This document is an Aboveground Storage Tank SP001 Inspection Report for Gasoline Tank 2 located at the Caven Point Marine Terminal in Jersey City, New Jersey. The inspection was conducted on February 27, 2024, by TSP Tank Services, with Mr. Robert Sherby performing the inspection and Mr. Ronald E. Swan, Jr., P.E. overseeing the process. The tank is a 2,000-gallon, rectangular, carbon steel gasoline storage tank constructed in 2023, with a fixed roof and flat floor, classified as a Category 1 tank with interstitial monitoring and double-wall secondary containment.
The inspection report found no critical repairs, code variances, or mandatory maintenance activities required. The tank was deemed suitable for its intended service, with recommendations for monthly inspections by the owner's inspector, annual inspections using the SP001 Annual Inspection Checklist, and a scheduled formal external inspection by a certified inspector due by February 27, 2029. The tank is located at 3 Chapel Ave and was prepared for the U.S. Army Corps of Engineers, New York District, with project number L23074.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Date: March 21, 2024 Report Version: 1.0
TSP Tank Services
25000 Capitol, Redford, Michigan 48239
(734) 838-0426 | tanks@tspenvironmental.com
Aboveground Storage Tank SP001 Inspection Report
Caven Point Marine Terminal
Gasoline Tank 2
Ronald E. Swan, Jr., CP, PE Principal Engineer
API-653 Inspector: 32328 SP-001 Inspector: AC14808
© 2024 Technical Service Professionals, LLC
Aboveground Storage Tank SP001 Inspection Report
Gasoline Tank 2
3 Chapel Ave Jersey City, NJ 07305
Prepared For:
U.S. Army Corps of Engineers, New York District 26 Federal Plaza, Room 1843
New York, NY 10028-0090
Prepared By:
TSP Tank Services 25000 Capitol
Redford, Michigan 48239
Project Number: L23074
March 21, 2024
Version: 1.0
TABLE OF CONTENTS
1 – Executive Summary 2 – Introduction 3 – Description of the Tank
3.1 – Tank History
3.2 – Physical Design Characteristics
3.3 – Operational Characteristics
3.4 – Tank Category
4 – Observations and Inspection Results
4.1 – Methodology
4.2 – Inspection Results
4.2.1 – Foundations and Supports
4.2.2 – Secondary Containment, Spill Control, and CRDM
4.2.3 – Shell
4.2.4 – Roof
4.2.5 – Ancillary Equipment
5 – Variance Analysis and Recommendations
5.1 – Critical Variances (Prior to Return to Service)
5.2 – Code Variances (Mandatory for Recertification)
5.3 – Minor Variances
6 – Estimate of Repair Costs 7 – Suitability for Service Statement
TABLE OF APPENDICES
Appendix A - Tank Layout and Observations Appendix B - SP001 Annual Inspection Checklist Appendix C - Nondestructive Testing Data Appendix D - Photographs Appendix E - Qualifications of Inspection Professionals
1 – EXECUTIVE SUMMARY
On February 27, 2024, TSP Tank Services (TSP) inspected Gasoline Tank 2 located at 3 Chapel Ave, Jersey City, NJ 07305.
The inspection was performed by Mr. Robert Sherby, a certified API-653 and SP001 aboveground storage tank inspector, and overseen by Mr. Ronald E. Swan, Jr., PE., a certified API-653 aboveground storage tank inspector and registered Professional Engineer in the State of Michigan. Inspection was conducted according to the methodology outlined in the SP001 standard as supplemented by the professional experience of Mr. Swan. The work performed included:
• Visual inspection of the tank exterior and area surrounding the tank.
• Visual inspection of welds at shell seams and appurtenances.
• Photographic documentation of observed variances from code requirements.
• Analysis of data resulting in a fitness for service determination.
• Recommendation of critical, mandatory, and optional maintenance tasks.
Based on the criteria established by SP001, Gasoline Tank 2 is suitable for its intended service.
The following critical repairs must be performed prior to return to service:
• None recommended.
The following code-required repairs must be performed before the tank can be certified:
• None recommended.
The following repairs or maintenance activities are recommended:
• None recommended.
Based on the category of the tank and its current condition, TSP recommends that future inspections be performed according to the following schedule:
• Monthly inspection by the Owner’s Inspector using the SP001 Monthly Inspection Checklist, with the next inspection due one month from the date of this report.
• Annual inspection by the Owner’s Inspector using the SP001 Annual Inspection Checklist, with next inspection due one year from the date of this report.
• Scheduled Formal External Inspection by a Certified Inspector, with the next inspection due by February 27, 2029.
This inspection report should be retained for the life of the tank.
2 – INTRODUCTION
An aboveground storage tank inspection is an engineered approach to determining the current condition of an aboveground storage tank (AST). The inspection process is designed to meet the requirements of various federal and state regulations, industry standards, and best practices. Periodic inspections performed by a certified professional provide a reference point for tank conditions, enabling owners and operators to plan and budget for maintenance and regulatory compliance activities.
Inspections are performed using a variety of techniques under the guidance of the relevant regulations and inspection standards and the professional experience of the AST Inspector.
Inspection techniques are selected to develop high quality data regarding the current condition of the tank. Techniques employed during this inspection included:
• Visual Inspection – A visual accounting by the AST Inspector of the condition of the tank. Visual inspection by an experienced professional can identify many variances and provide guidance for the remainder of the inspection effort.
Each of the inspection techniques are performed by individuals trained and experienced in their use. Our testing staff have been certified to at least Level 1 of the SNT-TC-1A standard published by the American Society for Nondestructive Testing in each of the testing methods described above.
3 – DESCRIPTION OF THE TANK
Prior to on-site inspection, TSP requested historic information and construction data regarding the tank. Inspection staff also reviewed nameplate information during the on-site inspection.
3.1 – Tank History
The following tank history was disclosed to the inspector at the time of the inspection. The tank may have a more extensive history than described below. The AST Inspector has not independently verified the information contained in this section.
• 2023 – Construction date.
3.2 – Physical Design Characteristics
Identifier: NAN-00585-GAS- 02-2000
Material of Construction: Carbon Steel
Orientation: Rectangular Roof Type: Fixed
Length: 10’6” Floor Type: Flat
Height: 3’4” Head Type: Flat
Depth: 5’0” Insulation Type: NA
Capacity: 2,000 gal Insulation Thickness: NA
3.3 – Operational Characteristics
Product Stored: Gasoline Operating Temperature: Ambient
3.4 – Tank Category
CRDM: Interstitial Monitoring
Spill Control: Double Walled
TANK CATEGORY: 1
4 – OBSERVATIONS AND INSPECTION RESULTS
On February 27, 2024, TSP Tank Services completed an API-653 inspection of Gasoline Tank 2 located at 3 Chapel Ave, Jersey City, NJ 07305. The inspection was performed by Mr. Robert Sherby, a certified API-653 and SP001 aboveground storage tank inspector, and overseen by Mr. Ronald E. Swan, Jr., P.E., a certified API-653 aboveground storage tank inspector and registered Professional Engineer in the State of Michigan.
4.1 – Methodology
Specific work required to successfully complete this inspection included:
• Formal External Inspection per SP001 §7.0.
• Identification and verification of tank geometry and appurtenances. (Appendix A)
• Completion of the SP001 Annual Inspection Checklist. (Appendix B)
• Photographic documentation of the current tank condition. (Appendix D)
4.2 – Inspection Results
A description of the current condition of the tank has been developed based on data collected during the inspection effort. Specific observations are shown in the sections below.
4.2.1 – Foundations and Supports
The tank rests on a support frame set atop a poured concrete foundation. Visual inspection did not reveal any variances from SP001 requirements.
4.2.2 – Secondary Containment, Spill Control, and CRDM
The tank is double walled with secondary containment and spill control provided by the outer shell. CRDM is provided by the interstitial monitor installed between the inner and outer shells and the elevated nature of the tank.
4.2.3 – Shell
Visual inspection of the tank shell did not reveal any variances relative to SP001 requirements.
4.2.4 – Roof
Visual inspection of the tank roof did not reveal any variances from SP001 requirements.
4.2.5 – Ancillary Equipment
Visual observation of the tank ancillary equipment did not reveal any variances relative to SP001 requirements.
5 – VARIANCE ANALYSIS AND RECOMMENDATIONS
Based on visual observations and data collected during the inspection, TSP has identified variances which may require additional investigation or repair. An analysis of variances, including their severity, is provided below.
Repairs may be completed by any method that conforms to SP001 and SP031. Repair recommendations, if provided, are based on prior experience with similar conditions, but are not an engineering design. TSP shall have no liability regarding the methods selected to correct variances or regarding variances which are not corrected.
5.1 – Critical Variances (Prior to Return to Service)
Critical variances are conditions which present immediate concerns regarding tank integrity or safety. TSP strongly recommends that the tank be placed out of service until all critical variances have been repaired.
SECTION INTENTIONALLY BLANK
NO CRITICAL REPAIRS REQUIRED
5.2 – Code Variances (Mandatory for Recertification)
Code variances are conditions which place the tank out of compliance with SP001 or other regulatory requirements or which may develop into critical variances. TSP recommends that code variances be repaired as soon as possible.
SECTION INTENTIONALLY BLANK
NO MANDATORY REPAIRS REQUIRED
5.3 – Minor Variances
Minor variances are conditions which are within code requirements, but which the Owner may nevertheless wish to address. Based on our experience, repairing minor variances will likely yield improvement in the quality, longevity, or safety of the tank.
SECTION INTENTIONALLY BLANK
NO MANDATORY REPAIRS REQUIRED
6 – ESTIMATE OF REPAIR COSTS
TSP offers the following estimates of repair costs based on the repair recommendations presented in this report. These estimates are based on TSP's professional experience with tank repairs and are intended to be used for planning and budgeting purposes. Actual repair costs may be higher or lower than the estimates listed below.
Scope of Work Estimated Cost
None N/A
Cost estimates do not include measures for interim storage / management facilities that may be required when the tank is removed from service.
7 – SUITABILITY FOR SERVICE STATEMENT
On February 27, 2024, TSP Tank Services completed an SP001 inspection of Gasoline Tank 2 located at 3 Chapel Ave, Jersey City, NJ 07305. The inspection was performed by Mr. Robert Sherby, a certified API-653 and SP001 aboveground storage tank inspector, and overseen by Mr. Ronald E. Swan, Jr., P.E., a certified API-653 aboveground storage tank inspector and registered Professional Engineer in the State of Michigan. Copies of employee qualifications to perform the work completed during this inspection are included in Appendix E.
Based on the data collected during this inspection and the criteria established by SP001, Gasoline Tank 2 is suitable for its intended service. This suitability for service determination is based on the current condition of the tank, its known history, and an understanding of its intended future use. TSP recommends that the tank be re-inspected whenever the tank is placed into service for a different use, including containment of a different product, or if there is any material change in the condition of the tank.
Owners and operators should carefully review all relevant regulations to ensure that the operation of the tank meets the established requirements, including requirements for future periodic inspections.
Ronald E. Swan, Jr., CP, PE Principal Engineer
API-653 Inspector: 32328 SP001 Inspector: AC14808
Appendix A - Tank Layout and Observations
Project No. Date:
Project Name:
Technician
Vent Type: Address:
Vent Size:
Emergency Vent Type: Tank ID:
Emergency Vent Size: Product: Age:
Gauge Type: Roof Type: [ X ] Fixed [ ] Floating [ ] Open Gauge Size: Exterior Coating: [ ] Yes [ X ] No Overfill Control Type: Interior Lining: [ ] Yes [ X ] No Overfill Control Size: Insulation Type: [ X ] None [ ] Overfill Alarm Type: Foundation: Poured concrete Overfill Alarm Size: Secondary Containment: Double wall tank
Release Detection: Elevated tank
Construction Standard:
Construction Date:
Serial Number:
Diameter:
Specific Gravity:
Design Pressure:
Original Construction Date:
Year Reconstructed:
Liquid Level Maximum:
Capacity:
Max. Operating Temperature:
Notes:
(1) Rectangular tank dimensions 10'6"W x 5'D x 3'4"H
2,000 gallons
Material A62621719
Height:
Shell Course
Allowable Stress
2"
SUMMARY TANK DESCRIPTION
L23074
UL-2085
Nameplate Information
N/A Electronic 2"
Nameplate Information
2/27/2024 Caven Point Gas Tank 2
Robert Sherby
TSP Tank Services
25000 Capitol Redford, Michigan 48239
(734) 838-0426
TANKS@TSPENVIRONMENTAL.COM
None
Visual (Tank structure)
6" Gasoline 1 Morrison Fig. 818
Tank Information Conservation vent 3 Chapel Ave
Jersey City, NJ 073052" Morrison / Clay & Bailey NAN-00585-GAS-02-2000
F2
F1
LI2
P1 LI3
P2
EV1
EV2
LI1
V1
D1
L23074-G2-SL
Shell Layout
TECHNICAL SERVICE
PROFESSIONALS COPYRIGHT 2024 ALL RIGHTS RESERVED
THIS DRAWING IS PROTECTED UNDER THE
COPYRIGHT ACT OF 1976 AND SHALL NOT BE
REUSED WITHOUT THE WRITTEN PERMISSION
OF TECHNICAL SERVICE PROFESSIONALS, LLC
REVISIONS
NO. DATE DESCRIPTION
DRAWN:
CHECKED:
DATE:
DRAWING TITLE
DRAWING No.
25000 CAPITOL
REDFORD, MI 48239
PROJECT TITLE
2024-02-27
Ronald E. Swan, Jr.
Robert Sherby
3 Chapel Ave Jersey City, NJ 07305
Caven Point
Project No Date:
Technician:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
Emergency vent.
6"
2"
EV1 Clay & Bailey Fig. 367
Discharge pump to dispenser station.
V1
2"
Pressure/vacuum vent.
D1
Threaded fill pipe with spill container.
F2
4"
Fill pipe with camlock hose connection.
TANK APPURTENANCES
L23074 2/27/2024 Caven Point Gas Tank 2
F1
3"
Robert Sherby
TSP Tank Services
25000 Capitol Redford, Michigan 48239
(734) 838-0426
TANKS@TSPENVIRONMENTAL.COM
Technician:
TANK APPURTENANCES
L23074 2/27/2024 Caven Point Gas Tank 2 Robert Sherby
TSP Tank Services
25000 Capitol Redford, Michigan 48239
(734) 838-0426
TANKS@TSPENVIRONMENTAL.COM
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
6"
EV2 Morrison Brothers Fig. 244
Clock gauge level indicator.
Emergency vent.
LI1 Morrison Brothers Fig. 818
2"
Electronic level sensor.
LI2
3"
Interstitial leak monitor.
LI3
1.5"
Capped threaded pipe.
P1
2"
Technician:
TANK APPURTENANCES
L23074 2/27/2024 Caven Point Gas Tank 2 Robert Sherby
TSP Tank Services
25000 Capitol Redford, Michigan 48239
(734) 838-0426
TANKS@TSPENVIRONMENTAL.COM
ID: Manufacturer: Model:
Location on Tank: [ X ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
ID: Manufacturer: Model:
Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:
Flange Thickness: Top/North: 90º Clockwise 180º: 270º:
Description:
Capped threaded pipe.
P2
1"
Appendix B - SP001 Annual Inspection Checklist
STI SP001 Annual Inspection Checklist
General Inspection Information:
Inspection Date: 2/27/2024 Prior Inspection Date: None Retain Until Date: 2/27/2027
Inspector Name: Robert Sherby Title: Inspector
Inspector Signature:
Tank ID: NAN-000585-GAS-02-2000
Facility Name: Caven Point Marine Terminal
Inspection Guidance:
For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified
Inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.
Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.
In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v)).
Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
Retain the completed checklists for 36 months.
Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists.
Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.
ITEM STATUS COMMENTS / DATE CORRECTED
Tank Foundation / Supports
1 Free of tank settlement or foundation washout? ☒Yes ☐No 2 Concrete pad or ring wall free of cracking and spalling? ☒Yes ☐No ☐N/A 3 Tank supports in satisfactory condition? ☒Yes ☐No ☐N/A 4 Is water able to drain away from tank if tank is resting on a foundation or on the ground?
☒Yes ☐No ☐N/A
5 Is the grounding strap between the tank and foundation/supports in good condition?
☒Yes ☒No ☐N/A
Tank Shell, Heads and Roof 6 Free of visible signs of coating failure? ☒Yes ☐No 7 Free of noticeable distortions, buckling, denting, or bulging?
☒Yes ☐No
8 Free of standing water on roof? ☒Yes ☐No ☐N/A 9 Are all labels and tags intact and legible? ☐Yes ☒No
Tank Manways, Piping, and Equipment 10 Flanged connection bolts tight and fully engaged with no sign of wear or corrosion?
☐Yes ☐No ☒N/A
ITEM STATUS COMMENTS / DATE CORRECTED
Tank Equipment
11 Normal and emergency vents free of obstructions? ☒Yes ☐No 12 Normal vent on tanks storing gasoline equipped with pressure/vacuum vent?
☒Yes ☐No ☐N/A
13 Are flame arrestors free of corrosion and are air passages free of blockage?
☐Yes ☐No ☒N/A
14 Is the emergency vent in good working condition and functional, as required by the manufacturer? Consult manufacturer’s requirements. Verify that components are moving freely (including long-bolt manways).
☒Yes ☐No ☐N/A
15 Is interstitial leak detection equipment in good condition?
Are windows on sight gauges clear? Are wire connections intact? If equipment has a test function, does it activate to confirm operation?
☐Yes ☐No ☒N/A
16 Are all valves free of leaks, corrosion, and other damage? Follow manufacturer’s instructions for regular maintenance of these items. Check the following and verify (as applicable):
16a Anti-siphon valve ☐Yes ☐No ☒N/A 16b Check valve ☐Yes ☐No ☒N/A 16c Gate valve ☒Yes ☐No ☐N/A 16d Pressure regulator valve ☐Yes ☐No ☒N/A 16e Expansion relief valve ☐Yes ☐No ☒N/A 16f Solenoid valve ☐Yes ☐No ☒N/A 16g Fire valve ☒Yes ☐No ☐N/A 16h Shear valve ☐Yes ☐No ☒N/A 17 Are strainers and filters clean and in good condition? ☒Yes ☐No ☐N/A
Insulated Tanks 18 Free of missing insulation?
Insulation free of visible signs of damage?
Insulation adequately protected from water intrusion?
☐Yes ☐No ☒N/A
19 Insulation free of noticeable areas of moisture? ☐Yes ☐No ☒N/A 20 Insulation free of mold? ☐Yes ☐No ☒N/A 21 Free of visible signs of coating failure? ☐Yes ☐No ☒N/A
Tank / Piping Release Detection 22 Is inventory control being performed and documented if required?
☒Yes ☐No ☐N/A
23 Is release detection being performed and documented if required?
☒Yes ☐No ☐N/A
Other Equipment 24 Are electrical wiring and boxes in good condition? ☒Yes ☐No ☐N/A 25 Has the cathodic protection system on the tank been tested as required by the designing engineer?
☐Yes ☐No ☒N/A
Additional Comments:
Appendix C - Photographs
Photographic Log
3 Chapel Ave, Jersey City, NJ 07305
Project: L23074 Date: 2/27/2024 Location: North Shell.
Description: General view of north shell.
Project: L23074 Date: 2/27/2024 Location: East Shell Description: General view of east shell.
Project: L23074 Date: 2/27/2024 Location: South Shell Description: General view of south shell.
Project: L23074 Date: 2/27/2024 Location: West Shell Description: General view of west shell.
Project: L23074 Date: 2/27/2024 Location:
Description: Tank nameplate.
Project: L23074 Date: 2/27/2024 Location: Roof Description: General view of roof.
Description: Threaded fill pipe with spill container (F1) and fill pipe with camlock connection (F2).
Description: Electronic level sensor (LI2).
Description: Interstitial leak monitor (LI3) capped pipe (P2), and emergency vent (EV1).
Description: Clock gauge level indicator (LI1).
Description: Emergency vent (EV2) and pressure/vacuum vent (V1) in corner.
Description: Discharge pump to dispenser station (D1).
Appendix D - Qualifications of Inspection Professionals
| Gasoline Tank 2 Layout.pdf |
| Sheets and Views |
| Gasoline Tank 2 Layout-Shell Layout |