROL SYSTEMS

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 09 93 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

25 05 11.00 28 05/21, CHG 1: 08/23 CYBERSECURITY

25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM

TESTING

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DI VI SI ON 26 - ELECTRI CAL

26 05 00.00 25 11/20 COMMON WORK RESULTS FOR ELECTRICAL

26 05 13.00 25 05/20 MEDIUM-VOLTAGE CABLES

26 05 19.10 25 11/22 INSULATED WIRE AND CABLE

26 05 36.00 25 CABLE BUS AND CABLE TRAYS FOR

ELECTRICAL SYSTEMS

26 05 48.00 25 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00.00 25 11/22 APPARATUS INSPECTION AND TESTING

26 11 16.00 25 11/21 SECONDARY UNIT SUBSTATIONS

26 12 16.00 25 DRY-TYPE SERVICE TRANSFORMERS

26 23 10.10 25 05/15, CHG 2: 11/19 480 VOLT SWITCHGEAR

26 28 00.00 25 08/19 PANELBOARDS

26 28 21.00 25 08/23 AUTOMATIC TRANSFER SWITCHES

26 29 23.00 25 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 42 13.00 20 04/06 CATHODIC PROTECTION BY GALVANIC ANODES

26 51 00.00 25 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 52 00.00 25 08/23 EMERGENCY LIGHTING

26 56 00.00 25 08/21 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00.00 25 08/11 BUILDING TELECOMMUNICATIONS CABLING

PROJECT TABLE OF CONTENTS Page 3

SYSTEM

27 21 10.00 25 11/20 FIBER OPTIC DATA TRANSMISSION SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 08/08, CHG 2: 02/21 EARTHWORK

31 05 19.16 GEOTEXTILE SOIL STABILIZATION

31 10 00 08/08 CLEARING FOR CIVIL WORKS

31 23 00.00 11/21 TUNNEL EXCAVATION - BLASTING

31 23 06.00 02/21, CHG 1: 11/21 BLASTING - SURFACE

31 36 00 02/21 GABIONS

31 43 13.13 02/21 CONCRETE PRESSURE GROUTING

31 63 29 11/19 DRILLED CONCRETE PIERS AND SHAFTS

31 66 10 02/21 ROCK FOUNDATION PREPARATION

31 68 13 11/20 SOIL AND ROCK ANCHORS

31 72 00 TUNNEL GROUND SUPPORT SYSTEMS

31 73 19 02/21 TUNNEL AND SHAFT GROUTING

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 23 05/22 AGGREGATE BASE COURSE

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 15 00 05/17 AGGREGATE SURFACING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING

33 26 00.00 10 04/08 RELIEF WELLS

33 40 00 11/21 STORMWATER UTILITIES

33 51 43 05/22 INSTRUMENTATION AND PERFORMANCE

MONITORING OF STRUCTURES

33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT IN VALVE

MANHOLES

33 71 02.00 25 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 01 41.00 10 11/14 ELECTROMECHANICAL OPERATING MACHINERY

FOR LOCKS AND DAMS

35 01 70.13 05/14 WIRE ROPE FOR GATE OPERATING DEVICES

35 05 40.14 10 08/20 HYDRAULIC POWER SYSTEMS FOR CIVIL

WORKS STRUCTURES

35 20 16.47 REGULATING OUTLET GATE MECHANICAL

EQUIPMENT

35 20 16.53 08/22 HYDRAULIC VERTICAL LIFT GATES

35 20 16.54 05/21 SLIDE GATES AND ACTUATORS

35 20 20 01/08 ELECTRICAL EQUIPMENT FOR GATE HOIST

35 31 19 01/08, CHG 1: 11/14 STONE, CHANNEL, SHORELINE/COASTAL

PROTECTION FOR STRUCTURES

35 45 01 02/21, CHG 3: 08/23 VERTICAL PUMPS, AXIAL-FLOW AND

MIXED-FLOW IMPELLER-TYPE

35 45 03.00 10 05/22 SPEED REDUCERS FOR STORM WATER PUMPS

DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS

40 05 13 10/07, CHG 2: 02/20 PIPELINES, LIQUID PROCESS PIPING

40 05 13.96 05/10 WELDING PROCESS PIPING

PROJECT TABLE OF CONTENTS Page 4

40 17 30.00 40 02/23 WELDING GENERAL PIPING

40 60 00.00 25 05/20 PROCESS CONTROL

DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT

41 65 10.00 10 05/09 DIESEL FUELED ENGINE PUMP DRIVES

DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT

46 25 14 02/11, CHG 1: 11/13 COALESCING OR VERTICAL TUBE OIL-WATER

SEPARATORS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

Pages from Attachment Covers_4
PROJECT
PROJECT

File details come from the government source that posted it. Updated .