Bid Abstract for W912DW17B0005 (Repair Replace Electrical Distribution Main Gingko, McChord Field, JBLM).

View the file

Other files

File Type Posted
W912DW-17-B-0005_AMENDMENT_0005.pdf PDF
W912DW-17-B-0005_Amendment_0005_Gingko_As-Built_Dwgs_(1997).pdf PDF
amendment4IFB0005.pdf PDF
26_11_14.00_10_-_Main_Elec_Supply_Station_&_Substation_-_10Aug2017.pdf PDF
E-502_Elec_Details_Rev-1_10Aug2017.pdf PDF
E-505_Elec_Manhole_Details_Rev-1_10Aug2017_-_Copy.pdf PDF
amendment4IFB0005.pdf PDF
26_11_14.00_10_-_Main_Elec_Supply_Station_&_Substation_-_10Aug2017.pdf PDF
E-505_Elec_Manhole_Details_Rev-1_10Aug2017_-_Copy.7z 7Z file
E-502_Elec_Details_Rev-1_10Aug2017.pdf PDF
33_71_02_-_UG_Elec_Distribution_-_08Aug2017.pdf PDF
W912DW-17-B-0005_Rev_Dwgs_Amend-0003.pdf PDF
W912DW17B0005_Amd_0003.pdf PDF
AMD_0002_Combined_Rev_Dwgs_-_04Aug2017.pdf PDF
W912DW17B0005_Amd_0002.pdf PDF
amendment1IFB17B0005.pdf PDF
Site_Visit_Attendance_Roster___17-B-0005.pdf PDF
Amendment_0001_33_71_02_-_UG_Elec_Distribution_-_31Jul2017.pdf PDF
Amendment_0001_CE0435_Sect_01_11_00_-_Summary_of_Work_31Jul2017.pdf PDF
Amendment_0001_Projnet_7080294_Response_Detail_4-way_Switch.pdf PDF
CE0435_Atch-4_McChord_Pipeline_Manual_-_Utility_Crossings_F-7.pdf PDF
CE0435_Atch-3_BNSF_2017_Temp_Occupancy_App_and_Instructions.pdf PDF
CE0435_Complete_Specs_-_19Jun2017_FINAL.pdf PDF
CE0435_Main-Gingko_IFB_Dwgs_Rev-1_29Jun2017xx.pdf PDF
CE0435_Atch-2_BNSF_2017_Pipeline,_Wire_Line_App_and_Instructions.pdf PDF
W912DW-17-B-0005_R&R_Electrical_Distro_Line_Main_Gingko.pdf PDF
CE0435_Atch-1_BNSF_Utility_Accommodation_Policy.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

US ARMY CORPS OF ENGINEERS, SPECIAL PROJECTS

BRANCH

2015 N. 4TH & PENDLETON

JOINT BASE LEWIS MCCHORD

REPAIR/REPLACE ELECTRICAL DISTRIBUTION LINE "MAIN

GINGKO, MCCORD FIELD, JBLM, WASHINGTON

1 REPAIR EXISTING OVERHEAD 13.8Kv

TOTAL BID

JOB1 7,832,955.70 7,832,955.70 3,896,000.003,896,000.00 4,997,000.00 4,997,000.00

W912DW-17-B-0005 1 2

KATHALEEN SCHOLLARD

ORDERING OFFICER

20% 20%

5 5

SCHOLLARD.KATHALEE

N.M.1021149590

Digitally signed by

SCHOLLARD.KATHALEEN.M.1021149590

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=SCHOLLARD.KATHALEEN.M.1021149590 Date: 2017.09.07 11:24:02 -07'00'

08/23/201707/18/2017

BRISTOL-CANNON JV, LLC

ANCHORAGE, AK

VET INDUSTRIAL

BREMERTON, WA

$7,832,955.70 $3,896,000.00 $4,997,000.00

7 Sept 17

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W912DW-17-B-0005

REPAIR/REPLACE

ELECTRICAL DISTRIBUTION

LINE, MAIN-GINGKO,

MCCHORD FIELD, JOINT

BASE LEWIS-MCCHORD

20% 20%

5 5

1 1 JOB

2 2

DOYON MANAGEMENT SVS

FEDERAL WAY, WA.

ORION CANNON

CONSTRUCT. WASILLA, AK

$4,998,916.42 $4,998,916.42

TOTAL BID $4,998,916.42

$4,754,000.00 $4,754,000.00

$4,754,000.00