This document is a lead-based paint (LBP) inspection report for Building 606 at the U.S. Military Academy at West Point, conducted by Lead Safe LLC at the request of the U.S. Army Corps of Engineers (USACE). The inspection was performed using portable X-ray Fluorescence (XRF) instrumentation, following the protocol developed by the Department of Housing and Urban Development (HUD), to identify areas with lead-based paint concentrations ≥1.0 mg/cm2 in preparation for planned building renovations.
The comprehensive inspection covered multiple floors and components, revealing widespread lead-based paint presence across various surfaces including structural steel, metal components, walls, stairs, pipes, and mechanical elements. Notable findings include lead-based paint on structural steel, large green bulbous pipe joints in mechanical rooms, metal door casings, window cases, stair components, and even exterior elements like handrails and pipes. The highest lead concentration detected was 64 mg/cm2 on a roof vent pipe, while most metal components showed lead concentrations between 1.1 and 19 mg/cm2. The report emphasizes the potential environmental and worker health hazards associated with lead-based paint, particularly when it deteriorates or is subjected to friction or impact.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PO Box 12166 • Syracuse, NY 13218-2166 • www.lead-safe.com Phone: 315-471-3210 • Fax: 315-703-9637 • Toll Free: 866-361-4777
EPA Certified – TSCA 402
LBP-2249-1
NAT-2249-1
NAT-RV-I-91969-2-EN
NAT-RV-R-91969-2-EN
Prior to 1978, the use of lead-based paint (LBP) was very common. The use of LBP diminished until it was ultimately banned in 1978 for residential housing, on toys and furniture. When LBP deteriorates or is subject to friction or impact, lead dust and paint chips can be released into the environment resulting in environmental and worker health hazards. Depending on the age of structures, lead-based paint (LBP) may potentially exist, either exposed or covered over with other paints or materials as a result of subsequent renovation.
At the request of USACE, an LBP inspection was conducted at Building 606 of the U.S. Military Academy at West Point to facilitate the planned renovations of this historic building. Lead Safe LLC conducted the inspection based on the protocol developed by United States Department of Housing and Urban Development (HUD) found in Chapter 7 of the Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (HUD Guidelines). According to HUD and US Environmental Protection Agency (EPA), LBP is defined as any coating that contains lead ≥1.0 mg/cm2. The HUD Guidelines specify the use of portable X-ray Fluorescence instrumentation (XRF) for measuring the concentration of lead in paint films because it can detect lead in paint even if it is buried under main layer of paint.
Portable XRF devices use an energy source that excites the atoms in the test area which causes them to emit or fluoresce a wave that the device can detect that indicates the presence of lead. The XRF determines the concentration of lead based on the number of times wave is detected. Lead Safe LLC utilized two XRF instruments for this project: serial numbers 1127 and 2419. For quality control, Lead Safe LLC performed calibration checks daily before testing, after every 4-hours of testing, and at the completion of each day. This is done to ensure the accuracy of the readings throughout the course of the day. XRF results are determined to be positive if they are ≥1.0 mg/cm2 or negative when they are less than 1.0 mg/cm2. OSHA considers any measurable concentration of lead to constitute a potential worker safety concern.
A LBP inspection is surface by surface testing of painted building components to determine the presence or absence of LBP. The protocol specifies all four (4) walls and one (1) of each component in each room be tested with the XRF. Similar components (other than walls) are grouped together so it is not necessary to test every single building component. The HUD protocol requires at least forty (40) of each component (excluding walls) be tested to ensure an accurate representation for untested building components is obtained. If there are less than forty (40) of a given building component present, then all must be tested.
Based on the XRF results, Lead Safe LLC determined all painted structural steel is coated with lead-based paint as are all large green bulbous pipe joints found in the mechanical rooms. A summary of positive results follows:
EPA Certified – TSCA 402
LBP-2249-1
NAT-2249-1
NAT-RV-I-91969-2-EN
NAT-RV-R-91969-2-EN
Room/Calibrations Level Side Component Substrate PB Units XRF
Mil. Justice Hall 4th Fl C Wall Drywall 1.5 mg/cm2 2419
Mil. Justice Hall 4th Fl C Wall Drywall 1.4 mg/cm2 2419
Mil Just Cubicles 4th Fl A Wall Drywall 1.4 mg/cm2 2419
OH Lab Area 2 3rd Mez D-Upr Cab.
Frame/Trim Metal 5.2 mg/cm2 2419
Sitting Area 3rd Fl C Wall Drywall 1.4 mg/cm2 2419
IT Open Office 3rd Fl A Wall Drywall 1.5 mg/cm2 2419
IT Open Office 3rd Fl A Wall Drywall 1.3 mg/cm2 2419
IT Hall 3rd Fl C Wall Drywall 1.4 mg/cm2 2419
IT Hall 3rd Fl C Wall Drywall 1.5 mg/cm2 2419
B8 Bsmt C Wall Drywall 2 mg/cm2 2419
B8 Bsmt Ctr Wall Drywall 2.1 mg/cm2 2419
B8 Bsmt C Wall Drywall 1.8 mg/cm2 2419
B10 Bsmt Beam Above Drop
Concrete 1.5 mg/cm2 2419
B7 Bsmt Beam Above Drop
Concrete 19 mg/cm2 2419
B7 Bsmt Ceiling Above Drop
Concrete 1.1 mg/cm2 2419
B11 Bsmt C Beam Above
Drop Metal 6.4 mg/cm2 2419
B2 Bsmt A Wall Drywall 1.5 mg/cm2 2419
B8 Storage Bsmt C Wall Drywall 2 mg/cm2 2419
DHPW Mech 14A Bsmt A tank support/I beam Metal 5.2 mg/cm2 2419
DEH Mech B-1 Bsmt C Wall Ceramic 11 mg/cm2 2419
DEH Mech B-1 Bsmt D/Ctr Support Metal 9.4 mg/cm2 2419
3w26 3rd Fl B Baluster Metal 2.4 mg/cm2 1127
3w26 3rd Fl B Stair Stringer Metal 2.9 mg/cm2 1127
DEH Mech B1 Bsmt Ceil Ceiling Concrete 17 mg/cm2 1127
DHPW 14 A Bsmt Ceil Beam Metal 19 mg/cm2 1127
2E37 X-Ray Rm 2nd Fl B Ctr Wall Drywall 2.7 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl B Wall Drywall 2.8 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl A Ctr Wall Drywall 2.8 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl B Wall Metal 9.9 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl B Wall Drywall 2.8 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl C Wall Drywall 2.2 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl C Wall Metal 10 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl B Door Casing Metal 5.9 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl B Door Jamb Metal 9.9 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl B Doorstop Metal 10 mg/cm2 2419
EPA Certified – TSCA 402
LBP-2249-1
NAT-2249-1
NAT-RV-I-91969-2-EN
NAT-RV-R-91969-2-EN
2E37 X-Ray Rm 2nd Fl B Ctr Window Stop Metal 1.7 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl A Ctr Window Stop Metal 7.8 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl C Door Casing Metal 9.6 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl C Door Jamb Metal 13 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl C Doorstop Metal 6 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl C Doorstop Metal 5.6 mg/cm2 2419
2E37 X-Ray Rm 2nd Fl C Door Wood 4 mg/cm2 2419
2E37 Sm Side Rm 2nd Fl D Window Case Metal 13 mg/cm2 2419
2E37 Sm Side Rm 2nd Fl C Window Case Metal 13 mg/cm2 2419
2E19 2nd Fl A Shelf Metal 3.1 mg/cm2 2419
1E6 1st Fl B Wall Drywall 1.7 mg/cm2 2419
1E6 1st Fl B Wall Drywall 2 mg/cm2 2419
1E8 1st Fl B Wall Drywall 2 mg/cm2 2419
1E8 1st Fl D Wall Drywall 1.4 mg/cm2 2419
1E8 1st Fl D Wall Drywall 1.5 mg/cm2 2419
1E10 1st Fl A Wall Drywall 1.7 mg/cm2 2419
1E37 1st Fl A Wall Drywall 1.9 mg/cm2 2419
1E37 1st Fl C Wall Drywall 2.6 mg/cm2 2419
1E37 1st Fl D Wall Drywall 2.3 mg/cm2 2419
1E37 1st Fl D Door Casing Metal 12 mg/cm2 2419
1E37 1st Fl D Door Jamb Metal 12 mg/cm2 2419
1E37 1st Fl D Doorstop Metal 10 mg/cm2 2419
1E37 1st Fl D Door Wood 4.8 mg/cm2 2419
1E37 1st Fl C Door Casing Metal 12 mg/cm2 2419
1E37 1st Fl C Door Jamb Metal 7.1 mg/cm2 2419
1E37 1st Fl C Doorstop Metal 3.9 mg/cm2 2419
1E37 1st Fl C Door Wood 5.2 mg/cm2 2419
1E79 1st Fl A Wall Drywall 2.4 mg/cm2 2419
1E79 1st Fl B Wall Drywall 2.1 mg/cm2 2419
1E79 1st Fl C Wall Drywall 2.2 mg/cm2 2419
1E79 1st Fl Ctr Wall Drywall 2.8 mg/cm2 2419
1E79 1st Fl Ctr Wall Drywall 2.4 mg/cm2 2419
1E79 1st Fl B Door Casing Metal 8.8 mg/cm2 2419
1E79 1st Fl B Door Jamb Metal 12 mg/cm2 2419
1E79 1st Fl B Doorstop Metal 6.2 mg/cm2 2419
1E79 1st Fl B Door Wood 4.7 mg/cm2 2419
2W20 2nd Fl Ceil Ceiling Concrete 2.7 mg/cm2 1127
2W19 2nd Fl B Baluster Metal 3.3 mg/cm2 1127
2W19 2nd Fl B Stair Stringer Metal 3.9 mg/cm2 1127
EPA Certified – TSCA 402
LBP-2249-1
NAT-2249-1
NAT-RV-I-91969-2-EN
NAT-RV-R-91969-2-EN
East Stairs 1st Fl Ctr Baluster Metal 8.9 mg/cm2 1127
East Stairs 1st Fl Ctr Newel Post Metal 7 mg/cm2 1127
East Stairs 1st Fl A Stair Riser Metal 15 mg/cm2 1127
East Stairs - Mid 4th Fl Ctr Newel Post Metal 2.8 mg/cm2 1127
East Stairs - Mid 4th Fl Ctr Baluster Metal 3.4 mg/cm2 1127
East Stairs - Mid 3rd Mez A Stair Stringer Metal 2.7 mg/cm2 1127
East Stairs - Mid 3rd Mez A Stair Riser Metal 3.3 mg/cm2 1127
East Stairs - Mid 3rd Mez C Rail Cap Metal 3.6 mg/cm2 1127
East Stairs - Mid 2nd Fl C Stair Under Pan Metal 8.3 mg/cm2 1127
East Stairs - Mid 2nd Fl C Beam Metal 7.9 mg/cm2 1127
Stairs S. 4th Fl Ctr Baluster Metal 1.5 mg/cm2 1127
Stairs S. 4th Fl C Rail Cap Metal 6.9 mg/cm2 1127
Stairs S. 4th Fl Floor Stair Stringer Metal 5.3 mg/cm2 1127
Stairs S. 4th Fl Floor Stair Riser Metal 1.4 mg/cm2 1127
Stairs S. 3rd Mez B Stair Under Pan Metal 2.6 mg/cm2 1127
Stairs S. 3rd Mez B Beam Metal 1.8 mg/cm2 1127
3 Exam Area 1st Fl A Door Wood 4.2 mg/cm2 1127
3 Exam Area 1st Fl A Door Casing Metal 1.9 mg/cm2 1127
1E44 1st Fl D Door Wood 4.3 mg/cm2 1127
1E44 1st Fl D Door Casing Metal 12 mg/cm2 1127
1E44 1st Fl D Wall Drywall 2.4 mg/cm2 1127
1E44 1st Fl D Wall Drywall 2.5 mg/cm2 1127
1E44 1st Fl D Wall Drywall 2.5 mg/cm2 1127
1E44 1st Fl D Wall Drywall 1.5 mg/cm2 1127
1E44 1st Fl C Door Wood 4 mg/cm2 1127
1E44 1st Fl Door Wood 59 mg/cm2 1127
1E77 1st Fl A Door Wood 3.9 mg/cm2 1127
1E77 1st Fl A Door Casing Metal 12 mg/cm2 1127
1E77 1st Fl A Wall Drywall 2.2 mg/cm2 1127
1E77 1st Fl C Wall Drywall 2.4 mg/cm2 1127
1E80 1st Fl C Wall Drywall 1.9 mg/cm2 1127
1E80 1st Fl D Wall Drywall 2.1 mg/cm2 1127
1E77A 1st Fl B Wall Drywall 2.2 mg/cm2 1127
1E76 1st Fl A Wall Drywall 2 mg/cm2 1127
1E76 1st Fl C Wall Drywall 1.7 mg/cm2 1127
1E2 1st Fl B Wall Drywall 1.3 mg/cm2 2419
Front Office (SE) 1st Fl D Wall Drywall 13 mg/cm2 2419
1E25 (S - Left) 1st Fl C Electrical Conduit
Metal 1.6 mg/cm2 2419
South Hall 1st Fl B Wall Drywall 2.3 mg/cm2 2419
EPA Certified – TSCA 402
LBP-2249-1
NAT-2249-1
NAT-RV-I-91969-2-EN
NAT-RV-R-91969-2-EN
Outside 1st Fl A Pipe Metal 1.6 mg/cm2 2419
Outside 1st Fl A Bench Support Metal 6.2 mg/cm2 2419
Outside Foyer/Conf 1st Fl A Air Duct Metal 6.3 mg/cm2 2419
Outside 1st Fl C Handrail Metal 3.1 mg/cm2 2419
Outside Near 1E54 Bsmt C Handrail Metal 4.8 mg/cm2 2419
Near 1E57 1st Fl C Grate Metal 1.5 mg/cm2 2419
Outside Brick Bldg 1st Fl A Wall Casing
/Post Concrete 4.4 mg/cm2 2419
Outside Brick Bldg 1st Fl A Handrail Metal 5.7 mg/cm2 2419
Outside Near Foyer 1st Fl A Lamp Metal 56 mg/cm2 2419
1W8 1st Fl C Wall Drywall 6.2 mg/cm2 1127
1W9 1st Fl C Wall Concrete 3.9 mg/cm2 1127
1E19 1st Fl Ceil Beam Metal 3.8 mg/cm2 1127
Roof 5th Fl D Vent Pipe Metal 64 mg/cm2 1127
E Stairs 4th Fl D Stair Stringer Metal 3.1 mg/cm2 1127
E Stairs 4th Fl D Stair Riser Metal 1.4 mg/cm2 1127
E Stairs 3rd Mez D Rail Cap Metal 2 mg/cm2 1127
E Stairs 3rd Mez D Baluster Metal 1.7 mg/cm2 1127
E Stairs 3rd Mez D Stair Under Pan Metal 5.1 mg/cm2 1127
E Stairs 3rd Mez Ceil Beam Metal 5.2 mg/cm2 1127
Outside Outside B Baluster Metal 5.9 mg/cm2 1127
Outside Bsmt B Handrail Metal 5.3 mg/cm2 1127
606 W 1st Fl D Window Case Metal 1.3 mg/cm2 1127
B18 Bsmt A Ceiling Concrete 1.1 mg/cm2 2419
1E70 2 Mech Rm E 1st Fl C Bulbous
Pipe/Joint Metal 1.1 mg/cm2 2419
Roof Storage Rm 4th Fl B Radiator Casing Metal 5.5 mg/cm2 2419
4E50 4th Fl D Closet Door
Jamb Wood 1.2 mg/cm2 2419
4E50 4th Fl D Closet Wall Concrete 1.3 mg/cm2 2419
4E50 4th Fl D Closet Ladder Metal 3.2 mg/cm2 2419