Drawings_(RTA-20161011)_1_of_4.pdf
PDF 21 MB Posted
- Solicitation number
- W912DW-17-R-0002
About this file
Drawings (RTA-20161011)_1 of 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R0010.pdf | ||
| R0009.pdf | ||
| R0008.pdf | ||
| Amendment_R0007.pdf | ||
| R0006.pdf | ||
| R0005.pdf | ||
| Amendment_0004.pdf | ||
| Site_Visit_Attendance_Rosters_for_Site_Visits__1_&_2.pdf | ||
| Amendment_0003.pdf | ||
| W912DW-17-R-0002-R0002.pdf | ||
| Drawings_(RTA-20161011)_2_of_4.pdf | ||
| Drawings_(RTA-20161011)_4_of_4.pdf | ||
| Reference_Drawings.pdf | ||
| Amendment_0001.pdf | ||
| Drawings_(RTA-20161011)_3_of_4.pdf | ||
| 00_24_00_-_Attachment_A_(Word_version).docx | DOCX document | |
| Solicitation_ _Specifications.pdf | ||
| 00_24_00_-_Attachment_B_(Word_version).docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISPLAYS ON - WEIGHT, PATTERN, TEXT NODE, ENTER DATA, DIMENSIONS, GRID (all views)
X X X X X X X X X X X X X X X X X X X X X X X X X XX
FLOW
C O L U M B I A R I V E R
CLOSURE STRUCTURE
INTAKE STRUCTURE
PEARL H
ILL ROAD
COLUMBIA
RIVER BRIDGE
RIGHT BANK
VIEW POINT
RUFUS
WOODS LAKE
DEBRIS HANDLING
FACILITY
STATE
HIGHWAY 17
SPILLWAY
PEARL HILL
BRIDGE
AREA MAP
CHIEF JOSEPH DAM
NOT TO SCALE
O R E G O N
I
D
A
H
O
B R I T I S H C O L U M B I A
BELLINGHAM
MT. VERNON
EVERETT
SEATTLE
OLYMPIA
ABERDEEN
CHEHALIS
VANCOUVER
PORTLAND
ELLENSBURG
YAKIMA
SPOKANE
TACOMA
VICINITY MAP
NOT TO SCALE
W A S H I N G T O N
WALLA WALLA
PENDLETON
UMATILLA ARMY DEPOT
of Engineers US Army Corps
Seattle District
CHIEF JOSEPH DAM , WA
BRIDGEPORT,
WASHINGTON
1 12
G-001
PN 394247
C O
V E
R
V
IC
IN
IT
Y
A N
R
E A
D E
S
IG
M
N A
G E
R C
H
IE
F
D E
S
IG
B
A N
C H
P r e p a r e d b y
S u b m it t e d b y
R e c o m m e n d e d b y
F il e
D a t e
A p p r o v e d b y
R e v ie w e d b y
S E
A T
T L
E
W A
S H
IN
G T
C
R P
F
G
IN
E E
R S
A
IL
L
N
IS
A R
G A
N D
P .E
C H
E N
G
IN
E E
R
IN
G
IV
C H
S P
E
T
V
IE
W
C
G U
Y
G R
E E
N
P .E
U .S .A
R
G
IN
E
IS
T R
IC
T
S E
A T
T
O J E
N A
G E
R
S V
IE
P .E
J O
A
W A
L L
S
P .E
CHIEF JOSEPH DAM
E
W
D W
R
W912DW-17-R-0002
S o li c it a it o n
CYCLE MAINTENANCE
FY17 SPILLWAY GATE LIFE
D A
T E
D A
T E
D A
T E
D A
T E
D A
T E
A L
N
IN
G E
R
O
C T
O B
E R
Seattle District
US Army Corps of Engineers
Sheet of
A
B
C
D
1 2 3 4 5
D A
O T
T E
D
T I
M E
D E
S I
L E
V
C i v i l
C h i e f J o s e p h
D a m
W A
S p i l l w a t e i f e c y c l i n t e n a n c e n g i n e e r i g s i g n s i g n
C l e s
C J
D L
C G
C V
R d g n number:
Plate
C H
IE
F
J
O S
E
M
A REDUCED PRINT. REDUCE SCALE ACCORDINGLY.
IF SHEET MEASURES LESS THAN 22" X 34" IT IS
B R
ID
G E
P O
S P
IL
L W
IF
C
IN
T E
N A
N
SHEET INDEX
NO.
PLATE
TITLE
NO.
SHEET
G-001
GENERAL
MECHANICAL NOTES
MECHANICAL
2 GENERAL NOTES AND SHEET INDEX
REFERENCE
4 HATCH COVERS AND LOAD INFO
9 CATHODIC PROTECTION LAYOUT
M-001
X X X X X X X X X X X X X X X X X X X X X X X XX
FLOW
CLOSURE STRUCTURE
INTAKE STRUCTURE RUFUS
WOODS LAKE
SPILLWAY
WORK AREA
M-001
M-101
M-102
M-103
M-104
M-105
M-106
M-107
M-108
M-109
M-110
REFERENCE R-1 TO R12
REFERENCE R-13 TO R48 SPILLWAY GATE REFERENCE DRAWINGS
REFERENCE R-49 TO R63
REFERENCE R-64 TO R73
WIRE ROPE REFERENCE DRAWINGS
HOIST MACHINERY REFERENCE DRAWINGS
OIL HEATER REFERENCE DRAWINGS
SPILLWAY GATE COATING
CATHODIC PROTECTION DETAILS
SEAL REPLACEMENT AND FILLER DETAILS
OIL SEAL HEATER SYSTEM
ABBREVIATIONS
COVER, VICINITY, AND AREA
SPILLWAY BRIDGE
ACCESS POINT TO
PARKING LOT
ACCESS ROAD
GENERAL NOTES AND AREA
STAGING AREA
TYP TYPICAL
SS STAINLESS STEEL
SPEC SPECIFICATION
OUTER DIAMETEROD
MAGNETIC PARTICLE TESTMT
LONGLG
LINEAR FEETLF
POUNDLB
INFO INFORMATION
IAW IN ACCORDANCE WITH
FOOTFT
ELEVATIONEL
DIAMETERDIA
CWI CERTIFIED WELDING INSPECTOR
CONTRACTING OFFICER REPRESENTATIVECOR
CENTERLINECL
S H
E E
T
IN
D E
X
G E
N E
R
T
D
HOISTWAY MACHINERY DETAILS
HOIST MACHINERY PHOTOS AND DETAILS
HOIST TORQUE SHAFT AND BRACKET DETAILS
DAM.
CONTRACTOR STORAGE AREA WILL BE ASSIGNED BY REPRESENTATIVE OF CHIEF JOSEPH
ALL TRAINING AND MEET ALL ACCESS REQUIREMENTS REQUIRED TO GAIN ACCESS.
WORK WITH STAFF AT PROJECT SITE AND PROJECT ENGINEER/ COR AND SHALL OBTAIN
ACCESS TO PROJECT SITE MAY BE RESTRICTED. CONTRACTOR SHALL COORDINATE G-6
INSTALLATION.
G-5 CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND QUANTITIES OF ALL ITEMS PRIOR TO
DIRECTED BY THE COR.
COR. THE MOST STRINGENT REQUIREMENTS SHALL GOVERN UNLESS OTHERWISE
BETWEEN THE GENERAL NOTES, SPECIFICATIONS, AND DRAWINGS, NOTIFY
GENERAL NOTES, SPECIFICATIONS, AND DRAWINGS. IN CASE OF CONFLICT
G-4 CONTRACTOR IS RESPONSIBLE FOR ALL WORK IN ACCORDANCE WITH
CONTRACTOR.
SAFETY MANUAL EM-385-1-1, IS THE SOLE RESPONSIBILITY OF THE
G-3 IMPLEMENTATION OF JOB SITE SAFETY, IN ACCORDANCE WITH CORPS OF ENGINEER
AFTER WORK IS PERFORMED.
REPAIR ANY DAMAGE TO THE STRUCTURE CAUSED BY THE TEMPORARY ATTACHMENT
ATTACHMENT TO STRUCTURES IS SUBJECT TO APPROVAL BY COR. CONTRACTOR SHALL
A REGISTERED PROFESSIONAL ENGINEER EMPLOYED BY THE CONTRACTOR. TEMPORARY
RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE DESIGNED/APPROVED BY
BRIDGES, UTILITIES, ETC, AND TO PERFORM THE WORK DURING CONSTRUCTION IS THE
THE STRUCTURAL INTEGRITY/STABILITY OF THE EXISTING STRUCTURES,
G-2 TEMPORARY BRACING, SHEETING, SHORING, SCAFFOLDING, ETC, REQUIRED TO ENSURE
STRUCTURE AT ALL STAGES OF CONSTRUCTION.
PRECAUTIONS TO MAINTAIN AND ENSURE THE INTEGRITY OF THE
RESPONSIBLE FOR IDENTIFYING AND IMPLEMENTING THE NECESSARY
THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS
G-1 METHODS, PROCEDURES AND SEQUENCES OF CONSTRUCTION ARE
WIRE ROPE REPLACEMENT INFORMATION
ROADWAY SHALL REMAIN OPEN.
EQUIPMENT. SMALLER ITEMS MAY BE STAGED ON SPILLWAY BRIDGE BUT
AND CONTRACTOR WILL BE RESPONSIBLE FOR SECURITY OF ITEMS AND
2. LAYDOWN AREA FOR LARGE ITEMS MAY BE OUTSIDE OF SECURE AREA
1. CONTRACTOR LAYDOWN AREA WILL BE DESIGNATED UPON AWARD.
NOTES:
.S .A
R
G
IN
E
T R
IC
T ,S
E A
T T
L E
P r e p a r e d b y
D r a w n b y
S E
A T
T L
E
W A
S H
IN
G T s ig n e d b y
C h e c k e d b y
D a t e
S y m b o l
S y m b o of Engineers
Sheet of e s c r ip t io n D a t e
D e s c r ip t io n A p p r
A
B
C
D
C O
R
G
IN
E E
1 2 3 4 5
A
O T
T E
D
T I
M E
D E
S I
L E
V
C i v i l
C h i e f J o s e p h
D a m
W A
S p i l l w f e c y c i n t e n a n c e g i n e e r i s i g n s i g n
C l e s
C J
D L
C M
M
E E
T
D G
N number:
Plate
C H
IE
F
J
O S
E
M
A REDUCED PRINT. REDUCE SCALE ACCORDINGLY.
IF SHEET MEASURES LESS THAN 22" X 34" IT IS
ID
G E
P O
M C
G O
W A
N
M C
G O
W A
N
A N
G E
L O
U
W
D W
R
F il
E
S o
IL
L W
C
IN
T E
N A
N C
E
O
C T
M-101
IR
P E
R E
P L
A C
E M
E N
T
IN
F O
R M
A T
IO
N
3 12
RADIUS EDGE 1/8"
DRAWING R6 (180-54854)
DRUM PLATE FROM REFERENCE
WHEN INSTALLED
INTERFERENCE IS REMOVED
FLIPPER
DRUM SOCKET PIN
BRIDGE BOWL SOCKET
DRUM SOCKET
JAM NUT
FULL NUT
EYE BOLT
PIN
B: DRUM PLATES FROM REFERENCE DRAWINGS
PHOTO 1: WIRE ROPE AND DRUM PLATES
COAT OVER SCREW HEADS AFTER ASSEMBLY (TYP)
ENSURE SCREWS HEADS ARE COUNTERSUNK.
PHOTO 2: GOVERNMENT FURNISHED WIRE ROPE AND ATTACHMENT COMPONENTS
PLATES FLUSH WITHIN 0.010"
UPON REASSEMBLY ENSURE DRUM
WITH ABRASION RESISTANT COATING.
OVERCOAT WEAR SIDES OF PLATES
NUTS SHALL BE PROVIDED BY CONTRACTOR AND INSTALLED.
LACK OF 2ND SET OF FULL NUTS ON R12, IN COMPARISON TO THIS DETAIL.
SEE REFERENCE DRAWINGS R1-R12 FOR DETAILS ON COMPONENTS. NOTE
M-104 FOR DETAILS.
PLATES WITH ABRASION RESISTANT COATING. SEE SHEET
PAINTING HOIST MACHINERY. OVERCOAT WEAR SIDES OF
AS MACHINERY. ADHERE TO SPECIFICATION 09 97 02.10
PLATES ARE TO BE COATED WITH SAME COATING
AND DENTS IN DRUMS AND PLATES. DRUM AND
DEBURR EDGES AND MAKE SMOOTH ALL SCRATCHES
NOTE: VISUALLY INSPECT DRUM AND DRUM PLATES.
IS TO PROVIDE WIRE ROPE AND ITEMS FOR REMAINING GATES.
SHALL NOTIFY COR IF ANY DEFECTS WITH EXISTING WIRE ROPE ARE DISCOVERED. CONTRACTOR
POINT AS NEEDED. GOVERNMENT FURNISHED WIRE ROPE IS FOR 8 GATES TOTAL. CONTRACTOR
YARD. CONTRACTOR IS TO ARRANGE MOVEMENT OF ITEMS FROM YARD TO INSTALLATION
NOTE: GOVERNMENT FURNISHED WIRE ROPE AND COMPONENTS ARE LOCATED IN STORAGE
DETAIL A: WIRE ROPE ASSEMBLY COMPONENTS - SEE REFERENCE DRAWINGS
SPECIFICATIONS FOR TESTING DETAILS.
BE LOAD TESTED TO 40% OF BREAKING STRENGTH. SEE
10. EACH WIRE ROPE ASSEMBLY, INCLUDING THREADED RODS, SHALL
AND DRUM PLATES.
PROVIDE USACE PERSONNEL ACCESS TO INSPECT DRUMS
INSPECTION OF WIRE ROPE DRUMS. CONTRACTOR IS TO
9. CONTRACTOR IS TO NOTIFY COR 3 DAYS PRIOR TO
ROPE AND ALL COMPONENTS ON REMAINING 8 SPILLWAY GATES.
8. CONTRACTOR IS TO INSTALL GOVERNMENT FURNISHED WIRE
ROPE AND ALL COMPONENTS ON 11 SPILLWAY GATES.
7. CONTRACTOR IS TO PROVIDE AND INSTALL WIRE
AND INSTALLED IN TOTAL.
A TOTAL OF 19 GATES MAKING 38 ASSEMBLIES TO BE REMOVED
6. NOTE-THERE ARE TWO WIRE ROPE ASSEMBLIES PER GATE.
COAT SACRIFICIAL ANODES.
WITH SAME PAINT SYSTEM AS GATES. DO NOT
COAT EYEBOLTS, NUTS, AND BOWL SOCKETS
5. AFTER FINAL ADJUSTMENTS AND TEST RUNS
HIGH WATER AND AS SPECIFIED.
4. LUBRICATE WIRE ROPE WRAPS ON DRUM, WIRE ROPE ABOVE
AND SPECIFICATION 35 01 43.
3. ADHERE TO REQUIREMENTS OF MANUFACTURER
ENSURE WIRE ROPES DO NOT WEAR ON DRUM PLATES.
AND IN PROPER ALIGNMENT AFTER INSTALLATION.
2. ENSURE WIRE ROPE IS UNDER ADEQUATE TENSION
REHABILITATION AND COATING OF GATES.
SHALL ONLY BE INSTALLED AFTER HOIST MACHINERY
WORK IN THIS CONTRACT. SPECIFICALLY WIRE ROPE
1. COORDINATE INSTALLATION WITH ALL OTHER
.A
R
G
IN
E
T R
IC
T ,S
E A
T T
L E
P r e p a r e d b y
D r a w n b y
S E
A T
T L
E
W A
S H
IN
G T s ig n e d b y
C h e c k e d b y
D a t e
S y m b o l
S y m b e s c r ip t io n D a t e
D e s c r ip t io n A p p r
A
B
C
D
C O
R
G
IN
E E
A
O T
T E
D
T I
M E
D E
S I
L E
V
C i v i l
C h i e f J o s e p h
D a m
W A
S p i l l w f e c y c i n t e n a n c e g i n e e r i s i g n s i g n
C l e s
C J
D L
C M
M
E E
T
D G
N number:
Plate
C H
IE
F
J
O S
E
M
ID
G E
P O
M C
G O
W A
N
M C
G O
W A
N
A N
G E
L O
U
W
D W
R
F
E
S o
IL
L W
C
IN
T E
N A
N C
E
O
C T
4 12
M-102
PHOTO 1: WIRE ROPE DRUM AND COVERS
AND MACHINERY
REMOVE, AND REINSTALL WIRE ROPE, COVERS,
SPILLWAY BRIDGE HATCH COVERS TO ACCESS,
AND MACHINERY
REMOVE, AND REINSTALL WIRE ROPE, COVERS,
SPILLWAY BRIDGE HATCH COVERS TO ACCESS,
HATCH COVERS
PHOTO 2: SPILLWAY BRIDGE HATCH COVERS
WIRE ROPE DRUM AND COVERS
ABOVE DRUMS AND GEAR COVERS
SPILLWAY BRIDGE HATCH COVERS
FOR ADDITIONAL INFORMATION.
AASHTO HS-20. SEE REFERENCE DRAWING R39
SHOWN ABOVE BASED ON LINKBELT CRANE AND
NOTE: SPILLWAY IS DESIGNED FOR LIVE LOADS AS
REMOVAL AND REINSTALLATION OF EQUIPMENT AND WIRE ROPES.
NOTE: THERE ARE TWO HATCH COVERS PER SPILLWAY GATE FOR
IMAGE FROM REFERENCE DRAWING R33
IMAGE FROM REFERENCE DRAWING R33
IMAGE FROM REFERENCE DRAWING R52
INFORMATION.
DRAWING R26 FOR LIFTING EYE ATTACHMENT
HEAVY LOADS ON ANY HATCHES. SEE REFERENCE
NOTE: DO NOT PLACE CRANE OUTRIGGERS OR
L O
A D
IN
F O
H A
T
V E
D
TRUCK CRANE LIVE LOADS FOR SPILLWAY BRIDGE
TO PREVENT LEAKS.
SEALS ARE REPLACED CORRECTLY
ENSURE THAT HATCH COVERS AND
NOTE: AFTER WORK IS COMPLETED,
SECTION VIEW
DETAIL A: SPILLWAY HATCH LOCATION FROM REFERENCE DRAWINGS
SECTION VIEW
DETAIL C: SPILLWAY HATCH AND MACHINERY FROM REFERENCE DRAWINGS
PLAN VIEW
DETAIL B: SPILLWAY BRIDGE HATCH COVERS FROM REFERENCE DRAWINGS
DETAIL D: CRANE INFO FROM REFERENCE DRAWINGS
.A
R
G
IN
E
T R
IC
T ,S
E A
T T
L E
P r e p a r e d b y
D r a w n b y
S E
A T
T L
E
W A
S H
IN
G T s ig n e d b y
C h e c k e d b y
D a t e
S y m b o l
S y m b e s c r ip t io n D a t e
D e s c r ip t io n A p p r
A
B
C
D
C O
R
G
IN
E E
A
O T
T E
D
T I
M E
D E
S I
L E
V
C i v i l
C h i e f J o s e p h
D a m
W A
S p i l l w f e c y c i n t e n a n c e g i n e e r i s i g n s i g n
C l e s
C J
D L
C M
M
E E
T
D G
N number:
Plate
C H
IE
F
J
O S
E
M
ID
G E
P O
M C
G O
W A
N
M C
G O
W A
N
A N
G E
L O
U
W
D W
R
F
E
S o
IL
L W
C
IN
T E
N A
N C
E
O
C T
5 12
M-103
H O
IS
T W
C H
IN
E R
Y
D E
T A
IL
S
IMAGE FROM REFERENCE DRAWING R52
IMAGE FROM REFERENCE DRAWING R52
IMAGE FROM REFERENCE DRAWING R52
PLAN VIEW
DETAIL A: SPILLWAY HOIST EQUIPMENT
SECTION VIEW FROM FIGURE C.
DETAIL B: SPILLWAY HOIST EQUIPMENT
ELEVATION VIEW
DETAIL C: SPILLWAY HOIST EQUIPMENT
DETAIL D: EQUIPMENT SCHEDULE
REDUCER NAMEPLATE
PHOTO A: ITEM 2 EXISTING ANGLE
REDUCER NAMEPLATE
PHOTO B: ITEM 19 EXISTING ANGLE
FIELD VERIFY ALL REQUIRED FASTENERS BEFORE ORDERING.
FASTENER ITEMS APPEAR TO BE COMMON. CONTRACTOR TO
WASHERS) ARE TO BE REPLACED-IN-KIND WITH NEW. ALL
13. ALL REMOVED FASTENERS (INCLUDING NUTS, BOLTS, AND
COR 3 DAYS PRIOR TO INSPECTIONS OF GEARS AND SHAFTS.
GEAR AND SHAFT INSPECTIONS. CONTRACTOR IS TO NOTIFY
12. COR OR REPRESENTATIVE SHALL BE PRESENT DURING ALL
INFORMATION.
AND CAPACITY. SEE PHOTO B FOR EXISTING NAMEPLATE
35 01 41.00 10. CONTRACTOR TO FIELD VERIFY DIMENSIONS
TO BE REPLACED WITH NEW REDUCERS ACCORDING TO
11. ANGLE REDUCERS (ITEM 19 ON EQUIPMENT SCHEDULE) ARE
PROPER ALIGNMENT, SEE M-104 PHOTO 6.
BEARING HOUSINGS MAY NEED TO BE MOVED TO ACHIEVE
BEARINGS. AFTER REPLACEMENT ENSURE ALIGNMENT. NOTE:
VERIFY SIZES, TYPES, AND DIMENSIONS BEFORE ORDERING
16A, & 17 ON EQUIPMENT SCHEDULE). CONTRACTOR TO FIELD
10. REPLACE ALL BEARINGS IN HOUSINGS (ITEMS 15, 15A, 16,
ITEMS TO PROVIDE FUNCTIONAL ENGINEERING REPLACEMENT.
BE OUT OF PRODUCTION, AND MAY BE REPLACED WITH SIMILAR
EQUIPMENT SCHEDULE) ARE TO BE REPLACED. BOTH ITEMS MAY
9. SELSYN TRANSMITTER AND ANGLE DRIVE (ITEMS 12 & 13 ON
8. SEE SHEET M-101 FOR WIRE ROPE INFORMATION.
7. SEE SHEET M-105 FOR HIGH SPEED TORQUE SHAFT.
ACCORDING TO 35 01 41.00 10.
DRAWING R51 & R53) ARE TO BE CLEANED AND INSPECTED
SCHEDULE) AND CORRESPONDING SHAFTS (REFERENCE
6. FINAL PINIONS, GEARS (ITEMS 6 & 7 ON EQUIPMENT
TO 35 01 41.00 10.
R51 & R53) ARE TO BE CLEANED AND INSPECTED ACCORDING
SCHEDULE) AND CORRESPONDING SHAFTS (REFERENCE DRAWING
5. INTERMEDIATE PINIONS, GEARS (ITEM 4 & 5 ON EQUIPMENT
ACCORDING TO 35 01 41.00 10.
SCHEDULE) ARE TO BE REMOVED AND REHABILITATED
4. PARALLEL SHAFT REDUCERS (ITEM 3 ON EQUIPMENT
A FOR EXISTING NAMEPLATE INFORMATION.
VERIFY EQUIPMENT DIMENSIONS AND CAPACITY. SEE PHOTO
ACCORDING TO 35 01 41.00 10. CONTRACTOR TO FIELD
SCHEDULE) ARE TO BE REPLACED WITH NEW REDUCERS
3. ANGLE REDUCERS (ITEM 2 ON EQUIPMENT
FROM MACHINERY SPACES WHERE POSSIBLE.
COATING. PERFORM BLASTING ON REMOVABLE ITEMS AWAY
CONCRETE, AND OTHER MACHINERY DURING BLASTING AND
HOIST MACHINERY. PROTECT ALL ELECTRICAL EQUIPMENT,
IS TO BE COATED ACCORDING TO 09 97 02.10 PAINTING
2. ALL MACHINERY, COVERS, AND SUPPORT STRUCTURE
ALL OTHER WORK IN THIS CONTRACT.
1. COORDINATE MACHINERY REHABILITATION WITH
.A
R
G
IN
E
T R
IC
T ,S
E A
T T
L E
P r e p a r e d b y
D r a w n b y
S E
A T
T L
E
W A
S H
IN
G T s ig n e d b y
C h e c k e d b y
D a t e
S y m b o l
S y m b e s c r ip t io n D a t e
D e s c r ip t io n A p p r
A
B
C
D
C O
R
G
IN
E E
A
O T
T E
D
T I
M E
D E
S I
L E
V
C i v i l
C h i e f J o s e p h
D a m
W A
S p i l l w f e c y c i n t e n a n c e g i n e e r i s i g n s i g n
C l e s
C J
D L
C M
M
E E
T
D G
N number:
Plate
C H
IE
F
J
O S
E
M
ID
G E
P O
M C
G O
W A
N
M C
G O
W A
N
A N
G E
L O
U
W
D W
R
F
E
S o
IL
L W
C
IN
T E
N A
N C
E
O
C T
File details come from the government source that posted it. Updated .