Part_1_of_3_Request_for_Proposal.PDF

PDF 1006 KB Posted

Attached to
Tactical Response Force Alert Facility at Malmstrom AFB, MT Federal contract opportunity
Solicitation number
W912DW18R0002
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

Part 1 of 3 - Request for Proposal (RFP) TRF at MAFB, MT

View the file

Other files for this federal contract opportunity

Other files attached to Tactical Response Force Alert Facility at Malmstrom AFB, MT, newest first.
File Type Posted
R0008.pdf PDF
Attachment_1_for_Section_00_22_16_Revised.docx DOCX document
R0007.pdf PDF
R0006.pdf PDF
R0005.pdf PDF
R0004.pdf PDF
R0003.pdf PDF
R0002.pdf PDF
R0001.pdf PDF
Part_2_of_3_Specifications.pdf PDF
Attachment_1_for_Section_00_22_16.docx DOCX document
Part_3_of_3_Drawings.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. W912DW18R0002

Seattle District

Tactical Response Force Alert Facility at Malmstrom AFB, MT

Construction Solicitation and Specifications

UNRESTRICTED

March 2018

W68MD970805559

Furnish all labor, materials and equipment and perform all w ork for:

Tactical Response Force Facility at Malmstrom AFB in MT in accordance w ith the attached Contract Clauses, Special Clauses, Technical Specifications and Draw ings.

JOHN P SCOLA 206-762-2122

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

23-Mar-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________* 00 73 00

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________26 Apr 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912DW18R0002 60

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DW18R0002

Section 00 10 00 - Solicitation

TABLE OF CONTENTS

SECTION TITLE

00 10 00 SF1442, Table of Content, Caution to Offeror and Corporate Certificate

00 20 00 Price Schedule

00 21 16 Instructions to Proposers - Provisions

00 22 16 Supplementary Instructions to Proposers

00 45 00 Representations and Certifications and Pre-Award Information

00 72 00 General Conditions - Contract Clauses

00 73 00 Special Clauses, which include the following:

a) Special Clauses 00 73 00 pages 1 thru 12

b) Attachment 00 73 00-A pages 1 thru 9

c) Davis-Bacon General Wage Decision No: MT180063

01 00 00 Technical Specifications: 01 14 00 thru 33 82 00-A

RETURN THE FOLLOWING WITH YOUR PROPOSAL:

Fully completed SF1442 (Must acknowledge all Amendments), filled out Price Schedule, Section 00 45 00 - Representations and Certifications to include the Pre-Award information pages 00 45 00-A and B.

20% Bid Bond - Bid Bonds must be accompanied by a Power of Attorney containing an original signature from the surety, which must be affixed to the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will only be accepted if accompanied by an original certification from a current officer of the surety attesting to its authenticity and continuing validity.

Current SF24 forms are available at the following website: http://www.gsa.gov/portal/forms/type/TOP.

! ! ! C A U T I O N TO O F F E R O R S ! ! !

1. TELEPHONES: There are no public telephones at the Seattle District Corps of Engineers.

2. BUSINESS HOURS: For the Seattle District Corps of Engineers are from 7:30 A.M. to 4:00 P.M., Monday through Friday.

3. AVAILABILITY OF FUNDS: Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available from which payment for contract purposes can be made.

BEFORE SIGNING AND MAILING THIS OFFER, PLEASE TAKE NOTE OF THE FOLLOWING, AS

FAILURE TO PERFORM ANY ONE OF THESE ACTIONS MAY CAUSE YOUR OFFER TO BE

REJECTED

4. AMENDMENTS: Have you acknowledged receipt of ALL amendments? If in doubt as to the number of amendments issued, please contact the representative listed on the Information Page.

5. AMENDED SECTIONS: If any of the amendments furnished amended sections, the amended sections must be used in submitting your offer.

6. MISTAKE IN OFFER: Have you reviewed your offer price for possible errors in calculation or work left out?

7. OFFER ACCEPTANCE PERIOD: The minimum offer acceptance period is specified in block 13D of SF1442, page 00 11 00 -1, Solicitation, Offer and Award. Please ensure that you allow at least the stated number of calendar days for the Government to accept your offer.

8. SYSTEM FOR AWARD MANAGEMENT: Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled, System for Award Management (SAM) and that all information required is current and up to date. https://www.sam.gov/portal/public/SAM/

9. Far 52.204-4 - Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) (b) The Contractor is asked to submit paper documents, such as offers, letters, or reports that are printed or copied double-sided on paper containing at least 30 percent postconsumer fiber, whenever practicable, when not using electronic commerce methods to submit information or data to the Government.

10. ATTENTION: Due to heightened security, the method of Hand Delivery has changed and takes longer than the previous method of arriving at the Federal Center South building lobby to deliver your Offer, Bid or Proposal.

Please allow sufficient time to allow for heightened security at Government installations and to get to Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building. From there, you will be directed to the USACE Oxbow Building (#1202) which sits behind the Federal Center South Building. Allow additional time.

Report to the Security Desk in the lobby of the USACE Oxbow Building (#1202) and call Sonia Frees, Procurement Technician, at 206-764-3516. A Contracting representative will come down and accept your Offer, Bid or Proposal.

A proposal is not received by the Government until it is in the physical possession of a representative of the Contracting office. Security guards and other non-contracting personnel are NOT authorized to accept proposals on behalf of the Government. Note that official receipt of a proposal shall be in accordance with FAR 52.215-1.

Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Offer, Bid, or Proposal has arrived on time.

11. IMPORTANT NOTE FOR OTHER THAN U.S. SMALL BUSINESSES ONLY:

Small Business Sub-Contracting Plan is Required: Please see FAR Clause 52.219-9. In accordance with FAR 19.702(a)(1), the offeror selected for award shall submit a sub-contracting plan to be eligible for award. The sub-contracting plan does not need to be submitted with your offer, but is required to be completed prior to award. If the selected offeror fails to submit a plan, the offeror will be ineligible for award. For information on the evaluation of sub-contracting plans, see Army Federal Acquisition Regulation Supplement (AFARS) Appendix DD.

CORPORATE CERTIFICATE

IF THE CONTRACTOR IS A CORPORATION OR PARTNERSHIP, THE APPLICABLE PORTION OF THE

FORM LISTED BELOW MUST BE COMPLETED. IN THE ALTERNATIVE, OTHER EVIDENCE MUST BE

SUBMITTED TO SUBSTANTIATE THE AUTHORITY OF THE PERSON SIGNING THE CONTRACT. IF A

CORPORATION, THE SAME OFFICER SHALL NOT EXECUTE BOTH THE CONTRACT AND THE

CERTIFICATE.

CORPORATE CERTIFICATE

I, _______________________, certify that I am the _________________________ Secretary of the Corporation named as Contractor herein; that _________________________________, who signed this contract on behalf of the Contractor was then ___________________________of said corporation; that said contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.

_____________________________ (CORPORATE

(Secretary) SEAL)

AUTHORITY TO BIND PARTNERSHIP

This is to certify that the names and signatures of all partners are listed below and that the person signing the contract has authority actually to bind the partnership pursuant to its partnership agreements. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership with the United States of America, except as follows: (state "none" or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.

(Names and Signatures)

NAME SIGNATURE

PRICE SCHEDULE

CLIN

Item # Description of Item

QT

Y Unit Unit Price Amount

BASE ITEMS

0001 All work for Construction of Tactical Response Force Alert Facility including flight simulator space and all associated site work within 5-feet of the building.

1 JOB N/A $__________________

0002 All work for Site preparation including demolition and construction of site work, site utilities, and all other improvements from the construction limits to 5-feet from the building.

1 JOB N/A $__________________

0003 Temporary steel casing of 18 inch drilled piers as required by subsurface conditions for Item #0001.

2 EA $__________ $__________________

0004 Temporary steel casing of 36 inch drilled piers as required by subsurface conditions for Item #0001.

30 EA $__________ $__________________

0005 All work for O&M manuals as specified in Section

01 78 23 OPERATIONS AND MAINTENANCE

MANUALS from preparation to final approval.

1 JOB N/A $60,000

0006 All work for As-Built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.

1 JOB N/A $25,000

All work for DD 1354 as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.

1 JOB N/A $12,000

0008 All work for Building Information Modeling (BIM) as specified in Section 01 78 25 BUILDING INFORMATION MODELING (BIM) from preparation to final approval.

1 JOB N/A $75,000

0009 All work for Construction Operations Building Information Exchange (COBIE) as specified in Section 01 79 00 CONSTRUCTION OPERATIONS BUILDING INFORMATION from preparation to final approval.

1 JOB N/A $75,000

Item # Description of Item

QT

Y Unit Unit Price Amount

TOTAL ALL BASE ITEMS 0001-00011 $_____________________

OPTIONAL ITEMS

0010 All work for construction of Bearcat Garage and associated site work within 5-feet of the garage.

1 JOB N/A $__________________

0011 All work for construction of West Parking Lot. 1 JOB N/A $__________________

0012 All work for construction of East Parking Lot. 1 JOB N/A $__________________

0013 Additional drilling and installation of 18 inch piers for Item #0001.

LF

0014 Additional drilling and Installation of 36 inch piers for Item #0001.

LF

0015 All work for excavation/disposal of contaminated soil.

250 CY $__________ $__________________

0016 All work for abatement and disposal of previously unidentified gas or water mains containing asbestos.

250 LF $__________ $__________________

0017 All work for relocation of existing gas utilities up to 5 feet vertically and/or horizontally.

100 LF $__________ $__________________

0018 All work for relocation of existing water utilities up to 5 feet vertically and/or horizontally.

100 LF $__________ $__________________

0019 All work for relocation of existing sewer utilities up to 5 feet vertically and/or horizontally.

100 LF $__________ $__________________

0020 All work for demolition of previously unidentified gas utilities.

250 LF $__________ $__________________

0021 All work for demolition of previously unidentified water utilities.

250 LF $__________ $__________________

0022 All work for demolition of previously unidentified sewer utilities.

Item # Description of Item

QT

Y Unit Unit Price Amount

0023 All work for demolition of previously unidentified electrical/telecommunications duct bank utilities.

TOTAL ALL OPTION ITEMS 0012-0023 $_____________________

TOTAL ALL ITEMS 0001-0023 $_____________________

NOTES:

1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.

2) To better facilitate the receipt and proposal process, all modifications to proposals shall be submitted on copies of the latest Price Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

3) Offerors must insert a price on all entry amount lines of numbered items of the Price Schedule. Failure to do so will result in the offer being unacceptable.

4) The dollar amount established in Item Nos. 0005, 0006, 0007, 0008, and 0009 shall not be revised by Offerors.

5) Item Nos. 0003, 0004, 0013, 0014, 0015, 0016, 0017, 0018, 0019, 0020, 0021, 0022, and 0023 are unit-priced items with estimated quantities and are subject to Contract Clause FAR 52.211-18 –VARIATION

IN ESTIMATED QUANTITY.

6) Award of optional items will be made in accordance with specification Section 00 73 00 SPECIAL CLAUSES, Paragraph “OPTION FOR INCREASED QUANTITY”.

QTY = Quantity LF = Linear Feet CY = Cubic Yards EA = Each

This page intentionally left blank.

Section 00 21 16 - Instructions to Proposers

CLAUSES INCORPORATED BY REFERENCE

52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.204-6 Unique Entity Identifier OCT 2016 52.211-6 Brand Name or Equal AUG 1999 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

FEB 1999

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fixed price contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Roger D. Williams Jr.

Chief, Contracting Division US Army Corps of Engineers – Seattle District P.O. Box 3755 Seattle, WA 98124-3755

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.farsite.hill.af.mil http://www.dtic.mil/dfars

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Alterations, if necessary, will be via amendment.

SECTION 00 21 16

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 MAGNITUDE OF CONSTRUCTION

1.3 SUBJECT TO AVAILABILITY OF FUNDS

1.4 GOVERNMENT SECURITY REQUIREMENTS

1.5 COPIES OF REQUEST FOR PROPOSAL (RFP) DOCUMENTS AND AMENDMENTS

1.6 OFFEROR'S QUESTIONS AND COMMENTS

1.7 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.8 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.9 PRE-PROPOSAL CONFERENCE / SITE VISIT

1.10 ACCURACY IN PROPOSALS

1.11 PROPOSAL SUBMITTALS

1.12 PROPOSAL FORMAT

1.13 JOINT VENTURE PROPOSAL REQUIREMENTS

1.14 SOLICITATION PROVISIONS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK:

The scope of project includes all work required for the construction of Tactical Response Force Alert Facility at Malmstrom AFB, MT.

The work shall be in accordance with Request for Proposal documents.

General description of work:

The USACE Seattle District has a requirement for the construction of a 3,839 square meter (SM) (41,312 square feet) for a Tactical Alert Force Facility (TRF) with an 809 square meter (SM) space for a flight simulator.

Supporting facilities include pavements, utilities, and site improvements. The purpose of the newly constructed TRF is to provide an adequately sized and configured facility that will co-locate squadron operations facility and the sleeping quarters of the alert crew with aircraft to minimize crew response times for 24-hour a day/7-days per week/365 days per year readiness. The facility will support planning, briefing, administration, alert response, life support, maintenance, and crew equipment storage and issue tasks.

1.2 MAGNITUDE OF CONSTRUCTION:

In accordance with DFARS 236.204, Disclosure of Magnitude of Construction Projects, the Magnitude of Construction is between $10,000,000.00 and $25,000,000.00.

1.3 SUBJECT TO AVAILABILITY OF FUNDS:

FAR Clause 52.232-18 “Availability of Funds,” (APR 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

1.4 GOVERNMENT SECURITY REQUIREMENTS:

The Offeror(s) must ensure that ALL mail sent to the Seattle District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to; bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located in Building 1202, at 4735 East Marginal Way South, Seattle, WA 98134 if it does not contain a return mailing address. THERE WILL BE NO EXCEPTIONS.

1.5 COPIES OF RFP DOCUMENTS AND AMENDMENTS:

Copies of the RFP and amendments are available by INTERNET ACCESS ONLY. All RFP documents will be posted to the Federal Business Opportunities website at http://www.fbo.gov under RFP number W912DW18R0002.

It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this RFP. There will be no public opening of the proposals received as a result of this RFP.

A list of interested vendors (potential Offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: http://www.fbo.gov via Quick Search (RFP No. W912DW18R0002).

Additional information regarding this RFP and potential Offerors and/or subcontractors is available at http://www.nws.usace.army.mil/BusinessWithUs/Contracting.aspx.

1.6 OFFEROR'S QUESTIONS AND COMMENTS:

Questions and/or comments relative to these documents should be submitted via e-mail or mailed to:

Contract Specialist:

U.S. Army Corps of Engineers, Seattle District ATTN: John Scola Mailing Address:

P.O. Box 3755 Seattle, WA 98124-3755 Email: John.P.Scola@usace.army.mil

[ATTENTION: I prefer to be contacted by email because I’m hearing impaired]

Contracting Officer:

U.S. Army Corps of Engineers, Seattle District ATTN: Michael Miyagi Phone: (206) 764-3266 Email: Michael.M.Miyagi@usace.army.mil

1.6.1. Bidder Inquiry:

1.6.1.1. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.

1.6.1.1.1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this RFP listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and then click continue.

1.6.1.1.2. From this page you may view all bidder inquiries or add inquiry.

1.6.1.1.3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

1.6.1.1.4. The RFP Number is: W912DW18R0002

1.6.1.1.5. The Bidder Inquiry Key is: E6G42R-4TKZHA

1.6.1.2. The Bidder Inquiry System will be unavailable for new inquires 5 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the RFP, if necessary.

1.6.1.3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

1.6.1.4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

1.6.1.5. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

1.7. SMALL BUSINESS SIZE STANDARD/NAICS CODE:

See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.

1.8. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS:

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.9 PRE-PROPOSAL CONFERENCE:

Site visit meeting will be held at 1000 am (PST) on Monday, 19 April 2018 at Building 770, 7218 Goddard

Drive, Malmstrom AFB, MT 59402.

Contractors interested in attending the pre-bid site visit will need to apply for access to Malmstrom AFB. They must submit the attached information on the "CEAL Roster.” Please see attachment 1 at the end of this Section.

Please fill out your information and email to john.p.scola@usace.army.mil and Michael.m.miyagi@usace.army.mil by 1300 PST on 29 March 2018. Security Forces requires at least ten (10) calendar days to perform background checks.

IMPORTANT: The information provided in the CEAL Roster MUST MATCH your ID. Nicknames, misspellings will result in being disapproved for access. Contractors must submit information for EVERYONE that will attend the site visit; there is no exceptions.

Attendees are required to have picture identification (valid ID) to access the base.

Participants must provide their own transportation. USACE POC is Darrick Godfrey (Resident Engineer) at

(406) 771-0092 X 1430 or Darrick.D.Godfrey@usace.army.mil.

Please allow yourself enough time to find parking.

OFFERORS ARE URGED and expected to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent, such information is reasonably obtainable. In no event, will a failure to inspect the site constitute grounds for withdrawal of a bid after opening or for a claim after award of the contract.

1.10 ACCURACY IN PROPOSALS:

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).

The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.11 PROPOSAL SUBMITTALS:

Due to heightened security at Government installations, those Offerors who have their proposals hand-delivered shall contact Procurement Technician, Sonia Frees at 206-764-3516 prior to delivering to the address shown below.

At the time specified on the SF1442, it will be announced that receipt of proposals is closed.

Note that the official receipt of a bid shall be in accordance with FAR 52.214-7. Recent terrorist threats have resulted in more time-consuming sign-in and escort procedures and may impact the timely delivery of offers. See FAR 52.215-1 for rules concerning late proposals.

See Box 13 of the Standard Form 1442 for the time and date your proposal is due.

EMAIL: Emailed Proposal will NOT be accepted.

FAX: Faxed Proposal will NOT be accepted.

FED-EX/UPS: John Scola, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District

CECT-NWS

4735 East Marginal Way S., Bldg. #1202 Seattle, WA 98134-2385 Note: Commercial Carriers will not deliver to PO Boxes

MAIL: John Scola, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District

CECT-NWS

PO Box 3755 Seattle, WA 98124-3755

HAND

DELIVERY: John Scola, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District

CECT-NWS

4735 East Marginal Way S., Bldg. #1202 Seattle, WA 98134-2385

The method of Hand Delivery has changed and takes longer than the previous method of arriving at the Federal Center South building (#1201) lobby to deliver your Offer, Bid or Proposal. Please allow sufficient time to allow for heightened security at Government installations and to get to our new location in Oxbow Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building (#1201). From there, you will be directed to the new USACE Oxbow Building (#1202) which sits behind the Federal Center South Building (#1201). Allow additional time.

Report to the Security Desk in the lobby of the USACE Oxbow Building and call Sonia Frees, Procurement Technician, at 206-674-3516. A Contracting representative will come down and accept your Offer, Bid or Proposal.

Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Offer, Bid, or Proposal has arrived on time.

The Packaging that contains the Proposals shall be marked:

“Proposal for RFP Number: W912DW18R0002, DO NOT OPEN”

1.12 PROPOSAL FORMAT:

(a) Please refer to Section 00 22 16 for Submission Format requirements.

(b) Technical Proposal: Submit one (1) Original printed volume, one (1) Copy of printed volume and one (1) Electronic Copy in PDF on a CD (assembled in one document). Both must be identical.

(c) Price proposal and Pro Forma information: Submit one (1) Original printed volume and one

(1) Electronic Copy in PDF on a CD. Both must be identical, except for the price schedule as noted below.

Note: the Price Schedule can be handwritten and “excluded” from the Price Proposal CD, but all other required items in your proposal shall be included in the CDs.

1.13 JOINT VENTURE PROPOSAL REQUIREMENTS:

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond, unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a), SDVOSB or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124, 13 CFR Part 125 and 13 CFR Part 126, respectively.

Any of the Joint Venture partners identified in the JV agreement can submit project(s) to meet the requirement in Section 00 22 16 for evaluation.

1.14 RFP PROVISIONS:

Please see Section 00 21 16 “Additional Clauses.”

END OF SECTION 00 21 16

CONTRACTOR ENTRY AUTHORIZATION LIST CURRENT AS OF 27 JAN 2010

HOURS: 0600‐1800

DAYS: Mon‐Sat

CODES: Standard = 0600 ‐ 1800 Mon ‐ Sat

Date Updated: 8 May 2015

NAME (Last, First MI) SSN DOB STATE/DL# Height Weight

Eye Color Hair Color SEX RESIDENCE (HOME) ADDRESS COMPANY

ACCESS

REQUIRED

(SAMPLE) SMITH, JOHN D 121456789 10‐Jul‐60 MT/0000000000000 72"/200 Blue/Brown M 0000 12th Ave N, Great Falls, MT 59404 Smith Construction Standard BW

All Days = 24/7

BW = Basewide

The personnel listed below have been verified and will require unescorted entry onto Malmstrom AFB to perform official contractual duties. All commercial/contractor vehicles must be searched regardless of size. All contractors will enter the installation through the 10th Ave North Gate. If there are questions please contact Corps of Engineers POC, Seth Henson at 406‐771‐0092x1423.

If there are any questions please contact the PROJECT MANAGER ‐ Name and Phone Number

SUBJECT:

COMPANY:

EFFECTIVE DATE: 5/11/2015

EXPIRATION DATE: 5/10/2016

MEMORANDUM FOR: US Army Corps of Engineers, Malmstrom Project Office

CONTRACT #: W912DW‐XX‐X‐XXXX

CONTRACTING OFFICER VERIFICATION

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUAL

AFI 33‐332, AIR FORCE PRIVACY ACT PROGRAM APPLIES. PROJECT MANAGER VERIFICATION

(CEAL)

Section 00 22 16 - Supplementary Instructions to Proposers

SECTION 00 22 16

FOR TACTICAL RESPONSE FORCE (TRF) ALERT FACILITY W912DW18R0002

PROPOSAL SUBMISSION REQUIREMENTS EVALUATION CRITERIA AND BASIS OF AWARD

ONE STEP - -TRADE-OFF PROCUREMENT, DESIGN BID BUILD (SINGLE AWARD)

1. EVALUATION PROCEDURES:

The objective of this evaluation is to evaluate the proposals in accordance with the criteria described herein and award a firm fixed price construction contract to the responsible Offeror whose proposal conforms to the terms and conditions of the solicitation and whose proposal is determined to represent the overall “Best Value Trade-off” to the Government. All evaluation factors, other than price, when combined, are considered significantly more important than the price. After the Government individually evaluates and rates each proposal, the Government will compare proposals to determine which proposal represents the best value. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. If there is a lower priced, conforming offer(s), the Government must determine that the added value of a more expensive proposal would justify award to that Offeror.

The Offeror’s proposal shall contain a response to all Factors (Company Experience, Past Performance, Management, Small Business, and Price); shall be in the form prescribed herein; and shall meet the minimum submittal requirements stated.

In accordance with FAR 15.306(a)(3) the Government intends to evaluate proposals and make award without discussions. An Offeror’s initial proposal should contain the Offeror’s best terms from a technical and price standpoint. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR

15.0001. Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.

As part of the evaluation, the Government will evaluate betterments in proposals relative to the minimum standards in the solicitation to determine if they offer additional value to the Government. In addition, innovations in proposals will be evaluated to determine if creative ideas of the Offeror are a better value to the Government compared to the minimum criteria.

Submit proposals in tabbed, three-ring binders. Note that the Government will not evaluate any material that exceeds the page limits, where indicated below.

2. DEFINITIONS:

Deficiency: A material failure of a proposal to meet a Government requirement or a combination of weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

Relevant: “Relevant” means having a logical connection with the requirements in this solicitation; that is, featuring work that involved similar scope, magnitude of effort, and complexity to the current requirement.

Risk: The potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor or criterion may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.

Shall: Indicates mandatory solicitation requirements. If not included in the Offeror’s proposal the proposal may be deemed to not meet solicitation requirements and may be rejected.

Should: Indicates solicitation requirements that are highly recommended to be included in the Offeror’s proposal.

Significant Strength: An aspect of an Offeror's proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

Significant Weakness: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

Strength: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

Team: The Offeror’s “team” is the Key Personnel and any subcontracting firms, taken as a whole.

Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.

3. TECHNICAL MERIT RATINGS:

The technical rating reflects the degree to which the proposed approach meets, or does not meet, the minimum performance or capability requirements through an assessment of the strengths, weaknesses, deficiencies, and risks of a proposal. Proposals will receive ratings in accordance with the adjectival descriptions below. The combined technical/risk rating includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies.

Combined technical/risk evaluations shall utilize the combined technical/risk ratings listed in Table 1 below.

TABLE 1. Combined Technical/Risk Ratings for Evaluation of Factors

RATING: DESCRIPTION:

Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths that outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.

Marginal

Proposal does not clearly meet requirements and has not clearly demonstrated adequate approach and understanding of the requirements. The proposal has one or more weaknesses that are not offset by strengths. Risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is non-awardable.

The technical risk ratings is listed in Table 2 below.

TABLE 2. TECHNICAL RISK RATINGS

Adjectival Rating

Description

Low 2

Moderate

Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High

Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

Note: Price will not be rated or scored, but will be evaluated for reasonableness through the use of a price analysis, and if necessary, for price realism.

4. FACTORS TO BE EVALUATED:

The basis of contract award will be the Tradeoff Process in accordance with Federal Acquisition Regulation (FAR) 15.101-1. Award will be made to the Offeror whose proposal is most advantageous to the Government based upon an integrated assessment of evaluation Factors described below. Reference Technical Evaluation Factors, Table 3, below regarding relative importance of Factors.

TABLE 3. TECHNICAL EVALUATION FACTORS

FACTOR: LOCATION: DESCRIPTION:

RELATIVE

IMPORTANCE:

33FACTOR 1 VOLUME 1, TAB A COMPANY EXPERIENCE Most important.

FACTOR 2 VOLUME 1, TAB B PAST PERFORMANCE

Less important than Factor 1

FACTOR 3 VOLUME 1, TAB C MANAGEMENT

Less important than Factor 2

FACTOR 4 VOLUME 1, TAB D SMALL BUSINESS

Less important than Factor 3

VOLUME 1 – TECHNICAL (NON-PRICE) SUBMISSION REQUIREMENTS AND EVALUATION

METHOD:

5.0 FACTOR 1 (TAB A) – COMPANY EXPERIENCE

5.1 SUBMISSION REQUIREMENTS:

For this Factor, the Offeror shall submit six (6) projects using Attachment 1 (no more than one (1) form for each project), Offeror or Key Subcontractor Experience Form, or using no more than three (3) type written pages for each project (minimum 10 point font and double spaced) that include at a minimum the same information as Attachment

1. Offeror should describe each project with enough detail to ensure that the Government can meaningfully assess whether the projects submitted are recent and relevant to this project. If more than six (6) projects are submitted, only the first six will be evaluated, starting with the most recent and working backwards in time. If submitting a project performed by a Key Subcontractor Attachment 2, Letter of Commitment for Key Subcontractor, shall also be provided.

Submitted projects shall be at least 100% construction progress completed and accepted by the client or have been completed within seven (7) years of the date this RFP was issued. Four (4) of the six (6) projects shall have been performed by the Offeror acting as the Prime Contractor. The other two (2) may have been performed by the Offeror acting as a Subcontractor or performed by a Key Subcontractor. Submit projects with characteristics matching the following, all are of equal importance:

1. At least one (1) project should be construction of a new Military Operations Facility valued over (>)

$10M on a Military Installation where the Offeror was the general/prime contractor.

2. At least one (1) project should be construction of a Risk Category IV facility valued over (>) $5M where the Offeror was the general/prime contractor.

3. At least one (1) project shall be construction of a facility valued over (>) $10M that required Building Information Modeling (BIM), the Offeror shall have been the general/prime contractor.

4. At least one (1) project should be construction of a facility that required Construction Operations Building Information Exchange (COBIE) Deliverables where the Offeror was the general/prime contractor.

5. At least one (1) project shall be construction of a facility valued over $10M in a Similar Geographic Location, the Offeror shall have been the general/prime contractor.

6. At least one (1) project shall be construction of a facility valued over $5M that included a Concrete Grade Beam Supported by Drilled Concrete Pier Foundation.

For the purposed of this project, the following definitions will apply:

1. Military Operations Facility: A facility such as or similar to a “Security Forces Facility,” “Air Operations Center,” “Joint Operations Center” and/or “Tactical Operations Center.”

2. Risk Category IV Facility: Experience constructing a Risk Category IV or higher facility as defined by the International Building Code 2015 Table 1604.5 or UFC 3-301-01 Table 2-2 Risk Category of Buildings and Other Structures.

3. Building Information Modeling (BIM): Experience constructing a facility that required BIM modeling, coordinating and resolving conflicts in the work prior to fabrication and installation of the work similar to the requirements of Specification Sections 01 78 25 of this solicitation.

4. Construction Operations Building Information Exchange (COBIE): Experience constructing a facility that required COBIE deliverables similar to the requirements of Specification Sections 01 79 00 of this solicitation.

5. Similar Geographic Location: Experience constructing…