AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Request for Proposal (RFP) W912DW19R0017 Construct a Hot Refueling System at Gray Army Airfield (GAAF), Joint Base Lew is-McChord
(JBLM), WA.
Please see Continuation Page for Details on this Amendment 0002.
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Jun-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW19R0017
X 9B. DATED (SEE ITEM 11)
28-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jun-2019
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
W912DW19R0017 Construct a Hot Refueling System at Gray Army Airfield (GAAF), Joint Base Lewis-McChord
(JBLM), WA
1. This amendment two (0002) provides for the following changes:
a. Revision to General Wage Determination: WA20190072, with 3 modifications, dated 14 June 2019 replaces in its entirety, WA190072 with 2 modifications, dated 12 April 2019.
b. Technical Specifications and Drawings:
a. Technical Specification Table of Contents
b. 00 01 15-A-R2
c. 00 01 15 B-R2
d. 00 01 15-R2
e. 01 22 00.00 10-R2
f. 01 33 29-A-RS
g. 01 78 00-A-R2
h. 10 14 00.20-A-R2
i. 26 28 01.00 10-R2
j. 33 08 53 AT2-R2
k. 33 08 53 AT2-R2
l. 33 52 43.11-R2
m. 33 52 43.13-R2
n. 33 52 43.14-R2
o. W912DW19R0017-Drawings-Revisions-R0002
c. Bid Schedule
2. The proposal submittal time and date is extended to 08 July 2019 at 2:00:00 p.m. LOCAL TIME. The SF1442 Solicitation, Offer and Award is revised to reflect the date extension.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.
Encl:
SF1442 (revised)
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 27-Jun-2019 01:00 PM to 08-Jul-2019 02:00 PM.
The following have been modified:
PRICE SCHEDULE
Refueling Facility Construction W912DW19R0017
DESC1905 R0002
Joint Base Lewis–McChord, WA
CONTRACT LINE ITEM PRICING SCHEDULE
BASIC ITEMS
ITEM
NO.
DESCRIPTION QUANTITY UNIT UNIT
PRICE
AMOUNT
0001 All work complete to provide new rotary wing aircraft direct fuel system including associated appurtenances.
1 Job N/A $_____________________
0002 All work complete to provide three 50,000 gallon F24 above ground fuel storage tanks including concrete slab and associated appurtenances.
1 Job N/A $_____________________
0003 All work complete to provide above and below ground fuel piping including cathodic protection and associated appurtenances.
1 Job. N/A $_____________________
0004 All work complete to provide new POL Operations Building including associated appurtenances.
1 Job. N/A $_____________________
0005 All work complete to provide 1 truck fill stand and associated appurtenances.
1 Job. N/A $_____________________
0006 All work complete to provide 2 truck offload points and associated appurtenances.
1 Job. N/A $_____________________
0007 Demolition Work required for site.
Includes removal and disposal of unsuitable soil, trees, and all existing above and below ground facilities.
1 Job N/A $_____________________
All work complete to provide Airfield Pavement.
1 Job N/A $_____________________
0009 All work complete for construction of all other concrete and asphalt, excluding Option Items below.
1 Job N/A $_____________________
All work complete to provide one electrical generator.
1 Job N/A $_____________________
0011 All work complete for remaining site preparation, earthwork, utilities, generator, drainage facilities, spill containment, cybersecurity measures, and all other work not included in other Basic Items.
1 Job N/A $_____________________
0012 All work complete for electrical system installation by utility owner.
1 Job N/A $_____________________
All work for As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $20,000
All work for O&M manuals as specified in Section 01 78 23
OPERATIONS AND
MAINTENANCE MANUALS
from preparation to final approval.
1 JOB N/A $50,000
All work for Form DD 1354 Checklist and Equipment in Place List as specified in Section 01 78
00 CLOSEOUT SUBMITTALS
from preparation to final approval.
1 JOB N/A $10,000
TOTAL AMOUNT BASIC ITEMS 0001 THROUGH 0015 $_____________________________
OPTION ITEMS
0016 All work complete to provide one additional 50,000 gallon F24 above ground fuel storage tank and associated appurtenances.
1 Job N/A
0017 All work complete to provide one additional truck fillstand and associated appurtenances, including PCC pavement.
1 Job N/A
0018 All work complete to provide one 5,000 gallon diesel above ground fuel storage tank including concrete slab, piping, dispenser, offload point, and associated appurtenances.
1 Job N/A
0019 All work complete to provide one canopy at filter separator facilities including associated appurtenances.
1 Job N/A
0020 All work complete to provide four individual canopies at load and offload facilities including associated appurtenances.
1 Job N/A
0021 All work complete to provide one large canopy over load and offload facilities instead of four canopies as shown in CLIN Item 0019.
1 Job N/A
0022 Additional amount for Disposal of Petroleum Contaminated Soil in lieu of basic work for working with uncontaminated soil.
250 Cubic Yards
(CY)
CY $_____________________
0023 All work complete to provide Automatic Tank Gauging System, excluding electrical connections, wiring, backboard and conduit included in CLIN Item 0002 or 0015.
1 Job. N/A $_____________________
TOTAL AMOUNT OPTION ITEMS 0016 THROUGH 0023 $_____________________________
TOTAL AMOUNT (ALL BASIC PLUS ALL OPTION ITEMS) $_____________________________
NOTES:
1. The Government reserves the right to exercise Option 0023 within 240 calendar days after notice to proceed.
The Government reserves the right to exercise Option Item 0022 anytime while excavation of soil is being performed for this project. The Government reserves the right to exercise Option items 0016 through 0021 within 60 days after Notice to Proceed. See FAR 52.217-5 Evaluation of Options.
2. Prices must be entered for all line items on the Pricing Schedule. Total amount prices submitted without prices for individual line items will not be evaluated. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price. In case of variation between the unit price(s) multiplied by the indicated quantity of units and the extension(s), the unit price(s) multiplied by the indicated quantity of units will be considered the price submitted.
3. 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
4. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
5. Offerors must insert a price on all numbered items of the Price Schedule. Failure to do so may result in the offer being unacceptable.
6. The dollar amount established in Contract Line Item Nos. 0013, 0014, and 0015 shall not be revised by the Offerors.
7. Award of optional items will be made in accordance with FAR 52.217-7, “Option for Increased Quantity- Separately Priced Line Item (MAR 1989)”, as found in Section 00 72 00.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION
General Decision Number: WA20190072 06/14/2019 Superseded General Decision Number: WA20180097 State: Washington
Construction Type: Heavy including water and sewer line construction
County: Pierce County in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate).
The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 02/15/2019
2 04/12/2019
3 06/14/2019
ASBE0007-001 01/01/2019
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Pipe and Duct Insulation)......................$ 53.62 15.87
--------- CARP0770-030 06/01/2018
Rates Fringes
CARPENTER (Including Formwork)...$ 43.92 16.12
MILLWRIGHT.......................$ 45.42 16.12
PILEDRIVERMAN....................$ 44.17 16.12
(HOURLY ZONE PAY: WESTERN AND CENTRAL
WASHINGTON - ALL CLASSIFICATIONS EXCEPT
MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham
Auburn Bremerton Anacortes
Renton Shelton Yakima
Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend
Zone Pay:
0 -25 radius miles Free
26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46- 55 radius miles $1.35/hour Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON -
MILLWRIGHT AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free
26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour
--------- ELEC0076-005 08/31/2018
Rates Fringes
ELECTRICIAN......................$ 43.69 23.10
--------- ELEC0077-001 02/01/2018
Rates Fringes
Line Construction:
LINEMEN.....................$ 51.73 1%+17.50
--------- ENGI0612-020 09/28/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1A $ 44.44 19.97
GROUP 1AA $ 45.09 19.97
GROUP 1AAA $ 45.73 19.97
GROUP 1 $ 43.79 19.97
GROUP 2 $ 43.23 19.97
GROUP 3 $ 42.74 19.97
GROUP 4 $ 40.01 19.97
Zone Differential (Add to Zone 1 rates):
Zone 2 (26-45 radius miles) = $1.00 Zone 3 (Over 45 radius miles) - $1.30
BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments);Tower crane over 175 ft in height, base to boom;
Excavator/Trackhoe: Over 90 metric tons
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments);Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over; excavator/Trackhoe:
over 50 metric tons to 90 metric tons; Backhoe- 6 yards and over with attachments
GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments);Crane-overhead, bridge type, 45 tons thru 99 tons;
Derricks on building work; Excavator/Trackhoe:
over 30 metric tons to 50 metric tons; Loader-overhead 6 yards to, but not including 8 yards;
Dozer D-10; Screedman; Scrapers: 45 yards and over; Grader/Blade
GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;Crane-overhead, bridge type-20 tons through 44 tons; Drilling machine;
Excavator/Trackhoe: 15 to 30 metric tons;
Horizontal/directional drill operator;
Loaders-overhead under 6 yards; Crane Oiler-100 Tons and Over; Scraper: under 45 tons; Backhoe- 3 yards and under; Mechanic; Piledriver; Boring Machine
GROUP 3 - Cranes-thru 19 tons with attachments;A-frame crane over 10 tons; Dozers-D-9 and under;
Motor patrol grader-nonfinishing; Roller-Plant Mix; Crane Oiler under
100 tons; Excavator/Trackhoe: under 15 metric tons; Service Oiler; Conveyors; Backhoe 75 hp and under; Forklift-3,000 lbs. and over with attachments; Boom Truck over 10 tons
GROUP 4 - Cranes-A frame-10 tons and under; Roller-other than plant mix; Rigger/Bellman; Grade Checker;
Drill Assistant;
Forklift-under3,000 lbs. with attachments: Boom Truck 10 tons and under
--------- IRON0086-010 07/01/2018
Rates Fringes
IRONWORKER (Reinforcing, Structural and Ornamental).......$ 40.81 28.22
LABO0252-011 06/01/2018
Rates Fringes
Laborers:
GROUP 2.....................$ 29.83 11.49
GROUP 3.....................$ 37.27 11.49
GROUP 4.....................$ 38.19 11.49
GROUP 5.....................$ 38.80 11.49
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $1.00
ZONE 3 - $1.30
BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT,
SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN,
SHELTON, PT.
TOWNSEND, PT. ANGELES, AND BREMERTON
ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall
LABORERS CLASSIFICATIONS
GROUP 2: Flagman
GROUP 3: General Laborer; Mason Tender- Cement/Concrete; Form Stripping;Sign Erector/Installer
GROUP 4: Grade Checker; Pipe Layer; Handheld Drill; High Scaler; Jackhammer
GROUP 5: Mason Tender-Brick
--------- PAIN0005-008 07/01/2018
Rates Fringes
PAINTER (Brush, Roller and Spray)...........................$ 22.94 11.61
* PLAS0528-004 06/01/2019
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 44.43 18.04
--------- PLUM0026-003 01/01/2019
Rates Fringes
Plumbers and Pipefitters.........$ 46.72 24.90
* TEAM0174-003 01/01/2018
Rates Fringes
Truck drivers:
ZONE A:
GROUP 1:...................$ 35.63 18.67
GROUP 2:...................$ 34.79 18.67
ZONE B (25-45 miles from center of listed cities*):
Add $.70 per hour to Zone A rates.
ZONE C (over 45 miles from centr of listed cities*): Add
$1.00 per hour to Zone A rates.
*Zone pay will be calculated from the city center of the following listed cities:
BELLINGHAM CENTRALIA RAYMOND
OLYMPIA EVERETT SHELTON
ANACORTES BELLEVUE SEATTLE PORT
ANGELES MT. VERNON KENT TACOMA
PORT TOWNSEND ABERDEEN BREMERTON
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 - Dump Trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional for each 10 yard increment.; Water Truck-3,000 gallons and over;
Semi-Trailer Truck
GROUP 2 - Dump trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with less than 16 yards capacity; Water Truck- less than 3,000 gallons
HAZMAT PROJECTS
Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical ""splash suit.""
LEVEL A: +$.75 per hour - This level utilizes a fully- encapsulated suit with a self-contained breathing apparatus or a supplied air line.
--------- SUWA2009-063 08/07/2009
Rates Fringes
LABORER: Landscape &
Irrigation $ 11.44 1.80
OPERATOR: Asphalt Plant $ 34.14 0.68
OPERATOR: Bobcat/Skid
Steer/Skid Loader $
10.63 0.00
OPERATOR: Broom/Sweeper $ 30.39 3.77
OPERATOR: Power Shovel $ 25.12 7.83
TRUCK DRIVER: Flatbed Truck $ 22.74 6.29
TRUCK DRIVER: Lowboy Truck $ 22.89 5.72
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana.
2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data.
EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter?
This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210 4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"