About this file

Revised Drawings for Amendment 0003 on IFB W912DW17B0005.

View the file

Other files

File Type Posted
W912DW17B0005_BIDABSTRACTMAINGINGKO23AUG17.pdf PDF
W912DW-17-B-0005_AMENDMENT_0005.pdf PDF
W912DW-17-B-0005_Amendment_0005_Gingko_As-Built_Dwgs_(1997).pdf PDF
amendment4IFB0005.pdf PDF
26_11_14.00_10_-_Main_Elec_Supply_Station_&_Substation_-_10Aug2017.pdf PDF
E-502_Elec_Details_Rev-1_10Aug2017.pdf PDF
E-505_Elec_Manhole_Details_Rev-1_10Aug2017_-_Copy.pdf PDF
amendment4IFB0005.pdf PDF
26_11_14.00_10_-_Main_Elec_Supply_Station_&_Substation_-_10Aug2017.pdf PDF
E-505_Elec_Manhole_Details_Rev-1_10Aug2017_-_Copy.7z 7Z file
E-502_Elec_Details_Rev-1_10Aug2017.pdf PDF
33_71_02_-_UG_Elec_Distribution_-_08Aug2017.pdf PDF
W912DW17B0005_Amd_0003.pdf PDF
AMD_0002_Combined_Rev_Dwgs_-_04Aug2017.pdf PDF
W912DW17B0005_Amd_0002.pdf PDF
amendment1IFB17B0005.pdf PDF
Site_Visit_Attendance_Roster___17-B-0005.pdf PDF
Amendment_0001_33_71_02_-_UG_Elec_Distribution_-_31Jul2017.pdf PDF
Amendment_0001_CE0435_Sect_01_11_00_-_Summary_of_Work_31Jul2017.pdf PDF
Amendment_0001_Projnet_7080294_Response_Detail_4-way_Switch.pdf PDF
CE0435_Atch-4_McChord_Pipeline_Manual_-_Utility_Crossings_F-7.pdf PDF
CE0435_Atch-3_BNSF_2017_Temp_Occupancy_App_and_Instructions.pdf PDF
CE0435_Complete_Specs_-_19Jun2017_FINAL.pdf PDF
CE0435_Main-Gingko_IFB_Dwgs_Rev-1_29Jun2017xx.pdf PDF
CE0435_Atch-2_BNSF_2017_Pipeline,_Wire_Line_App_and_Instructions.pdf PDF
W912DW-17-B-0005_R&R_Electrical_Distro_Line_Main_Gingko.pdf PDF
CE0435_Atch-1_BNSF_Utility_Accommodation_Policy.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

E UGP

UGP

UGP UGP UGP UGP UGP UGP UGP UGP

UGS UGS UGS UGS

UGS

UGS UGS UGS UGS UGS UGS UGS UGS

UGS

UGS

U G

S

U G

S

UGP

UGP

UGP UGP UGP UGP UGP UGP UGP UGP

E E E E E E

E E

E UGP

UGP UGP UGP UGP UGP

UGS UGS

UGS

UGS UGS UGS UGS

UGS

U G

S

UGP

UGP UGP UGP UGP

C-103

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

C

IV

IL

S

IT

E U

T

IL

IT

Y

L A

Y O

U T

P A

N E

L

McCHORD DRIVE SW

B R

ID

G

E P

O R

T W

A Y

S W

W E

S T

E N

T R

A N

C E

R O

A D

C H

IC

A G

O A

V E S

W

T R

U E

L A

N E

S W

McCHORD DRIVE SW

.0

' (T

Y P

NEW 13.8 kV

DISTRIBUTION POLE LINE

SEE NOTE 4

CLEARING ZONE

150.00' (TYP)

LAKEWOOD

526-T MH 01

NEW 13.8 kV

DISTRIBUTION LINE

3. REMOVE 13.8 kV UNDERBUILD (CONDUCTORS, CROSS ARMS AND BRACKETS, AND ASSOCIATED

GUY WIRES FROM TPU-OWNED 115 kV

TRANSMISSION POLES 484 THRU 480.

4. PROVIDE 13.8 kV OVERHEAD DISTRIBUTION LINE AS

INDICATED, PROVIDE 13.8 kV UNDERGROUND DUCT

BANK FROM POLE 526 AND MANHOLES FROM POLE

526 EAST TO THE RAILROAD TRACKS (SEE SHEET

C-104). UNDERGROUND DUCT BANK SHALL BE

INSTALLED USING DIRECTIONAL BORING IN LIEU OF

TRENCHING.

5. SEE SHEET C-200 FOR UNDERGROUND DUCTBANK

PROFILE.

6. POLE MOUNTED TRANSFORMER TO BE REMOVED

AND REPLACED BY PAD MOUNTED TRANSFORMER

AT POLE 526-T. CONNECT TRANSFORMER

SECONDARY TO EXISTING JUNCTION BOX FOR

EXISTING SIGN AND ROADWAY LIGHTING.

TRANSFORMER SHALL BE 50 kVA, 13800-240/120V.

7. SEE SHEET G-002 FOR LEGEND, ABBREVIATIONS,

AND GENERAL NOTES.

8. SEE SHEET C-700 FOR NEW POWER POLE

COORDINATES

E-501

3DEMOLITION

SEE NOTE 3 (TYP)

A

E-502

SEE NOTE 5

B

E-502

SIMILAR

TRANSITION

02 03 04

KEY PLAN

SEE NOTE 6

NOTES:

1. NEW 13.8 kV CONSTRUCTION SHALL BE GRADE C

PER IEEE C2 UNLESS OTHERWISE NOTED.

2. SEE SHEET E-705 FOR WOOD POLE SCHEDULE

(DEMOLITION AND NEW CONSTRUCTION)

B

E-502

F

E-502

W E

S T

E N

T R

A N

C E

R O

A D

EXISTING SIGN

JUNCTION BOX

EXISTING SIGN

McCHORD DRIVE SW

50 kVA

TRANSFORMER

SEE NOTE 6

3-250 KCMIL & 1 #2 GRD, 4" C

(ROUTE THRU MANHOLE TO

EXISTING SIGN JB)

C

E-502

G E

-5

E-505

G E-502

ENLARGEMENT

NOT TO SCALE

Amendment 0003

Manning, S (man67358) Snapshot

Manning, S (man67358) Snapshot

Manning, S (man67358) Text Box 8/26/16

Manning, S (man67358) Snapshot

G3ECNMJK

Text Box NOTE No. 9: CONTRACTOR TO PROVIDE AND INSTALL PRE-CAST VAULT WITH INSIDE DIMENSIONS OF 4'-0" X 6'-4" X 3'-7" AND SINGLE STEEL LOCKING ACCESS COVER WHICH IS OFFSET ALLOWING FOR PLACEMENT OF TRANSFORMER ON TOP OF VAULT. SECONDARY CONDUIT AND CONDUCTORS ARE TO BE ROUTED THROUGH NEW PRIMARY VAULT ENROUTE TO THE EXISTING McCHORD SIGN JUNCTION BOX. CONDUIT AND CONDUCTORS CAN BE ROUTED DIRECTLY TO THE SIGN JUNCTION BOX ONLY WHEN PULLING CALCULATIONS ARE SUBMITTED TO GOVERMENT DEMONSTRATING THAT THE MAXIMUM PULLING TENSION AND SIDWALL PRESSURE IS NOT EXCEEDED IN ANY BEND PER JBLM/NEC CRITERIA. AN ALTERNATE SOLUTION IS TO PROVIDE AND INSTALL SMALL HANDHOLE ENROUTE PRIOR TO INTERCEPTING THE SIGN JUNCTION BOX - THUS MINIMIZING THE NUMBER OF BENDS.

G3ECNMJK

Callout SEE NOTE No.9

G3ECNMJK

Text Box REV-1 TRANSFORMER VAULT INSTALLATION, NOTE No.9 08AUG2017 mjk

G3ECNMJK

Polygon

G3ECNMJK

Polygon

G3ECNMJK

Text Box

G3ECNMJK

Polygonal Line

G3ECNMJK

Text Box

G3ECNMJK

Polygonal Line x x x x

2-24" CASING PIPES

(SEE DETAIL F ON

SHEET E-502)

x x x x x x x

2-24" CASING PIPES

(SEE DETAIL E

ON SHEET E-502)

C-200

C

IV

IL

U N

D E

R G

R O

U N

D D

U C

T B

A N

K P

R O

F

IL

E

M A

T C

H L

IN

E

S

E E

B E

L O

W

M A

T C

H L

IN

E

S

E E

A B

O V

E

13.8 kV DISTRIBUTION LINE DUCTBANK

(SEE SHEETS C-103 AND C-104 FOR UTILITY LAYOUT)

13.8 kV DISTRIBUTION LINE DUCTBANK

(SEE SHEETS C-103 AND C-104 FOR UTILITY LAYOUT)

Work occurring around the existing Perimeter Security Fence (i.e. excavations, bore pits etc) must continue to maintain the secure conditions as provided by the cantonment fence. Any breach in the security fence will require supplemental measures be made by the contractor to ensure continuous perimeter security is maintained (i.e. supplemental temporary fencing etc.) in coordination with Security Forces criteria.

General Note: As part of the contractor’s ‘Means & Methods’ of accomplishing work, the location of bore pit(s) and length of bore can be adjusted in the field to allow for providing adequate clearances around existing utilities which are to be encountered as identified per the underground ductbank and boring profiles depicted

Amendment 0003

Manning, S (man67358) Snapshot

Manning, S (man67358) Snapshot

Manning, S (man67358) Text Box 8/26/16

G3ECNMJK

Line

G3ECNMJK

Line

G3ECNMJK

Text Box

G3ECNMJK

Polygonal Line

G3ECNMJK

Polygon

G3ECNMJK

Line

G3ECNMJK

Polygon

G3ECNMJK

Text Box REV-1; Bore Pit Allowances and Security Fence Requirements 08Aug2017 mjk

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

U G

P

NOTES:

1. EXPAND GINGKO SUBSTATION SWITCHGEAR

BUILDING AND ADD TWO 13.8 KV SWITCHGEAR

CUBICLES AND CIRCUIT BREAKERS.

2. SEE SHEET E-705 FOR WOOD POLE SCHEDULE

(DEMOLITION AND NEW CONSTRUCTION)

E-401

E L E

C T

R

IC

A L

E N

L A

R G

E D

G

IN

G K

O P

L A

N

I- 5

HIGHWAY

M A

T C

H L

IN

E

S E

E S

H E

E T

C -1

3. REMOVE 13.8 kV UNDERGROUND RISER FROM POLE

494 TO GINGKO SUBSTATION SWITCHGEAR.

4. PROVIDE 13.8 kV UNDERGROUND DISTRIBUTION TO

POLE 501.

5. SEE CABLE CONDUIT LIST ON SHEET E-601 FOR "A"

THRU "F" AND "UC".

6. SEE SHEETS S-521 AND S-522 FOR STRUCTURAL

DETAILS.

GINGKO

SUBSTATION

DEMOLITION

SEE NOTE 3

E-501

EXISTING

GAS SWITCH

02 03 04

KEY PLAN

MATCHLINE SEE SHEET C-101

MATCHLINE SEE SHEET C-101

GROUNDING ROD

7' CHAINLINK

SECURITY FENCE

GRAVEL

EXISTING

BUILDING

POWER POLE W/

RISER

POWER POLE W/

RISER

#TP32494

NN

0 8' 16'

RELOCATED

VOLTAGE

REGULATOR

SEE

NOTE 1

BYPASS SWITCH

STRUCTURE

EXISTING

TRANSFORMER

30 kVA TRANSFORMER

GAS SWITCH

A

SEE NOTE

4 & 5 (TYP)A

B

E

C

F

VR103

VR104

VR102

VR101

E-505

D

INTERNAL

TO VAULT

MH 04

CLEARING

ZONE

E-402

Amendment 0003

Manning, S (man67358) Snapshot

G3ECNMJK

Text Box

7. REMOVE 13.8kV UNDERBUILD (CONDUCTORS, CROSS-ARMS AND BRACKETS, 13.8 kV CABLE TERMINATIONS AND ARRESTORS) FROM TPU-OWNED POLE #494. 13.8kV SPAN GUY FROM TPU-OWNED POLE #494 TO ADJACENT DISTRIBUTION POLE (WITH RISER) TO THE SOUTHWEST SHALL BE REMOVED, WITH NEW GUY WIRE(S) (QTY:2) TO BE INSTALLED ON BOTH THE ADJACENT DISTRIBUTION POLE (WITH RISER) AND THE TPU-OWNED POLE #494.

G3ECNMJK

Callout SEE NOTE No.7

G3ECNMJK

Line

G3ECNMJK

Text Box Rev-1; Added Note No.7 (TPU-Owned Pole #494 Demolition Work) 31Jul2017 MJK

G3ECNMJK

Callout

WEIGHT OF EXISTING VOLTAGE REGULATOR (TO BE RELOCATED) IS 25.25 TONS

G3ECNMJK

Text Box

8. CONDUIT RUN BETWEEN VOLTAGE REGULATOR AND EXIST'G TRANSFORMER IS TO BE ABOVE GROUND MOUNTED AS INDICATED ON DWG SHT E-601, ITEM-B IN THE 'CABLE LIST' (NOT UG). SEE DETAIL No.1 ON DWG SHT E-402 DEPICTING THE (EIGHT) 4"C (FOUR 4"C TO THE VR, AND FOUR 4"C FROM THE VR) TURNING UP AT THE BYPASS SWITCH SUPPORT STRUCTURE. THE TURN-UP IS TO BE A UNISTRUT-TYPE RACK ATTACHED TO THE SUPPORT STRUCTURE LEG. THE CONDUITS ARE TO EXIT THE TRANSFORMER CONNECTION BOX AT A HEIGHT OF 48-INCHES FOR INSTALLATION ABOVE GROUND. AN INTERMEDIATE SUPPORT CONSISTING OF A UNISTRUT RACK IS TO BE ANCHORED TO THE SLAB. ONLY ONE INTERMEDIATE SUPPORT WILL BE REQUIRED, LOCATED AT THE NORTH EDGE OF THE TRANSFORMER SLAB.

G3ECNMJK

Polygon

G3ECNMJK

Text Box

G3ECNMJK

Polygonal Line

G3ECNMJK

Callout SEE NOTE No.8

G3ECNMJK

Line

G3ECNMJK

Text Box

G3ECNMJK

Polygonal Line

G3ECNMJK

Text Box Rev-2; Added Note No. 8 (Above Ground Conduit Run VR to Transfrmer) 08Aug2017 mjk

C-103 Site Utility Layout Panel-03_Rev-1_08Aug2017
C-200 Boring Profile_Rev-1_08Aug2017
E-401 Elec Enlarged Gingko Plan_Rev-2_08Aug2017

File details come from the government source that posted it. Updated .