W912DW19R0017, Hot Refueling System at Gray Army Airf ield (GAAF), Joint Base Lew is-McChord, Washington
In accordance w ith DFARS 236.204, Disclosure of the Magnitude of Construction Projects, this requirement is estimated to be betw een
$10,000,000 and $25,000,000.
NAICS Code 236220, Commercial and Institutional Building Construction, Size Standard $36,500,000
This project is set-aside 100% for Small Business.
Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available.
Technical inquiries and questions to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://projnet.org/projnet. Please see Section 00 21 00, Bidder Inquiry for further instructions.
LORRAINE LAURENTE 206-764-6662
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
28-May-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________27 Jun 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912DW19R0017 75
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912DW19R0017
Section 00 01 10 - Table of Contents
TABLE OF CONTENTS
TABLE OF CONTENTS
REQUEST FOR PROPOSAL
Gray Army Airfield (GAAF) Hot Refueling System
Joint Base Lewis-McChord, Washington
DIVISION 00 – PROPOSAL REQUIREMENTS, CONTRACT FORMS AND CONDITIONS
SECTION TITLE
00 10 00 SF 1442, Price Schedule, and Corporate Certificate
00 21 00 Instructions, Conditions and Notice to Offerors
00 21 16 Evaluation Factors for Award
00 45 00 Representations and Certifications and other Statements of Offerors, and
Pre-Award Information
00 72 00 General Conditions - Contract Clauses
00 73 00 Special Conditions – Davis-Bacon General Wage Decision No. WA 72
DIVISION 01 – GENERAL REQUIREMENTS, TECHNICAL SPECIFICATIONS
Appendices
RETURN THE FOLLOWING WITH YOUR PROPOSAL:
SF 1442
Price Schedule
Proposal, including all submission requirements as identified in Section 00 21 16
Corporate Certificate
Representations and Certifications, including Pre-Award Information
Bid Bonds
Bid Bond -- Bid Bonds must be accompanied by a Power of Attorney containing an original signature from the surety, which must be affixed to the Power of Attorney after the Power of
Attorney has been generated. Computer generated and signed Powers of Attorney will only be accepted if accompanied by an original certification from a current officer of the surety attesting to its authenticity and continuing validity.
Current SF24 forms are available at the following website:
http://www.gsa.gov/portal/forms/type/TOP.
Unless specified, the following information does not need to be submitted with your proposal, BUT it is required to be completed before the contract can be awarded:
Contractors are required, before receipt of contract award to ensure that their firm is registered in the government website entitled System for Award Management (SAM) and that all information required is current and up to date.
https://www.sam.gov/portal/public/SAM/.
http://www.gsa.gov/portal/forms/type/TOP https://www.sam.gov/portal/public/SAM/
Section 00 10 00 - Solicitation
CORPORATE CERTIFICATE
IF THE CONTRACTOR IS A CORPORATION OR PARTNERSHIP, THE APPLICABLE PORTION OF THE
FORM LISTED BELOW MUST BE COMPLETED. IN THE ALTERNATIVE, OTHER EVIDENCE MUST BE
SUBMITTED TO SUBSTANTIATE THE AUTHORITY OF THE PERSON SIGNING THE CONTRACT. IF A
CORPORATION, THE SAME OFFICER SHALL NOT EXECUTE BOTH THE CONTRACT AND THE
CERTIFICATE.
CORPORATE CERTIFICATE
I, ____________________________________, certify that I am the _________________________
Secretary of the Corporation named as Contractor herein; that _________________________________, who signed this contract on behalf of the Contractor was then ___________________________of said corporation; that said contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.
_____________________________ (CORPORATE
(Secretary) SEAL)
AUTHORITY TO BIND PARTNERSHIP
This is to certify that the names and signatures of all partners are listed below and that the person signing the contract has authority actually to bind the partnership pursuant to its partnership agreements. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership with the United States of America, except as follows: (state "none" or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.
(Names and Signatures of all Partners)
NAME SIGNATURE
PRICE SCHEDULE
CONTRACT LINE ITEM PRICING SCHEDULE
BASE ITEMS
ITEM
NO.
DESCRIPTION
QUANTITY
UNIT
UNIT
PRICE
AMOUNT
New Rotary Wing Aircraft Direct
Fuel System
Job
N/A
50,000 Gallon F24 Above Ground
Fuel Storage Tanks.
Above and Below Ground Fuel
Piping.
New POL Operations Building.
One Truck Fillstand
Two Truck Offload Points
Demolition Work For Site
Airfield Pavement
All Other Concrete and Asphalt Site
Paving
Electrical Generator
Remaining Site Work
Electrical System Installation
As-Builts
$20,000
Operation and Maintenance (O&M)
Manual
$50,000
Form DD 1354 Checklist and
Equipment in Place List
$10,000
TOTAL AMOUNT BASE ITEMS 0001 THROUGH 0015 $_____________________________
OPTION ITEMS
50,000 Gallon F24 Above Ground
Fuel Storage Tank
One Truck Fillstand
5,000 Gallon Diesel Above Ground
Fuel Storage Tank
Canopy at Filter Separator Facilities
Four Canopies at Load And Offload
Facilities
One Large Canopy Over Load and
Unload Facilities
Disposal of Petroleum
Contaminated Soil
Cubic
Yards
(CY)
CY
0023 Automatic Tank Gauging System
TOTAL AMOUNT OPTION ITEMS 0015 THROUGH 0023 $_____________________________
TOTAL AMOUNT (BASE PLUS ALL OPTIONS) $_____________________________
NOTES:
1. The Government reserves the right to exercise Option 0023 within 240 calendar days after Notice to Proceed
(NTP). The Government reserves the right to exercise Option Item 0022 anytime while excavation of soil is being performed for this project. The Government reserves the right to exercise Option Items 0016 through 0021 within 60 days after Notice to Proceed. See FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item.
2. Prices must be entered for all line items on the Pricing Schedule. Failure to do so may result in the offer being unacceptable. Total amount prices submitted without prices for individual line items will not be evaluated. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price. In case of variation between the unit price(s) multiplied by the indicated quantity of units and the extension(s), the unit price(s) multiplied by the indicated quantity of units will be considered the price submitted.
3. 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
4. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
5. The dollar amount established in Contract Line Item Nos. 0013, 0014, and 0015 shall not be revised by the
Offerors.
6. Award of optional items may be made in accordance with FAR 52.217-7, Option for Increased Quantity –
Separately Priced Line Item, as found in Section 00 72 00.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
Section 00 21 00 - Instructions
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT SECURITY REQUIREMENTS
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR'S QUESTIONS AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 ACCESS REQUIREMENTS AND DIRECTIONS FOR THE PRE-PROPOSAL CONFERENCE AND
SITE VISIT
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTALS
1.10 PROPOSAL FORMAT
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
1.12 SOLICITATION PROVISIONS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
The U.S. Army Corps of Engineers (USACE), Seattle District (NWS) intends to procure services for construction of a hot refueling system at Gray Army Airfield (GAAF) at Joint Base Lewis-
McChord in Tacoma, WA. The objective of this project is to construct a refueling complex that includes an aircraft direct fueling facility with Petroleum Oils & Lubricant (POL) operations that will provide Gray Army Airfield (GAAF) with a hydrant fuel system to allow hot refueling of all
Army helicopters utilizing the airfield. The project will supply an efficient, expeditious, safe, and dependable means of dispensing fuel to rotary wing aircraft and to support the Combat Aviation
Brigade by providing three (3) hot fuel points. Project is located in an airfield/flight-line industrial area. The project will be 100% design complete prior to solicitation.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Seattle District (NWS) District, U.S. Army
Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of
Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at US Army Corps of Engineers, P.O. Box 3755, Seattle WA
98124-3755 if it does not contain a return mailing address. There will be no exceptions.
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities website at:
www.fbo.gov W912DW19R0017.
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) with the solicitation announcement.
http://www.fbo.gov/
1.4. OFFEROR'S QUESTIONS AND COMMENTS
Administrative questions and/or comments relative to these documents should be submitted via e-mail or mailed to:
Contract Specialist
U.S. Army Corps of Engineers, Seattle District
ATTN: Lorraine Laurente
Mailing Address:
PO Box 3755
Seattle, WA 98124-3755
Email: Lorraine.Q.Laurente@usace.army.mil
Contracting Officer
ATTN: Susan Newby
Mailing Address:
PO Box 3755
Email: Susan.F.Newby@usace.army.mil
Note: All questions and/or comments should reach the above referenced Contracting Office no later than five (5) calendar days before proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers.
1.4.1. Bidder Inquiry
1.4.1.1.Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet
1.4.1.1.1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register go to web page, click BID tab select Bidder
Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
1.4.1.1.2. From this page you may view all bidder inquiries or add inquiry.
1.4.1.1.3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.4.1.1.4. The Solicitation Number is: W912DW19R0017
1.4.1.1.5. The Bidder Inquiry Key is: J5JG48-Y239MF
mailto:Lorraine.Q.Laurente@usace.army.mil mailto:Susan.F.Newby@usace.army.mil http://www.projnet.org/projnet
1.4.1.2. The Bidder Inquiry System will be unavailable for new inquiries five (5) days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
1.4.1.3. Offerors are requested to review the specification in its entirety, review the Bidder
Inquiry System for answers to questions prior to submission of a new inquiry.
1.4.1.4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone
(Chicago). The telephone number for the Call Center is 800-428-HELP.
1.4.1.5. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
NAICS Code: 236220, Commercial and Institutional Building Construction
Business Size Standard: $36,500,000
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. ACCESS REQUIREMENTS AND DIRECTIONS FOR THE PRE-PROPOSAL
CONFERENCE AND SITE VISIT
JBLM is a controlled access installation. In order to gain access to attend the pre-proposal conference and site-visit, a temporary one (1) day vehicle pass is required to drive on JBLM. The pass may be obtained from the Visitor Center at the JBLM Main Gate. Due to heightened security, the following procedures describe how to gain access for yourself and any subcontractors attending (if they or you do not have current access to the military installation):
All attendees must have valid picture identification*. All attendees driving privately-owned vehicles (POVs) must have a valid driver’s license, proof of vehicle insurance and vehicle registration. For rental vehicle access, you must have a rental agreement.
* REAL ID Act: On 1 May 2016, JBLM began enforcing the provisions of the REAL ID Act, passed by Congress in 2005. Under the provisions of this Act, a standard driver’s license or ID card issued by any of the following states is not accepted for unescorted access on JBLM:
Minnesota, Missouri and Washington. Persons requesting unescorted access on JBLM and who present a standard license or ID from one of those states will be required to present additional documentation to verify their identity prior to being allowed access on JBLM. The list of acceptable documents to present, along with a standard driver’s license or ID Card issued by one of those states, include: DoD CAC, DoD Uniformed Services Identification and Privileges
Cards, U.S. Passport or U.S. Passport Card, VA Issued Health Card, U.S. Coast Guard Merchant
Mariner Card, Transportation Worker ID Card (TWIC) issued by DHS, U.S. Government issued, authenticated Federal PIV credentials. US Military or Draft Record containing name and
DOB, etc. A full list acceptable identification verification documents accepted can be found at http://www.lewismcchord.army.mil/ under ‘Access to JBLM’/’Visitors center’/”Visitor
Information”. A state Enhanced Driver’s License (EDL) from Washington State and Minnesota are acceptable for access. Please visit the Department of Homeland Security (DHS) website at https://www.dhs.gov/real-id-frequently-asked-questions for more information regarding REAL
ID and frequently asked questions.
DIRECTIONS to Visitor Center / Liberty Gate (Main Gate): From I-5, take Exit 120 (JBLM -
Lewis Main) and proceed to the Visitor Center. The Visitor Center is on the far right just before the Main Gate.
A site visit meeting will be held at 09:00 AM (PDT) on Thursday, June 06, 2019 at the Joint-
Base-Lewis-McChord, WA, Building 3477.
From the JBLM Main Gate - Continue on 41st Division Drive, turn left on to Pendleton Ave, turn right on 2nd Division Drive and proceed. Building 3477 is located at the approximate SE end of Gray Army Airfield on the west side of 2nd Division Drive.
Participants must provide their own transportation.
The US Army Corps of Engineers (USACE) on-site point of contact is Rebekah Barker: 206-
764-6837, e-mail is Rebekah.L.Barker@usace.army.mil.
Please RSVP to either Rebekah or to the Contract Specialist, Lorraine Laurente (contact info in paragraph 1.4 above).
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.
1001.
1.9. PROPOSAL SUBMITTALS
Due to heightened security at Government installations, those offerors who have their proposals hand-delivered shall contact Procurement Technician, Sonia Frees at 206-764-3516 or Contract
Specialist, Lorraine Laurente at 206-764-6662 prior to delivering to the address shown below. At the time specified below, it will be announced that receipt of proposals is closed.
Recent terrorist threats have resulted in more time-consuming sign-in and escort procedures and may impact the timely delivery of offers. See FAR 52.215-1 for rules concerning late proposals.
See Box 13 of the Standard Form 1442 for the time and date your proposal is due.
EMAIL: Emailed Proposal will NOT be accepted.
FAX: Faxed Proposal will NOT be accepted.
FED-EX/UPS: Lorraine Laurente, Contract Specialist, Building 1202
CENWS-CTA
4735 E. Marginal Way S., Bldg # 1202
Seattle, WA 98134-2385
Note: Commercial Carriers will not deliver to PO Boxes
MAIL: Lorraine Laurente, Contract Specialist, Building 1202
CENWS-CTA
PO Box 3755
HAND DELIVERY: Lorraine Laurente, Contract Specialist, Building 1202
CENWS-CTA
4735 E. Marginal Way S., Bldg # 1202
Seattle, WA 98134-2385
The method of Hand Delivery has changed and takes longer than the previous method of arriving at the Federal Center South building lobby to deliver your Offer. Please allow sufficient time to allow for heightened security at Government installations and to get to our new location in
Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building. From there, you will be directed to the new
USACE Oxbow Building (#1202) which sits behind the Federal Center South Building. Allow additional time.
Report to the Security Desk in the lobby of the USACE Oxbow Building and call Sonia Frees, Procurement Technician at 206-764-3516, or Lorraine Laurente, Contract Specialist at 206-764-
6662. A Contracting representative will come down and accept your Proposal.
Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Proposal arrives on time.
The Packaging that contains the Proposals shall be marked:
”Proposals for Solicitation Number: W912DW19R0017, DO NOT OPEN” and include
Name and Address of the Offeror and the proposal due date and time.
1.10. PROPOSAL FORMAT
(a) Written materials: 8 ½” x 11” format, using 10 point or larger font size, in bound volumes, using 3-ring binders (except that Pro Forma material and price proposal shall be submitted in a closed manila envelope. Each bound volume will contain a Title Sheet on the cover for ready identification of the proposal and a full table of contents, separated by Tabs, as prescribed herein.
(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.
(ii) Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).
(b) Drawing sheets: Use 22” x 34” for full size drawings. Half-size sheets are also acceptable.
(c) Electronic Format: Provide two CDs in read-only format, preferably using .pdf files. All price breakdown information to aide in the price evaluation shall be submitted in Excel format.
(d) Number of copies: Submit one original and two (2) copies of drawings and printed matter
(Bound Volumes), as well as two (2) CDs. For Pricing and Pro Forma information submit the original and one copy and one separate CD.
1.11. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.
If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.12. SOLICITIATION PROVISIONS
CLAUSES INCORPORATED BY REFERENCE
52.204-6 Unique Entity Identifier OCT 2016
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.204-22 Alternative Line Item Proposal JAN 2017
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.215-22 Limitations on Pass-Through Charges--Identification of
Subcontract Effort
OCT 2009
52.217-5 Evaluation Of Options JUL 1990
52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
52.236-28 Preparation of Proposals--Construction OCT 1997
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
6.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from
Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Joint Base
Lewis-McChord, Tacoma, Pierce County, Washington State
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Roger D. Williams, Contracting Chief
P.O. Box 3755
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
See Section 00 21 00, Paragraph 1.7 for Site Visit Information.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vmfara.htm http://farsite.hill.af.mil/vmfara.htm
Section 00 21 16 - Instructions to Proposers
EVALUATION FACTORS
SECTION 00 21 16
EVALUATION FACTORS FOR AWARD
1.0 BASIS OF AWARD
Award of this Contract will be made to the technically acceptable responsible Offeror submitting the lowest priced offer (based on the total of all line items on the Price Schedule) – Lowest Priced
Technically Acceptable Offer (LPTA). This acquisition will result in the award of a firm-fixed price, construction contract.
The technical evaluation of each proposal will be solely on the basis of Technical Evaluation
Factors found in this section. The Government will evaluate each proposal on a technically acceptable/unacceptable basis only with respect to the technical evaluation factors (criteria) described herein. Award will be made on the basis of the lowest evaluated price of the proposal meeting or exceeding the acceptability standards for non-cost factors.
It is the intent of the Government to award off initial offers without discussions.
2.0 PROPOSAL EVALUATION
2.1 Technical Evaluation:
Acceptability will be based on all factors receiving an acceptable rating. The proposal will be evaluated according to the criteria for Non-Price Evaluation Factors of this section.
Proposals will receive either an ACCEPTABLE or an UNACCEPTABLE rating for each of the evaluation factors. Find the description of these ratings in Table 1.
TABLE 1: TECHNICAL ACCEPTABLE/UNACCEPTABLE RATINGS
Rating: Description:
Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
2.2 Pricing Evaluation:
The Government will evaluate price proposals in accordance with FAR 52.217-5, Evaluation of
Options for award purposes of all line items identified on the Contract Line Item Schedule
(Price-Schedule), Section 00 10 00 of this Solicitation.
3.0 EVALUATION PROCESS:
The evaluation process consists of three parts:
1) Proposal Compliance Review. This is an initial review to ensure that all required forms and certifications are complete and that a complete proposal is received. An initial review of each of the proposals will be conducted to check for apparent errors, omissions and areas that require clarification. The purpose of this preliminary review session is to eliminate minor irregularities or apparent clerical mistakes. This preliminary evaluation will ensure that each proposal contains the Technical Proposal Volume I and Price
Proposal Volume II and the correct number of copies.
2) Relevant Experience and Past Performance. Relevant Experience and Past
Performance will be evaluated according to the criteria for Non-Price Evaluation Factors found in this section.
3) Price Evaluation. The Government will evaluate price for fairness and reasonableness through the use of price analysis in accordance with FAR 15.404-1(b). Price will also be verified for unbalancing of line items in accordance with FAR 15.404-1(g).
3.1 Definitions:
a) Clarification is a limited exchange with an Offeror for the sole purpose of eliminating minor irregularities, informalities, or apparent clerical mistakes in the proposal or to address adverse past performance not previously addressed with the
Offeror. Clarifications do not give an Offeror the opportunity to revise or modify its proposal and are used, as necessary, when not opening discussions.
b) Communications are a limited exchange with an Offeror used to assist in determinations of the competitive range. Communications are limited to enhancing
Government understanding of proposals and addressing adverse past performance information not previously addressed if said information is the determining factor preventing an Offeror from being included in the competitive range. Such communications shall not be used to cure proposal deficiencies or material omissions, or otherwise revise the proposal.
c) Discussions offer the opportunity to resolve deficiencies or weaknesses in the proposals, based on the requirement and the evaluations factors set forth in the solicitation. If the Contracting Officer determines it is necessary to open discussions, they must discuss with all Offerors in the competitive range. Offerors have the opportunity to revise their proposals at the conclusion of discussions.
d) Relevant: “Relevant” is defined as having a logical connection with the requirements in this request for technical proposals; that is, featuring work that is similar in nature, magnitude, and complexity to the current requirement. To be acceptable, there must be an explanation of how the provided project information is relevant to the proposed work.
e) Year: A “year” is 365 consecutive days.
3.2 Bid Guarantee:
The Offeror is required to submit a bid guarantee along with its proposal in accordance with
FAR Subpart 28.101. The bid guarantee shall be included in Volume II of the proposal. Any proposal received without a bid guarantee will be rejected and is ineligible for review by the
Government. The amount of the Bid Guarantee shall be twenty (20) percent of the Offeror’s proposed price or $3,000,000.00, whichever is less.
3.3 Submission Format: (Please refer to Section 00 21 00 for number of required copies)
All proposal materials shall be submitted in binders with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified below. In Volume
I, Technical Proposal, there shall be a tabbed section for each Non-Price Evaluation factor.
Volume II, Price Proposal, shall be submitted in a clearly marked envelope.
3.3.1 Volume I - Offeror’s Technical Proposal shall include the following sections, in the general format specified below:
Table of Contents for Volume I - (Listing of all sections of the technical proposal)
Tab A/Factor A – Relevant Construction Experience of OFFEROR/PRIME, Attachment
1 & 2.
Tab B/Factor B – Past Performance of the Offeror, Attachment 3.
Tab C/Factor C – Proposed Technical Approach.
3.3.2 Volume II – Offeror’s Price Proposal shall include the following, in the general format specified below:
Price Proposal Format; Volume II
SF 1442 and Bid Schedule, Section 00 10 00. (filled out in its entirety)
Bid Guarantee
Pre-Award Information found at back of Section 00 45 00 (filled out in its entirety)
Section 00 45 00 Representations and Certifications
NOTE: Offeror’s Price Proposal is due at the same time as Technical Proposal.
4.0 EVALUATION CRITERIA
4.1 CRITERIA for Non-Price Evaluation Factors:
Proposals shall concisely, accurately, and completely provide the information required for each of the following non-price evaluation factors. NOTE: Absence of complete information will be deemed as if no support information was provided for that factor. Proposals that do not meet the minimum requirements of all of the non-price evaluation factors shall be determined to be
UNACCEPTABLE and are not eligible for award consideration. No assumptions may be made by the Government. Your proposal must clearly demonstrate the requisite technical experience and qualifications to receive an ACCEPTABLE rating for each of the following criteria:
TABLE 2: EVALUATION
FACTORS:
LOCATION: DESCRIPTION:
FACTOR A VOLUME 1, TAB A
RELEVANT CONSTRUCTION
EXPERIENCE OF OFFEROR/PRIME.
FACTOR B VOLUME 1, TAB B PAST PERFORMANCE OF PRIME
FACTOR C VOLUME 1, TAB C PROPOSED TECHNICAL APPROACH
5.0 FACTOR A– Relevant Construction Experience of Offeror/Prime:
5.1 Definitions for Factor A (Definitions for the purposes of this factor):
Relevant construction project means a construction project located on an active United States military installation that is capable of receiving, storing, transferring, and offloading aviation fuel, constructed for the purpose of fueling aircraft.
Substantially completed means at a minimum turned over for beneficial occupancy in its entirety (not partially turned over).
Affiliate means any entity that will have meaningful involvement in contract performance.
Key Subcontractor means a subcontractor who at a minimum directly performed all of the major or critical aspects of a relevant construction project, which are the facilities or systems for receiving, storing, transferring, and offloading aviation fuel.
5.2 Submission Requirements for Factor A:
The Offeror shall submit a minimum of two (2) and no more than four (4) examples of substantially completed relevant construction projects on which the Offeror (or Affiliate) performed either as the prime contractor or as a Key Subcontractor. However, at least one of the total number of submitted projects must have been performed by the Offeror. If any project submitted is that of an Affiliate, it must be accompanied by a signed Letter of Commitment from that Affiliate committing them as a member of the team for this project (see Attachment 2). The
Offeror shall use Attachment 2 to explain how the Affiliate will have meaningful involvement in contract performance.The submitted projects shall be 100% construction progress complete or substantially complete within six (6) years from the date of issuance of this solicitation.
5.2.1 At least one project example shall include all elements of the following four phases of airfield fueling: (1) offload, (2) transfer (systems of pumps, filters and pipes), (3) aviation fuel storage, and (4) fuel delivery to equipment that complies with the direct aircraft fueling systems criteria for Type III, IV, or V hydrant fueling systems as specified in the Unified Facilities
Criteria (UFC) 3-460-01. The construction contract for this project example shall be a minimum of $15 million in magnitude.
5.2.2 Other project examples shall include at a minimum two elements of the following four phases of airfield fueling, but may include multiple or all phases: (1) offload, (2) transfer
(systems of pumps, filters and pipes), (3) aviation fuel storage, or (4) fuel delivery to equipment that complies with the direct aircraft fueling systems criteria for Type III, IV, or V hydrant fueling systems as specified in the Unified Facilities Criteria (UFC) 3-460-01. One of the elements included must be phase (4). The construction contract for these project examples shall be a minimum of $8 million in magnitude.
5.2.3 At least one project example shall include vertical construction of at least 1,000 square feet
(SF) and include HVAC, mechanical, electrical, and plumbing features. This project submission may either be submitted independently of 5.2.1 or 5.2.2 or as part of a project submission under
5.2.1 or 5.2.2.
Using a Relevant Experience Matrix similar to that shown below in Table 3, clearly identify to which phase of airfield fueling each project example submitted under 5.2.1, 5.2.2. and 5.2.3 pertains.
Table 3: Factor A – Relevant Experience Matrix
Offload Transfer Aviation Fuel
Storage
Fuel Delivery to Equipment
Vertical
Construction
Project #1 –IAW
Para. 5.2.1 at least
$15MIL in magnitude (Must have 4 phases of refueling):
Offeror, Project
Title, Project
Location, Contract Amount, Date of 100% completion or substantial completion
X X X X
Project #2 – IAW
Para 5.2.2 at least
$8MIL in magnitude (At least 2 phases of refueling, including
Fuel Delivery to
Equipment):
Offeror, Project
Title, Project
Location, Contract Amount, Date of 100% completion or substantial completion
X X
Project #3 – IAW
Para 5.2.3 (Vertical
Construction):
Offeror, Project
Title, Project
Location, Contract Amount, Date of 100% completion or substantial completion
X
*Please note, Table 3 above is an example. In total, the projects submitted must fulfill all applicable column requirements as explained in Paragraphs 5.2.1 – 5.2.3.
The Offeror shall also submit an explanation briefly justifying each designation in the Relevant
Experience Matrix for each submitted example project. This explanation shall not exceed two (2)
8.5” x 11” double-sided pages or four (4) 8.5” x 11” single-sided pages, regardless of the total number of projects submitted.
If the Offeror submits more than four (4) project examples, the Government shall only evaluate the first four (4) submitted projects. If the Offeror submits more than two (2) project examples but the Government determines that two (2) project examples collectively meet the requirements of 5.2.1, 5.2.2, and 5.2.3, the Government may decline to evaluate the remaining project examples.
Note: For project(s) submitted where work was performed by the Offeror (or Affiliate) as a Key
Subcontractor, the Offeror shall submit a separate statement that includes the total contract amount, the dollar amount of the work performed as the Key Subcontractor, a description of the elements of work specifically completed by the Offeror (or Affiliate) while working as a Key
Subcontractor, and the percentage of work performed as the Key Subcontractor. The statement shall also justify how the Offeror (or Affiliate) meets the definition of “Key Subcontractor” in the context of the example project(s) submitted. The statement shall not exceed one (1) 8.5” x
11” double-sided page or two (2) 8.5” x 11” single-sided pages, regardless of the total number of projects submitted where work was performed as a Key Subcontractor. If it is determined by the
Government that based on the information provided by the Offeror (or Affiliate) does not in fact meet the definition of a Key Subcontractor, the project will not be considered for evaluation.
5.3 Evaluation Method for Factor A:
Factor A will be evaluated to determine whether the Offeror’s submission meets the requirements of this factor. If any of the required information is not provided in the Offeror’s proposal or fails to meet the requirements, the Offeror will be evaluated as “Unacceptable.”
TABLE 4: FACTOR A - RELEVANT CONSTRUCTION EXPERIENCE OF
OFFEROR/PRIME
Rating: Description:
Acceptable The proposal clearly demonstrates how at least two of the project examples submitted meets the requirements of section 5.0.
Unacceptable The proposal does not clearly demonstrate how at least two of the project examples submitted meets the requirements of section 5.0.
6.0 FACTOR B – Past Performance of Offeror/Prime
6.1 Submission Requirements for Factor B:
The project examples submitted for Paragraphs 5.2 Submission Requirements for Factor A will be used for evaluation of Past Performance of the Offeror (or Affiliate), as well as other past performance information.
The Past Performance Questionnaire (PPQ) (Attachment 3) included in the back of this Section
00 21 16 is provided for the Offeror to submit to the client of each project the Offeror includes in its proposal for Factor A in paragraph 5.2. Ensure correct phone numbers and email addresses are provided for the client’s point of contact (POC). Completed Past Performance Questionnaires should be submitted with your proposal. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Lorraine.Q.Laurente@usace.army.mil, via email prior to proposal closing date and time.
We will accept previously submitted PPQs on Form PPQ-0. Please ensure all information is up to date and meets the requirements of the evaluation factor.
Note: You may submit CCASS ratings in lieu of the PPQ forms included in Attachment 3 if you completely fill in blocks 1 - 5 of the Contract Information portion of the NAVFAC/USACE Past
Performance Questionnaire (Form PPQ-0) and submit with the Final CCASS report. Be sure to include the POC’s information of the Client and the Contract Number of the project.
6.2 Evaluation Method for Factor B: The method of rating for Factor B shall be as follows:
The Government will evaluate an Offeror’s (or Affiliate’s) past performance based on a demonstrated record of performance in accordance with FAR 15.305(a)(2). Past performance information is an indicator of an Offeror’s ability to perform the contract successfully.
The Government will evaluate the successful completion of all project examples for the past six
(6) years. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction.
The Government may review any other sources of information for evaluating past performance.
Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor
Performance Assessment Reporting System (CPARS). This information may involve the
Offeror’s Affiliate if an Affiliate’s project is submitted for Factor A.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
NOTE: In the case of an Offeror without a record of past performance or for whom information on past performance is not available; the Offeror’s past performance may not be evaluated as
TABLE 5: FACTOR B – PAST PERFORMANCE OF OFFEROR EVALUATION RATING
Rating: Description:
Acceptable
Based on the Offeror’s (or Affiliate’s) past performance record, the
Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.
Unacceptable
Based…