About this file

Amendment 0001

View the file

Other files

File Type Posted
W912DW17B0005_BIDABSTRACTMAINGINGKO23AUG17.pdf PDF
W912DW-17-B-0005_AMENDMENT_0005.pdf PDF
W912DW-17-B-0005_Amendment_0005_Gingko_As-Built_Dwgs_(1997).pdf PDF
amendment4IFB0005.pdf PDF
26_11_14.00_10_-_Main_Elec_Supply_Station_&_Substation_-_10Aug2017.pdf PDF
E-502_Elec_Details_Rev-1_10Aug2017.pdf PDF
E-505_Elec_Manhole_Details_Rev-1_10Aug2017_-_Copy.pdf PDF
amendment4IFB0005.pdf PDF
26_11_14.00_10_-_Main_Elec_Supply_Station_&_Substation_-_10Aug2017.pdf PDF
E-505_Elec_Manhole_Details_Rev-1_10Aug2017_-_Copy.7z 7Z file
E-502_Elec_Details_Rev-1_10Aug2017.pdf PDF
33_71_02_-_UG_Elec_Distribution_-_08Aug2017.pdf PDF
W912DW-17-B-0005_Rev_Dwgs_Amend-0003.pdf PDF
W912DW17B0005_Amd_0003.pdf PDF
AMD_0002_Combined_Rev_Dwgs_-_04Aug2017.pdf PDF
W912DW17B0005_Amd_0002.pdf PDF
Site_Visit_Attendance_Roster___17-B-0005.pdf PDF
Amendment_0001_33_71_02_-_UG_Elec_Distribution_-_31Jul2017.pdf PDF
Amendment_0001_CE0435_Sect_01_11_00_-_Summary_of_Work_31Jul2017.pdf PDF
Amendment_0001_Projnet_7080294_Response_Detail_4-way_Switch.pdf PDF
CE0435_Atch-4_McChord_Pipeline_Manual_-_Utility_Crossings_F-7.pdf PDF
CE0435_Atch-3_BNSF_2017_Temp_Occupancy_App_and_Instructions.pdf PDF
CE0435_Complete_Specs_-_19Jun2017_FINAL.pdf PDF
CE0435_Main-Gingko_IFB_Dwgs_Rev-1_29Jun2017xx.pdf PDF
CE0435_Atch-2_BNSF_2017_Pipeline,_Wire_Line_App_and_Instructions.pdf PDF
W912DW-17-B-0005_R&R_Electrical_Distro_Line_Main_Gingko.pdf PDF
CE0435_Atch-1_BNSF_Utility_Accommodation_Policy.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Removal of clauses 52.214-10 and 52.214-12. Revising FAR Provision 52.222-5 and FAR Clause 52.222-5 from referenced to full text;

incorporation of a revised SOW dated 31 July 2017, revised draw ings, (C-106, E-401, E-501, G-002), revised Specification 33 71 02 (UG Elec Distro) and Detail Draw ing 4 w ay sw itch in response to a bidder inquiry.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW17B0005

X 9B. DATED (SEE ITEM 11)

17-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2017

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW17B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE

AMENDMENT 0001

The purpose of Amendment 0001 to IFB W912DW-17-B-0005 for project entitled, “Repair Electrical Distro Line, ‘Main Gingko’ is to make the following revisions:

1.) Removal of FAR Provision 52.214-10 – Contract Award-Sealed Bidding (not applicable) 2.) Removal of FAR Clause 52.214-12 – Preparation of Bids (not applicable) 3.) Revise FAR Provision 52.222-5 and FAR Clause 52.252-2 – Changed from Reference Only to Full

Text as follows:

SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS

The following were previously included by reference and are now included by full text:

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

SECTION 00 72 00 - CONTRACT CLAUSES

The following have been modified:

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

(End of Clause)

W912DW17B0005

4.) Incorporate Revised Drawings: Drawings as listed below have replaced the original drawings by the same number/name in their entirety in the revised Combined Drawing file (Rev 2) dated 31 July 2017 that is being incorporated into the IFB solicitation via this amendment. The list of revised drawings inserted into the combined drawings file are as follows:

a) C-106_Rev-2_Main Substation-31 July 2017

b) E-401_Rev-1_Elec_31 July 2017

c) E-501_Rev-1, Exist’g Pole Photos 31 July 2017

d) G-002 Rev-1 General_31 July 2017

5.) Incorporate a revised Statement of Work dated 31 July 2017 6.) Incorporate a revised specification 33 71 02 (UG Electrical Distro) dated 31 July 2017. Specification was revised due to bidder inquiry and is being provided under separate cover. Revised specification is to replace original specification issued with the IFB solicitation posted on 14 June 2017.

7.) Incorporate Detail 4-Way Switch Sketch (Refer to Drawing E-401)

All other terms and conditions under this IFB remain unchanged.

-End of Summary of Changes-