R0004.pdf
PDF 2 MB Posted
- Attached to
- Tactical Response Force Alert Facility at Malmstrom AFB, MT Federal contract opportunity
- Solicitation number
- W912DW18R0002
About this file
Amendment R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R0008.pdf | ||
| Attachment_1_for_Section_00_22_16_Revised.docx | DOCX document | |
| R0007.pdf | ||
| R0006.pdf | ||
| R0005.pdf | ||
| R0003.pdf | ||
| R0002.pdf | ||
| R0001.pdf | ||
| Part_1_of_3_Request_for_Proposal.PDF | ||
| Part_2_of_3_Specifications.pdf | ||
| Attachment_1_for_Section_00_22_16.docx | DOCX document | |
| Part_3_of_3_Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD970805559
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Request for Proposal (RFP) W912DW18R0002 Amendment R0004
(Please see continuation page for details)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW18R0002
X 9B. DATED (SEE ITEM 11)
23-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Apr-2018
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW18R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text: R0004
1. This amendment four (0004) provides for the following:
The site visit slides and roster are provided for informational purposes only.
Attachment 00 73 00-A (Revised) Drawing S-100B, Foundation Plan – East (Revised) Clause 252.203-7004, Display of Hotline Poster (OCT 2016) has been revised.
2. The bid submittal time and date of 1:00:00 PM LOCAL TIME, 26 April 2018 remains the same.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments including this amendment by number and date on SF1442.
Encl:
Attachment 00 73 00-A (Revised) Drawing S-100B (Revised) Site Visit Slides and Roster (New)
W912DW18R0002
SECTION 00 72 00 - GENERAL CONDITIONS
The following included by full text have been revised:
252.203-7004 DISPLAY OF HOTLINE POSTERS (OCT 2016)
(a) Definition. “United States,” as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of hotline poster(s).
(1)(i) The Contractor shall display prominently the DoD fraud, waste, and abuse hotline poster prepared by the DoD Office of the Inspector General, in effect at time of contract award, in common work areas within business segments performing work under Department of Defense (DoD) contracts.
(ii) For contracts performed outside the United States, when security concerns can be appropriately demonstrated, the contracting officer may provide the contractor the option to publicize the program to contractor personnel in a manner other than public display of the poster, such as private employee written instructions and briefings.
(2) If the contract is funded, in whole or in part, by Department of Homeland Security (DHS) disaster relief funds and the work is to be performed in the United States, the DHS fraud hotline poster shall be displayed in addition to the DoD hotline poster. If a display of a DHS fraud hotline poster is required, the Contractor may obtain such poster from—
(i) DHS Office of Inspector General/MAIL STOP 0305, Attn: Office of Investigations – Hotline, 245 Murray Lane SW, Washington, DC 20528-0305; or
(ii) Via the internet at https://www.oig.dhs.gov/assets/Hotline/DHS_OIG_Hotline-optimized.jpg.
(c)(1) The DoD hotline poster may be obtained from: Defense Hotline, The Pentagon, Washington, D.C. 20301- 1900, or is also available via the internet at http://www.dodig.mil/hotline/hotline_posters.htm.
(2) If a significant portion of the employee workforce does not speak English, then the poster is to be displayed in the foreign languages that a significant portion of the employees speak.
(3) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the required poster at the website.
(d) Subcontracts. The Contractor shall include this clause, including this paragraph (d), in all subcontracts that exceed $5.5 million except when the subcontract is for the acquisition of a commercial item.
(End of clause)
(End of Summary of Changes)
4/13/2018
US Army Corps of Engineers
BUILDING STRONG®
Pre-Proposal Conference & Site Visit
Darrick Godfrey/Ken Parsons
Seattle District
19 April 2018
BUILDING STRONG®
Request for Proposal (RFP)
W912DW18R0002
Tactical Response Force Alert Facility at Malmstrom AFB, MT
BUILDING STRONG®
Introduction
The slides from this conference will be posted to the RFP by Amendment on the FedBizOpps website at www.FBO.gov.
This conference is for informational purposes only.
Comments/clarifications made today WILL NOT change the RFP in any way.
Changes to the RFP shall ONLY be made by written Amendments.
3 BUILDING STRONG®
Questions Any and all questions from this Pre-Proposal Conference and Site Visit should be submitted to www.ProjNet.org using the Bidder Inquiry Key and instructions provided in the RFP.
No technical-specific questions will be answered today.
Instead, all questions should be asked on www.ProjNet.org.
The cutoff for submitting questions in www.ProjNet.org is three (3) business days prior to the Offer due date.
BUILDING STRONG®
Questions During Proposal Stage
Contracting Web Address for RFP Documents:
www.FBO.gov.
Search for RFP Number:
► W912DW18R0002
Technical Questions: www.ProjNet.org For Any Other Administrative Questions, please contact
John Scola (Contract Specialist) at:
► Email: John.P.Scola@usace.army.mil
Federal Acquisition Regulation: http://farsite.hill.af.mil
5 BUILDING STRONG®
UNRESTRICTED
Responses to this RFP will be Unrestricted – open to both large and small businesses.
NAICS Code is 236220.
For specific small business related questions, please contact the Deputy for Small Business Programs at:
► Phone: (206) 764-3517
► Email: Scotty.W.Britt@usace.army.mil
BUILDING STRONG®
RFP
General Information
RFP NUMBER: W912DW18R0002
This RFP was advertised as a one phase, DBB, Trade- Off procurement.
Amendments will be issued when changes to RFP is necessary.
Magnitude of Construction is between $10M to $25M.
Bid Guarantee is required in the amount of 20% of the Price or $3M, whichever is less.
► Please see FAR 52.228-1 for more details.
7 BUILDING STRONG®
RFP
General Information, continued
Please read Sections 00 21 16 and 00 22 16 for required documents to be included with your proposal submittal.
The proposals are required to be delivered to the U.S.
Army Corps of Engineers, Seattle District Office, no later than 1:00:00 PM (Seattle Time), on 26 April 2018.
► Please refer to Block 13 on SF 1442.
NO offers will be accepted after the noted time and date.
PLEASE DO NOT BE LATE.
BUILDING STRONG®
Solicitation General Information
Read descriptions of all evaluation factors thoroughly.
Ensure proposal is complete and reflects all elements required by the RFP.
Proposals must be submitted in 2 Volumes (See Section 00 21 16 and 00 22 16).
► Volume 1 – Technical (Non- Price)
► Volume 2 – Price and Pro Forma Information
9 BUILDING STRONG®
Selection Procedures and Basis of Award
The Contracting Officer will award a firm-fixed-price contract to that responsible firm whose proposal:
a) Conforms to the solicitation.
b) Is considered fair and reasonable.
c) Offers the best overall value to the Government, considering technical evaluation factors described in the RFP and price.
BUILDING STRONG®
Selection Procedures and Basis of Award
Please read Sections 00 21 16 and Section 00 22 16 thoroughly.
Ensure your proposal is complete and reflects all elements required by the RFP.
Technical Proposals are evaluated on their own merit and against the evaluation factors only – not against other proposals.
Proposals must be submitted in Two (2) Volumes.
11 BUILDING STRONG®
Selection Procedures and Basis of Award
The Evaluation Factors consist of:
Volume 1 – Technical (Non-Price)
Factor 1 - Tab A – Company Experience
Factor 2 – Tab B – Past Performance
Factor 3 – Tab C – Management
Factor 4 – Tab D – Small Business Participation/Plan
BUILDING STRONG®
Selection Procedures and Basis of Award, continued
Volume 2 – Price and Pro Forma Information ► Tab A – Price SF1442 and Price (Bid) Schedule
► Tab B – Offer/Bid Guarantee (See Provision 52.228-1)
► Tab C – Pre-Award Information (See Section 00 45 00)
13 BUILDING STRONG®
Technical Evaluation
Technical Evaluation Rating System (See Section 00 22 16 for details):
► Outstanding
► Good
► Acceptable
► Marginal
► Unacceptable
BUILDING STRONG®
Price Evaluation
Price proposals will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of price analysis. Price will also be checked for the appearance of unbalanced line items.
Bid Bonds will be reviewed for legal sufficiency.
It is the intent of the Government to make award based upon initial offers, without further discussions or additional information.
15 BUILDING STRONG®
Wage Determinations Davis-Bacon wage rates shall be used on this contract.
The Department of Labor (DoL) establishes minimum monetary wages/fringe benefits to be paid in performance of this contract.
The Wage Determination (WD) incorporated into this RFP may be updated/modified during the solicitation period.
The most current version of the WD will be incorporated into the Contract at time of award.
Your price proposal, and if necessary, revised price proposal, must always reflect the latest update to the
WD.
BUILDING STRONG®
Conclusion
Continue to check your emails for new Amendments to the RFP. Check regularly up until the due date and time for receipt of Proposals.
Ensure you have completed ALL information required by the RFP and submit those items with your Proposal.
Ensure compliance with the Solicitation requirements.
This Solicitation shall ONLY be changed by written Amendment.
The Government intends to award on initial offers, to the Proposal which offers the Best Value to the Government.
17 BUILDING STRONG®
Directions to Site Visit
USACE POC: Darrick Godfrey and Ken Parson
MAFB Tactical Response Force Alert Facility 16031 Malmstrom AFB, Great Falls, MT W912DW18R0002
00 73 00-A - 1 R0003
ATTACHMENT 00 73 00-A
INDEX OF DRAWINGS
DRAWING RECORD FILE NO. 225s/141-32-03, DATED: 23 October 2017
PAGE# SHEET# SHEET TITLE REVISION DATE
GENERAL
1 G-001 TITLE SHEET, LOCATION, & VICINITY MAP
2 G-002 DRAWING INDEX
3 G-003 DRAWING INDEX
4 G-004 LIFE SAFETY PLAN - FIRST FLOOR
5 G-005 LIFE SAFETY PLAN - SECOND FLOOR
CIVIL
6 C-001 GENERAL NOTES
7 C-002 LEGENDS, ABBREVIATIONS, & ALIGNMENT TABLES
8 C-003 KEY MAP
9 C-004 BASE BID PLAN
10 C-005 BID OPTIONS PLAN
11 C-006 SITE ACCESS PLAN
12 C-007 SURVEY POTHOLE INFORMATION
13 C-101 GEOTECH INFORMATION
14 C-102 GEOTECH INFORMATION
15 C-103 GEOTECH INFORMATION
16 C-104 EXISTING CONDITIONS, SITE DEMOLITION, & TESC PLAN
17 C-105 EXISTING CONDITIONS, SITE DEMOLITION, & TESC PLAN
18 C-106 SITE LAYOUT PLAN
19 C-107 SITE LAYOUT PLAN
20 C-108 GRADING & DRAINAGE PLAN R0003 12 APR 2018
21 C-109 GRADING & DRAINAGE PLAN
22 C-110 ENLARGED GRADING PLAN
23 C-111 SITE UTILITY PLAN
24 C-112 SITE UTILITY PLAN
25 C-113 SITE UTILITY PLAN
26 C-114 UTILITY PROFILES
27 C-115 UTILITY PROFILES
28 C-116 UTILITY PROFILES
29 C-117 SECTIONS & DETAILS
30 C-118 MISCELLANEOUS DETAILS
31 C-119 MISCELLANEOUS DETAILS
32 C-120 MISCELLANEOUS DETAILS
33 C-121 MISCELLANEOUS DETAILS
34 C-122 MISCELLANEOUS DETAILS
35 C-123 MISCELLANEOUS DETAILS
36 C-124 MISCELLANEOUS DETAILS
37 C-125 MISCELLANEOUS DETAILS
38 C-126 MISCELLANEOUS DETAILS
39 C-127 MISCELLANEOUS DETAILS
00 73 00-A - 2 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
LANDSCAPE
40 L-101 LANDSCAPE REFERENCE PLAN - SHEET 1
41 L-102 LANDSCAPE REFERENCE PLAN - SHEET 2
42 L-103 PLANTING PLAN - SHEET 1
43 L-104 PLANTING PLAN - SHEET 2
44 L-105 PLAZA ENTRY & BICYCLE RACK ENLARGEMENT PLANS
45 L-501 LANDSCAPE DETAILS
46 L-502 CHAIN LINK FENCE DETAILS
47 L-503 ELECTRIC SLIDING GATE DETAILS
48 L-504 CHAIN LINK DOUBLE SWING GATE
49 L-505 TURNSTILES & ADA GATE
50 L-506 TURNSTILE DETAILS
51 L-507 DUMPSTER DETAILS
52 L-508 STAIRS, RAMP & HANDRAIL DETAILS
53 L-509 MISCELLANEOUS DETAILS
STRUCTURAL
54 S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS
55 S-002 GENERAL STRUCTURAL NOTES
56 S-003 ABBREVIATIONS & LEGEND
57 S-007 ATFP PLAN
58 S-008 SCHEDULES & DIAGRAMS
59 S-009 WIND LOADS - COMPONENTS & CLADDING
60 S-010 LOADING DIAGRAMS
61 S-100 FOUNDATION PLAN - OVERALL
62 S-100A FOUNDATION PLAN - WEST R0003 12 APR 2018
63 S-100B FOUNDATION PLAN - EAST R0004 20 APR 2018
64 S-101 FIRST FLOOR PLAN - OVERALL
65 S-101A FIRST FLOOR PLAN - WEST
66 S-101B FIRST FLOOR PLAN - EAST
67 S-101C FIRST FLOOR SLAB REINFORCEMENT - WEST
68 S-101D FIRST FLOOR SLAB REINFORCEMENT- EAST
69 S-102 SECOND FLOOR PLAN - OVERALL
70 S-102A SECOND FLOOR PLAN - WEST
71 S-102B SECOND FLOOR PLAN - EAST
72 S-103 ROOF PLAN - OVERALL
73 S-103A ROOF PLAN - WEST
74 S-103B ROOF PLAN - EAST
75 S-103C ROOF PLAN - GARAGE
76 S-200 FRAME ELEVATIONS
77 S-201 FRAME ELEVATIONS
78 S-202 FRAME ELEVATIONS
79 S-203 FRAME ELEVATIONS
80 S-204 FRAME ELEVATIONS
81 S-210 ATFP ELEVATIONS
82 S-211 ATFP ELEVATIONS
83 S-212 ATFP ELEVATIONS
00 73 00-A - 3 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
84 S-300 BUILDING SECTIONS
85 S-301 BUILDING SECTIONS
86 S-302 SCHEMATIC TRUSS PROFILES
87 S-400 ENLARGED FLOOR PLANS
88 S-402 ENLARGED STAIR PLANS
89 S-410 WALL SECTIONS
90 S-411 WALL SECTIONS
91 S-412 WALL SECTIONS
92 S-413 WALL SECTIONS
93 S-414 WALL SECTIONS
94 S-420 WALL SECTIONS - BEARCAT GARAGE
95 S-421 WALL SECTIONS - BEARCAT GARAGE
96 S-500 CONCRETE DETAILS
97 S-501 CONCRETE DETAILS
98 S-502 CONCRETE DETAILS
99 S-503 DRILLED PIER DETAILS
100 S-504 CONCRETE GRADE BEAM DETAILS
101 S-505 CONCRETE DETAILS
102 S-506 FOUNDATION DETAILS
103 S-507 FOUNDATION DETAILS
104 S-508 CONCRETE DETAILS - BEARCAT GARAGE
105 S-509 EXTERIOR STAIR & LANDING DETAILS
106 S-510 BASE PLATE DETAILS
107 S-520 TYPICAL STEEL DETAILS
108 S-521 TYPICAL STEEL DETAILS
109 S-522 SECOND FLOOR FRAMING DETAILS
110 S-523 SECOND FLOOR FRAMING DETAILS
111 S-524 STAIR FRAMING DETAILS
112 S-530 ROOF FRAMING DETAILS
113 S-531 ROOF FRAMING DETAILS
114 S-532 ROOF FRAMING DETAILS
115 S-533 ROOF FRAMING DETAILS
116 S-540 ATFP TYPICAL ELEVATION
117 S-541 ATFP DETAILS & SECTIONS
118 S-542 ATFP DETAILS & SECTIONS, ANTENNA SUPPORT FRAME
119 S-561 TYPICAL COLD-FORMED DETAILS
ARCHITECTURAL
120 A-001 ABBREVIATIONS & LEGENDS
121 A-002 AIR BARRIER BOUNDARY
122 A-003 BUILDING ASSEMBLY LEGENDS
123 A-004 BUILDING PARTITION TYPES
124 A-005 TYPICAL MOUNTING HEIGHTS
125 A-101 OVERALL FLOOR PLANS
126 A-102 FIRST FLOOR PLAN - WEST
127 A-103 FIRST FLOOR PLAN - EAST
128 A-104 SECOND FLOOR PLAN - WEST
00 73 00-A - 4 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
129 A-105 SECOND FLOOR PLAN - EAST
130 A-106 FIRST FLOOR PARTITION PLAN - WEST
131 A-107 FIRST FLOOR PARTITION PLAN - EAST
132 A-108 SECOND FLOOR PARTITION PLAN - WEST
133 A-109 SECOND FLOOR PARTITION PLAN - EAST
134 A-110 ROOF PLAN
135 A-111 ROOF PLAN - WEST
136 A-112 ROOF PLAN - EAST
137 A-121 REFLECTED CEILING PLANS
138 A-122 FIRST FLOOR REFLECTED CEILING PLAN - WEST
139 A-123 FIRST FLOOR REFLECTED CEILING PLAN - EAST
140 A-124 SECOND FLOOR REFLECTED CEILING PLAN - WEST
141 A-125 SECOND FLOOR REFLECTED CEILING PLAN - EAST
142 A-130 FIRST FLOOR INTERIOR FINISHES PLAN - WEST
143 A-131 FIRST FLOOR INTERIOR FINISHES PLAN - EAST
144 A-132 SECOND FLOOR INTERIOR FINISHES PLAN - WEST
145 A-133 SECOND FLOOR INTERIOR FINISHES PLAN - EAST
146 A-180 FIRST FLOOR FURNITURE PLACEMENT PLAN - WEST
147 A-181 FIRST FLOOR FURNITURE PLACEMENT PLAN - EAST
148 A-182 SECOND FLOOR FURNITURE PLACEMENT PLAN - WEST
149 A-183 SECOND FLOOR FURNITURE PLACEMENT PLAN - EAST
150 A-201 EXTERIOR ELEVATIONS
151 A-202 ENLARGED EXTERIOR ELEVATIONS
152 A-203 ENLARGED EXTERIOR ELEVATIONS
153 A-204 ENLARGED EXTERIOR ELEVATIONS
154 A-301 BUILDING CROSS SECTIONS
155 A-302 BUILDING LONGITUDINAL SECTIONS
156 A-310 WALL SECTIONS
157 A-311 WALL SECTIONS
158 A-312 WALL SECTIONS
159 A-400 ENLARGED PLANS & SECTIONS
160 A-401 ENLARGED PLANS & SECTIONS
161 A-402 ENLARGED PLANS & SECTIONS
162 A-410 INTERIOR ELEVATIONS
163 A-411 INTERIOR ELEVATIONS
164 A-412 INTERIOR ELEVATIONS
165 A-413 INTERIOR ELEVATIONS
166 A-500 DOOR & WINDOW DETAILS
167 A-501 BUILDING ENVELOPE DETAILS
168 A-502 EXTERIOR DETAILS
169 A-503 WALL DETAILS
170 A-504 WALL DETAILS
171 A-505 EXTERIOR DETAILS
172 A-510 ROOF DETAILS
173 A-520 INTERIOR DETAILS
174 A-521 INTERIOR DETAILS
00 73 00-A - 5 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
175 A-522 INTERIOR DETAILS
176 A-530 STAIR & ELEVATOR DETAILS
177 A-601 COLORS & MATERIALS SCHEDULE
178 A-602 DOOR SCHEDULE
179 A-603 CURTAIN WALL TYPES & SCHEDULES
180 A-604 LOUVER SCHEDULE & DOOR/FRAME TYPES
181 A-605 ROOM FINISH SCHEDULES
182 A-606 SIGNAGE & TYPES
183 A-607 SIGNAGE & TYPES
184 A-608 SIGNAGE & TYPES
185 A-801 PERSPECTIVE VIEWS
FIRE PROTECTION
186 FA001 FIRE ALARM / MASS NOTIFICATION LEGEND & NOTES
187 FA002 FIRE ALARM / MASS NOTIFICATION NOTES
188 FA003 FIRE ALARM / MASS NOTIFICATION NOTES CONTINUED
189 FA004 FIRE ALARM / MASS NOTIFICATION SEQUENCE OF
OPERATIONS
190 FA005 FIRE ALARM / MASS NOTIFICATION RISER DIAGRAM
191 FA006 FIRE ALARM / MASS NOTIFICATION ANTENA DETAIL
192 FA111 FIRST FLOOR FIRE ALARM PLAN - WEST
193 FA112 FIRST FLOOR FIRE ALARM PLAN - EAST
194 FA113 SECOND FLOOR FIRE ALARM PLAN - WEST
195 FA114 SECOND FLOOR FIRE ALARM PLAN - EAST
196 FX001 FIRE PROTECTION LEGEND, DESIGN CRITERIA, & FLOW TEST
197 FX002 FIRE PROTECTION GENERAL, SPECIAL, & CONSTRUCTION
NOTES
198 FX101 FIRE PROTECTION RISER DETAIL PLAN, EQUIPMENT LIST, &
CRITERIA
199 FX102 FIRE PROTECTION DETAIL ELEVATIONS, CONSTRUCTION
NOTES, SCHEDULES, & AUXILIARY RISER PLAN & ELEVATION
200 FX103 FIRE PROTECTION RISER DETAIL ELEVATIONS
201 FX111 FIRST FLOOR FIRE PROTECTION PLAN - WEST
202 FX112 FIRST FLOOR FIRE PROTECTION PLAN - EAST
203 FX113 SECOND FLOOR FIRE PROTECTION PLAN - WEST
204 FX114 SECOND FLOOR FIRE PROTECTION PLAN - EAST
205 FX121 FIRST FLOOR FIRE PROTECTION PIPING PLAN - WEST
206 FX122 FIRST FLOOR FIRE PROTECTION PIPING PLAN - EAST
207 FX123 SECOND FLOOR FIRE PROTECTION PIPING PLAN - WEST
208 FX124 SECOND FLOOR FIRE PROTECTION PIPING PLAN - EAST
209 FX125 ENLARGED FIRE PROTECTION PIPING PLANS
210 FX201 FIRE PROTECTION HYDRAULIC NODE SITE PLAN
211 FX202 FIRE PROTECTION RISER DETAIL HYDRAULIC NODE PLAN
212 FX203 FIRE PROTECTION AUXILIARY DRY SYSTEM RISER DETAIL
AND ELEVATIONS HYDRAULIC NODE PLAN
213 FX204 FIRE PROTECTION RISER DETAIL ELEVATIONS HYDRAULIC
NODE PLAN
214 FX205 FIRE PROTECTION FIRST FLOOR HYDRAULIC NODE PLAN -
00 73 00-A - 6 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
WEST
215 FX206 FIRE PROTECTION FIRST FLOOR HYDRAULIC NODE PLAN -
EAST
216 FX207 FIRE PROTECTION SECOND FLOOR HYDRAULIC NODE PLAN -
WEST
217 FX208 FIRE PROTECTION SECOND FLOOR HYDRAULIC NODE PLAN -
EAST
218 FX209 FIRE PROTECTION HYDRAULIC NODE PLANS
PLUMBING
219 P-001 PLUMBING LEGEND
220 PP101 UNDERGROUND PLUMBING PLAN - WEST
221 PP102 UNDERGROUND PLUMBING PLAN - EAST
222 PP103 FIRST FLOOR PLUMBING PLAN - WEST
223 PP104 FIRST FLOOR PLUMBING PLAN - EAST
224 PP105 SECOND FLOOR PLUMBING PLAN - WEST
225 PP106 SECOND FLOOR PLUMBING PLAN - EAST
226 PP107 ROOF PLUMBING PLAN - WEST
227 PP108 ROOF PLUMBING PLAN - EAST
228 PP401 ENLARGED PIPING PLANS
229 PP501 PLUMBING DETAILS I
230 PP502 PLUMBING DETAILS II
231 PP503 PLUMBING DETAILS III
232 PP504 DOMESTIC RISER DIAGRAM
233 PP505 WASTE RISER DIAGRAM
234 PP601 PLUMBING SCHEDULES I
235 PP602 PLUMBING SCHEDULES II
MECHANICAL
236 M-001 MECHANICAL LEGEND
237 MH101 FIRST FLOOR HVAC PLAN - WEST
238 MH102 FIRST FLOOR HVAC PLAN - EAST
239 MH103 SECOND FLOOR HVAC PLAN - WEST
240 MH104 SECOND FLOOR HVAC PLAN - EAST
241 MH105 ROOF HVAC PLAN - WEST
242 MH106 ROOF HVAC PLAN - EAST
243 MH121 FIRST FLOOR REFLECTED CEILING PLAN - WEST
244 MH122 FIRST FLOOR REFLECTED CEILING PLAN - EAST
245 MH123 SECOND FLOOR REFLECTED CEILING PLAN - WEST
246 MH124 SECOND FLOOR REFLECTED CEILING PLAN - EAST
247 MH301 MECHANICAL SECTIONS - MECHANICAL 121
248 MH302 MECHANICAL SECTIONS - MECHANICAL 203
249 MH303 MECHANICAL SECTIONS - MECHANICAL 228
250 MH401 FIRST FLOOR ENLARGED PLANS - MECHANICAL 121
251 MH402 SECOND FLOOR ENLARGED PLANS - MECHANICAL 228
252 MH403 SECOND FLOOR ENLARGED PLANS - MECHANICAL 203
253 MH501 MECHANICAL DETAILS I
254 MH502 MECHANICAL DETAILS II
00 73 00-A - 7 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
255 MH503 MECHANICAL DETAILS III
256 MH601 MECHANICAL SCHEDULES I
257 MH602 MECHANICAL SCHEDULES II
258 MH603 MECHANICAL SCHEDULES III
259 MH604 MECHANICAL SCHEDULES IV
260 MH605 MECHANICAL SCHEDULES V
261 MH606 MECHANICAL SCHEDULES VI
262 MH701 HYDRONIC HEATING SYSTEM DIAGRAM
263 MH702 CHILLED WATER SYSTEM DIAGRAM
264 MH703 MECHANICAL CONTROLS I
265 MH704 MECHANICAL CONTROLS II
266 MH705 MECHANICAL CONTROLS III
267 MH706 MECHANICAL CONTROLS IV
268 MH707 MECHCANICAL CONTROLS V
269 MH708 CONTROL POINTS TABLE
270 MP111 FIRST FLOOR HYDRONIC PIPING PLAN - WEST
271 MP112 FIRST FLOOR HYDRONIC PIPING PLAN - EAST
272 MP113 SECOND FLOOR HYDRONIC PIPING PLAN - WEST
273 MP114 SECOND FLOOR HYDRONIC PIPING PLAN - EAST
ELECTRICAL
274 E-001 SYMBOLS & ABBREVIATIONS
275 E-002 SITE POWER, LIGHTING, & SYSTEMS DEMOLITION PLAN
276 E-003 SITE POWER & LIGHTING PLAN
277 E-004 SITE SYSTEMS PLAN
278 E-101 FIRST FLOOR LIGHTING PLAN - WEST
279 E-102 FIRST FLOOR LIGHTING PLAN - EAST
280 E-103 SECOND FLOOR LIGHTING PLAN - WEST
281 E-104 SECOND FLOOR LIGHTING PLAN - EAST
282 E-111 FIRST FLOOR POWER PLAN - WEST
283 E-112 FIRST FLOOR POWER PLAN - EAST
284 E-113 SECOND FLOOR POWER PLAN - WEST
285 E-114 SECOND FLOOR POWER PLAN - EAST
286 E-121 FIRST FLOOR HVAC CIRCUITING PLAN - WEST
287 E-122 FIRST FLOOR HVAC CIRCUITING PLAN - EAST
288 E-123 SECOND FLOOR HVAC CIRCUITING PLAN - WEST
289 E-124 SECOND FLOOR HVAC CIRCUITING PLAN - EAST
290 E-131 FIRST FLOOR SYSTEMS PLAN - WEST
291 E-132 FIRST FLOOR SYSTEMS PLAN - EAST
292 E-133 SECOND FLOOR SYSTEMS PLAN - WEST
293 E-134 SECOND FLOOR SYSTEMS PLAN - EAST
294 E-141 GROUNDING PLAN - WEST
295 E-142 GROUNDING PLAN - EAST
296 E-151 LIGHTNING PROTECTION PLAN - WEST
297 E-152 LIGHTNING PROTECTION PLAN - EAST
298 E-401 ENLARGED PLANS - SHEET 1
299 E-402 ENLARGED PLANS - SHEET 2
00 73 00-A - 8 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
300 E-403 ENLARGED PLANS - SHEET 3
301 E-501 TYPICAL DETAILS - SHEET 1
302 E-502 TYPICAL DETAILS - SHEET 2
303 E-503 TYPICAL DETAILS - SHEET 3
304 E-504 TYPICAL DETAILS - SHEET 4
305 E-505 TYPICAL DETAILS - SHEET 5
306 E-506 TYPICAL DETAILS - SHEET 6
307 E-507 TYPICAL DETAILS - SHEET 7
308 E-508 TYPICAL DETAILS - SHEET 8
309 E-601 ONE-LINE DIAGRAM - SHEET 1 R0002 6 APR 2018
310 E-602 ONE-LINE DIAGRAM - SHEET 2
311 E-603 TYPICAL GROUNDING & BONDING SCHEMATIC DIAGRAM
312 E-604 NORMAL POWER FEEDER SCHEDULE & CIRCUIT ANALYSIS
313 E-605 EMERGENCY & STANDBY POWER FEEDER SCHEDULE &
CIRCUIT ANALYSIS
314 E-606 TYPICAL BRANCH CIRCUIT SCHEDULE & LABELING
315 E-607 PANEL SCHEDULES - SHEET 1
316 E-608 PANEL SCHEDULES - SHEET 2
317 E-609 PANEL SCHEDULES - SHEET 3
318 E-610 PANEL SCHEDULES - SHEET 4
319 E-611 PANEL SCHEDULES - SHEET 5
320 E-612 PANEL SCHEDULES - SHEET 6
321 E-613 PANEL SCHEDULES - SHEET 7
322 E-614 PANEL SCHEDULES - SHEET 8
323 E-615 PANEL SCHEDULES - SHEET 9
324 E-616 PANEL SCHEDULES - SHEET 10
325 E-617 PANEL SCHEDULES - SHEET 11
326 E-618 PANEL SCHEDULES - SHEET 12
327 E-619 PANEL SCHEDULES - SHEET 13
328 E-620 PANEL SCHEDULES - SHEET 14
329 E-621 PANEL SCHEDULES - SHEET 15
330 E-622 PANEL SCHEDULES - SHEET 16
331 E-623 PANEL SCHEDULES - SHEET 17
332 E-624 PANEL SCHEDULES - SHEET 18
333 E-625 PANEL SCHEDULES - SHEET 19
334 E-626 PANEL SCHEDULES - SHEET 20
335 E-627 PANEL SCHEDULES - SHEET 21
336 E-628 PANEL SCHEDULES - SHEET 22
337 E-629 PANEL SCHEDULES - SHEET 23
338 E-630 PANEL SCHEDULES - SHEET 24
339 E-631 PANEL SCHEDULES - SHEET 25
340 E-641 MECHANICAL EQUIPMENT CIRCUITING SCHEDULE
341 E-642 LUMINAIRE SCHEDULE
342 E-643 CONTROL DIAGRAMS - SHEET 1
343 E-644 CONTROL DIAGRAMS - SHEET 2
344 E-645 CONTROL DIAGRAMS - SHEET 3
00 73 00-A - 9 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
345 E-646 GENERATOR CALCULATIONS R0002 6 APR 2018
TELECOMMUNICATIONS
346 T-001 SYMBOLS & ABBREVIATIONS
347 T-002 SITE TELECOMMUNICATIONS PLAN
348 T-003 SITE TELECOMMUNICATIONS ROUTING PLAN
349 T-004 SITE BUTTERFLY DIAGRAMS
350 T-111 FIRST FLOOR TELECOMMUNICATIONS PLAN - WEST
351 T-112 FIRST FLOOR TELECOMMUNICATIONS PLAN - EAST
352 T-113 SECOND FLOOR TELECOMMUNICATIONS PLAN - WEST
353 T-114 SECOND FLOOR TELECOMMUNICATIONS PLAN - EAST
354 T-121 FIRST FLOOR CABLE TRAY PLAN - WEST
355 T-122 FIRST FLOOR CABLE TRAY LAYOUT - EAST
356 T-123 SECOND FLOOR CABLE TRAY LAYOUT - WEST
357 T-124 SECOND FLOOR CABLE TRAY LAYOUT - EAST
358 T-401 ENLARGED PLANS - SHEET 1
359 T-402 ENLARGED PLANS - SHEET 2
360 T-501 TYPICAL DETAILS - SHEET 1
361 T-502 TYPICAL DETAILS - SHEET 2
362 T-503 TYPICAL DETAILS - SHEET 3
363 T-601 TELECOMMUNICATIONS RISER DIAGRAM
364 T-602 TELECOMMUNICATIONS RISER DIAGRAM
365 T-603 TELECOMMUNICATIONS GROUNDING & BONDING
366 T-701 TELECOMMUNICATIONS ACCEPTANCE TESTING
REQUIREMENTS
CATHODIC PROTECTION
367 CP001 CATHODIC PROTECTION DETAILS
D.5
D.6
E
E E.1
E.3
E.4
E.6
E.7
F
F
G
G G.1 G.3 G.5 G.7 H
1.9
1.1
3.5
1.5
D.9
E.8
E.5
E.5
S-203
S-203
S-203
S-204
/1 S-100A
/1 S-100A
GGB32A GGB32B GGB32A GGB32C
GGB32B
G G
B D
GGB32C
GGB32A
GGB32AGGB32GGGB32GGGB32G
GGB42A
GGB32A
GGB42A GGB42A GGB42A GGB42A
GGB42A
G G
B A
GGB32FGGB32AGGB32C
GGB32A
GGB32AGGB32AGGB32AGGB32A
G G
B A
G G
B A
G G
B A
GGB36A GGB36A GGB36A GGB36A
GGB24AGGB24AGGB24A
GGB36A GGB36A GGB36A GGB36A
G G
B A
G G
B A
GGB42A
GGB42AGGB42AGGB42AGGB42AGGB42AGGB42A
GGB42A
G G
B A
G G
B A
P2 P2
P2
P2
P2P2P2P2P2
P1 P1
P1
P1
P1 P1 P1
P2
P2
P1P1P1P1
P1 P1 P1
P1
P1
P1
P2
P2P2
P3
P1
P2
P1P1
P1
P1
P1
P1
P1
P1 P1
P3
P3
P3
P2 P2
P2
P3 P3 P3 P3
P5 P5 P5
P3
P3
P3P3P3P3 P7
21' - 3" 6' - 1" 22' - 8" 4' - 9" 15' - 7" 9' - 3" 17' - 6" 9' - 8"
1' - 11"
6' - 6" 11' - 10" 18' - 0" 18' - 0" 18' - 1"
19' - 0" 5' - 4" 25' - 0 1/2" 8' - 5 1/2" 14' - 3"
4' - 6" 4' - 6"
6' - 2" 4' - 6" 4' - 6"
4' - 6" 4' - 6" 9' - 0" 6' - 6"
4' - 6" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 4' - 6"
10" 4' - 6"
2' - 0"
S-300
S-301
S-300
S-413
S-420
S-412
S-413
S-413
S-414
S-420
S-420
S-421
S-421
G.2
S-204
GGB32A
S-508
28' - 1" 9' - 8"
GGB32A P1
GGB32A
GGB32A
GGB32A
GGB32A
GGB32A GGB32A GGB32A
GGB42A
P5 GGB24AGGB24A
GGB36A
GGB36A
/2
S-509
8' - 0" 7' - 0" 21' - 1"
GGB42A
G G
B A
GGB42A
OPTION ITEM
BEARCAT GARAGE
P1
4' - 6" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 4' - 9"
P1
6"
24"
1' - 0" 10' - 4" 16' - 9" 8' - 4"
4' - 6"
GGB44A
G G
B A
G G
B A
S-301
P8
P1
NOTES:
1. P# INDICATES DRILLED PIER PER SHEET S-503.
2. GB-# INDICATES GRADE BEAM PER SHEET S-504.
3. SEE 9/S-500 FOR TYPICAL GRADE BEAM ASSEMBLY.
4. TOC EL -1'-0".
5. CONFIRM EXTERIOR LANDING DIMENSIONS WITH CIVIL.
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
F R
E D
R I C
K B
R O
W N
B E
M
J K
M
D D
V
36763
S-100B
F O
U N
D A
T
IO
N P
L A
N
E A
S T
T A
C T
IC
A
L R
E S
P O
N S
E F
O R
C E
A L E
R T
F A
C
IL
IT
Y
C O
R P
O F
E N
G
IN
E E
R S
S E
A T
T L E
W
A S
H
IN
G T
O N
/2
/2
W D
W R
S T
R U
C
N Z
A S
T R
A F
.r v t s /1
-3
-0
S -1
B
M A
L M
S T
R O
M A
F B
G
R E
A T
F A
L L S
M
T
R0004
1/8" = 1'-0"S-100B
1 FOUNDATION PLAN ENLARGED - EAST
SCALE:
8' 8'
1/8" = 1'-0"
16'16'
PLAN NORTH
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
D
R
IL
L E
D P
IE
R
U P
D A
T E
/1
/2
D
R
IL
L E
D P
IE
R
U P
D A
T E
/2
/2
| Amendment Narrative |
| Site Visit Slides |
| Site Visit Roster |
| Attachment 00 73 00-A - Index of Drawings |
| Drawing S-100B |
File details come from the government source that posted it.