FY19_GAAF_REFUELING_FACILITIES_SPECIFICATIONS.PDF

PDF 11 MB Posted

Attached to
Construct a Hot Refueling System at Gray Army Airfield (GAAF), JBLM, WA
Solicitation number
W912DW19R0017
Issued by

About this file

RFP W912DW19R0017, "Construct a Hot Refueling System at Gray Army Airfield (GAAF), Joint Base Lewis-McChord (JBLM), WA" Specifications Section. Due to a system error, the associated Drawings for this RFP will be uploaded to FBO tomorrow, 5/29/2019.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY19 GAAF REFUELI NG FACI LI TY CONSTRUCTI ON PROJECT NO. DESC 1905 19006

Joi nt Base Lewi s McChor d, WA

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 SUPPLEMENTARY REQUI REMENTS FOR JOI NT BASE LEWI S- MCCHORD

01 22 00. 00 10 PRI CE AND PAYMENT PROCEDURES

01 32 01. 00 10 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 10 QUALI TY CONTROL

01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

01 78 23. 33 OPERATI ON AND MAI NTENANCE MANUALS FOR AVI ATI ON FUEL

SYSTEMS

01 78 36 WARRANTY OF CONSTRUCTI ON

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 65 00 UNDERGROUND STORAGE TANK REMOVAL

02 82 00 ASBESTOS REMEDI ATI ON

02 83 00 LEAD REMEDI ATI ON

DI VI SI ON 03 - CONCRETE

03 11 13. 00 10 STRUCTURAL CAST- I N- PLACE CONCRETE FORMI NG

03 15 00. 00 10 CONCRETE ACCESSORI ES

03 20 00. 00 10 CONCRETE REI NFORCI NG

03 30 00. 00 10 CAST- I N- PLACE CONCRETE

03 35 00. 00 10 CONCRETE FI NI SHI NG

03 35 43 GROUND AND POLI SHED CONCRETE

03 39 00. 00 10 CONCRETE CURI NG

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 05 23. 16 STRUCTURAL WELDI NG

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOI ST FRAMI NG

05 30 00 STEEL DECKS

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

05 51 00 METAL STAI RS

05 51 33 METAL LADDERS

05 52 00 METAL RAI LI NGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

PROJECT TABLE OF CONTENTS Page 1

W912DW19R0017

06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS

06 61 16 SOLI D POLYMER ( SOLI D SURFACI NG) FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS

07 21 13 BOARD AND BLOCK I NSULATI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 22 00 ROOF AND DECK I NSULATI ON

07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS

07 60 00 FLASHI NG AND SHEET METAL

07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG

07 84 00 FIRESTOPPING

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 51 13 ALUMI NUM WI NDOWS

08 51 23 STEEL WI NDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMI C AND PORCELAI N TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 67 23. 16 FUEL RESI STI VE RESI NOUS FLOORI NG, 5- COAT SYSTEM

09 68 00 CARPETING

09 90 00 PAI NTS AND COATI NGS

09 97 13. 17 THREE COAT EPOXY I NTERI OR COATI NG OF WELDED STEEL

PETROLEUM FUEL TANKS

09 97 13. 27 EXTERI OR COATI NG OF STEEL STRUCTURES

DI VI SI ON 10 - SPECI ALTI ES

10 14 00. 20 I NTERI OR SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHERS

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 WI NDOW BLI NDS

12 35 70 LABORATORY CASEWORK

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 20 METAL CANOPY SYSTEMS ( CANOPI ES)

13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT

13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13. 00 10 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 09 23 DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER LOCAL BUI LDI NG

SYSTEMS

23 81 00. 00 20 UNI TARY AI R CONDI TI ONI NG EQUI PMENT

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 CYBERSECURI TY FOR FACI LI TY- RELATED CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 19. 10 10 I NSULATED WI RE AND CABLE

26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 27 13. 10 30 ELECTRI C METERS

26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON

26 32 14. 00 10 DI ESEL- GENERATOR SET, STATI ONARY 15- 300 KW, STANDBY

APPLICATIONS

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 42 14. 00 10 CATHODI C PROTECTI ON SYSTEM ( SACRI FI CI AL ANODE)

26 42 17. 00 10 CATHODI C PROTECTI ON SYSTEM ( I MPRESSED CURRENT)

26 51 00 I NTERI OR LI GHTI NG

26 56 00 EXTERI OR LI GHTI NG

26 56 20. 00 10 AI RFI ELD LI GHTI NG AND VI SUAL NAVI GATI ON AI DS

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 16. 71 COLD MI LLI NG ASPHALT PAVI NG

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

PAVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 20 BASE COURSE FOR RI GI D PAVI NG

32 11 23 AGGREGATE BASE COURSES

32 12 13 BI TUMI NOUS TACK AND PRI ME COATS

32 12 15. 13 HOT- MI X ASPHALT AI RFI ELD PAVI NG

PROJECT TABLE OF CONTENTS Page 3

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS

32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE

FACILITIES

32 13 14. 13 CONCRETE PAVI NG FOR AI RFI ELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 13 73 COMPRESSI ON JOI NT SEALS FOR CONCRETE PAVEMENTS

32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS

32 17 23 PAVEMENT MARKI NGS

32 31 13. 53 HI GH- SECURI TY CHAI N LI NK FENCES AND GATES

32 92 19 SEEDING

32 93 00 EXTERI OR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 08 53 AVI ATI ON FUEL DI STRI BUTI ON SYSTEM START- UP

33 08 55 COMMI SSI ONI NG OF FUEL FACI LI TY SYSTEMS

33 09 53 AVI ATI ON FUEL PUMP CONTROL AND ANNUNCI ATI ON SYSTEM

33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 30 00 SANI TARY SEWERAGE

33 40 00 STORM DRAI NAGE UTI LI TI ES

33 52 10 FUEL SYSTEMS PI PI NG ( SERVI CE STATI ON)

33 52 23. 15 POL SERVI CE PI PI NG WELDI NG

33 52 43 AVI ATI ON FUEL DI STRI BUTI ON ( NON- HYDRANT)

33 52 43. 11 AVI ATI ON FUEL MECHANI CAL EQUI PMENT

33 52 43. 12 AVI ATI ON FUEL PANTOGRAPHS

33 52 43. 13 AVI ATI ON FUEL PI PI NG

33 52 43. 14 AVI ATI ON FUEL CONTROL VALVES

33 52 43. 23 AVI ATI ON FUEL PUMPS

33 52 43. 28 FI LTER SEPARATOR, AVI ATI ON FUELI NG SYSTEM

33 52 80 LI QUI D FUELS PI PELI NE COATI NG SYSTEMS

33 56 10 FACTORY- FABRI CATED FUEL STORAGE TANKS

33 57 55 FUEL SYSTEM COMPONENTS ( NON- HYDRANT)

33 58 00 LEAK DETECTI ON FOR FUELI NG SYSTEMS

33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

1. 2. 2 Locat i on

1. 3 OCCUPANCY OF PREMI SES

1. 4 EXI STI NG WORK

1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES

1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on

1. 6 SALVAGE MATERI AL AND EQUI PMENT

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 00 Page 1

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s Sal vage Pl an; G, RO

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes f uel st or age, bul k l oad/ of f l oad capabi l i t y , an oper at i ons bui l di ng, and suppor t i ng i nf r ast r uct ur e t o pr ovi de t hr ee hot f uel i ng posi t i ons at Gr ay Ar my Ai r f i el d f or r api d r ef uel i ng of r ot ar y wi ng ai r cr af t and i nci dent al r el at ed wor k.

1. 2. 2 Location

The wor k i s l ocat ed at t he Joi nt Base Lewi s- McChor d, Washi ngt on, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 3 OCCUPANCY OF PREMI SES

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.

1. 4 EXI STI NG WORK

I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

SECTI ON 01 11 00 Page 2

Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.

1. 6 SALVAGE MATERI AL AND EQUI PMENT

I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed wi t hi n 5 mi l es of t he const r uct i on s i t e.

Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Use a syst em of pr oper t y cont r ol t hat i s appr oved by t he Cont r act i ng Of f i cer . St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 3

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00

SUPPLEMENTARY REQUI REMENTS FOR JOI NT BASE LEWI S- MCCHORD

11/11

PART 1 GENERAL

1. 1 ( UAI 5152. 231- 9000) EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE

SCHEDULE ( MAR 1995)

1. 2 ( UAI 5152. 232- 9000) PAYMENT FOR MATERI ALS DELI VERED OFF- SI TE ( MAR

2009)

1. 3 REFERENCES

1. 4 DEFI NI TI ONS

1. 5 PERMI TS OBTAI NED BY GOVERNMENT AND CONTRACTOR RESPONSI BI LI TI ES

1. 6 PROTECTI ON OF GOVERNMENT PROPERTY

1. 7 COMMERCI AL VEHI CLE ACCESS TO JOI NT BASE LEWI S- MCCHORD - REGI STERED

AND PREVI OUSLY I D' D ( RAPI D) GATE PROGRAM

1. 8 I DENTI FI CATI ON OF EMPLOYEES AND MI LI TARY REGULATI ONS

1. 8. 1 Compl i ance wi t h Regul at i ons

1. 8. 2 Speci f i c Requi r ement f or Vehi c l e Regi st r at i on

1. 8. 3 Empl oyee Access and I dent i f i cat i on

1. 8. 3. 1 I ssuance of RAPI D I dent i f i cat i on Badge

1. 8. 4 Compl i ance wi t h Rul es, Regul at i ons, and St at ut es

1. 8. 5 Wor k Hour s

1. 8. 6 Fi r ear ms

1. 8. 7 Ent r ance Deni al by Mi l i t ar y Pol i ce

1. 9 BASE DESI GN STANDARDS

1. 10 SUPPLEMENTAL ANTI TERRORI SM/ OPERATI ONS SECURI TY REQUI REMENTS

1. 10. 1 AT Level 1 Tr ai ni ng

1. 10. 2 Access and Gener al Pr ot ect i on/ Secur i t y Pol i cy and Pr ocedur es

1. 10. 3 i WATCH Tr ai ni ng

1. 10. 4 Access t o Gover nment I nf or mat i on Syst ems

1. 10. 5 OPSEC Tr ai ni ng

1. 10. 6 E- Ver i f y Pr e- Scr eeni ng

1. 11 RADI ATI ON PERMI T APPLI CATI ON ( RPA)

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00 Page 1

SECTI ON 01 14 00

SUPPLEMENTARY REQUI REMENTS FOR JOI NT BASE LEWI S- MCCHORD

11/11

PART 1 GENERAL

1. 1 ( UAI 5152. 231- 9000) EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE

SCHEDULE ( MAR 1995)

Not e: Copi es of each r egi onal schedul e may be obt ai ned t hr ough t he f ol l owi ng I nt er net s i t e:

http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx.

Cur r ent l y t he " Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e" can be accessed on page 11 of 14 of t he af or e i ndi cat ed URL.

St andar d For m 1411 i s no l onger a cur r ent f or m. The Cont r act i ng Of f i cer may r equi r e submi ssi on of cost or pr i c i ng dat a i n t he f or mat i ndi cat ed i n Tabl e 15- 2 of FAR 15. 408, speci f y an al t er nat i ve f or mat , or per mi t submi ssi on i n t he cont r act or ’ s f or mat . I nf or mat i on ot her t han cost or pr i c i ng dat a may be submi t t ed i n t he cont r act or ’ s own f or mat unl ess t he use of a speci f i c f or mat i s pr escr i bed el sewher e i n t hi s cont r act .

( a) Thi s c l ause does not appl y t o t er mi nat i ons. See UAI 5152. 249- 9000, Basi s f or set t l ement of pr oposal s and FAR Par t 49.

( b) Al l owabl e cost f or const r uct i on and mar i ne pl ant and equi pment i n sound wor kabl e condi t i on owned or cont r ol l ed and f ur ni shed by a Cont r act or or subcont r act or at any t i er shal l be based on act ual cost dat a f or each pi ece of equi pment or gr oups of s i mi l ar ser i al and ser i es f or whi ch t he Gover nment can det er mi ne bot h owner shi p and oper at i ng cost s f r om t he Cont r act or ' s account i ng r ecor ds. When bot h owner shi p and oper at i ng cost s cannot be det er mi ned f or any pi ece of equi pment or gr oups of s i mi l ar ser i al or ser i es of equi pment f r om t he Cont r act or ' s account i ng r ecor ds, cost s f or t hat equi pment shal l be based upon t he appl i cabl e pr ovi s i ons of EP 1110- 1- 8, " Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e, " Regi on VI I I . Wor ki ng condi t i ons shal l be consi der ed t o be aver age f or det er mi ni ng equi pment r at es usi ng t he schedul e unl ess speci f i ed ot her wi se by t he Cont r act i ng Of f i cer . For equi pment not i ncl uded i n t he schedul e, r at es f or compar abl e pi eces of equi pment may be devel oped usi ng t he f or mul a pr ovi ded i n t he schedul e. For f or war d pr i c i ng, t he Schedul e i n ef f ect at t he t i me of negot i at i ons shal l appl y.

For r et r ospect i ve pr i c i ng, t he Schedul e i n ef f ect at t he t i me t he wor k was per f or med shal l appl y.

( c) Equi pment r ent al cost s ar e al l owabl e, subj ect t o t he pr ovi s i ons of FAR 31. 105( d) ( i i ) and FAR 31. 205- 36. Rat es f or equi pment r ent ed f r om an or gani zat i on under common cont r ol , l ease- pur chase ar r angement s, and sal e- l easeback ar r angement s wi l l be det er mi ned usi ng t he schedul e, except t hat act ual r at es wi l l be used f or equi pment l eased f r om an or gani zat i on under common cont r ol t hat has an est abl i shed pr act i ce of l easi ng t he same or s i mi l ar equi pment t o unaf f i l i at ed l essees.

( d) When act ual equi pment cost s ar e pr oposed and t he t ot al amount of t he pr i c i ng act i on exceeds t he smal l acqui s i t i on t hr eshol d ( SAT) , t he cont r act i ng of f i cer shal l r equest t he cont r act or t o submi t ei t her cer t i f i ed cost or pr i c i ng dat a, or par t i al / l i mi t ed dat a as appr opr i at e.

SECTI ON 01 14 00 Page 2

The dat a shal l be submi t t ed on St andar d For m 1411, Cont r act Pr i c i ng Pr oposal Cover Sheet .

1. 2 ( UAI 5152. 232- 9000) PAYMENT FOR MATERI ALS DELI VERED OFF- SI TE ( MAR

2009)

( a) Pur suant t o FAR cl ause 52. 232- 5, Payment s Under Fi xed Pr i ced Const r uct i on Cont r act s, mat er i al s del i ver ed t o t he cont r act or at l ocat i ons ot her t han t he si t e of t he wor k may be t aken i nt o consi der at i on i n maki ng payment s i f i ncl uded i n payment est i mat es and i f al l t he condi t i ons of t he Gener al Pr ovi s i ons ar e f ul f i l l ed.

Payment f or i t ems del i ver ed t o l ocat i ons ot her t han t he wor k s i t e wi l l be l i mi t ed t o:

( 1) mat er i al s r equi r ed by t he t echni cal pr ovi s i ons; or

( 2) mat er i al s t hat have been f abr i cat ed t o t he poi nt wher e t hey ar e i dent i f i abl e t o an i t em of wor k r equi r ed under t hi s cont r act ;

or.

( 3) I t ems speci f i cal l y l i s t ed bel ow.

( b) Payment f or mat er i al s del i ver ed of f - s i t e shal l be made onl y af t er r ecei pt of pai d i nvoi ces l i s t i ng t he val ue of mat er i al and l abor i ncor por at ed i n t he i t ems al ong wi t h a cancel ed check showi ng t he pr i me cont r act or ' s t i t l e t o t he t i me del i ver ed of f s i t e. Payment f or mat er i al s del i ver ed of f - s i t e shal l be l i mi t ed t o t he f ol l owi ng i t ems: any const r uct i on mat er i al st or ed of f - s i t e may be consi der ed i n det er mi ni ng t he amount of a pr ogr ess payment

1. 3 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EP 1110- 1- 8 ( 2016) Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

32 CFR 655 Radi at i on Sour ces on Ar my Land

1. 4 DEFINITIONS

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

" SUPPLEMENTARY REQUI REMENTS" shal l be r ead t o per t ai n t o any of t he sect i ons of t he DI VI SI ON 1 as r equi r ed by t he cont ent of t he sect i on or par agr aph cont ai ni ng t he r ef er ence.

1. 5 PERMI TS OBTAI NED BY GOVERNMENT AND CONTRACTOR RESPONSI BI LI TI ES

I t wi l l be t he r esponsi bi l i t y of t he Cont r act or t o obt ai n al l ot her per mi t s/ l i censes r equi r ed f or t hi s pr oj ect . See t he Cont r act Cl ause

SECTI ON 01 14 00 Page 3

Par agr aph ent i t l ed PERMI TS AND RESPONSI BI LI TI ES.

1. 6 PROTECTI ON OF GOVERNMENT PROPERTY

I n addi t i on t o r equi r ement s of t he CONTRACT CLAUSES, pr ot ect al l Gover nment pr oper t y wi t hi n t he bui l di ngs i n whi ch t he Cont r act or i s wor ki ng, except f or such pr oper t y as i s r equi r ed t o be demol i shed.

Pr oper t y whi ch i s t o be demol i shed shal l be pr ot ect ed unt i l i t s schedul ed demol i t i on t i me. Pr ot ect i on shal l i ncl ude, but not be l i mi t ed t o, pr ot ect i on f r om const r uct i on gener at ed dust , debr i s, wat er , and vi br at i on.

1. 7 COMMERCI AL VEHI CLE ACCESS TO JOI NT BASE LEWI S- MCCHORD - REGI STERED AND

PREVI OUSLY I D' D ( RAPI D) GATE PROGRAM

Pr ocedur es f or commer ci al vehi c l e access t o Joi nt Base Lewi s- McChor d ar e subj ect t o change wi t hout pr i or not i ce. The f ol l owi ng r equi r ement s appl y.

a. Unl ess t he Cont r act or vol unt ar i l y par t i c i pat es i n t he RAPI D Gat e Pr ogr am, commer ci al vehi c l e access t o Joi nt Base Lewi s- McChor d wi l l be al l owed onl y at t he Logi st i cs Cent er Gat e ( Exi t 123 f r om I - 5) and t hr ough t he D St r eet Commer ci al Vehi c l e I nspect i on Poi nt on JBLM- Nor t h. Bot h gat es ar e open Monday t hr ough Fr i day, excl udi ng f eder al hol i days. These gat es wi l l be open f or i nbound commer ci al vehi c l e access and i nspect i on bet ween 0530 hour s and 2100 hour s.

These gat es ar e c l osed on weekends ( Sat ur days and Sundays) and f eder al hol i days. On Sat ur days, Sundays and f eder al hol i days, commer ci al vehi c l es must use t he Mai n Gat e ( Exi t 120 f r om I - 5) . Mai n Gat e i s open 24 hour s per day ever yday. A v i s i t or pass must be obt ai ned. Al l commer ci al vehi c l es wi l l be sear ched. Ant i c i pat e del ays i n get t i ng commer ci al vehi c l es on post . Al so al l ow addi t i onal t i me f or commer ci al vehi c l es t o r each t hei r dest i nat i on by dr i v i ng t hr ough Joi nt Base Lewi s- McChor d.

1. I f t he commer ci al vehi c l e i s car r y i ng a l oad of cement concr et e or hot asphal t concr et e f or del i ver y, t he dr i ver shal l not i f y t he gat e guar d as soon as possi bl e and r equest t hat t he vehi c l e be gi ven pr i or i t y f or bei ng sear ched; however , t he Gover nment does not guar ant ee t hat t he vehi c l e wi l l be gi ven pr i or i t y.

2. On weekends l ar ge vehi c l es ( needi ng gr eat er t han 12' - 5" c l ear ance) wi l l r equi r e a t i me- st amped " sear ched" l abel t o gai n access t o JBLM- Nor t h. " Sear ched" l abel s wi l l be i ssued at t he Mai n Gat e, as appr opr i at e. Dr i ver s needi ng access t o JBLM- Nor t h must i nf or m t he gat e guar d t hat t hei r vehi c l e i s over 12' - 5" i n hei ght and t hat t hey wi l l r equi r e access t o JBLM- Nor t h. The dr i ver wi l l r ecei ve a br i ef i ng on pr oper pr ocedur es and a " sear ched" l abel . Ensur e t hat dr i ver s, i ncl udi ng dr i ver s of Subcont r act or s at any t i er , compl y wi t h t he pr ocedur es as expl ai ned t o t hem f or access t o JBLM- Nor t h.

b. I f t he Cont r act or par t i c i pat es i n t he RAPI D Gat e Pr ogr am, Cont r act or vehi c l es may ent er t he i nst al l at i on t hr ough any RAPI D gat e l ane except at For ce Pr ot ect i on Level Char l i e or Del t a. Dur i ng For ce Pr ot ect i on Level Char l i e or Del t a, al l Cont r act or vehi c l es must ent er t hr ough t he Logi st i cs Cent er gat e or , i f t he Logi st i cs Cent er Gat e i s c l osed, t hr ough t he Mai n Gat e. Al l passenger s i n t he Cont r act or vehi c l e must have a RAPI D i dent i f i cat i on car d; ot her wi se, t he Cont r act or vehi c l e must ent er t hr ough t he Logi st i cs Cent er Gat e or t he Mai n Gat e, as appr opr i at e and obt ai n v i s i t or passes. Once t he RAPI D Gat e Pr ogr am i s f ul l y i mpl ement ed, RAPI D gat e l anes wi l l be at t he Mai n ( Li ber t y)

SECTI ON 01 14 00 Page 4

Gat e, t he East Gat e, t he DuPont Gat e, t he D St r eet Gat e, t he Logi st i cs Cent er Gat e, t he Madi gan Ar my Medi cal Cent er Gat e, and t he JBLM- Nor t h Gat e. Use onl y t hose l anes speci f i cal l y mar ked as RAPI D l anes.

1. 8 I DENTI FI CATI ON OF EMPLOYEES AND MI LI TARY REGULATI ONS

1. 8. 1 Compl i ance wi t h Regul at i ons

The Cont r act or shal l be r esponsi bl e f or compl i ance wi t h al l r egul at i ons and or der s of t he Commandi ng Of f i cer of t he Mi l i t ar y I nst al l at i on, r espect i ng i dent i f i cat i on of empl oyees, movement s on i nst al l at i on, par ki ng, t r uck ent r y, and al l ot her mi l i t ar y r egul at i ons whi ch may af f ect t he wor k.

1. 8. 2 Speci f i c Requi r ement f or Vehi c l e Regi st r at i on

The Commandi ng Of f i cer of Joi nt Base Lewi s- McChor d, Washi ngt on, has i ni t i at ed t he f ol l owi ng speci f i c r equi r ement r egar di ng vehi c l e r egi st r at i on f or t hi s cont r act :

a. Cont r act or s per f or mi ng wor k on Joi nt Base Lewi s- McChor d shal l , af t er awar d, r egi st er al l vehi c l es t o be used on t he i nst al l at i on wi t h t he Vehi c l e Regi st r at i on Sect i on of t he Law Enf or cement Command.

Cont r act or empl oyees ent er i ng t he i nst al l at i on i n pr i vat el y owned vehi c l es ( POVs) shal l al so r egi st er t hei r vehi c l es. A copy of cont r act awar d, pr oof of l i abi l i t y i nsur ance, cur r ent dr i ver ' s l i cense and st at e vehi c l e r egi st r at i on shal l be r equi r ed t o r egi st er Cont r act or , Subcont r act or , and empl oyee vehi c l es.

b. Upon compl et i on of t he cont r act , i t shal l be t he pr i me Cont r act or ' s r esponsi bi l i t y t o col l ect al l vehi c l e decal s i ssued under t he cont r act i ncl udi ng t hose i ssued t o empl oyees and Subcont r act or s. Decal s ar e t o be car ef ul l y r emoved f r om t he vehi c l e, pl aced i n an envel ope and at t ached t o t he or i gi nal document at i on ( i . e. , post vehi c l e r egi st r at i on document ) r ecei ved wi t h t he decal . Decal s, wi t h document at i on, must be r et ur ned t o Vehi c l e Regi st r at i on, Bui l di ng 2140. Pr oof of decal c l ear ance f or al l vehi c l es r egi st er ed under t hi s cont r act wi l l be i ssued t o t he pr i me Cont r act or and shal l be r et ur ned t o t he Cont r act i ng Of f i cer pr i or t o f i nal payment .

c. I n t he event of cont r act ext ensi on, i t shal l be t he pr i me Cont r act or ' s r esponsi bi l i t y t o r epor t t i me ext ensi on t o Vehi c l e Regi st r at i on, wi t h evi dence of same. For f ur t her i nf or mat i on, cont act Vehi c l e Regi st r at i on at Wal l er Hal l , Bui l di ng 2140, Tel ephone: ( 253) 967- 5065, Joi nt Base Lewi s- McChor d, Washi ngt on 98433- 9500.

1. 8. 3 Empl oyee Access and I dent i f i cat i on

a. Each empl oyee who r equi r es access t o Joi nt Base Lewi s- McChor d t o per f or m wor k under any cont r act , at any t i er , must obt ai n ei t her a RAPI D i dent i f i cat i on badge or a v i s i t or ' s pass t o obt ai n access t o Joi nt Base Lewi s- McChor d. A RAPI D i dent i f i cat i on badge wi l l onl y be i ssued t o an empl oyee, at any t i er , i f t he empl oyee r equi r es access t o Joi nt Base Lewi s- McChor d mor e t han t wi ce per week. Cont r act or empl oyees, at any t i er , who r equi r e access t o Joi nt Base Lewi s- McChor d t wi ce per week or l ess of t en or who do not par t i c i pat e i n t he RAPI D Gat e Pr ogr am shal l obt ai n a v i s i t or ' s pass at t he Mai n ( Li ber t y) Gat e, t he Logi st i cs Cent er Gat e or t he D St r eet Gat e. The vi s i t or ' s pass wi l l be i ssued f or a maxi mum of 30 days at a t i me. A RAPI D

SECTI ON 01 14 00 Page 5 i dent i f i cat i on badge wi l l onl y be i ssued t o Cont r act or empl oyees i f t he Cont r act or par t i c i pat es i n t he RAPI D Gat e Pr ogr am. The RAPI D Gat e Pr ogr am i s a vol unt ar y pr ogr am. The pr oduct i on of RAPI D badges has been cont r act ed out and t he cost of t he i dent i f i cat i on car d shal l be bor ne by t he Cont r act or . Cur r ent est abl i shed cost s ar e: $99 f or company st ar t - up and $99 per i ndi v i dual .

b. I f an empl oyee no l onger needs an i dent i f i cat i on badge f or any r eason ( e. g. , qui t s hi s/ her j ob or no l onger per f or ms wor k under t he cont r act ) , r et ur n t he i dent i f i cat i on badge t o Ei d wi t hi n t wo cal endar days of such change. I f t he i dent i f i cat i on badge cannot be r et ur ned wi t hi n t he r equi r ed t i me f r ame f or any r eason, i mmedi at el y not i f y bot h Ei d and t he Cont r act i ng Of f i cer ver bal l y, f ol l owed up i n wr i t i ng t he next wor k day. An empl oyee' s i nabi l i t y t o obt ai n ent r ance t o a Gover nment i nst al l at i on because he/ she does not have t he r equi r ed i dent i f i cat i on badge or v i s i t or ' s pass shal l not excuse t i mel y per f or mance of t he r equi r ement s of t hi s cont r act . Ei d or t he Gover nment may change t he l ocat i on at whi ch i dent i f i cat i on badges ar e i ssued or r et ur ned, wi t h or wi t hout advance not i ce t o t he Cont r act or .

Any such changes shal l not be a basi s f or adj ust i ng t he cont r act pr i ce under any cl ause of t hi s cont r act .

c. RAPI D i dent i f i cat i on badges shal l not be r epr oduced or copi ed by t he Cont r act or , i t s Subcont r act or s, or t hei r empl oyees. I f an empl oyee' s i dent i f i cat i on badge i s l ost , st ol en, or r epr oduced, ver bal l y r epor t t he l oss, t hef t , or r epr oduct i on t o bot h Ei d and t he Cont r act i ng Of f i cer on t he day such l oss, t hef t , or r epr oduct i on i s di scover ed, f ol l owed by a wr i t t en r epor t of t he c i r cumst ances t o bot h Ei d and t he Cont r act i ng Of f i cer wi t hi n one cal endar day af t er t he l oss, t hef t , or r epr oduct i on i s di scover ed.

d. Each Cont r act or empl oyee shal l wear t he RAPI D i dent i f i cat i on badge whi l e per f or mi ng wor k under t he cont r act . The i dent i f i cat i on badge shal l be wor n on t he upper f r ont of t he out er gar ment unl ess pr ecl uded by OSHA r egul at i on( s) . The i dent i f i cat i on badge shal l not be used f or access t o any Gover nment i nst al l at i on except f or per f or mance of wor k under t he cont r act f or whi ch i t was i ssued.

e. Upon expi r at i on or t er mi nat i on of t he cont r act , col l ect al l i dent i f i cat i on badges and t ur n t hem i n t o Ei d. The f i nal i nvoi ce wi l l not be consi der ed pr oper f or pur poses of t he Pr ompt Payment Act ( FAR

52. 232- 25 or FAR 52. 212- 4( i ) ) unt i l al l i dent i f i cat i on badges have been account ed f or .

1. 8. 3. 1 I ssuance of RAPI D I dent i f i cat i on Badge

Pr ovi de i nf or mat i on as r equi r ed by Ei d Passpor t , I nc. ( Ei d) , t o enabl e Ei d t o conduct a cr i mi nal hi st or y backgr ound check ( CHBC) on Cont r act or empl oyees who ar e t o have access t o Joi nt Base Lewi s- McChor d. The Cont r act or i s r esponsi bl e f or payi ng Ei d t he f ee per empl oyee f or conduct i ng t he CHBC and i ssui ng t he RAPI D i dent i f i cat i on car d. I f t he CHBC i s not adver se, a RAPI D i dent i f i cat i on badge wi l l be i ssued by Ei d t o t he Cont r act or empl oyee. I f t he CHBC i s adver se, Ei d i s pr ohi bi t ed f r om i ssui ng a RAPI D i dent i f i cat i on badge t o t he Cont r act or empl oyee. I f a RAPI D i dent i f i cat i on badge i s deni ed f or any r eason, t he Cont r act or empl oyee may onl y ent er t he i nst al l at i on by obt ai ni ng a v i s i t or ’ s pass;

however , i f t he Cont r act or empl oyee does not meet t he cr i t er i a f or bei ng i ssued a RAPI D i dent i f i cat i on badge, t he Gover nment may, i n i t s sol e di scr et i on, deci de not t o i ssue a v i s i t or ’ s pass t o t he Cont r act or

SECTI ON 01 14 00 Page 6 employee.

1. 8. 4 Compl i ance wi t h Rul es, Regul at i ons, and St at ut es

Al l Cont r act or empl oyees shal l obser ve and compl y wi t h al l appl i cabl e l ocal , St at e, and Feder al r ul es, r egul at i ons, and st at ut es i ncl udi ng t hose concer ni ng f i r e, saf et y, sani t at i on, secur i t y, vehi c l e saf et y, and hazar dous mat er i al handl i ng.

1. 8. 5 Wor k Hour s

Wor k hour s i n t he const r uct i on ar ea shal l be r est r i ct ed t o 7: 30 a. m. t o 4: 30 p. m. dai l y, Monday t hr ough Fr i day, excl udi ng Feder al hol i days. Wor k hour s ot her t han as speci f i ed above shal l be coor di nat ed wi t h and appr oved by t he Cont r act i ng Of f i cer .

1. 8. 6 Firearms

Cont r act or per sonnel whi l e per f or mi ng wor k under t hi s cont r act shal l not car r y any f i r ear ms.

1. 8. 7 Ent r ance Deni al by Mi l i t ar y Pol i ce

Cont r act or empl oyees may be deni ed ent r y t o t he I nst al l at i on by Mi l i t ar y Pol i ce i f i t i s det er mi ned t hat such ent r y may be cont r ar y t o good or der , di sci pl i ne, or t he secur i t y of t he I nst al l at i on.

1. 9 BASE DESI GN STANDARDS

Ensur e t hat t hi s pr oj ect i s const r uct ed i n compl i ance wi t h t he f ol l owi ng desi gn st andar ds:

a. For t Lewi s I nst al l at i on Desi gn Gui de ( Oct ober 2007)

b. Joi nt Base Lewi s- McChor d Gui de t o Gr een Pr ocur ement f or Const r uct i on

1. 10 SUPPLEMENTAL ANTI TERRORI SM/ OPERATI ONS SECURI TY REQUI REMENTS

The Cont r act or shal l be r esponsi bl e f or compl i ance wi t h al l appl i cabl e Ant i t er r or i sm/ Oper at i ons Secur i t y I t ems as out l i ned bel ow.

1. 10. 1 AT Level 1 Tr ai ni ng

Al l cont r act or empl oyees, t o i ncl ude subcont r act or empl oyees, r equi r i ng access t o Ar my i nst al l at i ons, f aci l i t i es and cont r ol l ed access ar eas shal l compl et e AT Level 1 awar eness t r ai ni ng wi t hi n 30 cal endar days af t er cont r act st ar t dat e. Submi t cer t i f i cat es of compl et i on f or each af f ect ed cont r act or empl oyee and subcont r act or empl oyee, t o t he COR wi t hi n 5 cal endar days af t er compl et i on of t r ai ni ng by al l empl oyees and subcont r act or per sonnel . AT Level 1 awar eness t r ai ni ng i s avai l abl e at t he f ol l owi ng websi t e: ht t ps: / / at l evel 1. dt i c. mi l / at .

1. 10. 2 Access and Gener al Pr ot ect i on/ Secur i t y Pol i cy and Pr ocedur es

Cont r act or and al l associ at ed subcont r act or s empl oyees shal l compl y wi t h appl i cabl e i nst al l at i on, f aci l i t y and ar ea commander i nst al l at i on/ f aci l i t y access and l ocal secur i t y pol i c i es and pr ocedur es ( pr ovi ded by gover nment r epr esent at i ve) . Al so pr ovi de al l i nf or mat i on r equi r ed f or backgr ound checks t o meet i nst al l at i on access r equi r ement s t o be accompl i shed by i nst al l at i on Pr ovost Mar shal Of f i ce, Di r ect or of Emer gency Ser vi ces or

SECTI ON 01 14 00 Page 7

Secur i t y Of f i ce. Cont r act or wor kf or ce must compl y wi t h al l per sonal i dent i t y ver i f i cat i on r equi r ement s as di r ect ed by DOD, HQDA and/ or l ocal pol i cy. I n addi t i on t o t he changes ot her wi se aut hor i zed by t he changes cl ause of t hi s cont r act , shoul d t he For ce Pr ot ect i on Condi t i on ( FPCON) at any i ndi v i dual f aci l i t y or i nst al l at i on change, t he Gover nment may r equi r e changes i n cont r act or secur i t y mat t er s or pr ocesses.

1. 10. 3 i WATCH Tr ai ni ng

The cont r act or and al l associ at ed subcont r act or s shal l br i ef al l empl oyees on t he l ocal i WATCH pr ogr am ( t r ai ni ng st andar ds wi l l be pr ovi ded by t he r equi r i ng act i v i t y Ant i t er r or i sm Of f i cer ( ATO) ) . Thi s l ocal devel oped t r ai ni ng wi l l be used t o i nf or m empl oyees of t he t ypes of behavi or t o wat ch f or and i nst r uct empl oyees t o r epor t suspi c i ous act i v i t y t o t he COR.

Thi s t r ai ni ng shal l be compl et ed wi t hi n 30 cal endar days of cont r act awar d and wi t hi n 30 cal endar days of new empl oyees commenci ng per f or mance wi t h t he r esul t s r epor t ed t o t he COR NLT 45 cal endar days af t er cont r act awar d.

1. 10. 4 Access t o Gover nment I nf or mat i on Syst ems

Al l cont r act or empl oyees wi t h access t o a gover nment i nf o syst em must be r egi st er ed i n t he ATCTS ( Ar my Tr ai ni ng Cer t i f i cat i on Tr acki ng Syst em) at commencement of ser vi ces, and must successf ul l y compl et e t he DOD I nf or mat i on Assur ance Awar eness pr i or t o access t o t he i nf or mat i on syst ems and t hen annual l y t her eaf t er .

1. 10. 5 OPSEC Tr ai ni ng

Al l new cont r act or empl oyees wi l l compl et e Level I OPSEC Tr ai ni ng wi t hi n 30 cal endar days of t hei r r epor t i ng f or dut y. Addi t i onal l y, al l cont r act or empl oyees must compl et e annual OPSEC awar eness t r ai ni ng.

Submi t cer t i f i cat es of compl et i on f or each af f ect ed cont r act or and subcont r act or empl oyee t o t he COR or t o t he cont r act i ng of f i cer ( i f a COR i s not assi gned) wi t hi n 5 cal endar days af t er compl et i on of t r ai ni ng.

OPSEC awar eness t r ai ni ng i s avai l abl e at t he f ol l owi ng websi t es:

ht t ps: / / www. i ad. gov/ i oss/ or http://www.cdse.edu/catalog/operations-security.html or i t can be pr ovi ded by t he RA OPSEC Of f i cer i n pr esent at i on f or m whi ch wi l l be document ed vi a memor andum.

1. 10. 6 E- Ver i f y Pr e- Scr eeni ng

Pr e- scr een Candi dat es usi ng t he E- ver i f y Pr ogr am (http://www.dhs.gov/E - Ver i f y) websi t e t o meet t he est abl i shed empl oyment el i gi bi l i t y r equi r ement s. Ensur e t hat t he Candi dat e has t wo val i d f or ms of Gover nment i ssued i dent i f i cat i on pr i or t o ensur e t he cor r ect i nf or mat i on i s ent er ed i nt o t he E- ver i f y syst em. An i ni t i al l i s t of ver i f i ed/ el i gi bl e candi dat es must be pr ovi ded t o t he COR no l at er t han 3 busi ness days af t er t he i ni t i al cont r act awar d.

1. 11 RADI ATI ON PERMI T APPLI CATI ON ( RPA)

A Radi at i on Per mi t i s r equi r ed t o use, st or e, or possess i oni z i ng r adi at i on sour ces on Feder al i nst al l at i ons i n accor dance wi t h 32 CFR 655.

An RPA shal l be r evi ewed by t he Radi at i on Pr ot ect i on Of f i cer ( RPO) and appr oved vi a t he Cont r act i ng Of f i cer . Remove al l per mi t t ed sour ces f r om i nst al l at i on by t he end of t he per mi t t ed per i od. RPA shal l speci f y st ar t and st op dat es f or t he Radi at i on Per mi t and descr i be t he i nt ended use of t he r adi oact i ve mat er i al . For seal ed sour ces, an af f i r mat i on t hat l eak

SECTI ON 01 14 00 Page 8 t est r equi r ement s ar e cur r ent shal l be i ncl uded i n t he RPA.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

- - End of Sect i on - -

SECTI ON 01 14 00 Page 9

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

1. 1. 1 New Rot ar y Wi ng Ai r cr af t Di r ect Fuel Syst em ( BASI C - CLI N

0001)

1. 1. 1. 1 Payment

1. 1. 1. 2 Uni t of Measur e

1. 1. 2 50, 000 Gal l on F24 Above Gr ound Fuel St or age Tanks ( BASI C -

CLI N 0002)

1. 1. 2. 1 Payment

1. 1. 2. 2 Uni t of Measur e

1. 1. 3 Above and Bel ow Gr ound Fuel Pi pi ng ( BASI C - CLI N 0003)

1. 1. 3. 1 Payment

1. 1. 3. 2 Uni t of Measur e

1. 1. 4 New POL Oper at i ons Bui l di ng ( BASI C - CLI N 0004)

1. 1. 4. 1 Payment

1. 1. 4. 2 Uni t of Measur e

1. 1. 5 1 Tr uck Fi l l s t and ( BASI C - CLI N 0005)

1. 1. 5. 1 Payment

1. 1. 5. 2 Uni t of Measur e

1. 1. 6 2 Tr uck Pf f l oad Poi nt s ( BASI C - CLI N 0006)

1. 1. 6. 1 Payment

1. 1. 6. 2 Uni t of Measur e

1. 1. 7 Demol i t i on Wor k For Si t e ( BASI C - CLI N 0007)

1. 1. 7. 1 Payment

1. 1. 7. 2 Uni t of Measur e

1. 1. 8 Ai r f i el d Pavement ( BASI C - CLI N 0008)

1. 1. 8. 1 Payment

1. 1. 8. 2 Uni t of Measur e

1. 1. 9 Al l Ot her Concr et e and Asphal t Si t e Pavi ng ( BASI C - CLI N 0009)

1. 1. 9. 1 Payment

1. 1. 9. 2 Uni t of Measur e

1. 1. 10 El ect r i cal Gener at or ( BASI C - CLI N 0010)

1. 1. 10. 1 Payment

1. 1. 10. 2 Uni t of Measur e

1. 1. 11 Remai ni ng Si t e Wor k ( BASI C - CLI N 0011)

1. 1. 11. 1 Payment

1. 1. 11. 2 Uni t of Measur e

1. 1. 12 El ect r i cal Syst em I nst al l at on ( BASI C - CLI N 0012)

1. 1. 12. 1 Payment

1. 1. 12. 2 Uni t of Measur e

1. 1. 13 As- Bui l t s ( BASI C - CLI N 0013)

1. 1. 13. 1 Payment

1. 1. 13. 2 Uni t of Measur e

1. 1. 14 Oper at i on and Mai nt enance ( O&M) Manual ( BASI C - CLI N 0014)

1. 1. 14. 1 Payment

SECTI ON 01 22 00. 00 10 Page 1

1. 1. 14. 2 Uni t of Measur e

1. 1. 15 For m DD 1354 Checkl i st and Equi pment i n Pl ace Li st ( BASI C -

CLI N 0015)

1. 1. 15. 1 Payment

1. 1. 15. 2 Uni t of Measur e

1. 1. 16 50, 000 Gal l on F24 Above Gr ound Fuel St or age Tank ( OPTI ON -

CLI N 0016)

1. 1. 16. 1 Payment

1. 1. 16. 2 Uni t of Measur e

1. 1. 17 1 Tr uck Fi l l s t and ( OPTI ON - CLI N 0017)

1. 1. 17. 1 Payment

1. 1. 17. 2 Uni t of Measur e

1. 1. 18 5, 000 Gal l on Di esel Above Gr ound Fuel St or age Tank ( OPTI ON

- CLI N 0018)

1. 1. 18. 1 Payment

1. 1. 18. 2 Uni t of Measur e

1. 1. 19 Canopy At Fi l t er Separ at or Faci l i t i es ( OPTI ON - CLI N 0019)

1. 1. 19. 1 Payment

1. 1. 19. 2 Uni t of Measur e

1. 1. 20 4 Canopi es At Load And Of f l oad Faci l i t i es ( OPTI ON - CLI N

0020)

1. 1. 20. 1 Payment

1. 1. 20. 2 Uni t of Measur e

1. 1. 21 One Lar ge Canopy Over Load and Unl oad Faci l i t i es ( OPTI ON -

CLI N 0021)

1. 1. 21. 1 Payment

1. 1. 21. 2 Uni t of Measur e

1. 1. 22 DI SPOSAL OF PETROLEUM CONTAMI NATED SOI L REMOVAL ( OPTI ON I TEM

0022)

1. 1. 22. 1 Uni t of Measur e

1. 1. 23 Aut omat i c Tank Gaugi ng Syst em ( OPTI ON - CLI N 0023)

1. 1. 23. 1 Payment

1. 1. 23. 2 Uni t of Measur e

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

3. 2 PROGRESS PAYMENT I NVOI CE

3. 3 COMPLI ANCE WI TH CONSTRUCTI ON WAGE RATE REQUI REMENTS

3. 3. 1 Cont r act or POC

3. 3. 2 Responsi bi l i t i es

3. 3. 3 Cer t i f i cat i on

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 10 Page 2

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

08/15

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he PRICING SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Mobi l i zat i ond and Demobi l i zat i on, Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 1. 1 New Rot ar y Wi ng Ai r cr af t Di r ect Fuel Syst em ( BASI C - CLI N 0001)

1. 1. 1. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t he new r ot ar y wi ng ai r cr af t di r ect f uel syst em and assoi cat ed appur t enances.

1. 1. 1. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 2 50, 000 Gal l on F24 Above Gr ound Fuel St or age Tanks ( BASI C - CLI N 0002)

1. 1. 2. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t hr ee 50, 000 gal l on F24 above gr ound f uel st or age t anks i ncl udi ng concr et e s l ab, di spenser , of f l oad poi nt and associ at ed appur t enances.

1. 1. 2. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 3 Above and Bel ow Gr ound Fuel Pi pi ng ( BASI C - CLI N 0003)

1. 1. 3. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t he above and bel ow gr ound f uel pi pi ng i ncl udi ng cat hodi c pr ot ect i on and associ at ed appurtenances.

1. 1. 3. 2 Uni t of Measur e

Uni t of measur e: j ob.

SECTI ON 01 22 00. 00 10 Page 3

1. 1. 4 New POL Oper at i ons Bui l di ng ( BASI C - CLI N 0004)

1. 1. 4. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t he new POL Oper at i ons Bui l di ng i ncl udi ng associ at ed appur t enances out t o poi nt of 5 f eet out si de of bui l di ng. .

1. 1. 4. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 5 1 Tr uck Fi l l s t and ( BASI C - CLI N 0005)

1. 1. 5. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of 1 t r uck f i l l s t and and associ at ed appur t enances.

1. 1. 5. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 6 2 Tr uck Pf f l oad Poi nt s ( BASI C - CLI N 0006)

1. 1. 6. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h oper at i ons necessar y f or const r uct i on of t he 2 t r uck of f l oad poi nt s and associ at ed appur t enances. .

1. 1. 6. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 7 Demol i t i on Wor k For Si t e ( BASI C - CLI N 0007)

1. 1. 7. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t he Demol i t i on Wor k r equi r ed f or s i t e. I ncl udes r emoval and di sposal of unsui t abl e soi l , t r ees, and al l exi st i ng above and bel ow gr ound f aci l i t i es.

1. 1. 7. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 8 Ai r f i el d Pavement ( BASI C - CLI N 0008)

1. 1. 8. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t he ai r f i el d pavement .

1. 1. 8. 2 Uni t of Measur e

Uni t of measur e: j ob.

SECTI ON 01 22 00. 00 10 Page 4

1. 1. 9 Al l Ot her Concr et e and Asphal t Si t e Pavi ng ( BASI C - CLI N 0009)

1. 1. 9. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of al l ot her concr et e and asphal t , excl udi ng Opt i on I t ems bel ow.

1. 1. 9. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 10 El ect r i cal Gener at or ( BASI C - CLI N 0010)

1. 1. 10. 1 Payment

Payment wi l l be made f or al l wor k compl et e t o pr ovi de one el ect r i cal generator.

1. 1. 10. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 11 Remai ni ng Si t e Wor k ( BASI C - CLI N 0011)

1. 1. 11. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t he r emai ni ng si t e pr epar at i on, ear t hwor k, ut i l i t i es, gener at or , dr ai nage f aci l i t i es, spi l l cont ai nment , cyber secur i t y measur es, and al l ot her wor k not i ncl uded i n ot her Basi c I t ems.

1. 1. 11. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 12 El ect r i cal Syst em I nst al l at on ( BASI C - CLI N 0012)

1. 1. 12. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t he el ect r i cal syst em i nst al l at i on by ut i l i t y owner .

1. 1. 12. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 13 As- Bui l t s ( BASI C - CLI N 0013)

1. 1. 13. 1 Payment

Payment wi l l be made at t he cont r act j ob pr i ce f or CLI N 0012, al l wor k f or As- Bui l t dr awi ngs as speci f i ed i n Sect i on 01 78 00 CLOSEOUT SUBMI TTALS f r om pr epar at i on t o f i nal appr oval . Payment shal l const i t ut e f ul l compensat i on f or t hi s i t em, compl et e.

1. 1. 13. 2 Uni t of Measur e

Uni t of measur e: j ob.

SECTI ON 01 22 00. 00 10 Page 5

1. 1. 14 Oper at i on and Mai nt enance ( O&M) Manual ( BASI C - CLI N 0014)

1. 1. 14. 1 Payment

Payment wi l l be made at t he cont r act j ob pr i ce f or CLI N 0013, al l wor k f or O&M manual s as speci f i ed i n Sect i on 01 78 23 OPERATI ONS AND MAI NTENANCE MANUALS f r om pr epar at i on t o f i nal appr oval . Payment shal l const i t ut e f ul l compensat i on f or t hi s i t em, compl et e.

1. 1. 14. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 15 For m DD 1354 Checkl i st and Equi pment i n Pl ace Li st ( BASI C - CLI N 0015)

1. 1. 15. 1 Payment

Payment wi l l be made at t he cont r act j ob pr i ce f or CLI N 0014, al l wor k f or For m DD 1354 Checkl i st and Equi pment i n Pl ace Li st as speci f i ed i n Sect i on 01 78 00 CLOSEOUT SUBMI TTALS f r om pr epar at i on t o f i nal appr oval . Payment shal l const i t ut e f ul l compensat i on f or t hi s i t em, compl et e.

1. 1. 15. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 16 50, 000 Gal l on F24 Above Gr ound Fuel St or age Tank ( OPTI ON - CLI N 0016)

1. 1. 16. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of one addi t i onal 50, 000 gal l on F24 above gr ound f uel st or age t ank and associ at ed appurtenances.

1. 1. 16. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 17 1 Tr uck Fi l l s t and ( OPTI ON - CLI N 0017)

1. 1. 17. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of 1 t r uck f i l l s t and and associ at ed appur t enances, i ncl udi ng PCC pavement .

1. 1. 17. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 18 5, 000 Gal l on Di esel Above Gr ound Fuel St or age Tank ( OPTI ON - CLI N 0018)

1. 1. 18. 1 Payment

Payment wi l l be made f or al l wor k compl et e f or const r uct i on of t he 5, 000 gal l on di esel above gr ound f uel st or age t ank i ncl udi ng concr et e s l ab, di spenser , of f l oad poi nt , and associ at ed appur t enances.

SECTI ON 01 22 00. 00 10 Page 6

1. 1. 18. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 19 Canopy At Fi l t er Separ at or Faci l i t i es ( OPTI ON - CLI N 0019)

1. 1. 19. 1 Payment

Payment wi l l be made f or al l wor k compl et e t o pr ovi de one canopy at f i l t er separ at or f aci l i t i es i ncl udi ng associ at ed appur t enances.

1. 1. 19. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 1. 20 4 Canopi es At Load And Of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.