R0003.pdf
PDF 6 MB Posted
- Attached to
- Tactical Response Force Alert Facility at Malmstrom AFB, MT Federal contract opportunity
- Solicitation number
- W912DW18R0002
About this file
Amendment R0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R0008.pdf | ||
| Attachment_1_for_Section_00_22_16_Revised.docx | DOCX document | |
| R0007.pdf | ||
| R0006.pdf | ||
| R0005.pdf | ||
| R0004.pdf | ||
| R0002.pdf | ||
| R0001.pdf | ||
| Part_1_of_3_Request_for_Proposal.PDF | ||
| Part_2_of_3_Specifications.pdf | ||
| Attachment_1_for_Section_00_22_16.docx | DOCX document | |
| Part_3_of_3_Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD970805559
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Request for Proposal (RFP) W912DW18R0002 Amendment R0003
(Please see continuation page for details)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW18R0002
X 9B. DATED (SEE ITEM 11)
23-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Apr-2018
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW18R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text: R0003
1. This amendment three (0003) provides for the following:
Revision to Section 00 21 16, Instructions, Conditions and Notices to Offerors.
Revision to Attachment 00 73 00-A, Index of Drawings.
Revision to Drawing C-108, Grading & Drainage Plan.
Revision to Drawing S-100A, Foundation Plan – West.
2. The bid submittal time and date of 1:00:00 PM LOCAL TIME, 26 April 2018 remains the same.
3. The attached revised sections are to be replaced in their entirety. Specifications changes are generally identified, for convenience, either by strikeout for deletions, and double underlining of text for additions or a single dark line in the margin. All portions of the revised sections shall apply whether or not changes have been indicated.
4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments including this amendment by number and date on SF1442.
Encl:
Section 00 21 16 (Revised) Attachment 00 73 00-A (Revised) Drawing C-108 (Revised) Drawing S-100A (Revised)
W912DW18R0002 00 21 16 - 1 R0003
SECTION 00 21 16
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 MAGNITUDE OF CONSTRUCTION
1.3 SUBJECT TO AVAILABILITY OF FUNDS
1.4 GOVERNMENT SECURITY REQUIREMENTS
1.5 COPIES OF REQUEST FOR PROPOSAL (RFP) DOCUMENTS AND AMENDMENTS
1.6 OFFEROR'S QUESTIONS AND COMMENTS
1.7 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.8 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.9 PRE-PROPOSAL CONFERENCE / SITE VISIT
1.10 ACCURACY IN PROPOSALS
1.11 PROPOSAL SUBMITTALS
1.12 PROPOSAL FORMAT
1.13 JOINT VENTURE PROPOSAL REQUIREMENTS
1.14 SOLICITATION PROVISIONS
W912DW18R0002 00 21 16 - 2 R0003
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK:
The scope of project includes all work required for the construction of Tactical Response Force Alert Facility at Malmstrom AFB, MT.
The work shall be in accordance with Request for Proposal documents.
General description of work:
The USACE Seattle District has a requirement for the construction of a 3,839 square meter (SM) (41,312 square feet) for a Tactical Alert Force Facility (TRF) with an 809 square meter (SM) space for a flight simulator.
Supporting facilities include pavements, utilities, and site improvements. The purpose of the newly constructed TRF is to provide an adequately sized and configured facility that will co-locate squadron operations facility and the sleeping quarters of the alert crew with aircraft to minimize crew response times for 24-hour a day/7-days per week/365 days per year readiness. The facility will support planning, briefing, administration, alert response, life support, maintenance, and crew equipment storage and issue tasks.
1.2 MAGNITUDE OF CONSTRUCTION:
In accordance with DFARS 236.204, Disclosure of Magnitude of Construction Projects, the Magnitude of Construction is between $10,000,000.00 and $25,000,000.00.
1.3 SUBJECT TO AVAILABILITY OF FUNDS:
FAR Clause 52.232-18 “Availability of Funds,” (APR 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
1.4 GOVERNMENT SECURITY REQUIREMENTS:
The Offeror(s) must ensure that ALL mail sent to the Seattle District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to; bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located in Building 1202, at 4735 East Marginal Way South, Seattle, WA 98134 if it does not contain a return mailing address. THERE WILL BE NO EXCEPTIONS.
1.5 COPIES OF RFP DOCUMENTS AND AMENDMENTS:
Copies of the RFP and amendments are available by INTERNET ACCESS ONLY. All RFP documents will be posted to the Federal Business Opportunities website at http://www.fbo.gov under RFP number W912DW18R0002.
It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this RFP. There will be no public opening of the proposals received as a result of this RFP.
A list of interested vendors (potential Offerors and subcontractors) is available on the federal business opportunities web site (registration required) is available at: http://www.fbo.gov via Quick Search (RFP No. W912DW18R0002).
Additional information regarding this RFP and potential Offerors and/or subcontractors is available at http://www.nws.usace.army.mil/BusinessWithUs/Contracting.aspx.
W912DW18R0002 00 21 16 - 3 R0003
1.6 OFFEROR'S QUESTIONS AND COMMENTS:
Questions and/or comments relative to these documents should be submitted via e-mail or mailed to:
Contract Specialist:
U.S. Army Corps of Engineers, Seattle District ATTN: John Scola Mailing Address:
P.O. Box 3755 Seattle, WA 98124-3755 Email: John.P.Scola@usace.army.mil
[ATTENTION: I prefer to be contacted by email because I’m hearing impaired]
Contracting Officer:
U.S. Army Corps of Engineers, Seattle District ATTN: Michael Miyagi Phone: (206) 764-3266 Email: Michael.M.Miyagi@usace.army.mil
1.6.1. Bidder Inquiry:
1.6.1.1. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
1.6.1.1.1. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this RFP listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and then click continue.
1.6.1.1.2. From this page you may view all bidder inquiries or add inquiry.
1.6.1.1.3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.6.1.1.4. The RFP Number is: W912DW18R0002
1.6.1.1.5. The Bidder Inquiry Key is: E6G42R-4TKZHA
1.6.1.2. The Bidder Inquiry System will be unavailable for new inquires 5 3 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the RFP, if necessary.
1.6.1.3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.6.1.4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.6.1.5. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.7. SMALL BUSINESS SIZE STANDARD/NAICS CODE:
See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.
1.8. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS:
W912DW18R0002 00 21 16 - 4 R0003
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.9 PRE-PROPOSAL CONFERENCE:
Site visit meeting will be held at 1000 am (PST) on Thursday, 19 April 2018 at Building 770, 7218 Goddard
Drive, Malmstrom AFB, MT 59402.
Contractors interested in attending the pre-bid site visit will need to apply for access to Malmstrom AFB. They must submit the attached information on the "CEAL Roster.” Please see attachment 1 at the end of this Section.
Please fill out your information and email to john.p.scola@usace.army.mil and Michael.m.miyagi@usace.army.mil by 1300 PST on 29 March 2018. Security Forces requires at least ten (10) calendar days to perform background checks.
IMPORTANT: The information provided in the CEAL Roster MUST MATCH your ID. Nicknames, misspellings will result in being disapproved for access. Contractors must submit information for EVERYONE that will attend the site visit; there is no exceptions.
Attendees are required to have picture identification (valid ID) to access the base.
Participants must provide their own transportation. USACE POC is Darrick Godfrey (Resident Engineer) at
(406) 771-0092 X 1430 or Darrick.D.Godfrey@usace.army.mil.
Please allow yourself enough time to find parking.
OFFERORS ARE URGED and expected to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the contract, to the extent, such information is reasonably obtainable. In no event, will a failure to inspect the site constitute grounds for withdrawal of a bid after opening or for a claim after award of the contract.
1.10 ACCURACY IN PROPOSALS:
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments).
The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.11 PROPOSAL SUBMITTALS:
Due to heightened security at Government installations, those Offerors who have their proposals hand-delivered shall contact Procurement Technician, Sonia Frees at 206-764-3516 prior to delivering to the address shown below.
At the time specified on the SF1442, it will be announced that receipt of proposals is closed.
Note that the official receipt of a bid shall be in accordance with FAR 52.214-7. Recent terrorist threats have resulted in more time-consuming sign-in and escort procedures and may impact the timely delivery of offers. See FAR 52.215-1 for rules concerning late proposals.
See Box 13 of the Standard Form 1442 for the time and date your proposal is due.
EMAIL: Emailed Proposal will NOT be accepted.
FAX: Faxed Proposal will NOT be accepted.
FED-EX/UPS: John Scola, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
W912DW18R0002 00 21 16 - 5 R0003
CECT-NWS
4735 East Marginal Way S., Bldg. #1202 Seattle, WA 98134-2385 Note: Commercial Carriers will not deliver to PO Boxes
MAIL: John Scola, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CECT-NWS
PO Box 3755 Seattle, WA 98124-3755
HAND
DELIVERY: John Scola, Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CECT-NWS
4735 East Marginal Way S., Bldg. #1202 Seattle, WA 98134-2385
The method of Hand Delivery has changed and takes longer than the previous method of arriving at the Federal Center South building (#1201) lobby to deliver your Offer, Bid or Proposal. Please allow sufficient time to allow for heightened security at Government installations and to get to our new location in Oxbow Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building (#1201). From there, you will be directed to the new USACE Oxbow Building (#1202) which sits behind the Federal Center South Building (#1201). Allow additional time.
Report to the Security Desk in the lobby of the USACE Oxbow Building and call Sonia Frees, Procurement Technician, at 206-674-3516. A Contracting representative will come down and accept your Offer, Bid or Proposal.
Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Offer, Bid, or Proposal has arrived on time.
The Packaging that contains the Proposals shall be marked:
“Proposal for RFP Number: W912DW18R0002, DO NOT OPEN”
1.12 PROPOSAL FORMAT:
(a) Please refer to Section 00 22 16 for Submission Format requirements.
(b) Technical Proposal: Submit one (1) Original printed volume, one (1) Copy of printed volume and one (1) Electronic Copy in PDF on a CD (assembled in one document). Both must be identical.
(c) Price proposal and Pro Forma information: Submit one (1) Original printed volume and one
(1) Electronic Copy in PDF on a CD. Both must be identical, except for the price schedule as noted below.
Note: the Price Schedule can be handwritten and “excluded” from the Price Proposal CD, but all other required items in your proposal shall be included in the CDs.
1.13 JOINT VENTURE PROPOSAL REQUIREMENTS:
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond, unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a), SDVOSB or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124, 13 CFR Part 125 and 13 CFR Part 126, respectively.
W912DW18R0002 00 21 16 - 6 R0003
Any of the Joint Venture partners identified in the JV agreement can submit project(s) to meet the requirement in Section 00 22 16 for evaluation.
1.14 RFP PROVISIONS:
Please see Section 00 21 16 “Additional Clauses.”
END OF SECTION 00 21 16
MAFB Tactical Response Force Alert Facility 16031 Malmstrom AFB, Great Falls, MT W912DW18R0002
00 73 00-A - 1 R0003
ATTACHMENT 00 73 00-A
INDEX OF DRAWINGS
DRAWING RECORD FILE NO. 225s/141-32-03, DATED: 23 October 2017
PAGE# SHEET# SHEET TITLE REVISION DATE
GENERAL
1 G-001 TITLE SHEET, LOCATION, & VICINITY MAP
2 G-002 DRAWING INDEX
3 G-003 DRAWING INDEX
4 G-004 LIFE SAFETY PLAN - FIRST FLOOR
5 G-005 LIFE SAFETY PLAN - SECOND FLOOR
CIVIL
6 C-001 GENERAL NOTES
7 C-002 LEGENDS, ABBREVIATIONS, & ALIGNMENT TABLES
8 C-003 KEY MAP
9 C-004 BASE BID PLAN
10 C-005 BID OPTIONS PLAN
11 C-006 SITE ACCESS PLAN
12 C-007 SURVEY POTHOLE INFORMATION
13 C-101 GEOTECH INFORMATION
14 C-102 GEOTECH INFORMATION
15 C-103 GEOTECH INFORMATION
16 C-104 EXISTING CONDITIONS, SITE DEMOLITION, & TESC PLAN
17 C-105 EXISTING CONDITIONS, SITE DEMOLITION, & TESC PLAN
18 C-106 SITE LAYOUT PLAN
19 C-107 SITE LAYOUT PLAN
20 C-108 GRADING & DRAINAGE PLAN R0003 12 APR 2018
21 C-109 GRADING & DRAINAGE PLAN
22 C-110 ENLARGED GRADING PLAN
23 C-111 SITE UTILITY PLAN
24 C-112 SITE UTILITY PLAN
25 C-113 SITE UTILITY PLAN
26 C-114 UTILITY PROFILES
27 C-115 UTILITY PROFILES
28 C-116 UTILITY PROFILES
29 C-117 SECTIONS & DETAILS
30 C-118 MISCELLANEOUS DETAILS
31 C-119 MISCELLANEOUS DETAILS
32 C-120 MISCELLANEOUS DETAILS
33 C-121 MISCELLANEOUS DETAILS
34 C-122 MISCELLANEOUS DETAILS
35 C-123 MISCELLANEOUS DETAILS
36 C-124 MISCELLANEOUS DETAILS
37 C-125 MISCELLANEOUS DETAILS
38 C-126 MISCELLANEOUS DETAILS
39 C-127 MISCELLANEOUS DETAILS
00 73 00-A - 2 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
LANDSCAPE
40 L-101 LANDSCAPE REFERENCE PLAN - SHEET 1
41 L-102 LANDSCAPE REFERENCE PLAN - SHEET 2
42 L-103 PLANTING PLAN - SHEET 1
43 L-104 PLANTING PLAN - SHEET 2
44 L-105 PLAZA ENTRY & BICYCLE RACK ENLARGEMENT PLANS
45 L-501 LANDSCAPE DETAILS
46 L-502 CHAIN LINK FENCE DETAILS
47 L-503 ELECTRIC SLIDING GATE DETAILS
48 L-504 CHAIN LINK DOUBLE SWING GATE
49 L-505 TURNSTILES & ADA GATE
50 L-506 TURNSTILE DETAILS
51 L-507 DUMPSTER DETAILS
52 L-508 STAIRS, RAMP & HANDRAIL DETAILS
53 L-509 MISCELLANEOUS DETAILS
STRUCTURAL
54 S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS
55 S-002 GENERAL STRUCTURAL NOTES
56 S-003 ABBREVIATIONS & LEGEND
57 S-007 ATFP PLAN
58 S-008 SCHEDULES & DIAGRAMS
59 S-009 WIND LOADS - COMPONENTS & CLADDING
60 S-010 LOADING DIAGRAMS
61 S-100 FOUNDATION PLAN - OVERALL
62 S-100A FOUNDATION PLAN - WEST R0003 12 APR 2018
63 S-100B FOUNDATION PLAN - EAST
64 S-101 FIRST FLOOR PLAN - OVERALL
65 S-101A FIRST FLOOR PLAN - WEST
66 S-101B FIRST FLOOR PLAN - EAST
67 S-101C FIRST FLOOR SLAB REINFORCEMENT - WEST
68 S-101D FIRST FLOOR SLAB REINFORCEMENT- EAST
69 S-102 SECOND FLOOR PLAN - OVERALL
70 S-102A SECOND FLOOR PLAN - WEST
71 S-102B SECOND FLOOR PLAN - EAST
72 S-103 ROOF PLAN - OVERALL
73 S-103A ROOF PLAN - WEST
74 S-103B ROOF PLAN - EAST
75 S-103C ROOF PLAN - GARAGE
76 S-200 FRAME ELEVATIONS
77 S-201 FRAME ELEVATIONS
78 S-202 FRAME ELEVATIONS
79 S-203 FRAME ELEVATIONS
80 S-204 FRAME ELEVATIONS
81 S-210 ATFP ELEVATIONS
82 S-211 ATFP ELEVATIONS
83 S-212 ATFP ELEVATIONS
00 73 00-A - 3 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
84 S-300 BUILDING SECTIONS
85 S-301 BUILDING SECTIONS
86 S-302 SCHEMATIC TRUSS PROFILES
87 S-400 ENLARGED FLOOR PLANS
88 S-402 ENLARGED STAIR PLANS
89 S-410 WALL SECTIONS
90 S-411 WALL SECTIONS
91 S-412 WALL SECTIONS
92 S-413 WALL SECTIONS
93 S-414 WALL SECTIONS
94 S-420 WALL SECTIONS - BEARCAT GARAGE
95 S-421 WALL SECTIONS - BEARCAT GARAGE
96 S-500 CONCRETE DETAILS
97 S-501 CONCRETE DETAILS
98 S-502 CONCRETE DETAILS
99 S-503 DRILLED PIER DETAILS
100 S-504 CONCRETE GRADE BEAM DETAILS
101 S-505 CONCRETE DETAILS
102 S-506 FOUNDATION DETAILS
103 S-507 FOUNDATION DETAILS
104 S-508 CONCRETE DETAILS - BEARCAT GARAGE
105 S-509 EXTERIOR STAIR & LANDING DETAILS
106 S-510 BASE PLATE DETAILS
107 S-520 TYPICAL STEEL DETAILS
108 S-521 TYPICAL STEEL DETAILS
109 S-522 SECOND FLOOR FRAMING DETAILS
110 S-523 SECOND FLOOR FRAMING DETAILS
111 S-524 STAIR FRAMING DETAILS
112 S-530 ROOF FRAMING DETAILS
113 S-531 ROOF FRAMING DETAILS
114 S-532 ROOF FRAMING DETAILS
115 S-533 ROOF FRAMING DETAILS
116 S-540 ATFP TYPICAL ELEVATION
117 S-541 ATFP DETAILS & SECTIONS
118 S-542 ATFP DETAILS & SECTIONS, ANTENNA SUPPORT FRAME
119 S-561 TYPICAL COLD-FORMED DETAILS
ARCHITECTURAL
120 A-001 ABBREVIATIONS & LEGENDS
121 A-002 AIR BARRIER BOUNDARY
122 A-003 BUILDING ASSEMBLY LEGENDS
123 A-004 BUILDING PARTITION TYPES
124 A-005 TYPICAL MOUNTING HEIGHTS
125 A-101 OVERALL FLOOR PLANS
126 A-102 FIRST FLOOR PLAN - WEST
127 A-103 FIRST FLOOR PLAN - EAST
128 A-104 SECOND FLOOR PLAN - WEST
00 73 00-A - 4 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
129 A-105 SECOND FLOOR PLAN - EAST
130 A-106 FIRST FLOOR PARTITION PLAN - WEST
131 A-107 FIRST FLOOR PARTITION PLAN - EAST
132 A-108 SECOND FLOOR PARTITION PLAN - WEST
133 A-109 SECOND FLOOR PARTITION PLAN - EAST
134 A-110 ROOF PLAN
135 A-111 ROOF PLAN - WEST
136 A-112 ROOF PLAN - EAST
137 A-121 REFLECTED CEILING PLANS
138 A-122 FIRST FLOOR REFLECTED CEILING PLAN - WEST
139 A-123 FIRST FLOOR REFLECTED CEILING PLAN - EAST
140 A-124 SECOND FLOOR REFLECTED CEILING PLAN - WEST
141 A-125 SECOND FLOOR REFLECTED CEILING PLAN - EAST
142 A-130 FIRST FLOOR INTERIOR FINISHES PLAN - WEST
143 A-131 FIRST FLOOR INTERIOR FINISHES PLAN - EAST
144 A-132 SECOND FLOOR INTERIOR FINISHES PLAN - WEST
145 A-133 SECOND FLOOR INTERIOR FINISHES PLAN - EAST
146 A-180 FIRST FLOOR FURNITURE PLACEMENT PLAN - WEST
147 A-181 FIRST FLOOR FURNITURE PLACEMENT PLAN - EAST
148 A-182 SECOND FLOOR FURNITURE PLACEMENT PLAN - WEST
149 A-183 SECOND FLOOR FURNITURE PLACEMENT PLAN - EAST
150 A-201 EXTERIOR ELEVATIONS
151 A-202 ENLARGED EXTERIOR ELEVATIONS
152 A-203 ENLARGED EXTERIOR ELEVATIONS
153 A-204 ENLARGED EXTERIOR ELEVATIONS
154 A-301 BUILDING CROSS SECTIONS
155 A-302 BUILDING LONGITUDINAL SECTIONS
156 A-310 WALL SECTIONS
157 A-311 WALL SECTIONS
158 A-312 WALL SECTIONS
159 A-400 ENLARGED PLANS & SECTIONS
160 A-401 ENLARGED PLANS & SECTIONS
161 A-402 ENLARGED PLANS & SECTIONS
162 A-410 INTERIOR ELEVATIONS
163 A-411 INTERIOR ELEVATIONS
164 A-412 INTERIOR ELEVATIONS
165 A-413 INTERIOR ELEVATIONS
166 A-500 DOOR & WINDOW DETAILS
167 A-501 BUILDING ENVELOPE DETAILS
168 A-502 EXTERIOR DETAILS
169 A-503 WALL DETAILS
170 A-504 WALL DETAILS
171 A-505 EXTERIOR DETAILS
172 A-510 ROOF DETAILS
173 A-520 INTERIOR DETAILS
174 A-521 INTERIOR DETAILS
00 73 00-A - 5 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
175 A-522 INTERIOR DETAILS
176 A-530 STAIR & ELEVATOR DETAILS
177 A-601 COLORS & MATERIALS SCHEDULE
178 A-602 DOOR SCHEDULE
179 A-603 CURTAIN WALL TYPES & SCHEDULES
180 A-604 LOUVER SCHEDULE & DOOR/FRAME TYPES
181 A-605 ROOM FINISH SCHEDULES
182 A-606 SIGNAGE & TYPES
183 A-607 SIGNAGE & TYPES
184 A-608 SIGNAGE & TYPES
185 A-801 PERSPECTIVE VIEWS
FIRE PROTECTION
186 FA001 FIRE ALARM / MASS NOTIFICATION LEGEND & NOTES
187 FA002 FIRE ALARM / MASS NOTIFICATION NOTES
188 FA003 FIRE ALARM / MASS NOTIFICATION NOTES CONTINUED
189 FA004 FIRE ALARM / MASS NOTIFICATION SEQUENCE OF
OPERATIONS
190 FA005 FIRE ALARM / MASS NOTIFICATION RISER DIAGRAM
191 FA006 FIRE ALARM / MASS NOTIFICATION ANTENA DETAIL
192 FA111 FIRST FLOOR FIRE ALARM PLAN - WEST
193 FA112 FIRST FLOOR FIRE ALARM PLAN - EAST
194 FA113 SECOND FLOOR FIRE ALARM PLAN - WEST
195 FA114 SECOND FLOOR FIRE ALARM PLAN - EAST
196 FX001 FIRE PROTECTION LEGEND, DESIGN CRITERIA, & FLOW TEST
197 FX002 FIRE PROTECTION GENERAL, SPECIAL, & CONSTRUCTION
NOTES
198 FX101 FIRE PROTECTION RISER DETAIL PLAN, EQUIPMENT LIST, &
CRITERIA
199 FX102 FIRE PROTECTION DETAIL ELEVATIONS, CONSTRUCTION
NOTES, SCHEDULES, & AUXILIARY RISER PLAN & ELEVATION
200 FX103 FIRE PROTECTION RISER DETAIL ELEVATIONS
201 FX111 FIRST FLOOR FIRE PROTECTION PLAN - WEST
202 FX112 FIRST FLOOR FIRE PROTECTION PLAN - EAST
203 FX113 SECOND FLOOR FIRE PROTECTION PLAN - WEST
204 FX114 SECOND FLOOR FIRE PROTECTION PLAN - EAST
205 FX121 FIRST FLOOR FIRE PROTECTION PIPING PLAN - WEST
206 FX122 FIRST FLOOR FIRE PROTECTION PIPING PLAN - EAST
207 FX123 SECOND FLOOR FIRE PROTECTION PIPING PLAN - WEST
208 FX124 SECOND FLOOR FIRE PROTECTION PIPING PLAN - EAST
209 FX125 ENLARGED FIRE PROTECTION PIPING PLANS
210 FX201 FIRE PROTECTION HYDRAULIC NODE SITE PLAN
211 FX202 FIRE PROTECTION RISER DETAIL HYDRAULIC NODE PLAN
212 FX203 FIRE PROTECTION AUXILIARY DRY SYSTEM RISER DETAIL
AND ELEVATIONS HYDRAULIC NODE PLAN
213 FX204 FIRE PROTECTION RISER DETAIL ELEVATIONS HYDRAULIC
NODE PLAN
214 FX205 FIRE PROTECTION FIRST FLOOR HYDRAULIC NODE PLAN -
00 73 00-A - 6 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
WEST
215 FX206 FIRE PROTECTION FIRST FLOOR HYDRAULIC NODE PLAN -
EAST
216 FX207 FIRE PROTECTION SECOND FLOOR HYDRAULIC NODE PLAN -
WEST
217 FX208 FIRE PROTECTION SECOND FLOOR HYDRAULIC NODE PLAN -
EAST
218 FX209 FIRE PROTECTION HYDRAULIC NODE PLANS
PLUMBING
219 P-001 PLUMBING LEGEND
220 PP101 UNDERGROUND PLUMBING PLAN - WEST
221 PP102 UNDERGROUND PLUMBING PLAN - EAST
222 PP103 FIRST FLOOR PLUMBING PLAN - WEST
223 PP104 FIRST FLOOR PLUMBING PLAN - EAST
224 PP105 SECOND FLOOR PLUMBING PLAN - WEST
225 PP106 SECOND FLOOR PLUMBING PLAN - EAST
226 PP107 ROOF PLUMBING PLAN - WEST
227 PP108 ROOF PLUMBING PLAN - EAST
228 PP401 ENLARGED PIPING PLANS
229 PP501 PLUMBING DETAILS I
230 PP502 PLUMBING DETAILS II
231 PP503 PLUMBING DETAILS III
232 PP504 DOMESTIC RISER DIAGRAM
233 PP505 WASTE RISER DIAGRAM
234 PP601 PLUMBING SCHEDULES I
235 PP602 PLUMBING SCHEDULES II
MECHANICAL
236 M-001 MECHANICAL LEGEND
237 MH101 FIRST FLOOR HVAC PLAN - WEST
238 MH102 FIRST FLOOR HVAC PLAN - EAST
239 MH103 SECOND FLOOR HVAC PLAN - WEST
240 MH104 SECOND FLOOR HVAC PLAN - EAST
241 MH105 ROOF HVAC PLAN - WEST
242 MH106 ROOF HVAC PLAN - EAST
243 MH121 FIRST FLOOR REFLECTED CEILING PLAN - WEST
244 MH122 FIRST FLOOR REFLECTED CEILING PLAN - EAST
245 MH123 SECOND FLOOR REFLECTED CEILING PLAN - WEST
246 MH124 SECOND FLOOR REFLECTED CEILING PLAN - EAST
247 MH301 MECHANICAL SECTIONS - MECHANICAL 121
248 MH302 MECHANICAL SECTIONS - MECHANICAL 203
249 MH303 MECHANICAL SECTIONS - MECHANICAL 228
250 MH401 FIRST FLOOR ENLARGED PLANS - MECHANICAL 121
251 MH402 SECOND FLOOR ENLARGED PLANS - MECHANICAL 228
252 MH403 SECOND FLOOR ENLARGED PLANS - MECHANICAL 203
253 MH501 MECHANICAL DETAILS I
254 MH502 MECHANICAL DETAILS II
00 73 00-A - 7 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
255 MH503 MECHANICAL DETAILS III
256 MH601 MECHANICAL SCHEDULES I
257 MH602 MECHANICAL SCHEDULES II
258 MH603 MECHANICAL SCHEDULES III
259 MH604 MECHANICAL SCHEDULES IV
260 MH605 MECHANICAL SCHEDULES V
261 MH606 MECHANICAL SCHEDULES VI
262 MH701 HYDRONIC HEATING SYSTEM DIAGRAM
263 MH702 CHILLED WATER SYSTEM DIAGRAM
264 MH703 MECHANICAL CONTROLS I
265 MH704 MECHANICAL CONTROLS II
266 MH705 MECHANICAL CONTROLS III
267 MH706 MECHANICAL CONTROLS IV
268 MH707 MECHCANICAL CONTROLS V
269 MH708 CONTROL POINTS TABLE
270 MP111 FIRST FLOOR HYDRONIC PIPING PLAN - WEST
271 MP112 FIRST FLOOR HYDRONIC PIPING PLAN - EAST
272 MP113 SECOND FLOOR HYDRONIC PIPING PLAN - WEST
273 MP114 SECOND FLOOR HYDRONIC PIPING PLAN - EAST
ELECTRICAL
274 E-001 SYMBOLS & ABBREVIATIONS
275 E-002 SITE POWER, LIGHTING, & SYSTEMS DEMOLITION PLAN
276 E-003 SITE POWER & LIGHTING PLAN
277 E-004 SITE SYSTEMS PLAN
278 E-101 FIRST FLOOR LIGHTING PLAN - WEST
279 E-102 FIRST FLOOR LIGHTING PLAN - EAST
280 E-103 SECOND FLOOR LIGHTING PLAN - WEST
281 E-104 SECOND FLOOR LIGHTING PLAN - EAST
282 E-111 FIRST FLOOR POWER PLAN - WEST
283 E-112 FIRST FLOOR POWER PLAN - EAST
284 E-113 SECOND FLOOR POWER PLAN - WEST
285 E-114 SECOND FLOOR POWER PLAN - EAST
286 E-121 FIRST FLOOR HVAC CIRCUITING PLAN - WEST
287 E-122 FIRST FLOOR HVAC CIRCUITING PLAN - EAST
288 E-123 SECOND FLOOR HVAC CIRCUITING PLAN - WEST
289 E-124 SECOND FLOOR HVAC CIRCUITING PLAN - EAST
290 E-131 FIRST FLOOR SYSTEMS PLAN - WEST
291 E-132 FIRST FLOOR SYSTEMS PLAN - EAST
292 E-133 SECOND FLOOR SYSTEMS PLAN - WEST
293 E-134 SECOND FLOOR SYSTEMS PLAN - EAST
294 E-141 GROUNDING PLAN - WEST
295 E-142 GROUNDING PLAN - EAST
296 E-151 LIGHTNING PROTECTION PLAN - WEST
297 E-152 LIGHTNING PROTECTION PLAN - EAST
298 E-401 ENLARGED PLANS - SHEET 1
299 E-402 ENLARGED PLANS - SHEET 2
00 73 00-A - 8 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
300 E-403 ENLARGED PLANS - SHEET 3
301 E-501 TYPICAL DETAILS - SHEET 1
302 E-502 TYPICAL DETAILS - SHEET 2
303 E-503 TYPICAL DETAILS - SHEET 3
304 E-504 TYPICAL DETAILS - SHEET 4
305 E-505 TYPICAL DETAILS - SHEET 5
306 E-506 TYPICAL DETAILS - SHEET 6
307 E-507 TYPICAL DETAILS - SHEET 7
308 E-508 TYPICAL DETAILS - SHEET 8
309 E-601 ONE-LINE DIAGRAM - SHEET 1 R0002 6 APR 2018
310 E-602 ONE-LINE DIAGRAM - SHEET 2
311 E-603 TYPICAL GROUNDING & BONDING SCHEMATIC DIAGRAM
312 E-604 NORMAL POWER FEEDER SCHEDULE & CIRCUIT ANALYSIS
313 E-605 EMERGENCY & STANDBY POWER FEEDER SCHEDULE &
CIRCUIT ANALYSIS
314 E-606 TYPICAL BRANCH CIRCUIT SCHEDULE & LABELING
315 E-607 PANEL SCHEDULES - SHEET 1
316 E-608 PANEL SCHEDULES - SHEET 2
317 E-609 PANEL SCHEDULES - SHEET 3
318 E-610 PANEL SCHEDULES - SHEET 4
319 E-611 PANEL SCHEDULES - SHEET 5
320 E-612 PANEL SCHEDULES - SHEET 6
321 E-613 PANEL SCHEDULES - SHEET 7
322 E-614 PANEL SCHEDULES - SHEET 8
323 E-615 PANEL SCHEDULES - SHEET 9
324 E-616 PANEL SCHEDULES - SHEET 10
325 E-617 PANEL SCHEDULES - SHEET 11
326 E-618 PANEL SCHEDULES - SHEET 12
327 E-619 PANEL SCHEDULES - SHEET 13
328 E-620 PANEL SCHEDULES - SHEET 14
329 E-621 PANEL SCHEDULES - SHEET 15
330 E-622 PANEL SCHEDULES - SHEET 16
331 E-623 PANEL SCHEDULES - SHEET 17
332 E-624 PANEL SCHEDULES - SHEET 18
333 E-625 PANEL SCHEDULES - SHEET 19
334 E-626 PANEL SCHEDULES - SHEET 20
335 E-627 PANEL SCHEDULES - SHEET 21
336 E-628 PANEL SCHEDULES - SHEET 22
337 E-629 PANEL SCHEDULES - SHEET 23
338 E-630 PANEL SCHEDULES - SHEET 24
339 E-631 PANEL SCHEDULES - SHEET 25
340 E-641 MECHANICAL EQUIPMENT CIRCUITING SCHEDULE
341 E-642 LUMINAIRE SCHEDULE
342 E-643 CONTROL DIAGRAMS - SHEET 1
343 E-644 CONTROL DIAGRAMS - SHEET 2
344 E-645 CONTROL DIAGRAMS - SHEET 3
00 73 00-A - 9 R0003
PAGE# SHEET# SHEET TITLE REVISION DATE
345 E-646 GENERATOR CALCULATIONS R0002 6 APR 2018
TELECOMMUNICATIONS
346 T-001 SYMBOLS & ABBREVIATIONS
347 T-002 SITE TELECOMMUNICATIONS PLAN
348 T-003 SITE TELECOMMUNICATIONS ROUTING PLAN
349 T-004 SITE BUTTERFLY DIAGRAMS
350 T-111 FIRST FLOOR TELECOMMUNICATIONS PLAN - WEST
351 T-112 FIRST FLOOR TELECOMMUNICATIONS PLAN - EAST
352 T-113 SECOND FLOOR TELECOMMUNICATIONS PLAN - WEST
353 T-114 SECOND FLOOR TELECOMMUNICATIONS PLAN - EAST
354 T-121 FIRST FLOOR CABLE TRAY PLAN - WEST
355 T-122 FIRST FLOOR CABLE TRAY LAYOUT - EAST
356 T-123 SECOND FLOOR CABLE TRAY LAYOUT - WEST
357 T-124 SECOND FLOOR CABLE TRAY LAYOUT - EAST
358 T-401 ENLARGED PLANS - SHEET 1
359 T-402 ENLARGED PLANS - SHEET 2
360 T-501 TYPICAL DETAILS - SHEET 1
361 T-502 TYPICAL DETAILS - SHEET 2
362 T-503 TYPICAL DETAILS - SHEET 3
363 T-601 TELECOMMUNICATIONS RISER DIAGRAM
364 T-602 TELECOMMUNICATIONS RISER DIAGRAM
365 T-603 TELECOMMUNICATIONS GROUNDING & BONDING
366 T-701 TELECOMMUNICATIONS ACCEPTANCE TESTING
REQUIREMENTS
CATHODIC PROTECTION
367 CP001 CATHODIC PROTECTION DETAILS
E x E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
S D x
S D x
S D x
S D x
S D x
SD
x
SD
x
SD
x
SD
x
SD
x
S D x
S D x
S D x
SD
x
SD
x
SD
x
S D x x
S
D x
S
D x
S
D x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
S
D x
S
D x
SD
x
SD
x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
FUTURE SITE
OF MISSILE
MAINTENANCE
DISPATCH
FACILITY
PLAN
F L
I G
H T
L I N
E
D
R
72ND ST N
M A
T C
H
L
I N
E
S
S
H E
T
C
2.19%
1A
C110
C110
A
C117
B
C117
STORM CONSTRUCTION NOTES
STORM ALIGNMENT 'A'
SEE PROFILE ON SHEET C115
GENERAL NOTES
EX-MH-3
24 IN. RCP NW; INV= 3457.904
24 IN. RCP SE; INV= 3457.994
12 IN. PVC NE; INV= 3465.904
EX-MH-4
24 IN. RCP NW; INV= 3458.268
15 IN. RCP SW; INV= 3458.218
24 IN. RCP SE; INV= 3458.168
RIM = 3469.751
12 IN. PVC W; INV= 3467.161
RIM = 3469.557
12 IN. PVC E; INV= 3467.007
12 IN. PVC SW; INV= 3466.977
RIM = 3467.192
12 IN. RCP NE; INV= 3462.972
12 IN. RCP SW; INV= 3462.592
RIM = 3470.169
8 IN. IRON SE; INV= 3467.154
12 IN. RCP NE; INV= 3465.659
RIM = 3471.532
8 IN. IRON NW; INV= 3468.312
8 IN. IRON SE; INV= 3468.452
12 IN. RCP NE; INV= 3466.602
3.01%
0.44%
FL=3471.33
FL=3469.25FL=3469.25
FL=3470.81
1. UTILITY INFORMATION PROVIDED BY TD&H ENGINEERING. CONTRACTOR
SHALL VERIFY LOCATION AND DEPTHS OF UTILITIES IN ACCORDANCE
WITH SPEC SECTION 01 14 00, PRIOR TO THE BEGINNING OF
CONSTRUCTION AND CONTACT THE CONTRACTING OFFICER AND
ENGINEER OF RECORD IF DISCREPANCIES ARE FOUND.
2. PROVIDE A MINIMUM OF 12" VERTICAL AND HORIZONTAL SEPARATION
BETWEEN ALL EXISTING UTILITIES AND NEW WATER PIPING. PROVIDE A
MINIMUM OF 24" OF VERTICAL SEPARATION AND A MINIMUM OF 10' OF
HORIZONTAL SEPARATION BETWEEN WATER AND SEWER LINES. IF A
MINIMUM SEPARATION CANNOT BE MET CONTRACTOR SHALL PROVIDE
CONCRETE ENCASEMENT.
3. CONTRACTOR SHALL COORDINATE UTILITY SHUTDOWN WITH
CONTRACTING OFFICER 21 DAYS PRIOR TO BEGINNING WORK, IN
ACCORDANCE WITH SPEC SECTION 01 14 00.
4. ADJUST ALL EXISTING SURFACE FEATURES TO FINISHED GRADE.
5. SEE SHEET C002 FOR PIPE ALIGNMENT TABLE.
6. SEE SHEET C104-C105 FOR TESC AND DEMOLITION PLANS.
7. STORM PIPE SHALL BE PVC IN ACCORDANCE WITH ASTM-D-3034.
8. INSTALL ALL NEW UTILITIES IN TRENCH PER DETAIL 6 ON SHEET C121.
9. SEE SHEETS C114-C116 FOR UTILITY PROFILES.
10.FINISHED GRADE (FG) ELEVATION CALLOUTS ARE TOP OF PAVEMENT
OR GUTTER FLOW LINE ELEVATIONS UNLESS OTHERWISE NOTED.
CONNECT TO EXISTING STORM PIPE
CONNECT TO EXISTING MANHOLE
STORM MANHOLE
CATCH BASIN
STORMWATER TRASH GRATE
STORMWATER FACILITY OUTLET STRUCTURE
CONNECT TO ROOF DRAIN AT BUILDING
DOWNSPOUT WITH 24" MIN COVER
MANUFACTURED WYE FITTING
CURB INLET
SLOPE PROTECTION
CLEAN CHECK EXTENDABLE BACKWATER VALVE OR APPROVED EQUAL.
FOUNDATION DRAIN, SEE STRUCTURAL PLANS
CLEANOUT
FUTURE SITE
OF MISSILE
MAINTENANCE
DISPATCH
FACILITY
FL=3471.49
FL=3471.72
FL=3471.17
FL=3469.76
FL=3469.59
FL=3471.96
FL=3471.47
EG=3470.9±
EG=3471.0±
EG=3471.2±
2.00%
0.58%
FL=3472.11
FG=3472.20
FG=3472.25
FL=3472.17
TC=3471.31
FG=3471.39
BOT=3465.65
1B
C110
FL=3470.21
FL=3470.11
0.47%
FL=3471.01
FL=3470.56
OUTLET-WEST
RIM=3468.30
'A' STA=0+70.26
IE (6") IN NE=3463.76
IE (15") OUT SW=3462.52
(15") PVC
S=0.8%
(6") PERF
S=0.2%
(6") PVC
S=1.0%
CO-02
N: 1192896.7687
E: 1551127.0036
IE (6") 3463.85
CO-01
N: 1192947.7489
E: 1551073.9728
IE (6") 3464.00
FG=3472.56
FL=3471.99
FL=3471.36
FL=3470.86
FG=3469.25
FG=3469.25
FG=3469.97
FG=3469.25
FG=3469.25
1.01%
1.00%
2.00%
FL=3470.11
EX-SD-MH-1
'A' STA=0+00.01
IE (15") IN NE=3461.98
IE (12") IN NE=3465.90
IE (24") IN SE=3457.99
IE (24") OUT NW=3457.90
OPTION ITEM WEST PARKING LOT
LIMITS (NOT IN BASE BID)
FL=3470.79
FL=3471.83
(OPTION ITEM WEST
PARKING LOT )
(OPTION ITEM WEST
PARKING LOT )
1.01%
FL=3471.20
FL=3470.95
FG=3470.30
FG=3470.20
0.47%
C o p y r i g h t
B e r g e r A
B A
M
A l l
R i g h t s
R e s e r v e d
L a s t
S a v e d b y
D u s t i n b r i g g s o n
O c t
A
M
F i l e
Q
F e d e r a l W a y
F
A B
L D
C
A D
D D w g s
C d w g
PLAN
NORTH
N
C O
R P
S
O
F
E
N G
I N
E E
R S
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
S
E A
T T
L E
S E
A T
T L E
W
A S
H I N
G T
O N t h
A v e n u e
S o u t h
S u i t e
F e d e r a l
W a y
W a s h i n g t o n
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
N
M
E
I S
S U
E
D
A T
E
C O
N T
R A
O
S O
L I C
I T
A T
I O
N
N
O
F I
U M
B E
R
1 2 3 4 5
A
B
C
D
SHEET ID
a x
M A
R K
D E
S C
R I P
T I O
N D
A T
E
US Army Corps of Engineers ®
SHEET OF20 367
RTA 1/5/18
D M
B
D M
B
T G
S
S
C
C-108
-W D
W R
F R
E D
R I C
K
B
R O
W N
G R
A D
I N
G
A
D
R A
I N
A G
E
P
L A
N
M A
L M
S T
R O
M
A
F B
G
R E
L
L S
M
T
T A
C T
I C
S
P O
N S
E
F
O R
E
C
I L
I
Y tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Triangle tony.pritchett Text Box tony.pritchett Text Box
TYP
tony.pritchett Cloud tony.pritchett Text Box R0003 tony.pritchett Text Box tony.pritchett Text Box
ADD EXISTING CONTOUR ELEVATIONS
tony.pritchett
4/12/2018
FG=3472.98
RIM = 3470.036
12 IN. RCP SW; INV= 3460.286
24 IN. RCP NW; INV= 3459.406
24 IN. RCP SE; INV= 3459.416
UNKNOWN E; TOP OF PIPE= 3460.836
E x
E x
E x
E x
E x
E x
E
E x
E x
S D x
S S x
S D x
S D x
S D x
S D x
S D x
S D x
S
D x
S
D x
SD
x
SD
x
SD
x
SD
x
S
D x
S
D x
S
D x
S
D x
S
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
SD
x
FO
C
HH
HH
PLAN
F L
I G
H T
L I N
E
D
R
TRFAF
FF=3473.00
1.12%
1.00%
0.50%
0.50%
C110
C110
C110
C110
C110
C110
D
C117
E
C117
C
C117
2.05%
2.07%
0.95%
7.97%
TG=3462.00
FL=3466.92
TG=3462.72
.5
1.59%
C110
TYP.
GENERAL NOTES
RIM = 3468.484
8 IN. CMP NE; INV= 3464.534
24 IN. RCP NE; INV= 3461.384
8 IN. CMP SW; INV= 3464.404
24 IN. RCP SW; INV= 3461.294
0.74%
FL=3467.50
FL=3468.49
FL=3470.78
FL=3469.16
FL=3468.63FL=3469.08
FL=3468.88
FG=3471.76
FG=3470.16
CO-16
RIM=3472.60
'C' STA=25+23.12
IE (6") IN S=3468.61
IE (6") OUT NE=3468.61
MH-D4
RIM=3472.39
'C' STA=34+91.44
IE (6") IN NE=3469.10
IE (12") OUT SE=3467.29
MH-C3
RIM=3471.45
'C' STA=24+64.52
IE (6") IN SW=3468.02
IE (12") OUT SE=3467.92
MH-C2
RIM=3471.18
'C' STA=21+79.16
IE (12") IN NW=3465.07
IE (4") IN SE=3466.41
IE (4") IN SW=3468.35
IE (12") OUT SE=3464.97
MH-B1
IE (15") IN NE=3459.87
IE (24") EXIST=3459.7±
MH-C1
RIM=3469.89
'C' STA=21+11.49
'D' STA= 30+00.00
IE (12") IN NW=3464.56
IE (12") IN S=3464.50
IE (12") OUT NE=3464.50
MH-D3
RIM=3470.33
'C' STA=31+74.60
IE (12") IN NW=3465.70
IE (12") OUT E=3465.70
MH-D2
RIM=3470.61
'C' STA=31+02.95
IE (12") IN W=3465.34
IE (12") IN NW=3466.17
IE (12") OUT NE=3465.24
OUTFALL-1
IE (12") =3463.94
'C' STA=20+00.13
OUTLET-EAST
IE (15") OUT=3460.28
'C' STA=10+68.72
(8") PVC
S=38.0%
CB-2
RIM=3471.26
N:1192640.9424
E:1551084.1624
IE (10") OUT=3467.24
CB-1
RIM=3470.00
N:1192709.7229
E:1551186.9689
IE (8") OUT=3465.00
TG=3470.49
TG=3470.49
EG=3467.6±
EG=3472.3±
EG=3468.5±
EG=3466.5±
M A
T C
H
L
I N
E
S
S
H E
STORM CONSTRUCTION NOTES
1. UTILITY INFORMATION PROVIDED BY TD&H ENGINEERING.
CONTRACTOR SHALL VERIFY LOCATION AND DEPTHS OF
UTILITIES IN ACCORDANCE WITH SPEC SECTION 01 14 00, PRIOR
TO THE BEGINNING OF CONSTRUCTION AND CONTACT THE
CONTRACTING OFFICER AND ENGINEER OF RECORD IF
DISCREPANCIES ARE FOUND.
2. PROVIDE A MINIMUM OF 12" VERTICAL AND HORIZONTAL
SEPARATION BETWEEN ALL EXISTING UTILITIES AND NEW WATER
PIPING. PROVIDE A MINIMUM OF 24" OF VERTICAL SEPARATION
AND A MINIMUM OF 10' OF HORIZONTAL SEPARATION BETWEEN
WATER AND SEWER LINES. IF A MINIMUM SEPARATION CANNOT
BE MET CONTRACTOR SHALL PROVIDE CONCRETE ENCASEMENT.
3. CONTRACTOR SHALL COORDINATE UTILITY SHUTDOWN WITH
CONTRACTING OFFICER 21 DAYS PRIOR TO BEGINNING WORK, IN
ACCORDANCE WITH SPEC SECTION 01 14 00.
4. ADJUST ALL EXISTING SURFACE FEATURES TO FINISHED GRADE.
5. SEE SHEET C002 FOR PIPE ALIGNMENT TABLES.
6. SEE SHEET C104-C105 FOR TESC AND DEMOLITION PLANS.
7. STORM PIPE SHALL BE PVC IN ACCORDANCE WITH ASTM-D-3034.
8. INSTALL ALL NEW UTILITIES IN TRENCH PER DETAIL 6 ON SHEET
C121.
9. SEE SHEETS C114-C116 FOR UTILITY PROFILES.
10.FINISHED GRADE (FG) ELEVATION CALLOUTS ARE TOP OF
PAVEMENT OR GUTTER FLOW LINE ELEVATIONS UNLESS
OTHERWISE NOTED.
TG=3470.49
TG=3470.49
FG=3469.07
FG=3467.70
(15") PVC
S=0.6% (12") PVC
S=0.5%
(12") PVC
S=0.6%
FG=3472.50
FG=3472.98
FG=3472.50
EG=3471.6±
(12") PVC
S=1.0%
(12") PVC
S=0.5%
(12") PVC
S=0.7%
(12") PVC
S=0.5%
(12") PVC
S=0.5%
(6") PVC
S=1.0%
'D' STA=34+91.44
4.41' RT
'D' STA=34+31.40
4.40' RT
'D' STA=34+17.71
4.40' RT
'D' STA=33+78.68
4.38' RT
'D' STA=33+36.68
4.37' RT
'D' STA=32+80.12
4.36' RT
'D' STA=31+22.05
21.93' RT
'D' STA=31+46.79
46.68' RT
'D' STA=32+48.46
4.35' RT
'D' STA=32+04.40
48.01' RT
'D' STA=30+77.94
3.67' RT
'C' STA=21+95.64
10.37' LT
'C' STA=22+42.06
10.77' LT
'C' STA=22+92.06
10.78' LT
'C' STA=23+42.06
10.79' LT
'C' STA=23+70.49
10.79' LT
'C' STA=23+90.41
10.79' LT
'C' STA=24+45.15
10.80' LT
'C' STA=25+07.39
12.36' LT
'C' STA=25+40.72
GARAGE
OUTFALL-2
IE (12") =3462.00
N:1192565.6983
E:1551493.7570
OUTLET-SWALE
IE (12") =3462.68
N:1192581.1125
E:1551477.7920
(12") PVC
S=3.1%
EG=3470.0±
EG=3470.4±
STORM ALIGNMENT 'C'
SEE PROFILE ON SHEET C116
STORM ALIGNMENT 'B'
SEE PROFILE ON SHEET C115
STORM ALIGNMENT 'D'
SEE PROFILE ON SHEET C116
STORM ALIGNMENT 'C'
SEE PROFILE ON SHEET C116
FG=3470.28
FG=3470.28
FG=3471.57
FG=3472.50
FG=3472.98
FG=3472.98
FG=3472.50
FG=3472.50FG=3472.50
FG=3472.98
FG=3472.91
FG=3472.98
FG=3472.91
FG=3472.91
FG=3472.90
FG=3472.43
EG=3469.0±
(4") PERF
S=1.1%
(4") PERF
S=0.2%
CO-15
N:1192590.9665
E:1551110.7638
IE (4") =3469.00
CO-13
N:1192394.9486
E:1551315.4353
IE (4") =3467.00
(4") PERF
S=0.2%
(4") PERF
S=0.2%
CO-07
N:1192446.7730
E:1551384.7566
IE (4") =3466.55
(OPTION ITEM
BEARCAT GARAGE)
(4") PERF
S=0.2%
(OPTION ITEM
BEARCAT GARAGE)
(4") PERF
S=0.2%
(OPTION ITEM
BEARCAT GARAGE)
(4") PERF
S=0.2%
(4") PERF
S=0.2%
(4") PERF
S=0.2%
CO-03
N:1192594.2698
E:1551112.5349
IE (4") =3469.17
MH-D1
RIM=3469.81
'C' STA=30+42.52
IE (12") IN SW=3464.81
IE (6") IN W=3465.50
IE (12") OUT N=3464.71
EG=3468.7±
TBC=3472.13
CONNECT TO EXISTING STORM PIPE
CONNECT TO EXISTING MANHOLE
STORM MANHOLE
CATCH BASIN
STORMWATER TRASH GRATE
STORMWATER FACILITY OUTLET STRUCTURE
CONNECT TO ROOF DRAIN AT BUILDING DOWNSPOUT WITH
6" PVC, S=1.0% MIN, 24" MIN COVER. CONFIRM LOCATION
WITH ARCH PLANS
MANUFACTURED WYE FITTING
CURB INLET
SLOPE PROTECTION
CLEAN CHECK EXTENDABLE BACKWATER VALVE OR
APPROVED EQUAL.
FOUNDATION DRAIN, SEE STRUCTURAL PLANS
CLEANOUT
(4") PERF
S=0.2%
(OPTION ITEM
BEARCAT GARAGE)
(4") PERF
S=0.2%
CO-06
N:1192469.6411
E:1551365.8062
IE (4") =3468.44
1.5%
FL=3466.92FL=3466.92
1.00%
FG=3472.23
FG=3472.91
FG=3472.98
7.0%
T
Y P
FG=3467.77
FL=3468.51
FG=3469.08
FL=3470.15
FL=3469.81
FL=3470.10
FG=3472.97
1.41%
1.12%
FL=3469.31
1.12%
1.35%
FL=3468.39
2.05%
FG=3470.21
FG=3470.04
CO-11
N:1192416.3283
E:1551341.8780
IE (4") =3466.93
CO-12
N:1192415.8252
E:1551335.5814
IE (4") =3466.94
CO-17
N:1192417.8799
E:1551351.3203
IE (12") =3466.93
CO-18
N:1192655.9596
E:1551171.7911
IE (4") =3469.00
CO-09
N:1192374.6861
E:1551404.9492
IE (4") =3466.75
(OPTION ITEM
BEARCAT GARAGE)
CO-08
N:1192402.0913
E:1551431.2733
IE (4") =3466.68
(OPTION ITEM
BEARCAT GARAGE)
CO-10
N:1192426.1797
E:1551351.3408
IE (4") =3466.90
IE (4") =3466.90
CO-19
N:1192505.5107
E:1551199.8498
IE (4") =3468.75
CO-20
N:1192555.9742
E:1551275.8826
IE (4") =3468.71
CO-05
N:1192460.6866
E:1551384.4767
IE (4") =3466.52
TYP.
(12") PVC
S=1.0%
(4") PVC
S=0.6%
(4") PVC
S=0.5%
FG=3472.50
FG=3472.50
FG=3472.50
(4") PERF
S=0.2%
(OPTION ITEM
BEARCAT GARAGE)
FF=3471.00
CO-22
N:1192443.1639
E:1551392.8622
IE (6") =3466.36
P
V
C
S
FG=3467.92
RIM = 3467.321
24 IN. RCP NW; INV= 3460.071
8 IN. IRON NW; INV= 3463.401
24 IN. RCP SW; INV= 3460.041
8 IN. CMP SW; INV= 3463.471
CO-21
N:1192419.1915
E:1551417.5267
IE (6") =3466.02
P
V
C
S
(6") PVC
S=1.0%
OPTION ITEM EAST PARKING LOT
LIMITS FOR SURFACE GRADING.
(DOES NOT INCLUDE UTILITIES
UNLESS NOTED OTHERWISE)
OPTION ITEM BEARCAT
GARAGE LIMITS
0.61%
0.09%
(OPTION ITEM EAST
PARKING LOT)
(OPTION ITEM EAST
PARKING LOT)
(OPTION ITEM EAST
PARKING LOT)
FG=3470.96
22.8'
6' 6'
6'
FG=3470.24
FG=3470.41
FG=3471.43
2.05% 2.05%
FG=3471.31
EG=3472.2±
EG=3472.2±
EG=3471.8±
4.03%
CONCRETE LID
TOP CONCRETE RISER RING = 3466.37
24 IN. RCP S; INV= 3460.08
24 IN. RCP NW; INV= 3459.93
'C' STA=21+84.61
10.38' LT
TYP.
FG=3472.42
TEE
C o p y r i g h r g e r A
B A
M
A l l
R i g h t s
R e s e r v e d
L a s t
S a v e d b y
D u s t i n b r i g
O c t l e
Q
F e d e r a l W a y
F
A B
L D
C
A D
D D w g s
C d w g
PLAN
NORTH
N
C O
R P
S
O
F
E
N G
I N
E E
R S
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
S
E A
T T
L E
S E
A T
T L E
W
A S
H I N
G T
O N t h
A v e n u e
S o u t h
S u i t e
F e d e r a l
W a y
W a s h i n g t o n
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I
M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
F I
M
B E
R
1 2 3 4 5
A
B
C
D
SHEET ID
x
M A
R K
D E
S C
R I P
T I O
N D
A T
E
US Army Corps of Engineers ®
SHEET OF21 367
RTA 1/5/18
D M
B
D M
B
T G
S
S
C
C-109
-W D
W R
F R
E D
R I C
K
B
R O
W N
G R
A D
I N
G
A
A
I N
A G
E
P
L A
N
M A
L M
S T
R O
M
A
F B
G
R E
L
L S
M
T
T A
C T
I C
S
P O
N S
E
F
O R
E
C
I L
I tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box R0003 tony.pritchett Text Box tony.pritchett Text Box
ADD EXISTING CONTOUR ELEVATIONS
tony.pritchett Text Box 4/12/2018 tony.pritchett Cloud tony.pritchett Triangle tony.pritchett Text Box tony.pritchett
TYP
x
E x
E x
E x
E x
HH
4.70%
0.63%
1.93%
FL=3471.24'
FG=3471.92'
FG=3471.95'
FG=3471.82
MATCH EXIST
GRADE
FG=3471.98'
FG=3471.79'
FG=3471.74'
FL=3471.14'
FL=3471.15'
EG=3471.6'±
FL=3470.71'
FL=3470.76'
FL=3470.48'
FG=3471.33'
FG=3471.25'
FG=3471.43'
EG=3470.6'±
FL=3470.53'
TBC=3471.00'
FL=3470.77'
EG=3470.6'±
EG=3470.8'±
FG=3470.99'
FG=3471.02'
FG=3470.94'
FL=3470.72'
FL=3470.33'
TBC=3471.25'
FG=3470.78'
FL=3471.01'
FL=3471.35'
FG=3471.55'
FG=3471.60'
FG=3471.69'
FG=3471.74'
FL=3471.05'
% 5
FL/FG=3470.82'
FL/FG=3470.74'
FL=3470.65'
EG=3470.8'±
FL/FG=3470.51'
FL/FG=3470.43'
FL=3470.24'
FL/FG=3471.30'
FL/FG=3471.25'
FL/FG=3471.09'
FL/FG=3471.04'
TBC=3471.88'
0.96%
FG=3471.63'
1.91%
FL=3470.99'
FL=3470.91'
FG=3472.07'
TBC=3472.00'
FL/FG=3471.22'
FL/FG=3471.28'
FL/FG=3471.47'
FL/FG=3471.53'
FL=3471.54'
1.50%
1.50%
7.97%
8.01%
FG=3470.98'
FG=3470.43'
FG=3469.97'
EG=3467.3'±
FG=3470.50'
5.0'
FG=3470.88'
EG=3468.0'±
TG=3470.04'
FG=3470.90'
FG=3470.42'
FG=3470.50'
FG=3470.50'
FG=3470.96'
FG=3470.96'
FG=3470.98'
FG=3470.90'
FG=3471.05'FG=3471.05'
FG=3471.12'
FG=3471.42'
FG=3471.54'
FG=3472.87'
FG=3472.91'
FG=3472.98'
FG=3471.80'
FG=3471.69'
FG=3472.91'
TG=3472.50'
TG=3472.50'
TG=3472.50'
FG=3472.95'
FG=3472.98'
FG=3472.91'
FG=3472.98'
FG=3471.27'
1.50%
1.50%
1.50%
0.00%
TG=3472.50'
TG=3472.50'
TG=3472.50'
TG=3472.39'
FG=3472.86'
FG=3472.81'
FG=3472.39'
FG=3472.79'
TG=3472.50'
FG=3472.79'
TG=3472.50'
FG=3472.45'
TG=3472.45'
HH
0.00%
FL/FG=3469.69'
1.57% 1.03%
FG=3470.17'
FG=3470.31'
FG=3470.31'
FG=3470.10'
FG=3472.89'
FG=3472.89'
FG=3472.89'
FG=3472.87'
6.63%
FG=3472.98'
TG=3472.50'
FG=3472.98'
TG=3471.00'
TG=3470.49'
FG=3470.59'FG=3470.59'
FL/FG=3469.69'
FG=3470.19'
FG=3470.20'
FL=3469.60'
FL=3469.63'
FG=3470.04'
TG=3470.43'
11.82%
TG=3472.50'
TG=3472.89'
TG=3470.92'
TG=3472.89'
CONCRETE WALL
PER STRUCTURAL
AND LANDSCAPE
FG=3472.94'
FG=3470.95'
FG=3471.13'
FG=3470.71'
FG=3470.98'
FG=3471.06'
FG=3472.98'
2.02%
1.00%
8.20%
FG=3470.90'
1.00%
0.74%
3.7'
3.7'22.6'
FG=3470.96'
FG=3472.98'
FG=3472.90'
1.00%
FG=3470.99'
FG=3471.07'
FG=3471.03'
FG=3470.94'
FG=3472.89'
FG=3472.89'
FG=3470.88'
4.50%
9.7'
6.0'
2.40%
0.00%
0.00%
FG=3470.18'
FG=3470.18'
FL=3470.54'
FL/FG=3470.54'
FG=3471.13'
FG=3471.05'FG=3471.05'
FG=3471.05'FG=3471.05'
FL/FG=3470.54'
FL/FG=3470.54'
FL/FG=3470.54'
FL/FG=3470.54'
FL/FG=3470.54'
FG=3471.05'FG=3471.05'
FG=3471.12'
0.00%
2.24%
FG=3471.12'
0.00%
2.29%
0.00%
FL=3470.24'
FL=3470.28'
0.47%
7.49%
EG=3470.5'±
FL=3470.32'
TBC=3471.01'
FL/FG=3470.41'
TBC=3470.69'
FG=3470.98'
2.71%
FL=3470.43'
0.46% 1.20%
TBC=3470.93'
1.53%
1.25%
FG=3470.92'
FG=3470.47'
FL/FG=3470.40'
TBC=3470.85'
0.46%
FG=3468.29'
FG=3467.95'
1.50% 1.51%
1.67%
FL=3467.72'
FL=3468.05'
FL=3467.51'
FL=3468.22'
FL=3468.30'
FL=3468.01'
EG=3466.9'±
EG=3466.6'±
FL=3467.18'
FL=3468.33'
FL=3468.63'
FL=3467.52'
FL=3467.82'
FL=3467.60'
FG=3467.38'
FL=3467.32'
FL=3467.86'
FG=3468.39'
FL=3468.08'
FL=3467.86'
FL=3470.00'
TBC=3470.77'
0.45%
0.46%
TBC=3470.40'
FL/FG=3470.15'
0.45%
1.90%
FG=3470.11'
FG=3470.59'
EG=3470.3'±
TBC=3470.54'
7.98%
FL/FG=3470.04'
EG=3470.0'±
0.45%
C o p y r i g h r g e r A
B A
M
A l l
R i g h t s
R e s e r v e d
L a s t
S a v e d b y
D u s t i n b r i g
O c t l e
Q
F e d e r a l W a y
F
A B
L D
C
A D
D D w g s
C d w g
DETAILED PLAN VIEW
SCALE: 1"=10'
5 DETAILED PLAN VIEW
SCALE: 1"=10'
6 DETAILED PLAN VIEW
SCALE: 1"=10'
7 DETAILED PLAN VIEW
SCALE: 1"=10'
DETAILED PLAN VIEW
SCALE: 1"=10'
1A
DETAILED PLAN VIEW
SCALE: 1"=10'
3DETAILED PLAN VIEW
SCALE: 1"=10'
2 DETAILED PLAN VIEW
SCALE: 1"=10'
DETAILED PLAN VIEW
SCALE: 1"=10'
1B
OPTION ITEM KEY NOTES
BASE BID
OPTION ITEM BEARCAT GARAGE
OPTION ITEM EAST PARKING LOT
OPTION ITEM WEST PARKING LOT
1" = 10' feet
201010 0 scale
N
PLAN
NORTH
N
PLAN
NORTH
N
PLAN
NORTH
N
PLAN
NORTH
N
PLAN
NORTH
N
PLAN
NORTH
N
PLAN
NORTH
N
PLAN
NORTH
N
PLAN
NORTH
(TOP)
(TOP)
(TOP)
(TOP) C
O
R P
S
O
F
E
N G
I N
E E
R S
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
S
E A
T T
L E
S E
A T
T L E
W
A S
H I N
G T
O N t h
A v e n u e
S o u t h
S u i t e
F e d e r a l
W a y
W a s h i n g t o n
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I
M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
F I
M
B E
R
1 2 3 4 5
A
B
C
D
SHEET ID
x
M A
R K
D E
S C
R I P
T I O
N D
A T
E
US Army Corps of Engineers ®
SHEET OF22 367
RTA 1/5/18
D M
B
D M
B
T G
S
S
C
C-110
-W D
W R
F R
E D
R I C
K
B
R O
W N
E N
L A
R G
G
A
D I N
G
P
L A
N
M A
L M
S T
R O
M
A
F B
G
R E
L
L S
M
T
T A
C T
I C
S
P O
N S
E
F
O R
E
C
I L
I tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box tony.pritchett Text Box R0003 tony.pritchett Text Box tony.pritchett Text Box
ADD EXISTING CONTOUR ELEVATIONS
tony.pritchett Text Box 4/12/2018 tony.pritchett Cloud tony.pritchett Triangle tony.pritchett Text Box tony.pritchett
TYP
A.6
A.6
B
B
C
C
C.1
C.3
C.4
C.8 D.1
D.5
D.6D.3
2 2
1.6
3.2
A.7
A.7
C.7 D
D
3.5
1.5
C.5
A.8
A.8
1.2
3.6
S-202
S-202
S-203
S-202
GGB32C
GGB32C
GGB32A
GGB44B GGB32A GGB32A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
GGB32A
GGB32J GGB32A
GGB32A GGB32A GGB32A
GGB32AGGB32AGGB32A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
GGB42A GGB42A GGB42A
GGB42A
GGB42A
G G
B C
G G
B C
GGB44C GGB42A
GGB42A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
GGB32A
G G
B A
G G
B A
G G
B A
G G
B A
GGB32A
GGB32A
GGB32A GGB32A
GGB32A GGB32F
G G
B E
GGB42A GGB42A GGB42A
GGB42A GGB42A GGB42D GGB42D
G G
B B
G G
B C
GGB32C
G G
B B
G G
B A
G G
B A
GGB32AGGB32A
GGB32A GGB32A
GGB32GGGB32A
G G
B A
GGB32AGGB32C
G G
B E
GGB32A GGB32A GGB32A GGB32A
G G
B A
GGB32A
G G
B A
G G
B C
GGB32I
GGB42A
GGB42A
GGB32A
G G
B A
G G
B A
G G
B A
G G
B A
G G
B A
P2 P2
P2 P1 P1
P1
P1
P4P4
P4 P4 P2
P2 P2 P2
P2 P2P2
P1
P1
P1 P1 P1 P1
P1
P2 P2
P1P1 P1 P1
P1
P1 P1 P1 P1
P1
P4
P2
P1
P1
P1
P1
P1
P2
P2 P2
P1
P1 P1
P1 P1
P1 P1
P1P4
P1
P1
P1
P1
P1
P2
P1
P1 P1
P1 P1
P1
P1
P1P4
P1
P1
P2
P1
P1P1
P1
P1 P1
P1
P6 P6
P8
P2
P1
P2P4
P2 P2
P9
4' - 6" 4' - 6"
/2
4' - 4" 10' - 0"
13' - 4 3/4" 9' - 0 1/4"
7' - 5" 8' - 11"
9' - 4" 9' - 4" 19' - 8" 4' - 8" 5' - 0" 9' - 8" 16' - 4" 20' - 0" 9' - 11" 22' - 5" 19' - 10"
3' - 8"
11' - 9" 15' - 4"
9' - 4" 9' - 4" 19' - 8" 4' - 8" 5' - 0" 9' - 8" 16' - 4" 2' - 0" 19' - 1" 24' - 9" 26' - 4" 27' - 8"
/2
/2
4' - 6" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 4' - 6"
4' - 6" 4' - 6" 4' - 6" 4' - 6"
6' - 1" 6' - 5"
4' - 6" 4' - 6"
8' - 7"
1' - 6" 4' - 6" 4' - 6" 4' - 6" 4' - 6"
4' - 6"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.