R0010.pdf
PDF 412 KB Posted
- Solicitation number
- W912DW-17-R-0002
About this file
Amendment 0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R0009.pdf | ||
| R0008.pdf | ||
| Amendment_R0007.pdf | ||
| R0006.pdf | ||
| R0005.pdf | ||
| Amendment_0004.pdf | ||
| Site_Visit_Attendance_Rosters_for_Site_Visits__1_&_2.pdf | ||
| Amendment_0003.pdf | ||
| W912DW-17-R-0002-R0002.pdf | ||
| Drawings_(RTA-20161011)_2_of_4.pdf | ||
| Drawings_(RTA-20161011)_4_of_4.pdf | ||
| Reference_Drawings.pdf | ||
| Drawings_(RTA-20161011)_1_of_4.pdf | ||
| Amendment_0001.pdf | ||
| Drawings_(RTA-20161011)_3_of_4.pdf | ||
| 00_24_00_-_Attachment_A_(Word_version).docx | DOCX document | |
| Solicitation_ _Specifications.pdf | ||
| 00_24_00_-_Attachment_B_(Word_version).docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68MD960487287
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Chief Joseph Dam Spillw ay Gates Lifecycle Maintenance
Please see Continuation Page for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jan-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-17-R-0002
X 9B. DATED (SEE ITEM 11)
29-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jan-2017
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CECT-NWS
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of Amendment ten (0010) is as follows:
Incorporate below items as indicated.
1. Bid Schedule Bid Schedule is revised and replaced in its entirety. Please submit pricing on Bid Schedule without Markups. Track changes version is provided for information purposes.
2. Provisions/Clauses – revised provisions/clauses are as follows:
Section 00 45 00 – Representations and Certifications 52.204-8
Section 00 72 00 – Contract Clauses 52.244-6
3. Proposal Submittal Proposal submittal date/time remains the same: 23 January 2017 at 12:30:00 p.m. LOCAL TIME.
NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.
Encl:
Bid Schedule (revised) Clauses – (only revised provisions/clauses included)
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following have been modified:
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2016)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990, Other
Heavy and Civil Engineering Construction.
(2) The small business size standard is $36,500,000 in average annual receipts.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at
52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.209-11, Representation by Corporations Regarding elinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(viii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(ix) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(x) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xi) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xv) 52.222-57, Representation Regarding Compliance with Labor Laws (Executive Order 13673). This provision applies to solicitations expected to exceed $50 million which are issued from October 25, 2016 through April 24, 2017, and solicitations expected to exceed $500,000, which are issued after April 24, 2017.
Note to paragraph (c)(1)(xv): By a court order issued on October 24, 2016, 52.222-57 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal
Register advising the public of the termination of the injunction.
(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased
Products Under Service and Construction Contracts.
(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xx) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and
III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $77,533, the provision with its Alternate II applies.
(D) If the acquisition value is $77,533 or more but is less than $100,000, the provision with its Alternate III applies.
(xxi) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-
5.
(xxii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiii) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxiv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
(i) 52.204-17, Ownership or Control of Offeror.
(ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain
Services--Certification.
(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-
Designated Products (Alternate I only).
(vii) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change https://www.acquisition.gov/
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
(End of provision)
SECTION 00 72 00 - CONTACT CLAUSES
The following included by reference have been revised:
52.244-6 Subcontracts for Commercial Items NOV 2016
(End of Summary of Changes)
FY16 Spillway Gate Life Cycle Maintenance 13028 Chief Joseph Dam, Bridgeport, WA W912DW-17-R-0002
00 11 00 - 5 R0010
BID SCHEDULE
NOTE:
For all CLIN items, see specification section 01 22 00.00 10 MEASUREMENT AND PAYMENT for additional information.
CLIN
Item #
Description of Item Quantity Unit Unit Price
Total Amount
BASE ITEMS
0001 Mobilization/demobilization. 1 JOB N/A $______________
0002 Design of trolley systems for traveling scaffolding.
1 JOB N/A $______________
0003 Fabrication, delivery, and installation of trolley systems for traveling scaffolding.
1 JOB N/A $______________
0004 Coating of spillway gates (upstream side only).
1 JOB N/A $______________
0005 Removal and replacement of existing spillway gate seals.
1 JOB N/A $______________
0006 Performance of inspections on spillway gates.
1 JOB N/A $______________
0007 Installation of cathodic protection system.
1 JOB N/A $______________
0008 Replacement of wire ropes with Government furnished wire ropes.
8 PR $___________ $______________
0009 Replacement of wire ropes with Contractor provided wire ropes.
11 PR $___________ $______________
0010 Rehabilitation of hoist machinery except CLINs # 0028-0030.
1 JOB N/A $______________
0011 Replacement of oil seal heating system piping and insulation.
1 JOB N/A $______________
0012 Weld filling of 500 square inches of pitted skinplate. See note #5.
1 JOB N/A $______________
0013 Providing construction access for work for CLINs #0003-0005 and #0007- 0012.
1 JOB N/A $______________
00 11 00 - 6 R0010
Amount
0014 All work for O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval.
1 JOB N/A $60,000
0015 All work for as-built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $25,000
TOTAL BASE ITEMS 0001 - 0015 $_____________________
OPTIONAL ITEMS - See note #6.
0016 Removing foam on gates. See note #8.
19 10 IN3 $___________ $______________
0017 Drilling drain holes on gates. See note #8.
19 EA $___________ $______________
0018 Replacing foam on gates. See note #8. 19 10 IN3 $___________ $______________
0019 Coating spillway gates (downstream side of gates only). See note #8.
19 EA $___________ $______________
0020 Coating downstream strut arms, braces, and horizontal girders. See notes #7 and #8.
19 EA $___________ $______________
0021 Weld filling additional square inches of pitted skinplate. See note #9.
50 50 IN2 $___________ $______________
0022 Repair of paint damage caused during execution of CLIN # 0021. See note #9.
50 50 IN2 $___________ $______________
0023 Repair of paint damage caused during execution of CLINs #0005 and #0007.
See note #10.
19 EA $___________ $______________
0024 Repair of paint damage caused during execution of CLIN #0012. See note #11.
19 EA $___________ $______________
00 11 00 - 7 R0010
Amount
0025 Providing construction access for work of CLINs # 0016-0024 for first gate accessed. See note #12.
1 JOB N/A $______________
0026 Providing construction access for work of CLINs # 0016-0024 for all subsequent gates accessed after first gate. See notes #12 and #13.
18 EA $___________ $______________
0027 Painting of compressed air line. See note #14.
1 JOB N/A $______________
0028 Replacement of all internal components of parallel shaft reducers of gates. See note #15.
19 EA $___________ $______________
0029 Replacement of all components of intermediate and final gears of gates except for work included in CLIN #0030. See note #15.
19 EA $___________ $______________
0030 Replacement of all intermediate and final bull gears of first gate. See note # 16.
1 JOB N/A $______________
0031 Replacement of all intermediate and final bull gears of all subsequent gates after the first gate. See note #16.
18 EA $___________ $______________
TOTAL OPTIONAL ITEMS 0016- 0031 $_____________________
TOTAL ALL ITEMS 0001- 0031 $_____________________
NOTES:
1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
2) To better facilitate the receipt and proposal process, all modifications to proposals shall be submitted on copies of the latest Bid Schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
00 11 00 - 8 R0010
3) Offerors must insert a price on all numbered items of the Bid Schedule. Failure to do so will result in the offer being unacceptable.
4) The dollar amount established for CLINs # 0014 and # 0015 shall not be revised by bidders.
5) Assumption is that weld filling will be distributed across all gates, requiring multiple setups, to address repair of minor pitting as required by the specifications.
6) Award of optional items will be made in accordance with specification Section 00 73 00 SPECIAL CLAUSES, Paragraph “OPTION FOR INCREASED QUANTITY”. Period of performance for a particular gate’s optional CLIN Items shall be concurrent with base CLIN Item work for that particular gate in accordance with the Contractor’s approved schedule.
7) Each unit includes two strut arms, and multiple braces and girders per gate.
8) Items for optional CLIN Items # 0016 through # 0020 may be exercised in any number up to 19 units, or none at all.
• CLIN Item # 0017 includes preparation and re-coating of the affected areas.
• CLIN Item # 0020 will not be awarded if CLIN # 0019 is not awarded.
• For each gate, CLIN Items # 0016 through # 0020 shall be awarded within a period of fifteen calendar days after the inspection report is received by the Government, or not at all.
9) Optional CLIN Items # 0021 and # 0022 may be exercised in any number up to 50 units each, or none at all. Optional CLIN Item # 0021 for a particular gate shall not be awarded after a period of 15 calendar days has elapsed after the inspection report is received by the Government for CLIN Item #0006 inspection work for that gate.
Optional CLIN Item # 0022 for a particular gate shall not be awarded after a period of 15 days has elapsed past the completion of CLIN Item # 0021 work for that gate.
10) Optional CLIN Item # 0023 for a particular gate shall not be awarded after a period of 15 calendar days past the completion of CLIN Items #0005 and #0007 for that gate.
11) Optional CLIN Item # 0024 for a particular gate shall not be awarded after a period of 15 calendar days past the completion of CLIN Item #0012 for that gate.
12) Optional CLIN Item # 0025 may only be awarded once. Optional CLIN Item # 0026 may be awarded up to 18 times, or none at all.
13) If none of optional CLIN Items # 0016-0024 are awarded for a particular gate, neither CLIN Item # 0025 nor CLIN Item # 0026 will be awarded for that gate. If any of CLIN Items # 0016-0024 are awarded for a particular gate, either CLIN Item # 0025 or CLIN Item # 0026 will be awarded for that gate.
14) Optional CLIN Item # 0027 will be awarded no later than 45 calendar days after Notice to Proceed or not at all.
00 11 00 - 9 R0010
15) Optional CLINs # 0028- 0029 may be exercised in any number up to 19 times, or none at all. These CLINs will not be awarded after a period of 15 calendar days past the completion of CLIN #0010 inspection of the respective gate's mechanical system.
16) Optional CLIN 0030 may only be awarded once. Optional CLIN 0031 may be awarded up to 18 times, or none at all. These CLINs will not be awarded after a period of 15 calendar days past the completion of CLIN #0010 inspection of the respective gate's mechanical system.
17) EA = EACH
LF = LINEAR FEET
PR = PAIR
IN2 = SQUARE INCHES
IN3 = CUBIC INCHES
END BID SCHEDULE
This page intentionally left blank.
00 11 00 - 5 R0010 - with track changes
BID SCHEDULE
NOTE:
For all CLIN items, see specification section 01 22 00.00 10 MEASUREMENT AND PAYMENT for additional information.
Amount
BASE ITEMS
0001 Mobilization/demobilization. 1 JOB N/A $______________
0002 Design of trolley systems for traveling scaffolding.
1 JOB N/A $______________
0003 Fabrication, delivery, and installation of trolley systems for traveling scaffolding.
1 JOB N/A $______________
0004 Coating of spillway gates (upstream side only).
1 JOB N/A $______________
0005 Removal and replacement of existing spillway gate seals.
1 JOB N/A $______________
0006 Performance of inspections on spillway gates.
1 JOB N/A $______________
0007 Installation of cathodic protection system.
1 JOB N/A $______________
0008 Replacement of wire ropes with Government furnished wire ropes.
8 PR $___________ $______________
0009 Replacement of wire ropes with Contractor provided wire ropes.
11 PR $___________ $______________
0010 Rehabilitation of hoist machinery except CLINs # 0028-0030.
1 JOB N/A $______________
0011 Replacement of oil seal heating system piping and insulation.
1 JOB N/A $______________
0012 Weld filling of 500 square inches of pitted skinplate. See note #5.
1 JOB N/A $______________
0013 Providing construction access for work for CLINs #0003-0005 and #0007- 0012.
1 JOB N/A $______________
00 11 00 - 6 R0010 - with track changes
Amount
0014 All work for O&M manuals as specified in Section 01 78 23 OPERATIONS AND MAINTENANCE MANUALS from preparation to final approval.
1 JOB N/A $60,000
0015 All work for as-built drawings as specified in Section 01 78 00 CLOSEOUT SUBMITTALS from preparation to final approval.
1 JOB N/A $25,000
TOTAL BASE ITEMS 0001 - 0016 $_____________________
OPTIONAL ITEMS - See note #6.
0016 Removing foam on gates. See note #8.
19 10 IN3 $___________ $______________
0017 Drilling drain holes on gates. See note #8.
19 EA $___________ $______________
0018 Replacing foam on gates. See note #8. 19 10 IN3 $___________ $______________
0019 Coating spillway gates (downstream side of gates only). See note #8.
19 EA $___________ $______________
0020 Coating downstream strut arms, braces, and horizontal girders. See notes #7 and #8.
19 EA $___________ $______________
0021 Weld filling additional square inches of pitted skinplate. See note #9.
50 50 IN2 $___________ $______________
0022 Repair of paint damage caused during execution of CLIN # 0021. See note #9.
50 50 IN2 $___________ $______________
0023 Repair of paint damage caused during execution of CLINs #0005 and #0007.
See note #10.
19 EA $___________ $______________
0024 Repair of paint damage caused during execution of CLIN #0012. See note #11.
19 EA $___________ $______________
g3ctccbm Text Box g3ctccbm Line g3ctccbm Line
00 11 00 - 7 R0010 - with track changes
Amount
0025 Providing construction access for work of CLINs # 0016-0024 for first gate accessed. See note #12.
1 JOB N/A $______________
0026 Providing construction access for work of CLINs # 0016-0024 for all subsequent gates accessed after first gate. See notes #12 and #13.
18 EA $___________ $______________
0027 Painting of compressed air line. See note #14.
1 JOB N/A $______________
0028 Replacement of all internal components of parallel shaft reducers of gates. See note #15.
19 EA $___________ $______________
0029 Replacement of all components of intermediate and final gears of gates except for work included in CLIN #0030. See note #15.
19 EA $___________ $______________
0030 Replacement of all intermediate and final bull gears of first gate. See note # 16.
1 JOB N/A $______________
0031 Replacement of all intermediate and final bull gears of all subsequent gates after the first gate. See note #16.
18 EA $___________ $______________
TOTAL OPTIONAL ITEMS 0017 - 0031 $_____________________
TOTAL ALL ITEMS 0001- 0031 $_____________________
NOTES:
1) 100% Design Projects cannot be altered, changed, or re-designed in any way. No alternate proposals will be accepted.
2) To better facilitate the receipt and proposal process, all modifications to proposals shall be submitted on copies of the latest Bid Schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
g3ctccbm Text Box g3ctccbm Line g3ctccbm Line
00 11 00 - 8 R0010 - with track changes
3) Offerors must insert a price on all numbered items of the Bid Schedule. Failure to do so will result in the offer being unacceptable.
4) The dollar amount established for CLINs # 0014 and # 0015 shall not be revised by bidders.
5) Assumption is that weld filling will be distributed across all gates, requiring multiple setups, to address repair of minor pitting as required by the specifications.
6) Award of optional items will be made in accordance with specification Section 00 73 00 SPECIAL CLAUSES, Paragraph “OPTION FOR INCREASED QUANTITY”. Period of performance for a particular gate’s optional CLIN Items shall be concurrent with base CLIN Item work for that particular gate in accordance with the Contractor’s approved schedule.
7) Each unit includes two strut arms, and multiple braces and girders per gate.
8) Items for optional CLIN Items # 0016 through # 0020 may be exercised in any number up to 19 units, or none at all.
• CLIN Item # 0017 includes preparation and re-coating of the affected areas.
• CLIN Item # 0020 will not be awarded if CLIN # 0019 is not awarded.
• For each gate, CLIN Items # 0016 through # 0020 shall be awarded within a period of fifteen calendar days after the inspection report is received by the Government, or not at all.
9) Optional CLIN Items # 0021 and # 0022 may be exercised in any number up to 50 units each, or none at all. Optional CLIN Item # 0021 for a particular gate shall not be awarded after a period of 15 calendar days has elapsed after the inspection report is received by the Government for CLIN Item #0006 inspection work for that gate.
Optional CLIN Item # 0022 for a particular gate shall not be awarded after a period of 15 days has elapsed past the completion of CLIN Item # 0021 work for that gate.
10) Optional CLIN Item # 0023 for a particular gate shall not be awarded after a period of 15 calendar days past the completion of CLIN Items #0005 and #0007 for that gate.
11) Optional CLIN Item # 0024 for a particular gate shall not be awarded after a period of 15 calendar days past the completion of CLIN Item #0012 for that gate.
12) Optional CLIN Item # 0025 may only be awarded once. Optional CLIN Item # 0026 may be awarded up to 18 times, or none at all.
13) If none of optional CLIN Items # 0016-0024 are awarded for a particular gate, neither CLIN Item # 0025 nor CLIN Item # 0026 will be awarded for that gate. If any of CLIN Items # 0016-0024 are awarded for a particular gate, either CLIN Item # 0025 or CLIN Item # 0026 will be awarded for that gate.
14) Optional CLIN Item # 0027 will be awarded no later than 45 calendar days after Notice to Proceed or not at all.
00 11 00 - 9 R0010 - with track changes
15) Optional CLINs # 0028- 0029 may be exercised in any number up to 19 times, or none at all. These CLINs will not be awarded after a period of 15 calendar days past the completion of CLIN #0010 inspection of the respective gate's mechanical system.
16) Optional CLIN 0030 may only be awarded once. Optional CLIN 0031 may be awarded up to 18 times, or none at all. These CLINs will not be awarded after a period of 15 calendar days past the completion of CLIN #0010 inspection of the respective gate's mechanical system.
17) EA = EACH
LF = LINEAR FEET
PR = PAIR
IN2 = SQUARE INCHES
IN3 = CUBIC INCHES
END BID SCHEDULE
| Amendment 0010 |
| Bid Schedule - without markup |
| Bid Schedule - with track changes |
File details come from the government source that posted it. Updated .