This document is an Aboveground Storage Tank SP001 Inspection Report for a Bilge Water Tank located at 3 Chapel Ave, Jersey City, NJ, prepared by TSP Tank Services for the U.S. Army Corps of Engineers, New York District. The inspection was conducted on February 27, 2024, by certified inspector Robert Sherby and overseen by Ronald E. Swan, Jr., a Professional Engineer.

The horizontal carbon steel tank, constructed around 1940 and placed into current service in 2012, has a 3,000-gallon capacity and is used to store water. The inspection revealed minor coating damage on the shell top and poor interior coating condition of the secondary containment, with no critical or mandatory repairs required. Recommended maintenance includes repairing shell coating spot damage and replacing the interior coating of the secondary containment. The tank was deemed suitable for its intended service, with future inspections recommended monthly by the owner and a formal external inspection scheduled by February 27, 2044. The tank is supported by steel saddles on a steel containment container with a concrete foundation and is categorized as a Tank Category 1.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report Date: March 21, 2024 Report Version: 1.0

TSP Tank Services

25000 Capitol, Redford, Michigan 48239

(734) 838-0426 | tanks@tspenvironmental.com

Aboveground Storage Tank SP001 Inspection Report

Caven Point Marine Terminal

Bilge Water Tank

Ronald E. Swan, Jr., CP, PE Principal Engineer

API-653 Inspector: 32328 SP-001 Inspector: AC14808

© 2024 Technical Service Professionals, LLC

Aboveground Storage Tank SP001 Inspection Report

Bilge Water Tank

3 Chapel Ave Jersey City, NJ 07305

Prepared For:

U.S. Army Corps of Engineers, New York District 26 Federal Plaza, Room 1843

New York, NY 10028-0090

Prepared By:

TSP Tank Services 25000 Capitol

Redford, Michigan 48239

Project Number: L23074

March 21, 2024

Version: 1.0

TABLE OF CONTENTS

1 – Executive Summary 2 – Introduction 3 – Description of the Tank

3.1 – Tank History

3.2 – Physical Design Characteristics

3.3 – Operational Characteristics

3.4 – Tank Category

4 – Observations and Inspection Results

4.1 – Methodology

4.2 – Inspection Results

4.2.1 – Foundations and Supports

4.2.2 – Secondary Containment, Spill Control, and CRDM

4.2.3 – Shell

4.2.4 – East Head

4.2.5 – West Head

4.2.6 – Ancillary Equipment

5 – Variance Analysis and Recommendations

5.1 – Critical Variances (Prior to Return to Service)

5.2 – Code Variances (Mandatory for Recertification)

5.3 – Minor Variances

5.3.1 – Repair Shell Coating Spot Damage

5.3.2 – Replace Interior Coating of Secondary Containment

6 – Estimate of Repair Costs 7 – Suitability for Service Statement

TABLE OF APPENDICES

Appendix A - Tank Layout and Observations Appendix B - SP001 Annual Inspection Checklist Appendix C - Nondestructive Testing Data Appendix D - Photographs Appendix E - Qualifications of Inspection Professionals

1 – EXECUTIVE SUMMARY

On February 27, 2024, TSP Tank Services (TSP) inspected the Bilge Water Tank located at 3 Chapel Ave, Jersey City, NJ 07305.

The inspection was performed by Mr. Robert Sherby, a certified API-653 and SP001 aboveground storage tank inspector, and overseen by Mr. Ronald E. Swan, Jr., PE., a certified API-653 aboveground storage tank inspector and registered Professional Engineer in the State of Michigan. Inspection was conducted according to the methodology outlined in the SP001 standard as supplemented by the professional experience of Mr. Swan. The work performed included:

• Visual inspection of the tank exterior and area surrounding the tank.

• Visual inspection of welds at shell seams and appurtenances.

• Ultrasonic Thickness measurement of the tank shell and heads.

• Photographic documentation of observed variances from code requirements.

• Analysis of data resulting in a fitness for service determination.

• Recommendation of critical, mandatory, and optional maintenance tasks.

Based on the criteria established by SP001, the Bilge Water Tank is suitable for its intended service.

The following critical repairs must be performed prior to return to service:

• None recommended.

The following code-required repairs must be performed before the tank can be certified:

• None recommended.

The following repairs or maintenance activities are recommended:

• Repair shell coating spot damage.

• Replace interior coating of secondary containment.

Based on the category of the tank and its current condition, TSP recommends that future inspections be performed according to the following schedule:

• Monthly inspection by the Owner’s Inspector using the SP001 Monthly Inspection Checklist, with the next inspection due one month from the date of this report.

• Annual inspection by the Owner’s Inspector using the SP001 Annual Inspection Checklist, with next inspection due one year from the date of this report.

• Scheduled Formal External Inspection by a Certified Inspector, with the next inspection due by February 27, 2044.

This inspection report should be retained for the life of the tank.

2 – INTRODUCTION

An aboveground storage tank inspection is an engineered approach to determining the current condition of an aboveground storage tank (AST). The inspection process is designed to meet the requirements of various federal and state regulations, industry standards, and best practices. Periodic inspections performed by a certified professional provide a reference point for tank conditions, enabling owners and operators to plan and budget for maintenance and regulatory compliance activities.

Inspections are performed using a variety of techniques under the guidance of the relevant regulations and inspection standards and the professional experience of the AST Inspector.

Inspection techniques are selected to develop high quality data regarding the current condition of the tank. Techniques employed during this inspection included:

• Visual Inspection – A visual accounting by the AST Inspector of the condition of the tank. Visual inspection by an experienced professional can identify many variances and provide guidance for the remainder of the inspection effort.

• Ultrasonic Thickness Testing – A testing method which uses sound waves to determine the thickness of plates, pipe walls, and coatings. TSP uses a dual-element transducer which allows separate determination of metal and coating thickness.

Each of the inspection techniques are performed by individuals trained and experienced in their use. Our testing staff have been certified to at least Level 1 of the SNT-TC-1A standard published by the American Society for Nondestructive Testing in each of the testing methods described above.

3 – DESCRIPTION OF THE TANK

Prior to on-site inspection, TSP requested historic information and construction data regarding the tank. Inspection staff also reviewed available nameplate information during the on-site inspection.

3.1 – Tank History

The following tank history was disclosed to the inspector at the time of the inspection. The tank may have a more extensive history than described below. The AST Inspector has not independently verified the information contained in this section.

• c1940 – Original construction date.

• 2012 – Tank placed into current service.

3.2 – Physical Design Characteristics

Identifier: Bilge Water Tank Material of Construction: Carbon Steel

Orientation: Horizontal Roof Type: NA

Diameter: 5’6” Floor Type: NA

Height: NA Head Type: Flat

Length: 26’6” Insulation Type: NA

Capacity: 3,000 gal Insulation Thickness: NA

3.3 – Operational Characteristics

Product Stored: Water Operating Temperature: Ambient

3.4 – Tank Category

CRDM: Elevated Tank

Spill Control: Steel Containment

TANK CATEGORY: 1

4 – OBSERVATIONS AND INSPECTION RESULTS

On February 27, 2024, TSP Tank Services completed an API-653 inspection of the Bilge Water Tank located at 3 Chapel Ave, Jersey City, NJ 07305. The inspection was performed by Mr.

Robert Sherby, a certified API-653 and SP001 aboveground storage tank inspector, and overseen by Mr. Ronald E. Swan, Jr., P.E., a certified API-653 aboveground storage tank inspector and registered Professional Engineer in the State of Michigan.

4.1 – Methodology

Specific work required to successfully complete this inspection included:

• Formal External Inspection per SP001 §7.0.

• Identification and verification of tank geometry and appurtenances. (Appendix A)

• Completion of the SP001 Annual Inspection Checklist. (Appendix B)

• Ultrasonic Thickness (UT) Testing of the exterior shell and heads. (Appendix C)

• Photographic documentation of the current tank condition. (Appendix D)

4.2 – Inspection Results

A description of the current condition of the tank has been developed based on data collected during the inspection effort. Specific observations are shown in the sections below.

4.2.1 – Foundations and Supports

The tank is supported by steel saddles that rest on the steel floor of the secondary containment container. The secondary containment container rests on poured concrete. The tank is attached to the saddles by stitch welds.

4.2.2 – Secondary Containment, Spill Control, and CRDM

Secondary containment and spill control are provided by the steel container in which the tank is located. Continuous release detection is provided by the elevated nature of the tank itself. UT measurement of the containment floor found it to have approximately ¼-inch thickness.

The interior coating of the secondary containment was found to be in poor condition with large areas of coating failure and associated corrosion of the steel containment floor. The depth of corrosion is limited and poses no immediate concern for the integrity of the containment.

4.2.3 – Shell

Visual inspection of the tank shell found the following conditions:

• Minor denting across the entire surface, with all observed dents well within acceptable tolerances.

• Localized coating failure on top of tank under platform, with no significant corrosion observed.

Ultrasonic Thickness (UT) measurements were taken at sixty-one points. There were no measurements where remaining shell thickness fell below 50% of the presumed original plate thickness. UT data and analysis is provided in Appendix C.

4.2.4 – East Head

Visual inspection of the east head revealed the following conditions:

• Minor denting on the top north portion of the head, with all observed dents well within acceptable tolerances.

Ultrasonic Thickness (UT) measurements were taken at nine points. There were no measurements where remaining shell thickness fell below 50% of the original plate thickness.

UT data and analysis is provided in Appendix C.

4.2.5 – West Head

Visual inspection of the east head revealed the following conditions:

• Minor denting across the entire surface, with all observed dents well within acceptable tolerances.

Ultrasonic Thickness (UT) measurements were taken at nine points. There were no measurements where remaining shell thickness fell below 50% of the original plate thickness.

UT data and analysis is provided in Appendix C.

4.2.6 – Ancillary Equipment

Visual inspection of the tank ancillary equipment did not reveal any variances relative to SP001 requirements.

5 – VARIANCE ANALYSIS AND RECOMMENDATIONS

Based on visual observations and data collected during the inspection, TSP has identified variances which may require additional investigation or repair. An analysis of variances, including their severity, is provided below.

Repairs may be completed by any method that conforms to SP001 and SP031. Repair recommendations, if provided, are based on prior experience with similar conditions, but are not an engineering design. TSP shall have no liability regarding the methods selected to correct variances or regarding variances which are not corrected.

5.1 – Critical Variances (Prior to Return to Service)

Critical variances are conditions which present immediate concerns regarding tank integrity or safety. TSP strongly recommends that the tank be placed out of service until all critical variances have been repaired.

SECTION INTENTIONALLY BLANK

NO CRITICAL REPAIRS REQUIRED

5.2 – Code Variances (Mandatory for Recertification)

Code variances are conditions which place the tank out of compliance with SP001 or other regulatory requirements or which may develop into critical variances. TSP recommends that code variances be repaired as soon as possible.

SECTION INTENTIONALLY BLANK

NO MANDATORY REPAIRS REQUIRED

5.3 – Minor Variances

Minor variances are conditions which are within code requirements, but which the Owner may nevertheless wish to address. Based on our experience, repairing minor variances will likely yield improvement in the quality, longevity, or safety of the tank.

5.3.1 – Repair Shell Coating Spot Damage

Visual inspection of the shell found isolated coating failures on the top center of the shell near the manway. Although the coating failures are not currently associated with significant corrosion, exposed steel where the coating has failed is likely to corrode at an accelerating rate, particularly as the tank is in a marine environment.

5.3.2 – Replace Interior Coating of Secondary Containment

Visual inspection of the secondary containment found the interior coating to be in poor condition with large areas of failure and associated corrosion of the underlying steel. Coating failure, particularly when coupled with standing water, causes accelerated corrosion of the containment floor plate, which may significantly affect the integrity of the containment area.

TSP recommends that any remaining coating be removed and that a new coating be applied.

Coating removal should be completed in accordance with the SPCC-SP6 (Commercial Cleaning) standard published by the Society for Protective Coatings. The replacement coating should be a two-part epoxy coating applied in accordance with the manufacturer recommendations.

6 – ESTIMATE OF REPAIR COSTS

TSP offers the following estimates of repair costs based on the repair recommendations presented in this report. These estimates are based on TSP's professional experience with tank repairs and are intended to be used for planning and budgeting purposes. Actual repair costs may be higher or lower than the estimates listed below.

Scope of Work Estimated Cost

Repair Shell Coating Spot Damage $1,500 - $2,500

Replace Interior Coating of Secondary Containment $5,000 - $7,500

Cost estimates do not include measures for interim storage / management facilities that may be required when the tank is removed from service.

7 – SUITABILITY FOR SERVICE STATEMENT

On February 27, 2024, TSP Tank Services completed an SP001 inspection of the Bilge Water Tank located at 3 Chapel Ave, Jersey City, NJ 07305. The inspection was performed by Mr.

Robert Sherby, a certified API-653 and SP001 aboveground storage tank inspector, and overseen by Mr. Ronald E. Swan, Jr., P.E., a certified API-653 aboveground storage tank inspector and registered Professional Engineer in the State of Michigan. Copies of employee qualifications to perform the work completed during this inspection are included in Appendix E.

Based on the data collected during this inspection and the criteria established by SP001, the Bilge Water Tank is suitable for its intended service. This suitability for service determination is based on the current condition of the tank, its known history, and an understanding of its intended future use. TSP recommends that the tank be re-inspected whenever the tank is placed into service for a different use, including containment of a different product, or if there is any material change in the condition of the tank.

Owners and operators should carefully review all relevant regulations to ensure that the operation of the tank meets the established requirements, including requirements for future periodic inspections.

Ronald E. Swan, Jr., CP, PE Principal Engineer

API-653 Inspector: 32328 SP001 Inspector: AC14808

Appendix A - Tank Layout and Observations

Project No. Date:

Project Name:

Technician

Vent Type: Address:

Vent Size:

Emergency Vent Type: Tank ID:

Emergency Vent Size: Product: Age:

Gauge Type: Roof Type: [ X ] Fixed [ ] Floating [ ] Open Gauge Size: Exterior Coating: [ X ] Yes [ ] No Overfill Control Type: Interior Lining: [ ] Yes [ X ] No Overfill Control Size: Insulation Type: [ X ] None [ ] Overfill Alarm Type: Foundation: Steel saddles on concrete.

Overfill Alarm Size: Secondary Containment: Steel spill container.

Release Detection: Elevated tank.

Construction Standard:

Construction Date:

Serial Number:

Diameter: 5 ft 26 ft 6 in Specific Gravity:

Design Pressure:

Original Construction Date:

Year Reconstructed:

Liquid Level Maximum:

Capacity:

Max. Operating Temperature:

Notes:

3,000 gallons

Material Length:6 in

Shell Course Allowable

Stress

N/A

SUMMARY TANK DESCRIPTION

L23074

1940 Nameplate Information

N/A None N/A

Nameplate Information

2/27/2024 USACE Caven Point

Robert Sherby

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

None

Visual (Tank structure)

N/A Water 84 None

Tank Information Nomrally open vents 3 Chapel Ave

Jersey City, NJ 073053" & 3" None Bilge Water Tank

B S

T N

B

V1

F1 MW1

P1

V2

D1

L23074-BWT-SL

Shell Layout

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2024 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2024-02-27

Ronald E. Swan, Jr.

Robert Sherby

3 Chapel Ave Jersey City, NJ 07305

Caven Point

H1

SP1

H1A

SP2

SP3

SP4

SP5

H1B

H1C

L23074-BWT-EHL

East Head Layout

NORTH

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2024 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2024-02-27

Ronald E. Swan, Jr.

Robert Sherby

3 Chapel Ave

H2

H2A

H2B

L23074-BWT-WHL

West Head Layout

NORTH

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2024 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2024-02-27

Ronald E. Swan, Jr.

Robert Sherby

3 Chapel Ave

Project No Date:

Technician:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

Normally open vent.

3"

1.5"

V2

Discharge with hose connection (disconnected).

V1

3"

Normally open vent.

D1

Manway.

F1

2"

Fill from loading station.

TANK APPURTENANCES

L23074 2/27/2024 Caven Point Bilge Water Tank

MW1

16"

Robert Sherby

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

Technician:

TANK APPURTENANCES

L23074 2/27/2024 Caven Point Bilge Water Tank

Robert Sherby

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ X ] Head East Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ X ] Head East Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ X ] Head East Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ X ] Head West Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

3"

P1

Heater.

Plugged half-coupling.

H1

3"

Heater controls.

H1A-C

1"

Sample ports.

SP1-5

1"

Heater.

H2

3"

Technician:

TANK APPURTENANCES

L23074 2/27/2024 Caven Point Bilge Water Tank

Robert Sherby

TSP Tank Services

25000 Capitol Redford, Michigan 48239

(734) 838-0426

TANKS@TSPENVIRONMENTAL.COM

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ X ] Head West Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

ID: Manufacturer: Model:

Location on Tank: [ ] Roof [ ] Floor [ ] Shell [ ] Head _______ Inner Diameter: Repad Present: [ ] Yes [ ] No Repad Thickness:

Flange Thickness: Top/North: 90º Clockwise 180º: 270º:

Description:

Heater controls.

H2A-B

1"

Appendix B - SP001 Annual Inspection Checklist

STI SP001 Annual Inspection Checklist

General Inspection Information:

Inspection Date: 2/27/2024 Prior Inspection Date: None Retain Until Date: 2/27/2027

Inspector Name: Robert Sherby Title: Inspector

Inspector Signature:

Tank ID: Bilge Water Tank

Facility Name: Caven Point Marine Terminal

Inspection Guidance:

For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.

The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified

Inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.

Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.

In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v)).

Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.

Retain the completed checklists for 36 months.

Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists.

Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.

ITEM STATUS COMMENTS / DATE CORRECTED

Tank Foundation / Supports

1 Free of tank settlement or foundation washout? ☒Yes ☐No 2 Concrete pad or ring wall free of cracking and spalling? ☒Yes ☐No ☐N/A 3 Tank supports in satisfactory condition? ☒Yes ☐No ☐N/A 4 Is water able to drain away from tank if tank is resting on a foundation or on the ground?

☒Yes ☐No ☐N/A

5 Is the grounding strap between the tank and foundation/supports in good condition?

☐Yes ☐No ☒N/A

Tank Shell, Heads and Roof 6 Free of visible signs of coating failure? ☐Yes ☒No Localized coating failure on top of tank under platform. No significant corrosion observed.

7 Free of noticeable distortions, buckling, denting, or bulging?

☐Yes ☒No Minor denting on shell.

8 Free of standing water on roof? ☒Yes ☐No ☐N/A 9 Are all labels and tags intact and legible? ☒Yes ☐No

Tank Manways, Piping, and Equipment

10 Flanged connection bolts tight and fully engaged with no sign of wear or corrosion?

☐Yes ☐No ☒N/A

Tank Equipment 11 Normal and emergency vents free of obstructions? ☒Yes ☐No 12 Normal vent on tanks storing gasoline equipped with pressure/vacuum vent?

☐Yes ☐No ☒N/A

13 Are flame arrestors free of corrosion and are air passages free of blockage?

☐Yes ☐No ☒N/A

14 Is the emergency vent in good working condition and functional, as required by the manufacturer? Consult manufacturer’s requirements. Verify that components are moving freely (including long-bolt manways).

☐Yes ☐No ☒N/A

15 Is interstitial leak detection equipment in good condition?

Are windows on sight gauges clear? Are wire connections intact? If equipment has a test function, does it activate to confirm operation?

☐Yes ☐No ☒N/A

16 Are all valves free of leaks, corrosion, and other damage? Follow manufacturer’s instructions for regular maintenance of these items. Check the following and verify (as applicable):

16a Anti-siphon valve ☐Yes ☐No ☒N/A 16b Check valve ☒Yes ☐No ☐N/A 16c Gate valve ☒Yes ☐No ☐N/A 16d Pressure regulator valve ☐Yes ☐No ☒N/A 16e Expansion relief valve ☐Yes ☐No ☒N/A 16f Solenoid valve ☐Yes ☐No ☒N/A 16g Fire valve ☐Yes ☐No ☒N/A 16h Shear valve ☐Yes ☐No ☒N/A 17 Are strainers and filters clean and in good condition? ☐Yes ☐No ☒N/A

Insulated Tanks 18 Free of missing insulation?

Insulation free of visible signs of damage?

Insulation adequately protected from water intrusion?

☐Yes ☐No ☒N/A

19 Insulation free of noticeable areas of moisture? ☐Yes ☐No ☒N/A 20 Insulation free of mold? ☐Yes ☐No ☒N/A 21 Free of visible signs of coating failure? ☐Yes ☐No ☒N/A

Tank / Piping Release Detection 22 Is inventory control being performed and documented if required?

☐Yes ☐No ☒N/A

23 Is release detection being performed and documented if required?

☒Yes ☐No ☐N/A

Other Equipment 24 Are electrical wiring and boxes in good condition? ☒Yes ☐No ☐N/A

25 Has the cathodic protection system on the tank been tested as required by the designing engineer?

☐Yes ☐No ☒N/A

Additional Comments:

The interior coating of the secondary containment is in poor condition with large areas of coating failure and associated corrosion of the steel containment floor.

Appendix C - Nondestructive Testing Data

B S

T N

B

L23074-BWT-SM

Shell Measurements

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2024 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2024-02-27

Ronald E. Swan, Jr.

Robert Sherby

3 Chapel Ave

Bottom South Top North

248 268 262 271

258 252 258 258

246 271 259 266

Bottom South Top North

255 258 241 259

252 275 260 276

2>1 264 247 281

Bottom South Top North Small Plate

262 257 248 242 262

263 277 270 274 252

259 273 252 258 256

Bottom South Top North

280 277 262 270

279 258 258 256

276 280 242 242

Bottom South Top North

274 272 265 256

262 265 259 271

270 262 265 289

Plate 5 (West)

Shell Thickness (mils)

Plate 1 (East)

Plate 2

Plate 4

Plate 3

Count 62 points Std Devs Limit Frequency

Minimum 0.241 in -3 0.23004 0

Maximum 0.289 in -2 0.24089 0

Average 0.263 in -1 0.25173 8

Std Dev 0.01085 in 0 0.26258 27

1 0.27343 15

2 0.28427 11

3 0.29512 1

>3 More 0

Standard Deviation indicates the amount of variation in shell thickness data, with higher values reflecting greater variation. Variations may result from the manufacturing process, local corrosion rates, and other factors.

Histogram shows spread of data within 3 Standard Deviations of the Average thickness. Data points more than 3 Standard Deviations below the Average may indicate localized corrosion / pitting.

Statistics Histogram

Statistical Analysis of Shell UT Data

L23074-BWT-EHM

East Head Measurements

NORTH

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2024 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2024-02-27

Ronald E. Swan, Jr.

Robert Sherby

3 Chapel Ave

268 251 247

266 283 268

264 270 275

East Head Thickness (mils)

Count 9 points Std Devs Limit Frequency

Minimum 0.247 in -3 0.23442 0

Maximum 0.283 in -2 0.24487 0

Average 0.266 in -1 0.25532 2

Std Dev 0.01045 in 0 0.26578 1

1 0.27623 5

2 0.28669 1

3 0.29714 0

>3 More 0

Statistical Analysis of East Head UT Data

Standard Deviation indicates the amount of variation in shell thickness data, with higher values reflecting greater variation. Variations may result from the manufacturing process, local corrosion rates, and other factors.

Histogram shows spread of data within 3 Standard Deviations of the Average thickness. Data points more than 3 Standard Deviations below the Average may indicate localized corrosion / pitting.

L23074-BWT-WHM

West Head Measurements

NORTH

TECHNICAL SERVICE

PROFESSIONALS COPYRIGHT 2024 ALL RIGHTS RESERVED

THIS DRAWING IS PROTECTED UNDER THE

COPYRIGHT ACT OF 1976 AND SHALL NOT BE

REUSED WITHOUT THE WRITTEN PERMISSION

OF TECHNICAL SERVICE PROFESSIONALS, LLC

REVISIONS

NO. DATE DESCRIPTION

DRAWN:

CHECKED:

DATE:

DRAWING TITLE

DRAWING No.

25000 CAPITOL

REDFORD, MI 48239

PROJECT TITLE

2024-02-27

Ronald E. Swan, Jr.

Robert Sherby

3 Chapel Ave

237 273 276

268 272 275

274 251 256

West Head Thickness (mils)

Count 9 points Std Devs Limit Frequency

Minimum 0.237 in -3 0.22614 0

Maximum 0.276 in -2 0.23898 1

Average 0.265 in -1 0.25183 1

Std Dev 0.01284 in 0 0.26467 1

1 0.27751 6

2 0.29035 0

3 0.30319 0

>3 More 0

Standard Deviation indicates the amount of variation in shell thickness data, with higher values reflecting greater variation. Variations may result from the manufacturing process, local corrosion rates, and other factors.

Histogram shows spread of data within 3 Standard Deviations of the Average thickness. Data points more than 3 Standard Deviations below the Average may indicate localized corrosion / pitting.

Statistical Analysis of West Head UT Data

Appendix D - Photographs

Photographic Log

3 Chapel Ave, Jersey City, NJ 07305

Project: L23074 Date: 2/27/2024 Location: SE Shell Description: General view of southeast shell.

Project: L23074 Date: 2/27/2024 Location: East Head Description: General view of east head.

Project: L23074 Date: 2/27/2024 Location: NE Shell Description: General view of northeast shell.

Project: L23074 Date: 2/27/2024 Location: NW Shell Description: General view of northwest shell.

Project: L23074 Date: 2/27/2024 Location: West Head Description: General view of west head.

Project: L23074 Date: 2/27/2024 Location: SW Shell Description: General view of southwest shell.

Project: L23074 Date: 2/27/2024 Location: Shell Top Description: Top of shell looking west.

Description: Shell platform with 16” manway installed in the middle.

Description: Top of shell looking east.

Project: L23074 Date: 2/27/2024 Location: East Head Description: Discharge with hose connection (D1).

Description: Minor coating damage on top of tank.

Project: L23074 Date: 2/27/2024 Location: Secondary Containment

Description: Corroded steel floor of secondary containment container.

Appendix E - Qualifications of Inspection Professionals

Bilge Water Tank Layout.pdf
Sheets and Views
Bilge Water Tank Layout-Shell Layout
Bilge Water Tank Layout-Shell Measurements
Bilge Water Tank Layout-East Head Layout
Bilge Water Tank Layout-East Head Measurements
Bilge Water Tank Layout-West Head Layout
Bilge Water Tank Layout-West Head Measurements

File details come from the government source that posted it. Updated .