Solicitation_ _Specifications.pdf
PDF 13 MB Posted
- Solicitation number
- W912DW-17-R-0002
About this file
Solicitation Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R0010.pdf | ||
| R0009.pdf | ||
| R0008.pdf | ||
| Amendment_R0007.pdf | ||
| R0006.pdf | ||
| R0005.pdf | ||
| Amendment_0004.pdf | ||
| Site_Visit_Attendance_Rosters_for_Site_Visits__1_&_2.pdf | ||
| Amendment_0003.pdf | ||
| W912DW-17-R-0002-R0002.pdf | ||
| Drawings_(RTA-20161011)_2_of_4.pdf | ||
| Drawings_(RTA-20161011)_4_of_4.pdf | ||
| Reference_Drawings.pdf | ||
| Drawings_(RTA-20161011)_1_of_4.pdf | ||
| Amendment_0001.pdf | ||
| Drawings_(RTA-20161011)_3_of_4.pdf | ||
| 00_24_00_-_Attachment_A_(Word_version).docx | DOCX document | |
| 00_24_00_-_Attachment_B_(Word_version).docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. W912DW-17-R-0002
Seattle District
Spillway Gate Life Cycle Maintenance, Chief Joseph Dam, Bridgeport, WA
Construction Solicitation and Specifications
This is a 100% Small Business Set-Aside
November 2016
This page was intentionally left blank for duplex printing.
W912DW-17-R-0002 1
THIS PROCUREMENT IS:
100% set-aside for Small Business
SITE VISIT
The purpose of the site visit is to familiarize Offerors with the scope of work and provide an opportunity to become familiar with the existing site conditions. It is the intent of the Government that all prospective Offerors visit the jobsite for the purpose of acquainting themselves with local conditions. Non-technical questions will be addressed; however, ALL technical questions regarding the solicitation will be submitted via ProjNet, a web-based program that allows Offerors to post questions regarding the solicitation and to view all questions by other Offerors and answers by USACE. Attendance at the site visit is strongly recommended.
Two organized site visits have been scheduled as follows:
Thursday, 8 December 2016, at 11:00 a.m., local time
Tuesday, 20 December 2016, at 2:00 p.m., local time
Participants will meet at:
Chief Joseph Dam – Commons Building Highway 17 and Pearl Hill Road Bridgeport, WA
To obtain access to the Commons Building, site visit participants will need to use the call button at Security and indicate they are attending the solicitation site visit for Chief Joseph Dam Spillway Gate Lifecycle Maintenance. Once through the gate, participants will proceed straight ahead to the security guard station, where they will need to present valid ID to the security officer. When allowed, site visit participants shall proceed to the Commons Building and meet in a conference room, location to be provided upon arrival. After the pre-site visit logistics briefing in the conference room, participants will be transported via Government van to and from the project work area for the site visit.
Site Visit Registration:
Firms must register no later than 12:00 PM the day prior to each respective site visit date.
Confirm attendance by sending an email to:
Ms. Lisa Scott at Lisa.M.Scott2@usace.army.mil AND Mr. Scott Bennett at Daniel.S.Bennett@usace.army.mil
Include the below information.
1) Solicitation Number
2) Project Title
3) Date of Attendance
4) Name of firm with complete mailing address and telephone number
5) Name, title and phone number of each representative
6) Are all individual(s) U.S. Citizens?
If not, please refer to ACCESS FOR FOREIGN NATIONALS below.
W912DW-17-R-0002 2
Site Visit Point of Contact: Mr. Zachary Zimchek, Chief Joseph Dam.
Email: Zachary.C.Zimchek@usace.army.mil Office Phone: (509) 686-2249
Alternate Site Visit Point of Contact: Cpt. Chandler Alford, Chief Joseph Dam.
Email: Chandler.D.Alford@usace.army.mil Office Phone: (509) 686-2249
Requests for attendance received after 12:00 PM the day prior to each respective site visit date will not be accepted. Due to Security requirements and limited field staff available for site visits, only two site visits will be offered. Individual requests for site visits will not be granted. Offerors should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so shall not relieve Offerors from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government shall assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Solicitation, specifications/plans, or related documents.
Each individual must have valid government picture identification on his/her person while at the project site. There can be no substitutions of one individual for another. If an individual arrives at the site visit without having RSVP’d ahead of time and/or without picture identification, that individual may not be allowed on the project.
Hardhats, hard toed boots, and safety reflective vests are required. Cameras will not be allowed.
However, the Government will bring a camera and take pictures as requested, to be reviewed and approved by the security officer prior to release. All participants will be required to sign an attendance list.
Due to new foreign disclosure requirements, non U.S. citizens will be unable to attend the site visit(s) for this project. Please contact Ms. Lisa Scott at the above email address if you have any questions.
BIDDING DOCUMENTS: View solicitations at the Internet site: http://www.fedbizopps.gov/
FOR INQUIRIES, CONTACT THE FOLLOWING:
Monday through Friday between the hours of 8:00 a.m. and 3:30 p.m.:
ADMINISTRATIVE MATTERS:
Contact: Caroline Mueller, Contract Specialist, caroline.b.mueller@usace.army.mil or 206-764-6741
Mail: Seattle District, U.S. Army Corps of Engineers, P.O. Box 3755, CECT-NWS, Bldg 1202, Seattle, WA 98124-3755
Street: Seattle District, U.S. Army Corps of Engineers, 4735 E. Marginal Way S., Bldg 1202, Seattle, WA 98134-2388
W912DW-17-R-0002 3
TECHNICAL QUESTIONS:
All inquiries regarding this solicitation are to be submitted via ProjNet-BID. Telephone and email inquiries will not be accepted. ProjNet-BID is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answers by USACE. ProjNet- BID can be accessed at https://www.projnet.org To access the ProjNet-BID website the first time:
1) Click the Quick Add menu in the upper right.
2) Enter the following information for access:
2a) Select USACE as the Agency.
2b) Input BID Key: QNER39‐6MSCQD 2c) Your email address.
3) Enter valid business contact information (e.g. First and Last Name, Company name, city and state, phone number,email address). (Required on first project only.)
4) Establish Secret Question and Answer which will be used as a password (required on first project only).
5) For subsequent access use your email address, the Key and response to the Secret Question to access the ProjNet-BID Module.
6) Submit technical questions by clicking Post a New Inquiry. When an answer is posted to a question, the question and answer is then available for all other bidders to review.
7) For questions about ProjNet-BID, please contact the Call Center help desk toll free at 1-800-428- HELP (4357), which operates from 8AM to 5PM (Central US time zone).
No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bidsm prior to bid submission. Nothing in the solicitation is changed unless an amendment is issued.
W912DW-17-R-0002
TABLE OF CONTENTS
CAUTION TO OFFERORS
SECTION TITLE
SF1442 - Pages 00 11 00-1 thru 00 11 00-8 (00 11 00-3 is reserved for use at a later time);
& Subcontracting Plan with sample if applicable*
00 21 00 Instructions, Conditions and Notice to Offerors
00 24 00 Evaluation Factors for Award
00 45 00 Representations and Certifications and other Statements of Offerors, and Pre-Award Information
00 72 00 Contract Clauses
00 73 00 Special Clauses, which include the following:
a) Special Clauses 00 73 00 pages 1 thru 12
b) Attachment 00 73 00-1 pages 1 thru 6
c) Davis-Bacon General Wage Decision No. WA20150079
01 00 00 Technical Specifications: 01 14 00 thru 41 24 26
RETURN THE FOLLOWING WITH YOUR PROPOSAL:
SF1442 - Pages 00 11 00-1 thru 00 11 00-8 (00 11 00-3 is reserved for use at a later time);
Section 004500 Representations and Certifications to include the Pre-Award information pages 00 45 00-A and B.
20% Bid Bond -- Bid Bonds must be accompanied by a Power of Attorney containing an original signature from the surety, which must be affixed to the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will only be accepted if accompanied by an original certification from a current officer of the surety attesting to its authenticity and continuing validity.
Current SF24 forms are available at the following website: http://www.gsa.gov/portal/forms/type/TOP.
*Additionally, if your firm is a large business you will be required to submit a "Small Business and Small Disadvantaged Business Subcontracting Plan," with your proposal.
Unless specified, the following information does not need to be submitted with your proposal, BUT it is required to be completed before the contract can be awarded:
Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date.
https://www.sam.gov/portal/public/SAM/.
! ! ! C A U T I O N TO O F F E R O R S ! ! !
1. TELEPHONES: There are no public telephones at the Seattle District Corps of Engineers.
2. BUSINESS HOURS: For the Seattle District Corps of Engineers are from 7:30 A.M. to 4:00 P.M., Monday through Friday.
BEFORE SIGNING AND MAILING THIS OFFER, PLEASE TAKE NOTE OF THE FOLLOWING, AS
FAILURE TO PERFORM ANY ONE OF THESE ACTIONS MAY CAUSE YOUR OFFER TO BE REJECTED
3. AMENDMENTS: Have you acknowledged receipt of ALL amendments? If in doubt as to the number of amendments issued, please contact the representative listed on the Information Page.
4. AMENDED SECTIONS: If any of the amendments furnished amended sections, the amended sections must be used in submitting your offer.
5. MISTAKE IN OFFER: Have you reviewed your offer price for possible errors in calculation or work left out?
6. OFFER ACCEPTANCE PERIOD: The minimum offer acceptance period is specified in block 13D of SF1442, page 00 11 00 -1, Solicitation, Offer and Award. Please ensure that you allow at least the stated number of calendar days for the Government to accept your offer.
7. SYSTEM FOR AWARD MANAGEMENT: Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date. https://www.sam.gov/portal/public/SAM/
8. Far 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) (b) The Contractor is asked to submit paper documents, such as offers, letters, or reports that are printed or copied double-sided on paper containing at least 30 percent postconsumer fiber, whenever practicable, when not using electronic commerce methods to submit information or data to the Government.
9. ATTENTION: Due to heightened security, hand-delivering proposals to Federal Center South may be more time-consuming than in years past.
Please allow sufficient time to allow for heightened security at Government installations and to get to Building #1202.
Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building. From there, you will be directed to the USACE Oxbow Building (#1202) which sits behind the Federal Center South Building. Allow additional time.
Report to the Security Desk in the lobby of the USACE Oxbow Building (#1202) and call Procurement Technician Sonia Frees at 206-764-3516 or Contract Specialist Caroline Mueller at 206-764-6741. A Contracting representative will come down and accept your Offer, Bid or Proposal.
A proposal is not received by the Government until it is in the physical possession of a representative of the Contracting office. Security guards and other non-contracting personnel are NOT authorized to accept proposals on behalf of the Government.
The desk guard will direct you to building 1202, the Oxbow Building, where you will contact the Contract Specialist, or a procurement technician or the Contracting Office Main Desk, at 206-764- 3773. Note that official receipt of a proposal shall be in accordance with FAR 52.215-1.
Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Offer, Bid, or Proposal has arrived on time.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE W912DW
Seattle District, Corps of Engineers
ATTN: CECT-NWS
PO Box 3755 Seattle, WA 98124-3755
8. ADDRESS OFFER TO
Seattle District, Corps of Engineers PO Box 3755 ATTN: CECT-NWS Seattle, WA 98124-3755
HAND CARRY:
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
Furnish all labor, materials and equipment and perform all work for
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
W912DW-17-R-0002 29 Nov 2016
Caroline Mueller 206-764-6741
Spillway Gate Life Cycle Maintenance, Chief Joseph Dam, Bridgeport, WA
5 10:00:00 AM
11 January 2017
G3CT9BAW
Typewritten Text in accordance with the attached Contract Clauses, Special Clauses, Technical Specifications and Drawings.
G3CT9BAW
Typewritten Text 00 11 00 - 1
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Federal Center South
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text , Army Corps of Engineers
G3CT9BAW
Typewritten Text Building 1202
G3CT9BAW
Typewritten Text 4735 E. Marginal Way South
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text Seattle, WA 98134
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
* See FAR 52.211-10
G3CT9BAW
Typewritten Text
G3CT9BAW
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
Tax ID No: DUNS No:
eMail:
15. TELEPHONE NUMBER (Include area code) Fax No.:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
US Army Corps of Engineers Finance Center
CEFC-AO-P
5722 Integrity Drive Millington, TN 38054-500
CODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
G3CT9BAW
Typewritten Text Cage Code:
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
SEE SCHEDULE
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text United States Army Corps of Engineers Seattle District Northwest Area Office USAED-Seattle PO Box 610 DuPont, WA 98327-0610
G3CT9BAW
Typewritten Text
G3CT9BAW
Typewritten Text SEE ALTERATIONS IN CONTRACT, Page 00 11 00 -3
G3CT9BAW
00 11 00 - 2
W912DW-17-R-0002 00 11 00 - 4
IF THE CONTRACTOR IS A CORPORATION OR PARTNERSHIP, THE APPLICABLE PORTION
OF THE FORM LISTED BELOW MUST BE COMPLETED. IN THE ALTERNATIVE, OTHER
EVIDENCE MUST BE SUBMITTED TO SUBSTANTIATE THE AUTHORITY OF THE PERSON
SIGNING THE CONTRACT. IF A CORPORATION, THE SAME OFFICER SHALL NOT
EXECUTE BOTH THE CONTRACT AND THE CERTIFICATE.
CORPORATE CERTIFICATE
I, ____________________________________, certify that I am the _________________________ Secretary of the Corporation named as Contractor herein; that _________________________________, who signed this contract on behalf of the Contractor was then ___________________________of said corporation; that said contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.
_____________________________ (CORPORATE
(Secretary) SEAL)
AUTHORITY TO BIND PARTNERSHIP
This is to certify that the names and signatures of all partners are listed below and that the person signing the contract has authority actually to bind the partnership pursuant to its partnership agreements.
Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership with the United States of America, except as follows: (state "none" or describe limitations, if any) ________________________________________
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.
(Names and Signatures of all Partners)
NAME SIGNATURE
FY16 Spillway Gate Life Cycle Maintenance 13028 Chief Joseph Dam, Bridgeport, WA W912DW-17-R-0002
00 11 00 - 5
BID SCHEDULE
NOTE:
For all CLIN items, see specification section 01 22 00.00 10 MEASUREMENT AND PAYMENT for additional information.
CLIN
Item #
Description of Item
Quantity
Unit
Unit Price
Total Amount
BASE ITEMS
0001 Mobilization/demobilization. 1 JOB N/A $______________
0002 Design of trolley systems for traveling scaffolding.
1 JOB N/A $______________
0003 Fabrication, delivery, and installation of trolley systems for traveling scaffolding.
1 JOB N/A $______________
0004 Coating of spillway gates (upstream side only).
1 JOB N/A $______________
0005 Removal and replacement of existing spillway gate seals.
1 JOB N/A $______________
0006 Performance of inspections on spillway gates.
1 JOB N/A $______________
0007 Installation of cathodic protection system.
1 JOB N/A $______________
0008 Replacement of wire ropes with Government furnished wire ropes.
8 PR $___________ $______________
0009 Replacement of wire ropes with Contractor provided wire ropes.
11 PR $___________ $______________
0010 Rehabilitation of hoist machinery except CLINs #0029 and #0030.
1 JOB N/A $______________
0011 Replacement of oil seal heating system piping and insulation.
1 JOB N/A $______________
0012 Weld filling of 500 square inches of pitted skinplate. See note #5.
1 JOB N/A $______________
0013 Performance of weld repairs per specification section 05 05 23
WELDING, STRUCTURAL.
1 JOB N/A $______________
00 11 00 - 6
CLIN
Amount
0014 Providing construction access for work for CLINs #0003-0005 and #0007- 0013.
1 JOB N/A $______________
0015 All work for O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval.
1 JOB N/A $60,000
0016 All work for as-built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $25,000
TOTAL BASE ITEMS 0001 - 0016 $_____________________
OPTIONAL ITEMS - See note #6.
0017 Removing foam on gates. See note #8.
19 10 IN3 $___________ $______________
0018 Drilling drain holes on gates. See note #8.
19 EA $___________ $______________
0019 Replacing foam on gates. See note #8. 19 10 IN3 $___________ $______________
0020 Coating spillway gates (downstream side of gates only). See note #8.
19 EA $___________ $______________
0021 Coating downstream strut arms, braces, and horizontal girders. See notes #7 and #8.
19 EA $___________ $______________
0022 Weld filling additional square inches of pitted skinplate. See note #9.
50 50 IN2 $___________ $______________
0023 Repair of paint damage caused during execution of CLIN #0022. See note #9.
50 50 IN2 $___________ $______________
0024 Repair of paint damage caused during execution of CLINs #0005 and #0007.
See note #10.
1 JOB N/A $______________
0025 Repair of paint damage caused during execution of CLIN #0012. See note #11.
1 JOB N/A $______________
00 11 00 - 7
CLIN
Amount
0026 Providing construction access for work of CLINs #0017-0025 for first gate accessed. See note #12.
1 JOB N/A $______________
0027 Providing construction access for work of CLINs #0017-0025 for all subsequent gates accessed after first gate. See notes #12 and #13.
18 EA $___________ $______________
0028 Painting of catwalk railings and compressed air line. See note #14.
1 JOB N/A $______________
0029 Repair or replacement of all components of parallel shaft reducers of gates. See note #15.
19 EA $___________ $______________
0030 Repair or replacement of all components of intermediate and final gears of gates. See note #15.
19 EA $___________ $______________
TOTAL OPTIONAL ITEMS 0017 - 0030 $_____________________
TOTAL ALL ITEMS 0001- 0030 $_____________________
NOTES:
1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
2) To better facilitate the receipt and proposal process, all modifications to proposals shall be submitted on copies of the latest Bid Schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
3) Offerors must insert a price on all numbered items of the Bid Schedule. Failure to do so will result in the offer being unacceptable.
4) The dollar amount established for CLINs #0015 and #0016 shall not be revised by bidders.
5) Assumption is that weld filling will be distributed across all gates, requiring multiple setups, to address repair of minor pitting as required by the specifications.
6) Award of optional items will be made in accordance with specification Section 00 73 00 SPECIAL CLAUSES, Paragraph “OPTION FOR INCREASED QUANTITY”. Period of
00 11 00 - 8 performance for a particular gate’s optional CLIN Items shall be concurrent with base CLIN Item work for that particular gate in accordance with the Contractor’s approved schedule.
7) Each unit includes two strut arms, and multiple braces and girders per gate.
8) Items for optional CLIN Items #0017 through #0021 may be exercised in any number up to 19 units, or none at all.
• CLIN Item #0018 includes preparation and re-coating of the affected areas.
• CLIN Item #0021 will not be awarded if CLIN #0020 is not awarded.
• For each gate, CLIN Items #0017 through #0021 shall be awarded within a period of fifteen calendar days after the inspection report is received by the Government, or not at all.
9) Optional CLIN Items #0022 and #0023 may be exercised in any number up to 50 units each, or none at all. Optional CLIN Item #0022 for a particular gate shall not be awarded after a period of 15 calendar days has elapsed after the inspection report is received by the Government for CLIN Item #0006 inspection work for that gate. Optional CLIN Item #0023 for a particular gate shall not be awarded after a period of 15 days has elapsed past the completion of CLIN Item #0022 work for that gate.
10) Optional CLIN Item #0024 for a particular gate shall not be awarded after a period of 15 calendar days past the completion of CLIN Items #0005 and #0007 for that gate.
11) Optional CLIN Item #0025 for a particular gate shall not be awarded after a period of 15 calendar days past the completion of CLIN Item #0012 for that gate.
12) Optional CLIN Item #0026 may only be awarded once. Optional CLIN Item #0027 may be awarded up to 18 times, or none at all.
13) If none of optional CLIN Items #0017-0025 are awarded for a particular gate, neither CLIN Item #0026 nor CLIN Item #0027 will be awarded for that gate. If any of CLIN Items #0017-0025 are awarded for a particular gate, either CLIN Item #0026 or CLIN Item #0027 will be awarded for that gate.
14) Optional CLIN Item #0028 will be awarded no later than 45 calendar days after Notice to Proceed or not at all.
15) Optional CLINs #0029 and #0030 may be exercised in any number up to 19 times, or none at all. These CLINs will not be awarded after a period of 15 calendar days past the completion of CLIN #0010 inspection of the respective gate's mechanical system.
16) EA = EACH
LF = LINEAR FEET
PR = PAIR
IN2 = SQUARE INCHES
IN3 = CUBIC INCHES
END BID SCHEDULE
W912DW-17-R-0002 00 21 00 - 1
1. 1
Section 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFEROR
Introduction: Your firm is invited to submit a proposal in response to this Request for Proposal (RFP) No. W912DW-17-R-0002, titled Spillway Gates Life Cycle Maintenance, Chief Joseph Dam, located in Bridgeport, WA.
PROPOSAL COMPOSITION AND SUBMISSION
General Requirements: Proposals must set forth full, accurate, and complete information as required by this Request for Proposal (RFP). Absence of information demonstrates the lack of support for a criterion. Proposals shall contain only data essential for evaluation of proposals to expedite both the RFP proposal preparation and evaluation. Data submitted must reflect the Offeror’s interpretation of criteria contained in the RFP.
Submit your proposal in two parts:
(a) Technical proposal, and (b) Price proposal. Submit each part in a separate envelope or package with the type of proposal (e.g., technical or price) clearly printed on the outside of the envelope or package.
Proposals are to be on 8-1/2 x 11-inch paper, to the maximum extent practicable, and submitted in standard letter (8-1/2 x 11-inch) hardback loose-leaf binders. Contents of binders shall be appropriately tabbed and labeled corresponding to the proposal table of contents, affording ease of identification.
Reference FAR Clause 52.204-4(b) Printed or Copied Double-Sided on Recycled Paper. In accordance with Section 101 of Executive Order 13101 of September 14, 1998, Greening the Government through Waste Prevention, Recycling, and Federal Acquisition, the Contractor is encouraged to submit paper documents, such as offers, letters, or reports, that are printed or copied double-sided on recycled paper that meet minimum content standards specified in Section 505 of Executive Order 13101, when not using electronic commerce methods to submit information or data to the Government.
Number pages consecutively. There shall be no consideration of information incorporated by reference or reiteration of the RFP. Proposal presentation shall be in a manner which allows it to “STAND ALONE” without need for evaluators to reference other documents. It is allowable to combine arrangements, layout plans, and notes on single sheets in order to simplify presentation, so long as there is maintenance of clarity. Elaborate brochures or other presentation materials beyond those sufficient to present complete and effective responses are unnecessary. Elaborate artwork, expensive paper and bindings, and expensive/extensive visual aids and other presentation aids are neither necessary nor wanted. Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
Offerors are required to meet ALL solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section and Section 00 24 00 of the solicitation at or before the exact time specified in the solicitation. There will be no public opening of the proposals received as a result of this solicitation. Failure to meet a requirement may result in an offer being ineligible for award.
W912DW-17-R-0002 00 21 00 - 2
1. 2
PROPOSAL SUBMITTALS
Proposals must be received no later than the date and time listed in Block 13(A) of the SF 1442.
Plainly mark the proposal package “Proposals for Solicitation Number: W912DW-17-R-0002, DO NOT
OPEN”
Hand-delivery / Fed-Ex / UPS or other commercial carrier:
Caroline Mueller - Contract Specialist, Building 1202 U.S. Army Corps of Engineers, Seattle District
CECT-NWS-C
4735 E. Marginal Way S, Building 1202 Seattle, WA 98134-2388
Mail:
Caroline Mueller – Contract Specialist U.S. Army Corps of Engineers, Seattle District CECT-NWS-C PO Box 3755 Seattle, WA 98124-3755
Note: Commercial carriers will not deliver proposals to P.O. Boxes.
ATTENTION: Due to heightened security, the method of Hand Delivery has changed and takes longer than the previous method of arriving at the Federal Center South building lobby to deliver your Offer, Bid or Proposal. Please allow sufficient time to allow for heightened security at Government installations and to get to Building #1202. Allow time to park, pass through a metal detector, sign in, and receive a building pass at the Federal Center South Building. From there, you will be directed to the USACE Oxbow Building (#1202) which sits behind the Federal Center South Building. Allow additional time.
Report to the Security Desk in the lobby of the USACE Oxbow Building and call Caroline Mueller, Contract Specialist, at 206-764-6741, Bonnie Lackey, Contracting Officer, at 206-764-4481, or Sonia Frees, Procurement Technician, at 206-764-3516. A Contracting representative will come down and accept your Offer, Bid or Proposal.
Note: If delivery is by any means other than Hand Delivery, please check prior to the due date and time to ensure that your Offer, Bid, or Proposal has arrived on time.
The clock located in the lobby of the USACE Oxbow Building, across the guard desk will establish official time.
A proposal is not received by the Government until it is in the physical possession of a representative of the Contracting office. Security guards and other non-contracting personnel are NOT authorized to accept proposals on behalf of the Government. See FAR 52.215-1 for rules concerning late proposals.
W912DW-17-R-0002 00 21 00 - 3
1. 3
TECHNICAL PROPOSAL FORMAT:
Technical Proposal:
• Submit One (1) Original (marked “ORIGINAL”) and Five (5) Copies (marked “COPY)”.
• Additionally, submit One (1) Electronic Copy in PDF on a CD.
• Number pages consecutively, from beginning to end. Do not repeat numbering for new sections.
• The technical proposal should include (1) a cover letter, (2) a table of contents, and (3) required technical data for evaluation. A description of each is as follows:
1.) Cover Letter: The technical proposal cover letter should be the first page of the technical proposal and should contain the following:
a) Solicitation Number
b) Vendor Legal Name
c) Listing of any alternate business names or d/b/a (doing business as)
d) CAGE Code and DUNS Number
e) Mailing Address
f) Physical Street Address
g) Principal Office Location (City, State and Zip)
h) Acknowledgement of all “amendments” by number and date of issue.
i) Statement the Offer is acceptable for a period of 90 calendar days from the date of submission.
j) Person(s) authorized to negotiate on Offeror’s behalf with the Government for this solicitation:
a. Name
b. Title
c. Phone Number (also include mobile number if applicable)
d. Email address
2.) Table of Contents: The Table of Contents should list all sections contained in the technical proposal. Provide a separate section for each evaluation factor. Any additions or revisions to the proposal shall include an updated Table of Contents for each set.
3.) Technical Data for Evaluation: The Technical Data section shall consist of all information required in Section 00 24 00. This section shall be specific and complete, demonstrating a thorough understanding of the requirements. It shall include, where applicable, diagrams and/or charts. It shall include complete explanations of procedures and proposed programs, as well as the demonstration of the merit of the offered technical approach, if applicable. It shall demonstrate all criteria requirements. It shall be an orderly, specific, and complete document in every detail.
W912DW-17-R-0002 00 21 00 - 4
1. 4
PRICE PROPOSAL FORMAT:
Price Proposal:
• Submit One (1) Original (marked “ORIGINAL”) and One (1) Copy (marked “COPY”).
• Additionally, submit One (1) Electronic Copy in PDF on a SEPARATE CD.
• An official authorized to bind your firm must sign the price proposal. Note that Standard Form 1442, Block 13A, provides the number of calendar days after the date of the offer for which the proposal is firm.
• Submit the price proposal at the same time as, but separate from the technical proposal.
• The price proposal and requisite forms should include the following:
a) SF 1442 – Solicitation, Offer and Award Document (Acknowledge all amendments (if any) by number of amendment and date in Block 19)
b) Corporate Certificate
c) Pricing Schedule
d) Representations, Certifications and Other Statements of Offerors (Contractors are required, before receipt of contract award to ensure that their firm is registered in the government web site entitled “System for Award Management” (SAM) and that all information required is current and up to date. https://www.sam.gov/portal/public/SAM/)
e) Bid Bond (Bid Bond must be accompanied by a Power of Attorney containing an original signature from the surety, which must be affixed to the Power of Attorney after the Power of Attorney has been generated. Computer generated and signed Powers of Attorney will only be accepted if accompanied by an original certification from a current officer of the surety attesting to its authenticity and continuing validity.)
RELEASE OF INFORMATION: After receipt of proposals, no source selection information will be available to any Offeror until contract award. This includes, but is not limited to, the relative standing of the Offeror’s proposal or the number or identity of the participating Offerors.
PROPOSAL EXPENSES AND PRE-CONTRACT COSTS: The Government is in no way responsible for costs incurred in the preparation and submission of a proposal or for any other costs incurred prior to the execution of a formal contract.
AWARD AND POST AWARD PROCEDURES
Technical Evaluation: There will be an evaluation of all technical proposals by a Source Selection Evaluation Board. The Board’s duty is the assignment of a fair, unbiased technical rating for each proposal based solely on the merits of the proposal. Proposals that do not conform to the terms and conditions contained in the Solicitation, or those that include stipulations or qualifying conditions unacceptable to the Government, are not eligible for award. There will be no consideration of pricing data during the technical evaluation.
https://www.sam.gov/portal/public/SAM/
W912DW-17-R-0002 00 21 00 - 5
1. 5
Selection and Award without Discussions: It is the intent of the Government to make award based upon initial offers, without further discussions or additional information. Therefore, submit your proposal on the most favorable terms from a technical standpoint. Do not assume you will have an opportunity to clarify, discuss or revise your proposal.
If award is not possible from initial offers, the Contracting Officer may establish a competitive range prior to either written and/or oral (i.e. telephonic) discussions with all Offerors in the competitive range.
As a result, Offerors may be asked to revise their initial offers. If an Offeror’s proposal is eliminated or otherwise removed from the competitive range during discussions, further revisions to that Offeror’s proposal will neither be accepted nor considered. Discussions will culminate in a request for a Final Proposal Revision (FPR), the date and time of which will be provided to all Offerors.
After discussions and the subsequent receipt of FPRs, the Source Selection Evaluation Board will evaluate supplemental information provided by Offerors and adjust previously assigned technical ratings.
Selection and Award: Contract award will be made to the responsible Offeror submitting the Lowest Price Technically Acceptable (LPTA) offer in accordance with FAR Part 15 procedures. The Government reserves the right to reject all offers.
Debriefings:
Pre-award: Offerors excluded from the competition before award will receive a notice and may request a debriefing before award by submitting a written request for a debriefing to the Contracting Officer within three (3) calendar days after receipt of the notice of exclusion from the competition. (FAR 15.505)
Post-award: Unsuccessful Offerors may request a post-award debriefing within three (3) calendar days after the date on which the Offeror received notification of contract award. There will be no point-by-point comparisons with other Offerors’ proposals and debriefings will not reveal any information that is not releasable under the Freedom of Information Act (FOIA). (FAR 15.506)
Section 00 21 00 - Instructions, Conditions and Notices to Offeror
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management JUL 2013 52.204-18 Commercial and Government Entity Code Maintenance JUL 2015 52.211-6 Brand Name or Equal AUG 1999 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.217-5 Evaluation Of Options JUL 1990 52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
DEC 2015
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.225-24 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS—
BUY AMERICAN STATUTE—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY
2014)
(a) Definitions.
“Construction material,” “domestic construction material,” “foreign construction material,” “manufactured construction material,” “Recovery Act designated country construction material,” “steel,” and “unmanufactured construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Required Use of Iron, Steel, and Manufactured Goods—Buy American statute—Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-23).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-23 in the request. If an offeror has not requested a determination regarding the inapplicability of section 1605 of the Recovery Act or the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies in accordance with FAR 25.604, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American statute by adding to the offered price of the contract--
(i) 25 percent of the offered price of the contract, if foreign manufactured construction material is included in the offer based on an exception for the unreasonable cost of comparable manufactured domestic construction material;
and
(ii) 6 percent of the cost of foreign unmanufactured construction material included in the offer based on an exception for the unreasonable cost of comparable domestic unmanufactured construction material.
(2) If the solicitation specifies award on the basis of factors in addition to cost or price, the Contracting Officer will apply the evaluation factors as specified in paragraph (c)(1) of this provision and use the evaluated cost or price in determining the offer that represents the best value to the Government.
(3) Unless paragraph (c)(2) of this provision applies, if two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, other than Recovery Act designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-23, the offeror also may submit an alternate offer based on use of equivalent domestic or Recovery Act designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-23 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-23 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or Recovery Act designated country construction material, and the offeror shall be required to furnish such domestic or Recovery Act designated country construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Contracting Officer U.S. Army Corps of Engineers – Seattle District 4735 East Marginal Way South, Building 1202 Seattle, WA 98134-2388
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vfdfara.htm
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
If applicable, the solicitation will be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .