W912DW19R0017-Mechanical-Drawing-Revisions-R0002.pdf

PDF 5 MB Posted

Attached to
Construct a Hot Refueling System at Gray Army Airfield (GAAF), JBLM, WA
Solicitation number
W912DW19R0017
Issued by

About this file

Plans 2 of 4 - Mechanical

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

L D

E

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

IO

N

X

X X

X X

X X

X

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

TRANSITION

UNDERGROUND

ABOVEGROUND -

FILTER SEPARATORS

600 GPM RECEIPT

FILLSTAND PIPING

6" S.S. UNDERGROUND

F-24 TANK TYPICAL

50,000 GALLON JET A

OFFLOAD/FILLBOX

5,000 GAL DS2 UL2085 AST

DISPENSER

FILTER SEPARATORS

600 GPM ISSUE 1,000 GAL JET A F-24 PRT

1 1/2" CS

CANOPY

PUMP

FILL

OFFLOAD PIPING

UNDERGROUND

6" C.C.S.

CANOPY

TRANSITION

UNDERGROUND

ABOVEGROUND -

TANK 1

TANK 2

TANK 3

TANK 4

PUMP

TIGHTNESS TEST

2" SS

S

M A

V

F S

S

M A

V

F S

S

M A

V

F S

S

M A

V

F S

S

S

FS

P S

FS

A

A

A

A

P C

V -1

N .O

N .O

P

IT

FS

M P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E a u to s h o rt d e s ig n

J U

N E

A

E N

D M

E N

T R

MS102

E

C H

A N

IC

A L E

N L

A R

G E

D P

L A

N

S H

E E

T O

F auto_design auto_sytime auto_username

NORTH

PLAN

0 10' 20'

KEY NOTES:

OPTION2

WILL BE SHIFTED ACCORDINGLY.

EXTENTS DEPICTED. CATWALK AND STAIRS

TANK IS AN OPTION INCLUDING 1

A2

MECHANICAL SITE PLAN

SCALE: 1" = 10'

_2

R0002

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

MATCHLINE A-A

0 3

5+00

6+00

14+0

15+0

5+50

14+5

E : 1

.5

N : 6

.0

.0

P

O B

E : 1

.8

N : 6

.2

.1

9 P I

E : 1

.3

N : 6

.2

.5

P I

E: 11

7.18N: 6

9.95 4+84

.89

PI

E: 11

2.54N: 6

0.72 6+32

.46

PI

E: 1123494.09 N: 641773.67 13+90.59

PI

E: 1123634.65

N: 641802.02

15+33.98

PI

E: 1123650.34

N: 641805.21 15+49.99

PI

E : 1

.0

N : 6

.7

.8

P I

E : 1

.2

N

0.

.2

P O E

AND C8 ON MS501

SEE DETAILS E4

S

MAV

FS

S

MAV

FS

S

F S

PS

F S

A

A

PCV-1

N.O.

N.O.

PIT

7'-0"

6" FROM JET-A ISSUE

10" WATER LINE

EXISTING GRADE

EXISTING GRADE

PROPOSED GRADE

PROPOSED GRADE

6" JET-A @ 0.33% SLOPE

6" JET-A @ 0.33% SLOPE

LOW POINT DRAIN PIT

LOW POINT DRAIN

6" ISSUE TEE TO PANTOGRAPH #1 @ PI 4+84.89

MATCHLINE A-A

S E

E S

H E

E T M

S -2

41.29° BEND @ PI 2+03.19

90° BEND @ PI 4+73.51

315315

-0+20 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00 5+20

E L E

V A

T

IO

N I

N F

E

T

P

E T

E R

S O

N

D S

C H

E U

F F

E L E

Z S

M E

D L

Y to s h o rt d e s ig n

J U

N E

E N

D M

E N

T

MS203

L O

O P P

L A

N S A

N D P

R O

F

IL

E S

S H

E E

T O

D3

HYDRANT LOOP PLAN

SCALE: 1" = 30'

SCALE: VER 1" = 5'

30' 60'0

20' 40'0

0 5' 10'

A1

HYDRANT LOOP PROFILE

SCALE: HOR 1" = 20'

NORTH

PLAN

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

MATCHLINE C-C

0 3

5+00

15+0

5+50

E : 1

.5

N : 6

.0

.0

P

O B

E : 1

.2

N

0.

.2

P O E

E : 1

.8

N : 6

.2

.1

9 P I

E : 1

.0

N : 6

.7

.8

P I

E: 1123650.34

N: 641805.21 15+49.99

PI

E : 1

.3

N : 6

.2

.5

P I

E: 1123634.65

N: 641802.02

15+33.98

PI

E: 11

7.18N: 6

9.95 4+84

.89

PI

MATCHLINE A-A

AND C8 ON MS501

SEE DETAILS E4

S

F S

PS

F S

PCV-1

N.O.

N.O.

PIT

MATCHLINE C-C

S E

E S

H E

E T M

S -2

6" JET-A @ 0.33% SLOPE

6" JET-A @ 0.33% SLOPE

LOW POINT DRAIN PIT

LOW POINT DRAIN

10" WATER LINE

PROPOSED GRADE

EXISTING GRADE

@ 20+27

6" TO JET-A RETURN

7'-0"

41.29° BEND @ PI 18+22.82

315315

16+40 16+60 16+80 17+00 17+20 17+40 17+60 17+80 18+00 18+20 18+40 18+60 18+80 19+00 19+20 19+40 19+60 19+80 20+00 20+20 20+40

E L E

V A

T

IO

N I

N F

E

P

E T

E R

S O

N

D S

C H

E U

F F

E L E

Z S

M E

D L to s h o rt d e s ig n

J U

N E

E N

D M

E N

T

MS206

L O

O P P

L A

N S A

N D P

R O

F

IL

E S

S H

E E

T O

SCALE: VER 1" = 5'

30' 60'0

20' 40'0

0 5' 10'

A2

HYDRANT LOOP PROFILE

SCALE: HOR 1" = 20'

D3

HYDRANT LOOP PLAN

SCALE: 1" = 30'

NORTH

PLAN

PIPE SUPPORT

VALVE

4 " DBB PLUG

MAV

CONTROL VALVE

4" BACK PRESSURE

SUPPLY

STEEL

STAINLESS

6"

STEEL RETURN

6" STAINLESS

MAV CURBING

CONCRETE

PLUG VALVE

6" FULL PORT DBB

IFIF

3"

M

IN

M

IN

M A

X

6" MIN. (TYP.)

SLIP REMOVAL

NECESSARY FOR

DIMENSION AS

SEE DETAILS, SHEET ES-503.

BOLT GROUND TO VALVE,

2" BALL VALVE (TYP.)

FEMALE DUST CAP (TYP.)

TYPE CONNECTOR WITH

2" ALUMINUM MALE CAM

AND NOTES.

S-904 FOR TYPICAL FEATURES

LEAF PIT DOOR. SEE SHEET

GALVANIZED STEEL SINGLE

4'-0" X 4'-0" ALUMINUM OR

GRADE

PIPE SLOPE

PER SHEETS MS201-206

2" SCH. 40

#4 AT 12" E.W.

PIPE SLOPE

AND LINK-SEAL

PIPE SLEEVE

AND BAR GRATING DETAILS.

REINFORCED CONCRETE

SEE SHEET SS-304 FOR

TEE

REDUCING

REDUCING TEE

TRANSITION

UNDERGROUND

ABOVEGROUND -

WELDING BRANCH

RADIOGRAPHICAL

SLEEVE

SEGMENTED SEAL IN

MECHANICAL ADJUSTABLE

PIPE SLEEVE WITH

IN ONE PIT

BOTH LOW POINTS

FUEL LINES WILL HAVE

PITS FOR PARALLEL

30"

18" CLEAR

M

IN

2" BALL VALVE

IF

2" SCH 80

OF BACKFILL AROUND PIT.

SEE SHEET SS302 FOR DETAILS

TO PIPE

COLLAR WELDED

STEEL BANDS

BUNA-N SEAL WITH STAINLESS

" FROM TOP OF PIT LID.2

1CAP. 4

CONNECTOR W/FEMALE DUST

2" ALUMINUM MALE CAM TYPE

PIT COVER CAST "FUEL DRAIN"

SLOPE

" THICK FIBERGLASS PIT4

BUTT WELD JOINTS

TO VALVE

BOLT GROUND

6'-0"

6"

6"12"

'-0

ABOVE GRATING

VALVE, ADAPTOR AND IF

2" LOW POINT DRAIN,

2" WELDING BRANCH (TYP.)

2" ABOVE SUMP PIT BOTTOM

GRATING AND PIPE EXTENDED TO

ADAPTOR AND DUST CAP ABOVE

MALE CAN TYPE DRY BREAK

2" PUMP OUT PIPE WITH ALUMINUM

PIPE SLEEVE AND SEAL (TYP.)

/1

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13MS501.dwg

3:10:33 PM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

A M

E N

D M

E N

T R

J U

N E

W A

M S .d w g

M P

E T

E R

S O

N

Z S

M E

D L E

Y

Z S

M E

D L

E L P

IT

D

E T

A

IL

S

O F F A

P R

O N

MS501

C4

HYDRANT LOOP LOW POINT DRAIN ELEVATION

C1

BACK PRESSURE CONTROL VALVE ELEVATION

SCALE: 1/2" = 1'-0"

E1

BACK PRESSURE CONTROL VALVE PLAN

SCALE: 3/4" = 1'-0" E4

HYDRANT LOOP LOW POINT DRAIN PLAN

0 2' 4'1'

2'0 1' 4'

C8

FILLSTAND/OFFLOAD LOW POINT DRAIN PIT

SCALE: NTS

8 7

26 28 25(TYP)

IF

4"

IF

6"

2"

30 27

(TYP.)

BOLLARD

(TYP)

N.C.

PSIG

0-100

SEE DETAIL F9

N.C.

BOLLARD

PANTOGRAPH PIPING.

LONG

TO MATCH PIPING) CHANNEL IS 10'-0"

5" (ALUMINUM OR STAINLESS STEEL TYPE

6" FROM PUMP HOUSE

6" TO PUMP HOUSE

GRADE

25 14

24'-0"

N.C.

IF

LINE

DRAIN

METER

4"

6"

(TYP)

(TYP)

13 12

RELATIONSHIP TO GROUND.

TO READ 10,000 OHMS OR LESS IN

GROUND ROD. ROD SHALL BE TESTED

" x 10'-0" LONG ZINC COATED STEEL 4

TYP. BOTH SIDES)

LENGTH, 1'-0" CENTERS,

" DRAIN HOLES (ENTIRE 2

SECTION

INCH = 1 FOOT2

1SCALE:

DIAMETER OF THE LARGER PIPE.

IS LARGER THAN 16", THEN IT IS A PIPE

12" MINIMUM SEPERATION UNLESS PIPE

NOTES:

1. SEE SHEET MS504 FOR GENERAL NOTES AND TAG NUMBER DESCRIPTIONS.

SHEET MS503

DESIGNER #2

SEE NOTE TO

6" FROM PUMP HOUSE

6" RETURN TO PUMP HOUSE

F S

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13MS503.dwg

3:12:09 PM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

A M

E N

D M

E N

T R

N E

W

M S .d w g

M P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E

P

N T

O G

R A

P H H

O S

E E

N D T

Y P

E S

H E

E T /2

MS503

C1

AIRCRAFT DIRECT FUELING STATION

SCALE: 1/2" = 1'-0"

A1

ELEVATION

SCALE: 1/2" = 1'-0"

A7

ELEVATION

SCALE: 1/2" = 1'-0"

E6

GROUNDING ROD DETAIL

SCALE: NO SCALE

F9

HOSE RACK DETAIL

SCALE: NO SCALE

M-503

A7

C8

M-503

A1

M-503

C8

HYDRANT LOOP PIPING TRANSITION

SCALE: 1/2" = 1'-0"

0 2' 4'1'

0 2' 4'1'

0 2' 4'1' 0 2' 4'1'

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13MS504.dwg

3:13:01 PM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

A M

E N

D M

E N

T

N E

M S .d w g

M P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E

N T

O G

R A

P H H

O S

E E

N D T

Y P

E S

H E

E T /2

MS504

PANTOGRAPH PRESSURE CONTROL VALVE (PPCV).

INCLUDE TWO (2) SPARE D-1 NOZZLES AND SEXLESS COUPLINGS FOR FLUSHING PADS 1 AND 2.

PRESSURE FUELING NOZZLE W/ 40 STRAINER AND DRY BREAK COUPLING; CCR NOZZLES FOR PADS 1 AND 2.

" D-1 NOZZLE ADAPTER W/DUST CAP.2

7 HOSE TRAY, SEE DETAIL

SWIVEL JOINTS (TYP).

FUELING STATION VENTURI.

BUTTERFLY VALVE W/FUSIBLE LINK.

300 GPM FUELING STATION METER. METER HEAD TO BE VISIBLE TO THE OPERATOR.

4" REFUELING CONTROL VALVE. (PFV)

STATIC GROUND HOSE REEL.

HYDRAULIC DEADMAN HOSE REEL.

EMERGENCY STOP PUSHBUTTON STATION, SEE DETAIL ON ES501

CONCRETE PAD, SEE NOTE 4

PULL HANDLE.

SAMPLE CONNECTION, SEE DETAIL

MANUAL AIR VENT

SET AT 150 PSIG

RELIEF VALVE, SEE DETAIL

PIPE SUPPORT, SEE DETAIL

31 CHANNEL TYPE PIPE SUPPORT.

CATHODIC PROTECTION TEST STATION.

PIPE ANCHOR.

SHUT-EMERGENCY BREAKAWAY COUPLING.

STEEL POST W/RESILIENT BUMPER.

GROUNDING ROD, SEE DETAIL.

LOW POINT DRAIN.

BALL VALVE WITH DEADMAN SPRING RETURN HANDLE.

PRESSURE GAGE, SEE DETAIL

ALL TERRAIN WHEELS (TYP FOR 4).

3" DIAMETER API 1529 AIRCRAFT FUELING HOSE. NOMINAL 10' LENGTH.

SECTION. DIAMETER OF PANTOGRAPH PIPING SHALL BE AS SPECIFIED.

TWO PIPE SECTION, SS PANTOGRAPH. NOMINAL LENGTH: 24' PER PIPE

PIPE SECTIONS TO PASS WHEN EXTENDING

HINGED HOLDING BRACKET W/HASP AND LOCK. TO FOLD AND ALLOW PANTOGRAPH

INDICATING STATION CONDITION (SCHEME A ONLY), SEE DETAIL ON ES501

CONTROL STATION WITH PUSHBUTTONS FOR START/STOP AND LIGHT FOR

REQUIRED PRESSURE RANGES

SEE FLOW DIAGRAM FOR

AND MAXIMUM ALLOWABLE HIEGHT RESTRICTIONS.

POINT OF CONNECTION MAY VARY BASED ON PANTOGRAPH TYPE,

PANTOGRAPH CONNECTION POINT. DIRECTION AND/OR ELEVATION FOR

TAGGED ITEM DESCRIPTIONS:

---- WORK THIS SHEET WITH MS503 ----

34 BASKET STRAINER W/ BALL VALVE DRAIN WITH PLUG

MS503

E6

M-502

A1

M-501

A8

M-502

A7

M-501

A5

MS503

F9

M-501

E1

35 HOSE END REGULATOR, 45 PSIG FOR PAD 3; 25 PSIG FOR PAD 1 & PAD 2.

CONNECTING THE TWO MANIFOLDS.

NOTE: FOR THE ABOVEGROUND, WELDED, 6” PIPING LOCATED BETWEEN OFFLOAD MANIFOLDS: PLACE MULTIPLE PS-2 (SEE THIS SHEET) PIPE SUPPORTS NO GREATER THAN 13 FEET APART ALONG THE LENGTH OF THE 6 INCH PIPE

NOTE:

THE AFFECTED PUMP WILL BE CALLED OFF AND AN ALARM WILL SOUND.

ASSOCIATED PUMP DISCHARGE FLOW SWITCH FOR A 10 SECOND INTERVAL),

SUCCESSFULLY STARTING (AS INDICATED BY OPEN CONTACTS ON THE

IN THE EVENT A PUMP IS CALLED ON AND FAILS TO START OR FAILS AFTER

AIR BLOCK / CHECK VALVE

CONDITION VALVE ACTION SOLENOID "A"

FUEL

SENSOR IN

LOW LEVEL

DE-ENERGIZED

FUEL

SENSOR IN

UPPER LEVEL

ENERGIZED

150 GPM

OPEN

MINIMUM

300 GPM

OPEN

MOST

BALL VALVE

4" FULL PORT

ROTATED 45 )

INDICATOR (INSTALL

4" SITE FLOW

(TYP.)

PS-1 PIPE SUPPORT

SEQUENCE OF OPERATION

TRUCK OFFLOAD

LEVEL SENSOR IS COVERED BY FUEL.

OPEN TO CONTROL THE FLOW AT 150 GPM AS LONG AS THE LOWER

VALVE, AND THE VALVE WILL CLOSE, AND THE 2" AIR BLOCK/CHECK VALVE WILL

LEVEL SENSOR, SOLENOID "A" WILL BE DE-ENERGIZED ON THE 4" AIR BLOCK/CHECK

IF THE FUEL LEVEL IN THE AIR ELIMINATOR TANK DROPS BELOW THE UPPER

THE 2" AIR BLOCK/CHECK VALVE WILL BE ENERGIZED TO CLOSE.

VALVE, AND THE 4" VALVE WILL OPEN TO CONTROL THE FLOW AT 300 GPM.

IS COVERED BY FUEL, SOLENOID "A" WILL BE ENERGIZED ON THE 4" AIR BLOCK/CHECK

IF THE FUEL LEVEL IN THE AIR ELIMINATOR TANK RISES AND THE UPPER LEVEL SENSOR

CONTROL THE FLOW AT 150 GPM. THE 4" AIR BLOCK/CHECK VALVE WILL REMAIN CLOSED.

WITH FUEL THE 2" AIR BLOCK/CHECK VALVE IN THE DISCHARGE LINE WILL BE OPEN TO

WHILE THE PUMP IS RUNNING, IF ONLY THE LOWER LEVEL SENSOR IS COVERED

THE CONTROL SYSTEM WILL STOP THE PUMP.

CONTINUE TO RUN. IF FUEL LEVEL DROPS BELOW THE LOWER LEVEL SENSOR,

AS LONG AS THE LOWER LEVEL SENSOR IS COVERED WITH FUEL, THE PUMP WILL

BUTTON IS PUSHED, THE PUMP WILL BE ALLOWED TO START.

TANK. WHEN THE LOWER LEVEL SENSOR IS COVERED BY FUEL AND THE START

COUPLER AND BALL VALVE. FUEL WILL FLOW TO THE AIR ELIMINATOR

TO EACH TRUCK COMPARTMENT CONNECTION, OPENS EACH ASSOCIATED

TO INITIATE A TRUCK OFFLOAD, AN OPERATOR CONNECTS AN OFFLOAD HOSE

OFFLOAD PUMP (OP). A START BUTTON IS LOCATED AT EACH OFFLOAD STATION.

THE TRUCK OFFLOAD SYSTEM SKID IS SETUP TO OFFLOAD ONE TRUCK WITH ONE

4"

VENT

HIGH POINT

IF

6" PLUG VALVE

IF

VALVE

6" PLUG

300 GPM

OFFLOAD PUMP (OP)

NOZZLE ADAPTOR)

RECEPTACLE (D-1

" SINGLE POINT 2

CONTROL VALVE (AB/CV)

4" AIR BLOCK / CHECK

6"

4"

CONTROL VESSEL

ELIMINATOR/FLOW

VERTICAL AIR

WITH CAP

TYPE DRY BREAK

2" DRAIN AND CAM

6" STRAINER

CONTROL VESSEL

AIR ELIMINATOR/FLOW

VERTICAL

VALVE

PREVENTION

OVERFILL

FLOW SWITCH

" FLANGED2

6"

PS-2

14'-0" ABOVE PAD

1" DRAIN

2" VENT

LEVEL SENSOR (TYP 2)

C6

6"

VACUUM VENT

2" PRESSURE/

TO 60 PSIG

30" WG VAC.

3" X 2" REDUCER

VALVE, AND BALL VALVE

SOLENOID VALVE, GLOBE

2" BYPASS WITH

COMPENSATION

WITH TEMPERATURE

DISPLACEMENT METER

4", 300 GPM POSITIVE

S

PSIG

0-150

PG

METER SUPPORT

1"

VALVE

4" PLUG

6"

23'-5"

CONTROL VALVE

4" AIR BLOCK/CHECK

4" CAM LOCK

4" STRAINER

SP = 125 PSIG

HOSE HANGER

10' LONG (TYP.)

4" FUEL HOSE,

SLEEVE

PIPE

STEEL CLAMPS

RUBBER SEAL WITH STAINLESS

SEGMENTED ELASTOMERIC SEAL

MECHANICALLY ADJUSTABLE

FROST.

SHALL BE BELOW

OF THE SLEEVE

AND THE BOTTOM

ABOVE GRADE

A MIN. OF 6"

SLEEVE SHALL BE

THE TOP OF THE

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13MS505.dwg

3:15:44 PM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

A M

E N

D M

E N

T R

N E

M S .d w g

M P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E

R

U C

K O

F F

L O

A D S

E C

T

IO

N S A

N D D

E T

A

IL

S

MS505

F1

TRUCK OFFLOAD PLAN VIEW

SCALE: 1/2" = 1-'0"

C1

TRUCK OFFLOAD ELEVATION

SCALE: 1/2" = 1'-0"

C6

SECTION

SCALE: 3/8" = 1'-0"

0 2' 4'1'

0 2' 4'1' 4'0 2' 8'

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13M-001.dwg

11:17:16 AM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

A M

E N

D M

E N

T R

N E

W A

M -0

.d w g

M P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E L E

F U

E L S

Y S

T E

M L

E G

E N

D

M-001

FUEL SYSTEM LEGEND:

CONTROL VALVE

IF

DIFFERENTIAL PRESSURE GAUGE

DIFFERENTIAL PRESSURE TRANSMITTER

LIQUID LEVEL INDICATOR

METER

PRESSURE INDICATING TRANSMITTER

PRESSURE GAGE - SEE DETAIL ON SHEET M-502

BASKET STRAINER

FLOW SWITCH

SIGHT FLOW INDICATOR

ANGLE TYPE CONTROL VALVE

LINE SIZE REDUCER

BALL VALVE

JET FUEL LINE

WYE STRAINER

PLUG VALVE

CAP

CONNECTOR

FLEXIBLE BALL JOINT

FLEXIBLE HOSE

CHECK VALVE

NEEDLE VALVE

INSULATING FLANGE

LIMIT SWITCH

SAMPLE CONNECTION - SEE DETAIL ON SHEET M-502

CONTROL VALVE WITH SOLENOID OPERATED PILOT SYS.

HYDRANT CONTROL VALVE

NON-SURGE CHECK VALVE WITH RATE OF FLOW CONTROLLER

RELIEF VALVE - SEE DETAIL ON SHEET M-502

BPCV

CV

D/FV

DPT

ESO

FP

FSCV

FSI

HLV

IF

MAV

O.V.

PCV

PS

SFI

PRP

AAV

FSR

N.C.

N.O.

WC

AUTOMATIC AIR VENT

BACK PRESSURE CONTROL VALVE

NON-SURGE CHECK VALVE W/RATE

OF FLOW CONTROLLER

DEFUEL/FLUSH VALVE

DIFFERENTIAL PRESSURE TRANSMITTER

EMERGENCY SHUT-OFF VALVE

FUELING PUMP

FILTER SEPARATOR CONTROL VALVE

FILTER SEPARATOR ISSUE

FILTER SEPARATOR RECEIVING

HIGH LIQUID LEVEL SHUT-OFF VALVE

INSULATING FLANGE

MANUAL AIR VENT

NORMALLY CLOSED

NORMALLY OPEN

OVER FILL VALVE

PRESSURE CONTROL VALVE

PIPE SUPPORT

SIGHT FLOW INDICATOR

WATER COLUMN

PRESSURE SENSOR

TEMPERATURE SENSOR

MOTORIZED VALVE

M

PRODUCT RETURN PUMP

CS CARBON

SS STAINLESS STEEL

MECHANICAL FUELING NOTES:

PLACE FLANGE PROTECTORS AT ALL LOCATIONS.13.

BRANCH CONNECTIONS ARE PER UFGS 33 52 43.13 UNLESS CALLED OUT OTHERWISE.12.

WHICH MUST BE INTERIOR AND EXTERIOR EPOXY COATED CARBON STEEL.

ALL PIPING IS STAINLESS STEEL WITH THE EXCEPTION OF THE TRUCK OFFLOAD LINE 11.

ETC., SHOWN ON OTHER CONTRACT DOCUMENTS AND DRAWINGS.

CIVIL, ELECTRICAL WORK,

COORDINATE CONSTRUCTION OF ALL MECHANICAL FUELING WORK WITH STRUCTURAL, 10.

ITS WORK.

CONTRACTOR SHALL PROVIDE TEMPORARY PIPE SUPPORTS AS REQUIRED TO COMPLETE 9.

BELOWGROUND TO ABOVEGROUND PIPING.

PROVIDE FBE COATING A MINIMUM OF 6 INCHES BEYOND TRANSITION FROM 8.

PROVIDE CLASS 150 BLIND FLANGES AT ALL PIPE TERMINATIONS.7.

PIPE FLANGES SHALL BE ASME B16.5, CLASS 150 UNLESS NOTED OTHERWISE.6.

ALL PIPING BENDS SHALL BE LONG RADIUS UNLESS NOTED OTHERWISE.5.

PADLOCKS.

VALVES AND SAFETY RELIEF VALVES SHALL BE LOCKED OPEN WITH KEYED ALIKE

ALL MAINTENANCE BALL VALVES DOWNSTREAM AND UPSTREAM OF THERMAL RELIEF 4.

SMALL BORE PIPING IS INDICATED SCHEMATICALLY.3.

BASED ON PIPE SUPPORT DETAILS INDICATED IN THE CONTRACT DRAWINGS.

CONTRACTOR SHALL ESTABLISHING TOP-OF-CONTRETE ELEVATIONS FOR PIPE SUPPORTS

ADJUSTMENTS REQUIRED TO COMPLETE PIPING WORK.

CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ELEVATIONS AND RESULTING

NEW PIPE ELEVATIONS ARE BASED ON THE BEST INFORMATION AVAILABLE.

CAN BE INSTALLED IN THE PROVIDED SPACE.

EQUIPMENT SELECTION AND ADJUST SYSTEMS TO ENSURE THAT EQUIPMENT AND PIPE

VERIFY ALL DIMENSIONS, ELEVATIONS, AND CONNECTIONS THAT ARE DETERMINED BY 2.

OPERATIONAL FUELING SYSTEM.

IN VIEWS. USING THESE DRAWINGS AND PROJECT SPECIFICATIONS, CONSTRUCT A FULLY

DRAWINGS ARE IN GENERAL SCHEMATIC IN NATURE; NOT ALL COMPONENTS ARE SHOWN 1.

CONTRACT OPTIONS:

ONE TANK AS SHOWN ON MS101 & MS102.3.

ONE TRUCK FILLSTAND AS SHOWN ON MS103.2.

RETAIL FUELING SYSTEM ON SHEET MS105.1.

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

BOWSER DRAIN PUMP

WATER DRAW-OFF AND

CONCRETE EDGE

2" KICKER LINES

TANK

PRODUCT RECOVERY

PUMP

SHELTER DRAIN

CANOPY

FSI-2

FSI-1 FSR-1

FSR-2

BYPASS

POLISHING

LINE

S.S. TRUCK FILLSTAND

S.S. SUPPLY AND RETURN

EXTERNALLY COATED U/G

C.S LINE U.G.

TRUCK OFFLOAD

TO TANK 1

TO TANK 2

TO TANK 3

TO TANK 4

FROM TANKS

LINE

2" VENT AND DRAIN

ACCESS ROAD

FTP-1

OV-1

IF IF

IF

IF

S.S.

FSICV-1 FSICV-2 FSRCV-1 FSRCV-2

S.S.S.S.

C.S.

S.S. S.S.

FILL

SLOW

1"

BYPASS

TANK-TO-TANK

2" MOV

PCV FOR LEAK TESTING

3"

S

FS

P S

FS

P C

V -1N .O

N .O

P

IT

S

FS

P S

FS

P C

V -1N .O

N .O

IT

P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E to s h o rt d e s ig n

J U

N E

E N

D M

E N

T R

M-101

P

IP

IN

G P

L

NORTH

PLAN

0 2' 4'1'

C C C C

B

A

A

A

A A

A

M-301

C1

C1

SHELTER PIPING PLAN

SCALE: 1/2" = 1'

MECHANICAL FUELING NOTES:

OPERATIONS

POSITION MANUAL VALVE HANDLES TO AVOID INTERFERENCE AGAINST NORMAL4.

CARBON STEEL. ALL REMAINING PIPING MUST BE STAINLESS STEEL.

ALL PIPING FROM THE TRUCK OFFLOAD TO THE INLET OF THE RECEIPT F/S MUST BE3.

SEE M-701 FOR PRV SCHEDULE.2.

CONNECT ALL LOW POINT DRAINS TO THE COMMON DRAIN LINE. 1.

KEY NOTES

CONTRACT OPTION. BLIND FLANGE TEE IN VERTICAL1.

_2

_2

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

HIGH-HIGH

HIGH

LOW

LOW-LOW 1% SLOPE

MINIMUM

OFF VALVE FLOAT

8" HIGH LEVEL SHUT

6"

DRAIN PIT

LOW POINT

600 GPM

N.O.

1"

1"

FSICV-1

FSI-1

6"

2"

1"

VENT

HIGH POINT

HYDRANT LOOP

600 GPM

N.O.

1"

1"

FSICV-2

FSI-2

6"

1"

DRAIN DRAIN

ULS

LLS

MLS

AIR ELIMINATOR

VENT

VACUUM

PRESSURE

DRAIN

PUMP

TO 60 PSIG

30"WG VAC

PSIG

0-150

M

4"

4" FUEL HOSE (10')

4" QUICK DISCONNECT

6"

6" 4"

OVERFILL PREVENTION VALVE

2"

TRUCK OFFLOADS

6"

AND/OR HYDRANT PUMP

TURBINE FILLSTAND

300 GPM VERTICAL

2" WATER DRAW-OFF

4" FILL DROP TUBE

10" EMERGENCY VENT

MECHANICAL TANK LEVEL DIAL GAUGE

4" PRIMARY VENT

36" MANWAY

36" MANWAY

8" SLOTTED ATG GAUGE WELL

6" SLOTTED ATG WATER PROBE WELL

10" EMERGENCY VENT

PRESSURE VACUUM VENT CAP

STRIKER PLATE

PLATE

STRIKER

4" STICK GAUGE HATCH

LADDER

INTERNAL

FOR INDEPENDENT LEVEL ALARMS

4" SLOTTED ATG GAUGE WELL

BPCV

IF

DRAIN PIT

LOW POINT

MONITOR

INTERSTITIAL

DRAIN PIT

LOW POINT

DRAIN PIT

LOW POINT

TANK

RECOVERY

PRODUCT

600 GPM

N.O.

1"

1"

6"

2"

1"

600 GPM

N.O.

1"

1"

6"

1"

N.O.

FSR-1

FSRCV-1

FSR-2

FSRCV-2

S

FS

6"

4"

4"

DRAIN DRAIN

ULS

LLS

MLS

AIR ELIMINATOR

VENT

VACUUM

PRESSURE

DRAIN

PUMP

TO 60 PSIG

30"WG VAC

PSIG

0-150

M

4"

4" FUEL HOSE (10')

4" QUICK DISCONNECT

6"

6" 4"

OVERFILL PREVENTION VALVE

2"

S

4" AB/CV

2" AB/CV

2"

IF

GLOBE VALVE

4" 6"

4"

4"

4"

4"

PTCV-1

6"

6"

6"

IF

N.O.N.O.

IF

DRAIN

IF

PSIG

0-300 M

TFV-1

DRAIN

SWIVEL

D-1

3" HOSE

PSIG

0-300 4"

6"

IF

DRAIN

IF

PSIG

0-300 M

TFV-2

DRAIN

SWIVEL

D-1

3" HOSE

PSIG

0-300 4"

6"

TRUCK FILL STANDS

6"

VALVES

DBB PLUG

M M

M M

MM

M M

HIGH POINT VENT

HIGH POINT VENT

N.O.N.O.

N.O.N.O.

IF

IF

IF

S

4" AB/CV

2" AB/CV

2"

IF

GLOBE VALVE

4"

DRAIN

DRAIN

2-1/2" SPR

DISCONNECT

BREAK QUICK

4" CAM TYPE DRY

HLSOV-1

HLSOV-2

HLSOV-3

HLSOV-4

R12R1

R2 R22

R3 R32

R4 R42

T4

T3

T2

T1

(TYP. OF 6)

PANTOGRAPH

IF

M

PPCV-1

I1

4" I2

4" I3

4" I4

I6

I8

I5

I7

I10I14

I11

I12

I13

I9

I16

I17

R11 R10

R7

P3

R8R9

R6

R5

(TYP)

SWIVEL

N.C.

PCV-1

M

M

M

M

F1

F2

I10A

T5

6"

P1

P2

P6

P5

P4

D1

D2

D3

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13M-201.dwg

11:23:53 AM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

A M

E N

D M

E N

T R

N E

M -2

.d w g

M P

E T

E R

S O

N

Z S

M E

D L E

Y

D S

C H

E U

F F

E

O W D

IA

G R

A

M-201

_2

_2

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

FTP-1

FTP-2

FTP-3

FTP-4

T1

T2

T3

T4

IF

FSICV-2

FSICV-1

FSRCV-2

FSRCV-1

IF

IF

DRAIN PIT

LOW POINT

DRAIN PIT

LOW POINT

CONTROL VALVE

BACK PRESSURE

OFFLOADS

TRUCK

IF

IF

TR

U C

K

FI

LL

S

TAN

D S

IF

IF

IF

R12

R22

R32

R42

R1

R2

R3

R4

TANK

TANK

TANK

TANK

M

M

HLSOV-4

HLSOV-3

HLSOV-2

HLSOV-1

I1

I2

I3

I4

I5

I6

I7

I8

I9

I10

I11

I12I13

I14

T5

R5

R6

R7

R8

R9

R10

R11

P6

P4

P5

P3

D2

I16

I17

(TYP. OF 6)

PANTOGRAPH

IF

IF

PTCV-1

PPCV-1

PCV

M

M

M

M

M

M

M

M

M

M

F2

F1

FTP-1

RECOVERY TANK

PRODUCT P2

D3

P1

I10A D1

D2

D1

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13M-202.dwg

11:25:20 AM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

A M

E N

D M

E N

T R

N E

M -2

.d w g

M P

E T

E R

S O

N

Z S

M E

D L E

Y

D S

C H

E U

F F

E

IS

M E

T R

IC

D

IA

G R

A

M-202

_2

_2

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13M-203.dwg

11:29:19 AM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

M -2

.d w g

M P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E

Q U

E N

C E O

F O

P E

R A

T

IO

N S S

O O /2

M-203

SEQUENCE OF OPERATIONS

SYSTEM DESCRIPTION:

1.

2.

3.

4.

5.

SYSTEM IN MANUAL MODE - JETA-F24 TRUCK OFFLOADING:

1.

IN THE NEW FILTRATION SHELTER TO NEW STORAGE TANKS 1-4.

TWO (2) 300 GPM TRUCK OFFLOADING POSITIONS WITH PUMPS SUPPLY FUEL THROUGH RECEIPT FILTER-SEPARATORS

2. TO INITIATE A TRUCK OFFLOADING OPERATION, INSURE THAT THE DESIRED FUEL STORAGE TANK IS VALVED TO RECEIVE

FUEL AND ALL OTHER AFFECTED VALVES ARE PROPERLY SET. FUELS PERSONNEL MUST MAKE CONNECTIONS FOR

GROUNDING THE FUEL SUPPLY TRUCK AND CONNECT THE OFFLOADING HOSES TO THE TRUCK. TO BEGIN OFFLOADING, FUELS PERSONNEL MUST DEPRESS THE PUMP “START” PUSHBUTTON FOR THE OFFLOADING PUMP AS WELL AS A DEADMAN SWITCH. EACH OFFLOADING POSITION IS EQUIPPED WITH AN AIR ELIMINATOR TANK WITH LEVEL SWITCHES

THAT CONTROL OFFLOADING CONTROL VALVES AT EACH OFFLOADING POSITION TO ALLEVIATE SYSTEM SURGES AND TO

CHECK IN THE EVENT OF BACK-FLOW.

3. AS FUEL IS RECEIVED AT NEW TANKS, THE OPERATOR WILL MONITOR THE HIGH LEVEL ALARM SWITCHES

INSTALLED ON THE TANKS. A HIGH LEVEL CONTROL VALVE INSTALLED AT EACH TANK WILL SHUT OFF FUEL FLOW TO THE

TANK WHEN THE HIGH LEVEL CONTROL VALVE FLOAT IS SATISFIED. SHOULD THIS FAIL, A HIGH HIGH LEVEL SWITCH

INSTALLED ON EACH TANK WILL SHUT OFF TRUCK OFFLOADING PUMPS..

4. TO STOP AN OFFLOADING OPERATION, THE OPERATOR SHALL RELEASE THE DEADMAN AND PUSH THE PUMP

“STOP” PUSHBUTTON. THIS WILL CLOSE THE OFFLOADING CONTROL VALVE AND DE-ENERGIZE THE PUMP. FOLLOWING THE PUMP SHUT-DOWN THE OPERATOR WILL DISCONNECT THE TRUCK OFFLOADING HOSES AND THE GROUND CONNECTION.

SYSTEM IN MANUAL MODE - TRUCK FILL OPERATION:

1.

TWO (2) 600 GPM ISSUE FILTER SEPARATORS (FSI-1 THROUGH FSI-2) TO THE TRUCK FILLSTANDS.

FUEL PUMPS FP-1 THRU FP-4 IN THE NEW FUEL TANKS. FUEL IS PUMPED FROM STORAGE TANKS 1-4 THROUGH

TWO (2) NEW 300 GPM TRUCK FILLSTANDS ARE PROVIDED. THE TRUCK FIILLSTANDS WILL BE SUPPLIED BY THE 300 GPM

2. TO INITIATE A TRUCK FILL OPERATION, ENSURE THAT THE DESIRED FUEL STORAGE TANKS ARE VALVED TO ISSUE FUEL AND

ALL OTHER AFFECTED VALVES ARE PROPERLY SET. FUELS PERSONNEL MUST MAKE CONNECTIONS FOR GROUNDING THE

FUEL TRUCKS AND CONNECT THE LOADING HOSE NOZZLE TO THE FUEL TRUCK.

3. TO BEGIN LOADING A FUEL TRUCK, FUELS PERSONNEL MUST DEPRESS THE PUMP “START” PUSHBUTTON FOR THE TRUCK LOADING POSITION AS WELL AS DEPRESS A HYDRAULIC DEADMAN SWITCH TO OPEN THE TRUCK LAODING VALVE AT

EACH LOADING SPOT.

4. TO END A TRUCK LOADING OPERATION, FUELS PERSONNEL MUST RELEASE THE HYDRAULIC DEADMAN SWITCH AND

DEPRESS THE PUMP “STOP” PUSHBUTTON. THIS WILL CLOSE THE LOADING CONTROL VALVE AND DE-ENERGIZE THE PUMP.

FOLLOWING THE PUMP SHUT-DOWN, THE OPERATOR WILL DISCONNECT THE TRUCK LOADING HOSE NOZZLE AND

THE GROUND CONNECTION.

5. SHOULD THE LEVEL IN THE ISSUING FUEL TANK FALL TO THE LOW LOW LEVEL WHILE LOADING FUEL ONTO A TRUCK, FUEL PUMPS (FP-1 THROUGH FP-4) WILL BE DE-ENERGIZED AND FUELING WILL CEASE.

6.

ISSUE PUMP WILL STOP THE PUMP AFTER 10 SECONDS.

SHOULD THE OPERATOR FORGET TO PUSH THE PUMP STOP BUTTON, A FLOW SWITCH INSTALLED DOWNSTREAM OF EACH

7. TO REDUCE PRESSURE SURGE SPIKES AT THE LOADING RACKS BPCV-1 (LOCATED NEAR HOT PITS) WILL OPEN

QUICKLY AND BY-PASS FUEL BACK TO THE OPERATING TANK, SHOULD THE PRESSURE RISE ABOVE 85 PSI. THE VALVE IS

ADJUSTABLE TO HOLD A BACK PRESSURE ON THE SYSTEM WHILE OPERATING AND TO RELIEVE PRESSURE SPIKES.

EMERGENCY STOP AND RESET:

1. DEPRESSION OF ANY EMERGENCY STOP PUSHBUTTON OR ACTUATION OF THE FIRE ALARM SYSTEM SHALL STOP FUELING

PUMPS AND DE-ENERGIZE THE FILTER SEPARATOR CONTROL VALVES SOLENOID CAUSING THE VALVES TO CLOSE.

2. IN ORDER TO RESET THE SYSTEM AFTER AN ALARM, DEPRESS “EFSO RESET” PUSHBUTTON LOCATED ON THE PUMP

CONTROL PANEL IN THE CONTROL ROOM.

PUMP.

FILTRATION TO THE NEW FUEL STORAGE TANKS 1-4, AND IS EQUIPPED WITH A BOWSER OFFLOAD AND WATER DRAWOFF

THE PRODUCT RECOVERY TANK HAS A FUEL TRANSFER PUMP (FTP-1) TO RETURN FUEL THROUGH INBOUND RECEIPT

WALL 1,000 GALLON ABOVEGROUND PRODUCT RECOVERY TANK LOCATED IN AN OPEN PIT WITHIN THE PUMP SHELTER.

RELIEF VALVE DISCHARGE AND ALL FUEL DRAINS FROM THE PUMP SHELTER ARE COLLECTED AND ROUTED TO A DOUBLE

NEW FILTRATION SHELTER.

TWO (2) NEW TRUCK FILLSTAND POSITIONS WILL BE SUPPLIED BY THE ISSUE PUMPS AND FILTER SEPARATORS IN THE

FUEL STORAGE TANKS 1-4.

OFFLOADING BULK FUEL TRUCKS THRU THE RECEIPT FUEL FILTER SEPARATORS IN THE NEW PUMP SHELTER TO NEW

TWO NEW TRUCK OFFLOADING POSITIONS, EACH RATED AT 300 GPM, ARE PROVIDED FOR

(2) 600 GPM ISSUE FILTER-SEPARATORS FOR LOADING AND TWO (2) 600 GPM RECEIPT FILTER SEPARATORS.

THE PUMP SYSTEM INCLUDES FOUR (4) 300 GPM VERTICAL TURBINE PUMPS. THE FILTRATION SHELTER INCLUDES TWO

SERVE AS BOTH RECEIPT AND OPERATING TANKS FOR HOT REFUELING OPERATIONS.

THE FUEL STORAGE SYSTEM CONSISTS OF FOUR NEW 50,000 GAL TANKS (TANKS 1-4). THE FOUR NEW TANKS ARE TO

SYSTEM IN MANUAL MODE - HELICOPTER FILL OPERATION:

1.

5.

6.

EACH ISSUE PUMP WILL STOP THE PUMP AFTER 10 SECONDS.

SHOULD THE OPERATOR FORGET TO PUSH THE PUMP STOP BUTTON, A FLOW SWITCH INSTALLED DOWNSTREAM OF

7.

QUICKLY AND BY-PASS FUEL BACK TO THE OPERATING TANK, SHOULD THE PRESSURE RISE ABOVE 85 PSI. THE VALVE IS

ADJUSTABLE TO HOLD A BACK PRESSURE ON THE SYSTEM WHILE OPERATING AND TO RELIEVE PRESSURE SPIKES.

SHOULD THE LEVEL IN THE ISSUING FUEL TANK FALL TO THE LOW LOW LEVEL WHILE LOADING FUEL INTO A HELICOPTER, FUEL PUMPS (FP-1 THROUGH FP-4) WILL BE DE-ENERGIZED AND FUELING WILL CEASE.

TO REDUCE PRESSURE SURGE SPIKES AT THE LOADING RACKS BPCV-1 (LOCATED NEAR HOT PITS) WILL OPEN

LIMITED TO 100 GPM AND PAD 3 MUST BE 300 GPM.

(2) 600 GPM ISSUE FILTER SEPARATORS (FSI-1 THROUGH FSI-2) TO THE PANTOGRAPHS. PAD 1 AND PAD 2 MUST BE

PUMPS FP-1 THRU FP-4 IN THE NEW FUEL TANKS. FUEL IS PUMPED FROM STORAGE TANKS 1-4 THROUGH TWO

EACH HAVE TWO 60 FOOT REACH PANTOGRAPHS. THE PANTOGRAPHS WILL BE SUPPLIED BY THE 300 GPM FUEL

THREE (3) NEW HELICOPTER HOT REFUELING FUELING PADS ARE PROVIDED. THE HOT REFUELING PADS

2.

GROUNDING THE HELICOPTER AND CONNECTING THE PANTOGRAPH NOZZLE TO THE HELICOPTER.

ISSUE FUEL AND ALL OTHER VALVES ARE PROPERLY SET. FUELS PERSONNEL MUST MAKE CONNECTIONS FOR

TO INITIATE A HELICOTPER FILL OPERATION, ENSURE THAT THE DESIRED FUEL STORAGE TANKS ARE VALVED TO

AT PAD 1 AND PAD 2 MUST MODULATE TO DIVERT EXCESS FLOW TO THE RETURN LINE.

VALVE AT EACH LOADING SPOT. PANTOGRAPH PRESSURE CONTROL VALVES

PANTOGRAPH) AS WELL AS DEPRESS A HYDRAULIC DEADMAN SWITCH TO OPEN THE PANTOGRAPH LOADING CONTROL

OPERATORS MUST DEPRESS THE PUMP START PUSHBUTTON FOR THE HELICOPTER LOADING POSITION (ONE AT EACH

TO BEGIN FILLING A HELICOPTER, THE PANTOGRAPH MUST BE ROLLED TO THE PROPER FUELING POSITION. THE FUELS 3.

TO THE SECURE POSITION.

PANTOGRAPH LOADING NOZZLE AND GROUND CONNECTION. THE PANTOGRAPH MUST BE ROLLED BACK

ENERGIZE TEH PUMP. FOLLOWING THE PUMP SHUTDOWN, THE OPERATOR WILL DISCONNECT THE

AND DEPRESS THE PUMP STOP PUSHBOTTON. THIS WILL CLOSE THE LOADING CONTROL VALVE AND DE-

TO END A HELICOPTER LOADING OPERATION, FUELS OPERATORS MUST RELEASE THE DEADMAN SWITCH4.

EMERGENCY OPERATION - PLC'S DOWN:

1. IN THE EVENT THE PLC'S ARE DOWN, THE SYSTEM MAY BE ACTIVATED FOR EMERGENCY FUELING AS FOLLOWS:

-MANUALLY START FUELING PUMP(S) AS REQUIRED. MANUALLY STOP LAST FUELING PUMP AFTER EMERGENCY OPERATING

IS COMPLETE.

-IN THE EMERGENCY OPERATION THE OPERATOR IS REQUIRED TO CONTINUOUSLY VERIFY OPERATING TANK(S) FUEL

LEVEL TO ENSURE ADEQUATE FUEL SUPPLY IS AVAILABLE. FUEL LEVEL VERIFICATION SHALL BE BY MEANS OF THE

OPERATING TANK'S MECHANICAL TAPE LEVEL GAUGE. UPON COMPLETION OF EMERGENCY OPERATION, OPERATOR

SHALL RETURN FUELING PUMP SELECTOR SWITCHES TO ORIGINAL POSITIONS.

RETURN FUEL TO STORAGE (RTB) - R-11 OR HEMTT OFF-LOAD:

1. RETURN TO BULK (RTB) FUEL CONNECTION IS PROVIDED AT EACH TRUCK OFFLOADING SKID TO OFFLOAD.

THE OPERATOR MUST GROUND THE VEHICLE AND CONNECT THE TRUCK'S FUELING HOSE NOZZLE TO THE SINGLE POINT

THE TANK LEVELS MUST BE MONITORED AS IN TRUCK OFFLOADING AND THE R-11 OPERATOR MUST MANUALLY STOP THE HEMTT PUMP.

THE FUEL GOES TO THE DESIRED FUEL TANK. THE FUEL WILL BE PUMPED BACK THROUGH RECEIPT FUEL FILTRATION TO STORAGE TANKS 1-4.

RECEPTACLE (SPR) AND USE ITS ONBOARD PUMP TO OFFLOAD TO THE DESIRED STORAGE TANK. THE CHRISTMAS TREE MUST BE ADJUSTED SO

TANK TO TANK TRANSFER (OR FLUSH MODE):

1. FUEL FROM EACH TANK MAY BE TRANSFERRED TO ANOTHER TANK BY OPERATING APPROPRIATE VALVES IN THE SHELTER.

2.

TO THE DESIRED TANK.

FUEL WILL BE DIRECTED THROUGH ISSUE FILTER SEPARATORS USING TANK ISSUE PUMPS,THROUGH THE TANK BYPASS VALVE (T5) AND BACK

3. DURING FLUSH MODE A SELECTOR SWITCH CAN BE SET TO HOLD THE BPCV-1 OPEN, OR BPCV-1 CAN BE CLOSED OFF WITH

THE ISOLATION VALVES AND THE 6" BYPASS VALVE OPENED.

REMARKS

1. DURING THE ABOVE DESCRIBED OPERATIONS ALL MANUAL DRAIN AND VENT VALVES SHALL BE CLOSED. AUTOMATIC AIR

VENTS, AUTOMATIC FILTER SEPARATOR DRAINS AND RELIEF VALVES SHALL REMAIN OPERATIONAL.

4.

MAXIMIZE VELOCITY THROUGH THE PANTOGRAPH.

A MINIMUM OF 3 PANTOGRAPHS NEED TO BE CONNECTED FOR FLUSHING. FLUSH ONE PANTOGRAPH AT A TIME TO

TO FLUSH PANTOGRAPHS, CONNECT THE PANTOGRAPH'S HOSE END TO THE RTB CONNECTION ON THE PANTOGRAPH.

S H

E E

T C

H A

N G

E A

M E

N D

M E

N T R

J U

N E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

\\nwofpcadd01\AEC_WS_001\WA13\40000 Design Products\CAD_BIM\_Sheets\WA13M-204.dwg

11:30:13 AM 6/18/2019 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

A M

E N

D M

E N

T

N E

M -2

.d w g

M P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E

Q U

E N

C E O

F O

P E

R A

T

IO

N S S

O O /2

M-204

OPERATION -TWO SOLENOID

BACK PRESSURE CONTROL VALVE (BPCV)

CONDITION VALVE ACTION SOLENOID 'A'

"FUELING" MODE ENABLE ENERGIZED

"FLUSH" MODE ENABLE DE-ENERGIZED

SEQUENCE OF OPERATIONS CONT.

MANUAL VALVE OPERATION

1. FILLING OF THE OPERATION TANK 1 FROM TRUCK OFFLOADS

OPEN VALVES: T1,R1, R5, R6, R7, R8, R9, R10, R11

CLOSE VALVES:P3, R2, R3, R4, R12

2. FILLING OF THE OPERATION TANK 2 FROM TRUCK OFFLOADS

OPEN VALVES: T2, R2, R5, R6, R7, R8, R9, R10, R11

CLOSE VALVES:P3, R1, R3, R4, R22

3.

FUELING OF TANK TRUCKS FROM OPERATING TANK 1

OPEN VALVES:I1, I5, I6, I7, I8, I9, I16, I17

CLOSE VALVES:I10, T5

4.

FUELING OF TANK TRUCKS FROM OPERATING TANK 2

OPEN VALVES:I2, I5, I6, I7, I8, I9, I16, I17

CLOSE VALVES:I10, T5

5.

6.

EMPTYING OF REMAINING FUEL FROM ANY TANK TO ANY OTHER TANK

OPEN VALVES:I1 (I2, I3, I4), I5, I6, I7, I8, R22 (R12, R32, R42), T2 (T1, T3, T4), T5

CLOSE VALVES:I9, I10, I14, R12, R32, R42 (R22), R1, R2, R3, R4

7.

EMPTYING OF PRODUCT RECOVERY TANK INTO OPERATING TANK 1

OPEN VALVES:P1, P3, R1, R8, R9, R10, R11, T1

CLOSE VALVES:P2, P6, R2, R3, R4, R7, R12

8.

EMPTYING OF PRODUCT RECOVERY TANK INTO OPERATING TANK 2

OPEN VALVES:P1, P3, R2, R8, R9, R10, R11, T2

FILLING OF THE OPERATION TANK 3 FROM TRUCK OFFLOADS

OPEN VALVES:

CLOSE VALVES:

FILLING OF THE OPERATION TANK 4 FROM TRUCK OFFLOADS

OPEN VALVES:

CLOSE VALVES:

T3, R3, R5, R6, R7, R8, R9, R10, R11

P3, R1, R2, R4, R32

T4, R4, R5, R6, R7, R8, R9, R10, R11

P3, R1, R2, R3, R42

9.

10.

11.

12.

FUELING OF TANK TRUCKS FROM OPERATING TANK 3

OPEN VALVES:

CLOSE VALVES:

FUELING OF TANK TRUCKS FROM OPERATING TANK 4

OPEN VALVES:

CLOSE VALVES:

I3, I5, I6, I7, I8, I9, I16, I17

I10, T5

I4, I5, I6, I7, I8, I9, I16, I17

I10, T5

EMPTYING OF PRODUCT RECOVERY TANK INTO OPERATING TANK 3

OPEN VALVES:P1, P3, R3, R8, R9, R10, R11, T3

13. EMPTYING OF PRODUCT RECOVERY TANK INTO OPERATING TANK 4

OPEN VALVES:P1, P3, R4, R8 R9, R10, R11, T4

CLOSE VALVES:P2, P6, R1, R3, R4, R7, R22

CLOSE VALVES:P2, P6, R1, R2, R4, R7, R32

CLOSE VALVES:P2, P6, R1, R2, R3, R7, R42

NOTES:

SEE M-201 OR M-202 FOR VALVE DESIGNATION NUMBERS.1.

SYSTEM IN TIGHTNESS TESTING MODE

1. CLOSE RETURN LOOP ISOLATION VALVE (I14)

CLOSE THE FILLSTAND ISOLATION VALVE (I9)2.

PRESSURE CONTROL VALVE (I11 AND I12) AT THE END OF THE SUPPLY LOOP

CLOSE ISOLATION VALVES AT PANTOGRAPHS AND AROUND THE BACK 3.

ACTIVATE FOR PRESSURE TESTING.

BUILDING. 2" MOV I10A WILL OPEN. TTP-1 WILL

SELECT "TIGHTNESS TEST" MODE FROM THE PANEL IN THE OPERATIONS 4.

TO RUN THROUGH THE SHUTDOWN SEQUENCE

TO END THE PROCEDURE, SWITCH TO "AUTO" MODE ON THE PANEL 5.

DRAINING WATER FROM FILTERS

1.

SLOWFILL LINE ARE CLOSED

ON M-302, ENSURE VALVE TO PRT DRAIN LINE & VALVE FROM

2. OPEN REMAINING VALVE TO DRAIN WATER

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

HIGH-HIGH

HIGH

LOW

LOW-LOW SLOPE

MINIMUM 1%

MONITOR

INTERSTITIAL

MONITOR

INTERSTITIAL

OFF VALVE FLOAT

8" HIGH LEVEL SHUT

OFF VALVE W/ FLOAT

HIGH LEVEL SHUT

LEVEL CONTROL FLOAT

8" OPENING FOR HIGH

MAV

1"

MAV

1"

4" BALL VALVE

4" BALL VALVE

VALVE WITH ANTI-SIPHON SOLENOID

4" PUMP DISCHARGE CONTROL

FS

FLOW SWITCH

2" WATER DRAW OFF

4" FILL TUBE

10" EMERGENCY VENT

36" MANWAY

36" MANWAY

4" STICK GAUGE HATCH

8" SLOTTED ATG GAUGE WELL

6" SLOTTED ATG WATER PROBE WELL

10" EMERGENCY VENT

AND/OR HYDRANT PUMP

TURBINE FILLSTAND

300 GPM VERTICAL

2" WATER DRAW-OFF

4" RECEIPT PIPING

10" EMERGENCY VENT

MECHANICAL TANK LEVEL DIAL GAUGE

4" PRIMARY VENT

36" MANWAY

36" MANWAY

8" SLOTTED ATG GAUGE WELL

6" SLOTTED ATG WATER PROBE WELL

10" EMERGENCY VENT

PRESSURE VACUUM VENT CAP

STRIKER PLATE

PLATE

STRIKER

4" STICK GAUGE HATCH

LADDER

INTERNAL

4" PRIMARY VENT

FOR INDEPENDENT LEVEL ALARMS

4" SLOTTED ATG GAUGE WELL

FOR INDEPENDENT LEVEL ALARMS

4" SLOTTED ATG GAUGE WELL

STORAGE TANK

UL 2085 DOUBLE WALL

SADDLE TYP.

HOLES, (2) PER

SHIPMENT BANDING

12'-6" OUTER DIAMETER

12-0" INNER DIAMETER

" M

IN

MECHANICAL TANK LEVEL DIAL GAUGE

AND/OR HYDRANT PUMP

TURBINE FILLSTAND

300 GPM VERTICAL

4'

PUMP

HAND

10" CONE

STEEL

COATED

12"x12" X1/4"

PLATE

DIFFUSER

STEEL

COATED

12"x12" X1/4"

PLATE

DIFFUSER

S

TESTING PUMP SUCTION

2" NOZZLE FOR TIGHTNESS

P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E to s h o rt d e s ig n

M A

Y

E N

D M

E N

T

M-401

J E

T F

U E

L S

T O

R A

G E T

A N

K S

E C

T

IO

PUMP DESIGN BASIS: BLACKMER PA828B

11. PROVIDE GRADE MOUNTED WATER DRAW-OFF PUMP WITH CAMLOCK.

OPERATION OF PUMP.

PUMP. NOZZLES SHALL BE REINFORCED TO HANDLE WEIGHT AND

10. COORDINATE PUMP NOZZLE FLANGE TYPE, SIZE, AND CLASS WITH

645,000 CUBIC FEET PER HOUR.

9. EMERGENCY VENT SHALL HAVE A MINIMUM VENTING CAPACITY OF

REINFORCING PLATE IS NECESSARY.

MUR TANKS ONLY. TANK MANUFACTURER SHALL DETERMINE WHETHER

8. ATG GAUGE WELL DETAIL ON THIS SHEET IS FOR FACTORY FABRICATED

WHETHER REINFORCING PLATE IS NECESSARY.

FABRICATED F-24 TANKS ONLY. TANK MANUFACTURER SHALL DETERMINE

7. ATG WATER PROBE DETAIL ON THIS SHEET IS FOR FACTORY

TANK MANHOLE FLAGNES.

OUT ON TANK. LEVEL OF PLATFORM ABOVE TANKS SHALL BE AT LEVEL OF

ALLOWS ONE TO REACH ALL TANK APPURTENANCES WITHOUT CLIMBING

6. TANKS SHALL EACH HAVE CATWALK AND SAFETY RAILING THAT

FOR CONNECTIONS.

RESIDE, STAINLESS STEEL BOLTS, NUTS AND WASHERS SHALL BE USED

5. ALL LOCATIONS WHERE DISSIMILAR METAL FLANGED CONNECTIONS

4. ALL BOLTS, NUTS AND WASHERS SHALL BE STAINLESS STEEL.

3. ALL ISSUE PIPING AND APPURTENANCES SHALL BE STAINLESS STEEL.

ABOVEGROUND STORAGE TANKS.

2. THE DETAIL SHOWN ON THIS SHEET IS TYPICAL FOR 4 (FOUR) F-24

1. ABOVEGROUND STORAGE TANKS SHALL BE 2085 DOUBLE WALL.

NOTES:

0 4' 8'2'

LEVEL ALARM TABLE

LOW

LOW - LOW MIN SUB

15%

90%

98%HIGH - HIGH

HIGH

VALVE CLOSURE

HIGH LEVEL

95%

A1

50,000 GALLON ABOVEGROUND STORAGE TANK DETAILS

SCALE: 1/4" = 1'-0"

ATG

ATG WATER PROBE

RECEIPT

PUMP PER MFG

NOZZLE SCHEDULE

ILA

MANWAY

GAUGE HATCH

MANWAY

PRIMARY VENT

DIAL GAUGE

EMERGENCY VENT

HIGH LEVEL FLOAT

EMERGENCY VENT

WATER DRAW OFF

INTERSTITIAL MONITOR

4"

6"

8"

4"

4"

36"

4"

4"

10"

8"

10"

2"

2"

36"

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

S

FS

4' - 1" OUTER DIAMETER

4' - 0" INNER DIAMETER

STORAGE TANK

UL 142 DOUBLE WALL

(2) PER SADDLE TYP.

SHIPMENT BANDING HOLES,

GALLON MINIMUM)

SPILL BUCKET (5

WITH DUSTCAP

CAM TYPE CONNECTOR

ELECTRIC PUMP

3" BALL VALVE

CHECK VALVE

3"

1"

LADDER

30" MANWAY

LEVEL DIAL GAUGE

MECHANICAL TANK

PRODUCT RETURN PUMP

50 GPM VERTICAL TURBINE

4" STICK GAUGE HATCH

RELIEF VENT

EMERGENCY

ALARMS AND ATG

4" NOZZLE FOR LEVEL

WEATHER HOOD WITH BIRD SCREEN

2" PRIMARY VENT

OVERFILL PROTECTION

2" FILL DROP TUBE WITH

4" NOZZLE

2" WATER DRAW-OFF NOZZLE

2" NOZZLE INTERSTITIAL MONITOR

SHELTER

TO PUMP

SHELTER

FROM PUMP

2"

RELIEF VENT

EMERGENCY

P

E T

E R

S O

N

D S

C H

E U

F F

E L E

D S

C H

E U

F F

E to s h o rt d e s ig n

J U

N E

E N

D M

E N

T R

M-402

P R

O D

U C

T R

E C

O V

E R

Y T

A N

K

S E

C T

IO

N S A

N D D

E T

A

IL

CUBIC FEET PER HOUR.

6. EMERGENCY VENT SHALL HAVE A MINIMUM VENTING CAPACITY OF 147,000

REACH ALL TANK APPURTENANCES WITHOUT CLIMBING OUT ON TANK.

5. TANK SHALL HAVE CATWALK AND SAFETY RAILING THAT ALLOWS ONE TO

CONNECTIONS.

RESIDE, STAINLESS STEEL BOLTS, NUTS AND WASHERS SHALL BE USED FOR

4. ALL LOCATIONS WHERE DISSIMILAR METAL FLANGED CONNECTIONS

3. ALL BOLTS, NUTS AND WASHERS SHALL BE STAINLESS STEEL.

2. ALL NEW PIPING AND APPURTENANCES SHALL BE STAINLESS STEEL.

1. ABOVEGROUND STORAGE TANKS SHALL BE 2085 DOUBLE WALL.

NOTES:

0 2' 4'1'B1

1,000 GALLON ABOVEGROUND PRODUCT RECOVERY TANK DETAILS

SCALE: 1/2" = 1'

2_2

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

O M

A H

A D

IS

T R

IC

T

C

A P

IT

O L A

V E

N U

E

O M

A H

A

N E

S E

A T

T L E D

IS

T R

IC

T

E M

A R

G

IN

A L W

A Y S

S E

A T

T L E

W A

W X

X X

X X -X

X -X -X

X X

M A

Y

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

W

D W

R

J O

IN

T B

A S

E L

E W

IS

-M c C

H O

R D

W A

G R

A Y A

R M

Y A

IR

F

IE

S C

R E

F U

E L

IN

G F

A C

IL

IT

Y C

O N

S T

R U

C T

X X

X X

X X

X

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

ADVERTISEMENT

S T

A Y

L O

R P .E

S

C H

E U

F F

E L E

G

IB

A R

R to s h o rt d e s ig n

J U

N E

E N

D M

E N

T

M-701

E Q

U

IP

M E

N T S

C H

E D

U L

DESIGNATION TYPE OF PUMP LOCATION FLUID SPECIFIC GRAVITY FLOW RATE (GPM)

PRESSURE

DIFFERENTIAL

FT OF FLUID /

NOTES

MOTOR DATA

HP V/PH/HZ RPM

FP-1

FP-2

FP-3

FP-4

FTP-1

DP-1 (OPTION)

FSDP-1

BDP-1

OFP-1

OFP-2

VERTICAL TURBINE

VERTICAL TURBINE

VERTICAL TURBINE

VERTICAL TURBINE

VERTICAL TURBINE

SUBMERSIBLE

CENTRIFUGAL

CENTRIFUGAL

CENTRIFUGAL

CENTRIFUGAL

TANK 1

TANK 2

TANK 3

TANK 4

PRT (TRANSFER)

RETAIL TANK

DRAIN

BOWSER

TRUCK OFFLOAD

TRUCK OFFLOAD

F-24

F-24

F-24

F-24

F-24

F-24

F-24 / WATER

F-24 / WATER

F-24 / WATER

DIESEL

0.81

0.81

0.81

0.81

0.81

0.81

0.98

0.86

0.98

0.98

1.5

0.75

0.75

460 / 3 / 60

460 / 3 / 60

460 / 3 / 60

460 / 3 / 60

460 / 3 / 60

460 / 3 / 60

460 / 3 / 60

208 / 1 / 60

208 / 1 / 60

208 / 1 / 60

BASIS: NATIONAL PUMP

BASIS: NATIONAL PUMP

BASIS: NATIONAL PUMP

BASIS: NATIONAL PUMP

BASIS: NATIONAL PUMP

BASIS: NATIONAL PUMP

BASIS: NATIONAL PUMP

BASIS: NATIONAL PUMP

BASIS: NATIONAL PUMP

BASIS: FRANKLIN FUELING SYSTEM

PUMP SCHEDULE

FILTER SEPARATOR SCHEDULE

DESIGNATION TYPE OF FILTER LOCATION FLUID FLOW RATE (GPM) ASME LABELED WORKING PRESSURE CONNECTIONS INLET / OUTLET NOTES

FSI-1

FSI-2

FSR-1

FSR-2

HORIZONTAL

HORIZONTAL

HORIZONTAL

HORIZONTAL

FILTER SHETLER

FILTER SHETLER

FILTER SHETLER

FILTER SHETLER

F-24

F-24

F-24

F-24

275 PSI

275 PSI

275 PSI

275 PSI

6", ANSI B16.5, CLASS 150

6", ANSI B16.5, CLASS 150

6", ANSI B16.5, CLASS 150

6", ANSI B16.5, CLASS 150

EI 1581 CAT-M

PRV SCHEDULE

150 PSIG

75 PSIG

265 PSIG

A

B

C

EI 1581 CAT-M

EI 1581 CAT-M

EI 1581 CAT-M

70 3450

MECHANICAL SITE
M-001 FUEL SYSTEM LEGEND
MS102 MECHANICAL ENLARGED PLAN SHEET 1 OF 2
MS203 LOOP PLANS AND PROFILES SHEET 1 OF 4
MS206 LOOP PLANS AND PROFILES SHEET 4 OF 4
MS501 FUEL PIT DETAILS (OFF APRON)
MS503 PANTOGRAPH HOSE END TYPE SHEET 1/2
MS504 PANTOGRAPH HOSE END TYPE SHEET 1/2
MS505 TRUCK OFFLOAD SECTIONS AND DETAILS
M-101PIPING PLAN
M-201FLOW DIAGRAM
M-202 ISOMETRIC DIAGRAM
M-203 SEQUENCE OF OPERATIONS (SOO) 1/2
M-204 SEQUENCE OF OPERATIONS (SOO) 2/2
M-401 JET FUEL STORAGE TANK SECTIONS
M-402 PRODUCT RECOVERY TANK SECTIONS AND DETAILS
M-701 EQUIPMENT SCHEDULES

File details come from the government source that posted it.