AMD_0002_Combined_Rev_Dwgs_-_04Aug2017.pdf
PDF 5 MB Posted
- Solicitation number
- W912DW17B0005
About this file
Revised drawings originally intended for Amendment 0001.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
ELECTRIC MANHOLE
ELECTRIC POLE
NEW 13.8 kV OVERHEAD PRIMARY
UGPNEW 13.8 kV UNDERGROUND PRIMARY
CLEARING ZONE
LEGEND GENERAL NOTES
ABBREVIATIONS
E
X X
X X
DOUBLE CROSSARMS
SINGLE CROSSARM
FUSED OUT, 14 kV
FINISH FLOOR
FLOWABLE THERMAL BACKFILL
TRANSFORMER
SUSPENSION INSULATOR, POLYMER
ARM MOUNTED PIN INSULATOR, PORCELAIN
PHASE
SECTIONALIZING
PROPOSED POWER POLE NUMBER
EXISTING POWER POLE NUMBER
MANHOLE
DA
SA
FCO
FF
FTB
XFMR
SUSP
PIN
PH
SECT
MH
1. FOR LOCATIONS OF EXISTING FACILITIES SEE LOCATION AND VICINITY MAPS.
2. EXISTING UTILITY LOCATIONS SHOWN ARE BASED ON BEST AVAILABLE INFORMATION AND MAY
NOT EXACTLY REFLECT FIELD CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING ALL UTILITY LOCATIONS.
3. THE CONTRACTOR SHALL NOT DISTURB OR BLOCK ACCESS TO OTHER FACILITIES AND WORK
AREAS THAT MAY BE ADJACENT TO THE SITE. DETOURS, WHEN REQUIRED, SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER.
4. CARE SHALL BE TAKEN WHEN DIGGING IN THE AREA OF EXISTING OPERATIONAL FUEL LINES.
PROBES SHALL BE USED TO LOCATE PIPE. EXCAVATION SHALL BE BY HAND DIGGING FROM
WITHIN 18 INCHES VERTICALLY ABOVE AND 4 FEET HORIZONTALLY, OF THE EXISTING FUEL LINES.
BASE FUELS PERSONNEL SHALL BE NOTIFIED THROUGH THE CONTRACTING OFFICER 14 DAYS IN
ADVANCE OF EXCAVATIONS, SO THAT THEY CAN BE ON-SITE WHEN-EVER EXCAVATIONS ARE IN
PROGRESS.
5. HARVESTING OF TREES AND SALEABLE TIMBER REQUIREMENTS WILL BE AS PER JBLM LOG
DECKING SPECIFICATIONS. SEE SHEET C-701 AND C-702 FOR TREE TYPE AND SIZE INFORMATION.
6. CONTRACTOR WILL NOT BE REQUIRED TO GRUB THE TREES THAT ARE CLEARED BETWEEEN THE
AREA OF WEST ENTRANCE ROAD AND GINGKO SUBSTATION.
DETAIL INDICATION
DETAIL TITLE
GENERAL SYMBOLS
SECTION CUT
TOP - SECTION IDENTIFICATION LETTER
BOTTOM - DRAWING ON WHICH SECTION IS DRAWN
SECTION TITLE
TOP - SECTION IDENTIFICATION LETTER
BOTTOM - DRAWING(S) FROM WHICH SECTION IS TAKEN
TOP - DETAIL IDENTIFICATION NUMBER
BOTTOM - DRAWING(S) FROM WHICH DETAIL IS TAKEN
TOP - DETAIL IDENTIFICATION LETTER
BOTTOM - DRAWING ON WHICH DETAIL IS DRAWN
1. MINIMUM 0.25% SLOPE FOR POWER AND COMMUNICATION CONDUITS. SLOPE TO DRAIN TOWARDS
THE MANHOLE/END OF DUCTBANK.
2. MINIMUM 36" DEPTH BELOW FINISHED GRADE FOR ALL CONDUITS. DISTANCE MEASURED FROM
CONDUIT OUTSIDE DIAMETER.
DUCT BANK PROFILE MINIMUM REQUIREMENTS
A
E-500
A
E-100
SECTION
E-500
E-100
DETAIL
NEW 600 kV UNDERGROUND SECONDARY UGS
STARTING AT EAST SIDE OF GINGKO SUBSTATION (NEAR POLE 501)
TO WEST ENTRANCE ROAD
* SEE GENERAL NOTE 6 ABOVE
EW EACH WAY
EF EACH FACE
T&B TOP AND BOTTOM
TYP TYPICAL
MIN MINIMUM
MAX MAXIMUM
PCF POUNDS PER CUBIC FOOT
PSF POUNDS PER SQUARE FOOT
PLF POUNDS PER LINEAR FOOT
TOC TOP OF CONCRETE
TOS TOP OF SLAB
DIA DIAMETER
REINF REINFORCING
CJ CONSTRUCTION JOINT
CONC CONCRETE
STD STANDARD
HORIZ HORIZONTAL
UNO UNLESS NOTED OTHERWISE
JT JOINT
NTS NOT TO SCALE
NEW UNDERGROUND CONTROLS UC
G-002
G E
N E
R A
L
D R
A W
IN
G
I N
D E
X A
B B
R E
V
IA
T
IO
N S
A N
D S
Y M
B O
L S
VARIES
VARIES
12' (TYP)10.00'20.00'
PROPOSED 13.8 kV
DISTRIBUTION POLE LINE
30' CLEARING ZONE
E X
IS
T
IN
G
P A
T R
O L
R O
A D
EXISTING
SECURITY
FENCE
TYPICAL CLEARING ALONG
ELECTRICAL DISTRIBUTION ROUTE
N.T.S.
Amendment 0001
Manning, S (man67358) Snapshot
G3ECNMJK
Callout 22'-0"
G3ECNMJK
Line
G3ECNMJK
Callout 32'-0"
G3ECNMJK
Line
G3ECNMJK
Text Box Rev-1; Clear Zone Dimensional Revision 31Jul2017 MJK
G3ECNMJK
Text Box NOTE: TREE CLEARING WILL ALSO OCCUR FROM NEW POLE #527 NORTHWARD TOWARD 'MAIN' SUBSTATION ALONG BNSF RAILWAY AND PERIMETER SECURITY FENCE. CONTRACTOR TO PROVIDE FOR A 22'-0" 'CLEAR ZONE' ON EACH SIDE OF THE CENTERLINE OF THE DISTRIBUTION LINE (TOTAL OF 44'-0" CLEAR ZONE).
G3ECNMJK
Polygon
F M
F M
FM
FM
FM
FM
FM
FM
F M
FM
FM
E
E
E
U G
P U
G P
U G
P
C-104
MATCHLINE SEE SHEET C-105
M A
T C
H L
IN
E
S E
E S
H E
E T
C -1
C
IV
IL
S
IT
E U
T
IL
IT
Y
L A
Y O
U T
P A
N E
L
McCHORD DRIVE SW
T H
A V
E N
U E
S W
B N
S F
R A
IL
R
O A
D
1ST STREET NWNEW 13.8 kV
DISTRIBUTION LINE
SEE NOTE 5 & 6
LAKEWOOD
"A"
LAKEWOOD
MH 03
NEW 13.8 kV
DISTRIBUTION POLE LINE
3. REMOVE 13.8 kV UNDERBUILD (CONDUCTORS, CROSS ARMS AND BRACKETS, AND ASSOCIATED
GUY WIRES FROM TPU-OWNED 115 kV
TRANSMISSION POLES 479 THRU 477.
4. REMOVE 13.8 kV CONDUCTORS, CROSSARMS AND
BRACKETS AND GUY WIRES FROM POLE "A".
COORDINATE REMOVAL OF POLE "A" WITH TPU AND
CITY OF LAKEWOOD.
5. PROVIDE 13.8 kV OVERHEAD DISTRIBUTION LINE AS
INDICATED, PROVIDE 13.8 kV UNDERGROUND DUCT
BANK AND MANHOLES FROM POLE 527 WEST TO
BRIDGEPORT WAY (SEE SHEET C-103).
UNDERGROUND DUCT BANK SHALL BE INSTALLED
USING DIRECTIONAL BORING IN LIEU OF
TRENCHING. COORDINATE UNDERGROUND
RAILROAD TRACK CROSSING WITH BNSF RAILROAD.
6. SEE SHEET C-200 FOR UNDERGROUND DUCTBANK
PROFILE.
7. TRANSITION UNDERGROUND DUCTBANK FROM
SECTION C TO SECTION A AS SHOWN ON SHEET
E-502.
8. SEE SHEET G-002 FOR LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
9. SEE SHEET C-700 FOR NEW POWER POLE
COORDINATES
E-501
DEMOLITION
SEE NOTE 3 (TYP)
C
E-502
SEE NOTE 7
02 03 04
KEY PLAN
SEE NOTE 4
MH 02 A
E-502
E E-502
NOTES:
1. NEW 13.8 kV CONSTRUCTION SHALL BE GRADE C
PER IEEE C2 UNLESS OTHERWISE NOTED.
2. SEE SHEET E-705 FOR WOOD POLE SCHEDULE
(DEMOLITION AND NEW CONSTRUCTION)
C E-502
E-505
E-505
UGP
10. ROUTE OF OH DISTRIBUTION LINE FROM POLE #527
NORTHWARD ALONG SECURITY FENCE WILL
REQUIRE CUTTING AND CLEARING OF TREES
WHICH ENCROACH INTO THE 22'-0" 'CLEAR ZONE'
FROM THE CENTERLINE OF POLE ON BOTH SIDES
OF THE DISTRIBUTION LINE (TOTAL OF 44'-0"
'CLEAR ZONE').
Amendment 0001
Manning, S (man67358) Snapshot
Manning, S (man67358) Snapshot
Manning, S (man67358) Text Box 8/26/16
Manning, S (man67358) Snapshot
G3ECNMJK
Oval
G3ECNMJK
Callout
MH-03
G3ECNMJK
Rectangle
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Rectangle
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Rectangle
G3ECNMJK
Rectangle
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Callout DIRECTIONAL BORING UNDER BNSF TRACKS TO OCCUR WITHIN ESTABLISHED BNSF EASEMENT MC-317E-1
G3ECNMJK
Polygonal Line
G3ECNMJK
Callout
BNSF EASEMENT MC-317E-1
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Text Box REV-1 BORING LOCATION UNDER BNSF - 29JUN2017 mjk
G3ECNMJK
Callout HYDRO-EXCAVATING REQUIRED AT ALL UTILITY CROSSINGS OCCURING WITHIN THE U.S. OIL (TANK FARM) TYP.
G3ECNMJK
Callout ROUTING OF UG DUCTBANK IS LIMITED TO 'BENDS' CONSISTING OF LONG SWEEPS (MIN 25' DIA.) WITH NO ANGLE FITTINGS
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Polygonal Line
G3ECNMJK
Polygonal Line
G3ECNMJK
Polygonal Line
G3ECNMJK
Polygonal Line
G3ECNMJK
Callout NEW 13.8 Kv ELEC OH DISTRIBUTION LINE; ROUTE
G3ECNMJK
Oval
G3ECNMJK
Callout OPERABLE VEHICLE GATE - COORD W/QAR TO OBTAIN ACCESS THRU U.S. OIL AND DES SECURITY FORCES
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Polygonal Line
G3ECNMJK
Polygonal Line
G3ECNMJK
Callout EXIST'G (U.S. OIL) JET FUEL PIPELINE (6-inch) TO TANK FARM; BORING FOR TWO 24-inch DIA CASINGS OCCURS 5-FEET BELOW EXIST'G PIPELINE
G3ECNMJK
Callout SEE NOTE No.10 (TYP.)
G3ECNMJK
Polygon
G3ECNMJK
Text Box REV-2 ADD NOTE No.10 - TREE CLEARING - 31JUL2017 mjk
E
E
E E
E E E E
E
NOTES:
1. NEW 13.8 kV CONSTRUCTION SHALL BE GRADE C
PER IEEE C2 UNLESS OTHERWISE NOTED.
2. SEE SHEET E-705 FOR WOOD POLE SCHEDULE
(DEMOLITION AND NEW CONSTRUCTION)
C-106
MATCHLINE SEE SHEET C-105
C
IV
IL
S
IT
E U
T
IL
IT
Y
L A
Y O
U T
P A
N E
L
T H
A V
E N
U E
S W
B N
S F
R A
IL
R
O A
D
7TH STREET NW
8TH STREET NW
"B"
NEW 13.8 kV
DISTRIBUTION POLE LINE
SEE NOTE 5
MAIN
SUBSTATION
542543
3. REMOVE 13.8 kV UNDERBUILD (CONDUCTORS, CROSS ARMS AND BRACKETS, AND ASSOCIATED
GUY WIRES FROM TPU-OWNED 115 kV
TRANSMISSION POLES 473 THRU 924.
4. REMOVE 13.8 kV DEADEND FROM POLE "B" TO MAIN
SUBSTATIONS STEEL STRUCTURE. REMOVE POLE
"B" AND 12 kV TPU UNDERBUILD SHALL REMAIN.
5. PROVIDE 13.8 kV OVERHEAD DISTRIBUTION LINE AS
INDICATED.
6. RAILROAD CROSSING (POLE 540 UPPER
CROSSARMS AND DEADEND; POLE 541 TANGENT
CROSSARMS) SHALL BE GRADE B CONSTRUCTION
PER IEEE C2.
7. CONNECT OVERHEAD LINE FROM POLE 542 TO
UPPER CROSSARMS ON POLE 543. CONNECT
LOWER CROSSARMS ON POLE 543 TO OVERHEAD
LINE TO POLE 544.
8. SEE SHEET G-002 FOR LEGEND, ABBREVIATIONS,
AND GENERAL NOTES.
9. SEE SHEET C-700 FOR NEW POWER POLE
COORDINATES
DEMOLITION
SEE NOTE 3 (TYP)
E-501
02 03 04
KEY PLAN
(EXISTING)
SEE NOTE 4
(SEE NOTE 7)
SEE NOTE 6
Amendment 0001
11. ROUTE OF OH DISTRIBUTION LINE FROM POLE #527
NORTHWARD ALONG SECURITY FENCE WILL REQUIRE
CUTTING AND CLEARING OF TREES WHICH ENCROACH
INTO THE 22'-0" 'CLEAR ZONE' FROM THE CENTERLINE OF
POLE ON BOTH SIDES OF THE DISTRIBUTION LINE (TOTAL
OF 44'-0" 'CLEAR ZONE').
Manning, S (man67358) Snapshot
Manning, S (man67358) Snapshot
Manning, S (man67358) Text Box 8/26/16
Manning, S (man67358) Snapshot
G3ECNMJK
Polygonal Line
G3ECNMJK
Callout POLE-MTD OH ELECTRICAL DISTRIBUTION LINE WORK TO OCCUR WITHIN ESTABLISHED CITY OF TACOMA EASEMENT A-90L
G3ECNMJK
Text Box REV-1 OH POLE-MTD DISTRO LINE CITY OF TACOMA EASEMENT A-90L; 29JUN2017 mjk
G3ECNMJK
Line
G3ECNMJK
Callout
SITE ACCESS THRU EXIST'G SUBSTATION GATES
G3ECNMJK
Callout
TACOMA POWER ELEC SUBSTATION #12415
G3ECNMJK
Callout
NEW OH ELEC DISTRO LINES CROSSING BNSF TRACK
G3ECNMJK
Polygonal Line
G3ECNMJK
Callout NEW 13.8Kv OH ELEC DISTRIBUTION LINES LOCATED WITHIN EASEMENT
G3ECNMJK
Callout
CITY OF TACOMA EASEMENT A-90L (200'-0" WIDE N-S)
G3ECNMJK
Text Box REVISED NOTE No.4: REMOVE 13.8kV DEADEND/CROSSARMS FROM POLE 'B' AS PART OF OVERALL 13.8kV DISTRIBUTION LINE REMOVAL - INCLUDING TO MAIN SUBSTATIONS STEEL STRUCTURE. POLE 'B' TO REMAIN INTACT FOR SUPPORT OF EXISTING 12.47 LAKEVIEW LIGHT & POWER 12.47kV DISTRIBUTION LINES.
G3ECNMJK
Polygon
G3ECNMJK
Text Box
10. POLE #545 TO BE LOCATED WITHIN FENCED SUBSTATION AT DISTANCE FROM VEHICLE GATE TO ALLOW FOR GUY WIRE PLACEMENT TO NOT ENCROACH INTO EXISTING VEHICLE TURNAROUND BETWEEN GATE AND POLE 'B'.
G3ECNMJK
Text Box
G3ECNMJK
Polygon
G3ECNMJK
Callout
SEE NOTE 10
G3ECNMJK
Text Box
REV-2 POLE 'B' AND 545 MODIFICATIONS; 31JUL2017 MJK
G3ECNMJK
Text Box
G3ECNMJK
Polygonal Line
G3ECNMJK
Text Box
G3ECNMJK
Polygonal Line
G3ECNMJK
Text Box
G3ECNMJK
Polygonal Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Line
G3ECNMJK
Callout 200'-0" EASEMENT DIMENSION - CONFIRM SITE RESTRICTED LAYOUT TO ENSURE ALL WORK IS WITHIN EXISTING EASEMENT
G3ECNMJK
Oval
G3ECNMJK
Callout SEE NOTE No. 11 (TYP.)
G3ECNMJK
Polygon
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
U G
P
NOTES:
1. EXPAND GINGKO SUBSTATION SWITCHGEAR
BUILDING AND ADD TWO 13.8 KV SWITCHGEAR
CUBICLES AND CIRCUIT BREAKERS.
2. SEE SHEET E-705 FOR WOOD POLE SCHEDULE
(DEMOLITION AND NEW CONSTRUCTION)
E-401
E L E
C T
R
IC
A L
E N
L A
R G
E D
G
IN
G K
O P
L A
N
I- 5
HIGHWAY
M A
T C
H L
IN
E
S E
E S
H E
E T
C -1
3. REMOVE 13.8 kV UNDERGROUND RISER FROM POLE
494 TO GINGKO SUBSTATION SWITCHGEAR.
4. PROVIDE 13.8 kV UNDERGROUND DISTRIBUTION TO
POLE 501.
5. SEE CABLE CONDUIT LIST ON SHEET E-601 FOR "A"
THRU "F" AND "UC".
6. SEE SHEETS S-521 AND S-522 FOR STRUCTURAL
DETAILS.
GINGKO
SUBSTATION
DEMOLITION
SEE NOTE 3
E-501
EXISTING
GAS SWITCH
02 03 04
KEY PLAN
MATCHLINE SEE SHEET C-101
MATCHLINE SEE SHEET C-101
GROUNDING ROD
7' CHAINLINK
SECURITY FENCE
GRAVEL
EXISTING
BUILDING
POWER POLE W/
RISER
POWER POLE W/
RISER
#TP32494
NN
0 8' 16'
RELOCATED
VOLTAGE
REGULATOR
SEE
NOTE 1
BYPASS SWITCH
STRUCTURE
EXISTING
TRANSFORMER
30 kVA TRANSFORMER
GAS SWITCH
A
SEE NOTE
4 & 5 (TYP)A
B
E
C
F
VR103
VR104
VR102
VR101
E-505
D
INTERNAL
TO VAULT
MH 04
CLEARING
ZONE
E-402
Amendment 0001
Manning, S (man67358) Snapshot
G3ECNMJK
Text Box
7. REMOVE 13.8kV UNDERBUILD (CONDUCTORS, CROSS-ARMS AND BRACKETS, 13.8 kV CABLE TERMINATIONS AND ARRESTORS) FROM TPU-OWNED POLE #494. 13.8kV SPAN GUY FROM TPU-OWNED POLE #494 TO ADJACENT DISTRIBUTION POLE (WITH RISER) TO THE SOUTHWEST SHALL BE REMOVED, WITH NEW GUY WIRE(S) (QTY:2) TO BE INSTALLED ON BOTH THE ADJACENT DISTRIBUTION POLE (WITH RISER) AND THE TPU-OWNED POLE #494.
G3ECNMJK
Callout SEE NOTE No.7
G3ECNMJK
Line
G3ECNMJK
Text Box Rev-1; Added Note No.7 (TPU-Owned Pole #494 Demolition Work) 31Jul2017 MJK
G3ECNMJK
Callout
WEIGHT OF EXISTING VOLTAGE REGULATOR (TO BE RELOCATED) IS 25.25 TONS
E-501
E L E
C T
R
IC
A L
D E
T A
IL
S
POWER POLE #494
POWER POLE #492 (POLE "C")
POWER POLE #480
POWER POLE #478 (POLE "A")
POWER POLE "B"
POLE B
Amendment 0001
Manning, S (man67358) Snapshot
G3ECNMJK
Callout SEE NOTE No.7 ON DWG SHT E-401
G3ECNMJK
Polygon
G3ECNMJK
Text Box Rev-1; TPU Pole #494 Revision (Guy Wires) 31Jul2017 MJK
| G-002 Main-Gingko IFB Dwg Rev-1_31Jul2017 |
| C-104 Main-Gingko IFB Dwg Rev-2_31Jul2017-2 |
| C-106 Main-Gingko IFB Dwg Rev-2_31Jul2017-3 |
| E-401 Main-Gingko IFB Dwg Rev-1_31Jul2017-4 |
| E-501 Main-Gingko IFB Dwg Rev-1_31Jul2017-5 |
File details come from the government source that posted it. Updated .