Drawings_(RTA-20161011)_4_of_4.pdf

PDF 37 MB Posted

Attached to
Chief Joseph Dam Spillway Gates Lifecycle Maintenance, Bridgeport, WA
Solicitation number
W912DW-17-R-0002
Issued by

About this file

Drawings (RTA-20161011)_4 of 4

View the file

Other files

File Type Posted
R0010.pdf PDF
R0009.pdf PDF
R0008.pdf PDF
Amendment_R0007.pdf PDF
R0006.pdf PDF
R0005.pdf PDF
Amendment_0004.pdf PDF
Site_Visit_Attendance_Rosters_for_Site_Visits__1_&_2.pdf PDF
Amendment_0003.pdf PDF
W912DW-17-R-0002-R0002.pdf PDF
Drawings_(RTA-20161011)_2_of_4.pdf PDF
Reference_Drawings.pdf PDF
Drawings_(RTA-20161011)_1_of_4.pdf PDF
Amendment_0001.pdf PDF
Drawings_(RTA-20161011)_3_of_4.pdf PDF
00_24_00_-_Attachment_A_(Word_version).docx DOCX document
Solicitation_ _Specifications.pdf PDF
00_24_00_-_Attachment_B_(Word_version).docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12 12

M-110

O

IL

S E

A L

H

A T

E R

S Y

S T

E M

PHOTO 4: OIL FILTERS AND CATCH PAN

NOTES:

PHOTO 3: HEATING OIL CIRCULATION PUMP AND PIPING

SEE REFERENCE DRAWINGS R64-R73

FOR PRINTING OIL CHANGE DATES.

EXISTING LABELS, BUT INCLUDE A SECTION

OIL TYPE. LABELS SHALL BE SIMILAR TO

CHANGE OIL TYPE LABELS TO REPLACED

(SEE NOTE 5)

FOR FILTERS

AND CATCH PAN

INSTALL SHROUD

FABRICATE AND

SEE NOTE 6

GUARD FOR THIS ROUTING

FABRICATE AND INSTALL PIPE

SEE NOTE 6

GUARD FOR THIS ROUTING

FABRICATE AND INSTALL PIPE

TANKS, AND HEATERS

REUSE EXISTING MOTORS, PUMPS,

NEOPRENE/RUBBER DIELECTRIC GASKET

HIGH TEMPERATURE RUBBER EXPANSION JOINT

(SEE DETAIL)

BETWEEN THE DISSIMILAR METALS.

EXPANSION AND CATHODIC ISOLATION

RUBBER EXPANSION JOINT FOR THERMAL

PERFORMED WITH A HIGH TEMPERATURE

STAINLESS STEEL PIPE SHALL BE

STEEL PIPE AND NEW SCHEDULE 80

EMBEDDED SCHEDULE 40 ANODIZED

CONNECTION BETWEEN EXISTING

PHOTO 5: PIPE GUARD INSTALL LOCATION

80 WHERE EMBEDDED IN CONCRETE.

SCHEDULE 40 WHERE EXPOSED, AND SCHEDULE

EXISTING PIPING IS ASTM A120, SEAMLESS, BLACK,

ENTRANCE TO CONCRETE, WELD ON FLANGE.

CUT PIPING NO MORE THAN 12 INCHES FROM

PIPE, SEE DETAIL THIS SHEET.

7. FOR CONNECTION BETWEEN EXISTING EMBEDDED PIPE AND NEW EXPOSED

SAFETY YELLOW.

CATWALK AND PROTECT PIPE ON 3 SIDES IN WALKWAY. PAINT GUARDS

FOR PIPE GUARD FABRICATION. PIPE GUARDS SHALL FASTEN TO

6. SEE SPECIFICATION 05 50 13 MISCELLANEOUS METAL FABRICATIONS

MATCH.

FILTERS; CONTRACTOR SHALL INSTALL FILTERS ON THE 3RD SYSTEM TO

IN SPECIFICATION. NOTE - ONLY 2 OF THE 3 SYSTEMS CURRENTLY HAVE

SHALL BE REMOVABLE. PROVIDE ADDITIONAL CATCH PANS AS REQUIRED

EASY REMOVAL OF FILTERS AND OPERATION OF VALVES. CATCH PAN

05 50 13 MISCELLANEOUS METAL FABRICATIONS. SHROUD SHALL ALLOW

5. FOR OIL SHROUD AND CATCH PAN FABRICATION SEE SPECIFICATION

IS APPROXIMATELY 550 GALLONS OF OIL.

TO NEW SYSTEM. CAPACITY OF ALL 3 OIL HEATING SYSTEMS COMBINED

WHEN REMOVING EXISTING OIL PRIOR TO DEMOLITION AND WHEN ADDING OIL

4. ADHERE TO REQUIREMENTS IN 41 24 26 SEAL HEATING OIL SYSTEM

3. NOTE, NO ASBESTOS IS PRESENT IN THE EXISTING PIPING INSULATION.

INSTALLATION WITH ALL OTHER WORK IN THIS CONTRACT.

2. COORDINATE OIL HEATING SYSTEM DEMOLITION AND NEW PIPING

SCHEDULE 40, WELDED, ASTM TYPE 304 STAINLESS STEEL.

INSULATION, THEN REPLACE ALL REMOVED PIPING. NEW PIPING SHALL BE

(I.E. NOT EMBEDDED IN CONCRETE) SEAL HEATER OIL PIPING AND

1. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL EXISTING EXPOSED

TYPICAL SMALL LEAKS AROUND GAUGES

PHOTO 6: PIPING SYSTEM GAUGES AND

OFFICER'S APPROVAL.

CONTRACTING

BE REUSED WITH

GAUGES, ETC. MAY

APPURTENANCES,

ALL PIPING SYSTEM

PHOTO 2: DAMAGED PIPE INSULATION

PHOTO 1: PIPE ENTRY INTO CONCRETE

SMALL LEAKS AROUND GAUGES

DETAIL A: EXPANSION JOINT FOR PIPE ENTRY INTO CONCRETE

U .S .A

R M

Y

N

G

IN

E

R

D

IS

T R

IC

T ,S

E A

T T

L E

P r e p a r e d b y

D r a w n b y

S E

A T

T L

E

W A

S H

IN

G T e s ig n e d b y

C h e c k e d b y

D a t e

S y m b o l

S y m b o l

Seattle District

US Army Corps of Engineers

Sheet of e s c r ip t io n D a t e

D e s c r ip t io n A p p r

A

B

C

D

C O

R P

F

G

IN

E E

1 2 3 4 5

A

T

I

O T

T E

D

T I

M E

D E

S I

G

I

L E

V

C i v i l

C h i e f J o s e p h

D a m

W A

S p i l l w a y t i f e c y c i n t e n a n c e n g i n e e r i n g s i g n s i g n

C i l e s

C J

D L

C M

M

E E

T

D G

N number:

Plate

C H

IE

F

J

O S

E

M

A REDUCED PRINT. REDUCE SCALE ACCORDINGLY.

IF SHEET MEASURES LESS THAN 22" X 34" IT IS

B

ID

G E

P O

W

M C

G O

W A

N

M C

G O

W A

N

A N

G E

L O

U

W

D W

R

F il o

E

S o

IL

L W

IF

C

C

IN

T E

N A

N C

E

O

C T

File details come from the government source that posted it. Updated .