About this file

This document is a comprehensive Submittal Register for a construction project at the United States Military Academy (USMA) at West Point, NY, covering renovation work for Building 606, the General Instruction Building. The 126-page register details required submittals across multiple construction specification divisions, including preconstruction documents, shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions, operation and maintenance data, and closeout submittals.

The submittal register encompasses a wide range of construction disciplines such as concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, specialties, equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, and site and infrastructure work. Each specification section includes detailed requirements for contractor submissions, with specific classification codes, paragraphs, and approval processes. The document serves as a comprehensive tracking mechanism for all project documentation, ensuring systematic review and approval of materials, methods, and documentation throughout the construction process for the USMA building renovation project.

View the file

Other files

File Type Posted
Solicitation Amendment W912DS25RA0020011 SF 30 (1).pdf PDF
Solicitation Amendment W912DS25RA0020009 SF 30.pdf PDF
Solicitation Amendment W912DS25RA0020008 SF 30.pdf PDF
E-512_AM 7.pdf PDF
I-108_AM 6.pdf PDF
I-105_AM 6.pdf PDF
I-100.3_AM 6.pdf PDF
I-100.2_AM 6.pdf PDF
AD-101_AM 6.pdf PDF
A-304_AM 6.pdf PDF
A-315_AM 6.pdf PDF
A-503_AM 6.pdf PDF
A-003_AM 6.pdf PDF
A-002_AM 6.pdf PDF
H-103_AM 6.pdf PDF
H-104_AM 6.pdf PDF
H-102_AM 6.pdf PDF
H-001_AM 6.pdf PDF
H-108_AM 6.pdf PDF
MP-102_AM 6.pdf PDF
MH-104_AM 6.pdf PDF
M-505_AM 6.pdf PDF
S-316_AM 6.pdf PDF
S-311_AM 6.pdf PDF
S-310_AM 6.pdf PDF
S-113_AM 6.pdf PDF
S-110_AM 6.pdf PDF
S-109_AM 6.pdf PDF
S-001_AM 6.pdf PDF
Appendix G_AM 5.pdf PDF
A-602_AM 4.pdf PDF
A-564_AM 4.pdf PDF
M-303_AM3.pdf PDF
E-512 - DETAILS - ELECTRICAL_AM3.pdf PDF
MSEC- Building 606 - Amendment 3 - RFIs - 16 Sep 25.pdf PDF
Solicitation Amendment W912DS25RA0020003 SF 30.pdf PDF
A-319.pdf PDF
Site Walk through sign in sheet_04Sept25.pdf PDF
S-318.pdf PDF
S-112.pdf PDF
A-406.pdf PDF
A-122.pdf PDF
Solicitation Amendment W912DS25RA0020001 SF 30.pdf PDF
Solicitation - W912DS25RA002.pdf PDF
JA-007-25 Monaco Fire Alarm MSEC - 31 Jan 25 signedJF sDL_Redacted.pdf PDF
JA-004-25 Best Cylinders MSEC - 31 Jan 25 signedJF sDL -_Redacted.pdf PDF
JA-008-25 IDS MSEC - 31 Jan 25 signedJF sDL_Redacted.pdf PDF
JA-006-25 CAC MSEC - 31 Jan 25 signedJF sDL -_Redacted.pdf PDF
W912DS19C0034 PN 94078 Repair Building 606 Revised RTA Drawings - Volume 3.pdf PDF
W912DS19C0034 PN 94078 Repair building 606 REV.RTA Specification Manual Volume 2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 126 PAGES

BLDG USMA

01 11 00 SD-01 Preconstruction Submittals

1.10.1 G RODig Safe Permit

01 14 00 SD-01 Preconstruction Submittals

1.3.3.1List of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.4View Location Map

1.5Progress and Completion

Pictures

1.5.4.2Preconstruction Digital

Photographs

1.5.5.2 G ROPreconstruction Video Recording

SD-04 Samples

1.3 G ROConstruction Color Boards

SD-05 Design Data

1.5.5.3Periodic Construction Video

Recordings

1.5.4.3Periodic Construction Digital

Photographs

1.5.5.4Final Completion Construction

Video Recordings

SD-11 Closeout Submittals

1.5.4.4Final Completion Construction

Digital Photographs

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 126 PAGES

01 32 01.00 10 3.4.2 G ROInitial Baseline Project Schedule

3.6.2 G ROPeriodic Schedule Update

3.5.2 G RONarrative Report

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 G ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G ROSustainability Action Plan

1.5.3.2 G ROPreliminary Sustainability

eNotebook

SD-06 Test Reports

1.5.3.2 GThird Party Certification Design

Compliance Report

SD-11 Closeout Submittals

1.5.3.2 G ROFinal High Performance and

Sustainable Building Checklist

1.5.3.2 G ROFinal Sustainability eNotebook

1.5.3.2 G ROAmended Final Sustainability

eNotebook

1.5.3.2 G ROAmended Final High

Performance and Sustainable

Building Checklist

3.2 G ROThird Party Certification

Certificate, Assessment, or

Validation and Compliance Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 126 PAGES

01 35 26 SD-01 Preconstruction Submittals

1.8 G ROAccident Prevention Plan (APP)

1.16 SFinal IAQ Management Plan

1.16 G ROIndoor Air Quality (IAQ)

Management Plan

SD-06 Test Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

1.5 G ROMonthly Exposure Reports

SD-07 Certificates

1.9 G ROActivity Hazard Analysis (AHA)

1.12.4Certificate of Compliance

1.13Hot Work Permit

1.14License Certificates

1.14.1 G ROPortable Gauge Operations

Planning Worksheet

1.14.1 G RORadiography Operation Planning

Work Sheet

1.12.4 G ROStandard Lift Plan

01 45 00 SD-01 Preconstruction Submittals

1.5.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

SD-07 Certificates

1.6.6.1 G ROCertificate Of Readiness

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 126 PAGES

01 45 35 SD-01 Preconstruction Submittals

3.1.1 G AESIOR Letter of Acceptance

3.1.1 G AEProject Manual

3.1.1 G AEProject Manual

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Certificate of Compliance

1.5.10 G AESpecial Inspector of Record

1.5 G AESpecial Inspector

3.1.1Qualification Records

SD-11 Closeout Submittals

3.1.1 G AEComprehensive Final Report

3.1.3 G AEComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.4 G ROConstruction Site Plan

3.4.1 G ROTraffic Control Plan

2.2.1 G ROHaul Road Plan

1.7.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 126 PAGES

01 50 00 1.7.6 G ROContractor Temporary Network

Cybersecurity Compliance

Statements

SD-06 Test Reports

3.5Backflow Preventer Tests

SD-07 Certificates

1.5.1Backflow Tester

1.5Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.10 G ROSolid Waste Management Permit

1.5.2 G RORegulatory Notifications

1.6 GEnvironmental Protection Plan

1.6.9.1 G RODirt and Dust Control Plan

1.5.5 G ROEmployee Training Records

1.5.4 G ROEnvironmental Manager

Qualifications

SD-06 Test Reports

1.10.1 G ROMonthly Solid Waste Disposal

Report

SD-07 Certificates

1.5.5 G ROEmployee Training Records

1.5.5.1Certificate of Competency

1.5.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 126 PAGES

01 57 19 3.6.1 G ROWaste Determination

Documentation

3.6.3.6 G RODisposal Documentation for

Hazardous and Regulated Waste

1.5.5 G ROAssembled Employee Training

Records

1.10 G ROSolid Waste Management Permit

3.6.2.1 G ROProject Solid Waste Disposal

Documentation Report

3.6.3.1 G ROHazardous Waste/Debris

Management

1.5.2 G RORegulatory Notifications

3.6.2.1 G ROSales Documentation

01 58 00 SD-02 Shop Drawings

1.3.1 G ROSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROConstruction Waste Management

Plan

SD-06 Test Reports

1.8.2Quarterly Reports

1.8.3Annual Report

SD-11 Closeout Submittals

1.9 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 126 PAGES

01 78 00 1.8.5Warranty Tags

1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

1.8.1instructions

SD-10 Operation and Maintenance

Data

3.7 G RO Operation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G RO As-Built Drawings

3.3 G RO Record Drawings

1.8.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4 G ROFinal Approved Shop Drawings

3.5 G ROConstruction Contract

Specifications

2.2 G ROICertification of EPA Designated

Items

2.3 G ROCertification Of USDA Designated

Items

3.9.1 G ROInterim DD FORM 1354

3.9.2 G ROChecklist for DD FORM 1354

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 126 PAGES

01 78 00 3.9.2 GHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G RO Training Video Recording

3.1.6 G RO Validation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals

1.4.1Facility Data Project Execution

Plan

SD-10 Operation and Maintenance

Data

3.1 G ROFacility Data Workbook, Construction Progress

3.1 G ROFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 G ROFacility Data Workbook, Construction Final

1.4.3 G ROFacility Document Set, Construction Final

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 126 PAGES

01 78 24.00 10 3.2 G ROFacility Document Set, Construction Final

01 91 00.15 SD-06 Test Reports

3.6 GCompleted Construction

Observation Checklists

3.4 GInterim Construction Phase

Commissioning Plan

3.4 G SFinal Construction Phase

Commissioning Plan

3.11 GInitial Commissioning Report

1.14 GIssues Log

SD-07 Certificates

1.10 GCommissioning Firm

1.15 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.10 GMaintenance and Service Life

Plan

3.9 GSystems Manual

SD-11 Closeout Submittals

3.11 G AEFinal Commissioning Report

3.11 G AEFinal Commissioning Report

3.12 G AEUpdated Final Commissioning

Report

3.11 S AEFinal Commissioning Report

(eNotebook)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 126 PAGES

01 91 00.15 3.12 S AEUpdated Final Commissioning

Report (eNotebook)

01 91 19 SD-01 Preconstruction Submittals

1.10.2.1 GBuilding Enclosure

Commissioning Specialist

Qualifications

1.7 GBuilding Enclosure Testing Work

Plan

SD-03 Product Data

2.1 GThermal Imaging Camera

2.1 GTest Equipment

SD-06 Test Reports

3.6 GCompleted Building Envelope

Inspection Checklists

SD-07 Certificates

1.11Certificate of Readiness

SD-10 Operation and Maintenance

Data

3.7 GTraining

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G AEDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 G AENotification

SD-11 Closeout Submittals

3.3.4Receipts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 126 PAGES

02 82 00 SD-03 Product Data

1.2.2 G AEAmended Water

1.3.9 G AESafety Data Sheets (SDS) for All

Materials

2.1 G AEEncapsulants

3.1.2.1 G AERespirators

3.1.7 G AELocal Exhaust Equipment

3.1.7 G AEPressure Differential Automatic

Recording Instrument

3.1.8 G AEVacuums

3.1.10 G AEGlovebags

SD-06 Test Reports

1.5.5 G AEAir Sampling Results

1.5.6 G AEPressure Differential Recordings

for Local Exhaust System

3.2.12.5 G AEClearance Sampling

3.3.3.2 G AEAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.4 G AEEmployee Training

1.3.5 G AENotifications

1.3.7 G AERespiratory Protection Program

1.3.10 G AEAsbestos Hazard Abatement Plan

1.3.11 G AETesting Laboratory

1.3.12 G AELandfill Approval

1.3.12 G AEDelivery Tickets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 126 PAGES

02 82 00 1.3.12 G AEWaste Shipment Records

1.3.13 G AETransporter Certification

1.3.14 G AEMedical Certification

1.5.1 G AEPrivate Qualified Person

Documentation

1.5.2 G AEDesignated Competent Person

1.5.3 G AEWorker's License

1.5.4 G AEContractor's License

1.5.7 G AEFederal, State or Local Citations

on Previous Projects

2.1 G AEEncapsulants

3.1 G AEEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 G AEWater Filtration Equipment

3.1.8 G AEVacuums

3.1.8 G AEVentilation Systems

SD-11 Closeout Submittals

1.3.5 G AEPermits and Licenses

1.3.5 G AENotifications

1.3.7.1 G AERespirator Program Records

1.7.1 G AERental Equipment

02 84 16 SD-07 Certificates

1.8.1 G AEQualifications of CIH

1.8.1 G AETraining Certification

1.8.2 G AEPCB and Lamp Removal Work

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 126 PAGES

02 84 16 1.8.3 G AEPCB and Lamp Disposal Plan

3.3.1testing results

SD-11 Closeout Submittals

3.5.2 G AETransporter Certification

3.2.4 G AECertification of Decontamination

3.5.2.1 G AECertificate of Disposal and/or

recycling

03 01 00 SD-01 Preconstruction Submittals

1.5.3 G AEQualifications

1.5.5 G AEWork Plan

1.6.1 G AEWork Plan

1.5.2 G AEQuality Control Plan

SD-03 Product Data

2.5Conventional Concrete

2.6Polymers

2.7Miscellaneous Materials And

Equipment

SD-05 Design Data

3.1.3 G AEFormwork And Shoring

1.5.1Repair Procedures

3.1.3Repair Procedures

SD-06 Test Reports

2.8Mixture Proportioning

3.1.5Quality Control

3.2.3Quality Control

3.3.3Quality Control

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 126 PAGES

03 01 00 2.5Conventional Concrete

SD-07 Certificates

1.5.3Qualifications

2.4Reinforcement And

Reinforcement Supports

2.5Conventional Concrete

2.2Equipment For Concrete

Preparation

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5Quality Control Plan

1.6.6Quality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8Laboratory Accreditation

3.3.7Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 G AEReinforcing Steel

SD-03 Product Data

2.4.5 G AEJoint Sealants

2.4.4 G AEJoint Filler

2.1 G AEFormwork Materials

2.3.1 G AECementitious Materials

2.4.6 G AEVapor Retarder and Vapor Barrier

2.4.1 G AEConcrete Curing Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 126 PAGES

03 30 00 2.6 G AEReinforcement

2.4.3.1 G AELiquid Chemical Floor Hardeners

and Sealers

2.3.4 G AEAdmixtures

2.2.2 G AEWaterstops

2.2.3 G AEBiodegradable Form Release

Agent

1.6.3.2 G AEPumping Concrete

1.6.3.3 G AEFinishing Plan

2.4.2 G AENonshrink Grout

SD-05 Design Data

1.6.1.1 G AEConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G AEConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Aggregates

3.9.2.1Tolerance Report

3.13.3.3Compressive Strength Tests

3.13.3.5Unit Weight of Structural

Concrete

3.13.3.4Air Content

3.13.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 126 PAGES

03 30 00 1.6.3.4Safety Data Sheets

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.1Curing Compound

03 45 00 SD-02 Shop Drawings

1.12.1 G AEPrecast Drawings

SD-03 Product Data

2.3 G AECast-In Embedded Items And

Connectors

2.3.2 G AEConnection Devices

2.2.4 G AEAdmixtures

2.5 G AEBearing Pads

SD-05 Design Data

1.10Erector's Post Audit Declaration

1.12.2Batch Ticket Information

1.5.4 G AEDesign Calculations

2.1.1 G AEContractor-Furnished Mix Design

2.4.9 G AERepair of Surface Defects

SD-06 Test Reports

1.11.2 GStrength Tests

1.11.2Slump

1.11.2Air Content

1.11.1Test for Concrete Materials

2.2.5Water

3.6.4Testing Precast Units for Strength

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 126 PAGES

03 45 00 SD-07 Certificates

1.4 GManufacturer's Qualifications

1.8.1Fabricator Quality Certifications

1.9Erector Certification

SD-08 Manufacturer’s Instructions

3.3 GInstallation

3.8 GCleaning

04 03 00 SD-01 Preconstruction Submittals

1.5.1 G AEQuality Control Plan

1.3.1 G AEProject Training Program

1.5.2 G AEQualifications

SD-02 Shop Drawings

1.5.6 G AEPhotographic Documentation

SD-03 Product Data

1.5.2 G AEQualifications

1.5.7.1 G AECleaning and Restoration

Methods

2.1 G AECleaning Materials

2.1.4 G AEBiocides

2.2.2.1 G AEReplacement Mortar, Grout And

Stucco

2.2.2.2 G AEReplacement Mortar, Grout And

Stucco

2.4 G AEMortar Mix

1.7.2.2 G AEStone Consolidants/Water

Repellent

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 126 PAGES

04 03 00 3.5.3 G AEStone Consolidants

2.2REPAIR MATERIALS

SD-04 Samples

1.5.8.1 G AEMock-ups

SD-06 Test Reports

2.2.2.1Testing and Matching

04 20 00 SD-02 Shop Drawings

3.3.4.1 G AECut CMU

3.4.1.1 G AEDetail Drawings

2.2.4 G AEDimension Stone Trim

2.6.6.1 G AEThru-wall Flashing Details

2.7 G AEBluestone Pavement

2.7.1 G AEBluestone Pavement

2.2.4.3 G AERetaining Wall Cap

SD-03 Product Data

1.5.1 G AEHot Weather Procedures

1.5.2 G AECold Weather Procedures

2.2.2 G AEClay or Shale Brick

2.2.4 G AEDIMENSION STONE

2.4 G AEMaterials

2.7 G AEBluestone Pavement

2.7.1 G AEBluestone Pavement

2.2.3.2.1 G AECement

2.7.2 G AEPolymeric Jointing Sand

2.4.1.1 G AECementitious Materials

2.6.7 G AEInsulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 126 PAGES

04 20 00 SD-04 Samples

2.2.2 G AEClay or Shale Brick

2.2.4.2 G AEGranite Masonry

2.2.4.1 G AELimestone Masonry

2.2.4.3 G AEBluestone Masonry

2.2.4.4 G AESlate Stone Masonry

SD-05 Design Data

2.1.2 G AEMasonry Compressive Strength

2.2.3.3 G AEFire-Rated Concrete Masonry

Units

3.2.5 G AEBracing Calculations

SD-06 Test Reports

2.2.2.1.3Efflorescence Test

2.2.3.3Fire-Rated Concrete Masonry

Units

3.7.2Field Testing of Mortar

3.7.2Field Testing of Grout

3.7.1.1Prism Tests

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.3.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 126 PAGES

04 20 00 2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

05 05 20 SD-01 Preconstruction Submittals

1.5.1.1 G AEInstaller Qualifications

1.5.1.2 G AEPost-Installed Anchor Special

Inspector Qualifications

SD-03 Product Data

2.1.1.3 G AEMechanical Anchors in Concrete

2.1.1.4 G AEAdhesive Anchor System in

Concrete

2.1.1.5 G AEMechanical and Adhesive

Anchors in Masonry

3.1.3 G AENon-Shrink, Non-Metallic Grout

SD-06 Test Reports

3.3.4 G AEPost-Installed Anchor Special

Inspections Report

SD-07 Certificates

2.1.1.1 G AEPost-Installed Anchor

Certification

SD-08 Manufacturer’s Instructions

2.1.1.2 G AEManufacturer's Printed

Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 126 PAGES

05 05 20 3.1.3 G AENon-Shrink, Non-Metallic Grout

1.5Manufacturer's Material Safety

Data Sheets

05 05 23.16 SD-01 Preconstruction Submittals

3.2 G AEWelding Quality Assurance Plan

SD-03 Product Data

1.3 G AEWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 G AEPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G AEErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G AEFabrication Drawings

SD-03 Product Data

2.6.2 G AEShop Primer

2.4.1 G AEWelding Electrodes and Rods

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 126 PAGES

05 12 00 2.4.2 G AENon-Shrink Grout

2.3.3 G AETension Control Bolts

SD-05 Design Data

1.4.3 G AEDesign Calculations for Steel

Connections

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Bolt Testing Reports

3.7.3Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3 G AEAISC Structural Steel Fabricator

Quality Certification

1.3Quality Certification

1.4.4.1Welding Procedures and

Qualifications

2.4.1 G AEWelding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 126 PAGES

05 30 00 1.3.5 G AEFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.2.11Mechanical Fasteners

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-05 Design Data

2.1 G AEDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.10Stud Manufacture's Certification

2.2.10Stud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings

1.5.1 G AEFraming Components

SD-03 Product Data

2.1Studs, Joists

SD-05 Design Data

1.5Design Calculations

SD-07 Certificates

3.2.1Welds

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 126 PAGES

05 50 13 SD-02 Shop Drawings

2.3 GFloor Gratings

2.4 G AEAngles and Plates

SD-03 Product Data

2.3 G AEFloor Gratings

05 51 00 SD-02 Shop Drawings

2.1 G AEIron and Steel Hardware

2.1 G AESteel Shapes, Plates, Bars, and

Strips

2.2.1 G AEMetal Stair System

SD-03 Product Data

2.4.1 G AEStructural Steel Plates, Shapes, and Bars

2.4.2 G AEStructural Steel Tubing

2.4.5 G AEHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 G AECold-Finished Steel Bars

2.4.3 G AEHot-Rolled Carbon Steel Bars

2.4.6 G AECold-Rolled Carbon Steel Sheets

2.4.7 G AEGalvanized Carbon Steel Sheets

2.4.8 G AECold-Drawn Steel Tubing

2.4.9 G AEGray Iron Castings

2.3.2 G AEConcrete Inserts

2.3.3 G AEMasonry Anchorage Devices

2.2.4 G AEProtective Coating

2.2.2 G AESteel Pan Stairs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 126 PAGES

05 51 00 2.3.1 G AESteel Stairs

2.3.1.2 G AESteel Grating

SD-05 Design Data

1.3.3 G AEDesign Calculations

SD-07 Certificates

1.3.1Welding Procedures

1.3.1Welder Qualification

1.3.3.1Certification Letter from

Contractor's Professional Engineer

SD-08 Manufacturer’s Instructions

2.2.4Protective Coating

2.3.3Masonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.3 G AELadders

2.3.2 G AEManufactured Alternating Tread

Device

SD-03 Product Data

2.3 G AELadders

SD-05 Design Data

1.3.2Design Calculations

SD-07 Certificates

1.3 G AEFabricator Certification for Ladder

Assembly

1.3 G AEFabricator Certification for

Manufactured Alternating Tread

Device Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 126 PAGES

05 52 00 SD-02 Shop Drawings

1.4.3 G AEShop Drawings

1.4.4 G AEShop Drawings

3.2 G AEIron and Steel Hardware

3.2 G AESteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 G AEStructural-Steel Plates, Shapes, and Bars

2.2.2 G AEStructural-Steel Tubing

2.2.4 G AECold-Finished Steel Bars

2.2.3 G AEHot-Rolled Carbon Steel Bars

2.2.5 G AECold-Drawn Steel Tubing

2.4 G AEConcrete Inserts

2.5 G AEMasonry Anchorage Devices

2.1.2 G AEProtective Coating

2.7 G AESteel and Stainless Steel Railings

and Handrails

2.7.3.1 G AEGate Hardware

2.7.3.1 G AEGate Hardware

3.2 G AEAnchorage and Fastening

Systems

SD-05 Design Data

1.4.3 G AEMember and Connection

Calculations

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 126 PAGES

05 52 00 1.4.4.1Certification Letter from

Contractor's Professional Engineer

1.4.1Welding Procedures

1.4.2Welder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

05 72 00 SD-02 Shop Drawings

2.5.1 G AEOrnamental Glass Railings

SD-03 Product Data

2.5.1 G AEOrnamental Glass Railings

SD-04 Samples

2.2 G AEStainless Steel Components

SD-05 Design Data

1.3.3 G AEEngineering Calculations

SD-06 Test Reports

1.3.3 G AEGlass Supported Railing

Components

SD-07 Certificates

1.3.1Certification Letter from

Contractor's Professional Engineer

1.5Warranty

SD-10 Operation and Maintenance

Data

3.8 G AEMaintenance Instructions

06 10 00 SD-03 Product Data

2.1Oriented Strand Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 126 PAGES

06 10 00 1.8Fire-retardant Treatment

2.2.1Gypsum Wall Sheathing

2.2.3Adhesives

SD-06 Test Reports

1.4.3Preservative-Treated Lumber and

Plywood

SD-07 Certificates

1.9.1Certificates of Grade

2.2.3 SIndoor Air Quality for Aerosol

Adhesives

2.2.3 SIndoor Air Quality for Non-aerosol

Adhesives

06 20 00 SD-01 Preconstruction Submittals

1.7.1Manufacturer Qualifications

SD-02 Shop Drawings

1.3 G AEDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1.1 G AEHigh Pressure Compact Laminate

Panels

1.4 G AEWood Products

2.1 G AEWood Products

2.4 G AEHardware and Accessories

SD-04 Samples

1.5 G AEPanel Samples

2.4 G AEMounting Hardware Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 126 PAGES

06 20 00 2.4 G AETrim Samples

2.4 G AEHook Samples

06 41 16.00 10 SD-02 Shop Drawings

2.10 G AEShop Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1Wood Materials

SD-04 Samples

2.3 G AEPlastic Laminates

2.6 G AECabinet Hardware

SD-07 Certificates

1.4Quality Assurance

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2 G AEDetail Fabrication Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1.1 G AESolid Polymer

2.2.2indoor air quality for solid surface seam and sealant products

2.1.1 G AEQuartz Agglomerate Material

SD-04 Samples

2.1 G AEMaterial

2.3.4 G AECounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 126 PAGES

06 61 16 SD-07 Certificates

1.4.1Qualifications

2.1.1Indoor Air Quality For Solid

Surface Fabrication Products

SD-10 Operation and Maintenance

Data

2.1.1 G AESolid Polymer

2.1.1 G AEQuartz Agglomerate Material

07 14 00 SD-03 Product Data

2.1 G AEFluid-Applied Waterproofing

2.2 G AEMembrane Primer

2.8 G AEElastomeric Sheet

2.10 G AEFlexible Foam-Backed

Elastomeric Sheet

3.3 G AESolvent

3.4.1 G AEMoisture Meter

2.11 G AEProtection Board

2.12 G AEDrainage Panel

2.7 G AEBond Breaker

SD-11 Closeout Submittals

1.6Warranty

3.7Information Card

3.5Instructions To Government

Personnel

07 21 13 SD-03 Product Data

2.2 G AEPressure Sensitive Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 126 PAGES

07 21 13 1.3 G AEProtection Board or Coatings

2.3 G AEAccessories

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.3.1Adhesive

SD-11 Closeout Submittals

1.7SPECIAL WARRANTIES

07 21 16 SD-03 Product Data

2.1.1 G AEThermal Insulation

2.1.2 G AESound-attenuating Insulation

2.2 G AEAccessories

SD-08 Manufacturer’s Instructions

3.2.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 G AEInsulation Board Layout

1.3 G AEVerification of Existing Conditions

SD-03 Product Data

2.1 G AEInsulation

1.4 G AECover Board

2.3 G AEFasteners

SD-06 Test Reports

1.8.1Flame Spread Rating

SD-07 Certificates

1.6Installer Qualifications

1.6Certificates Of Compliance For

Felt Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 126 PAGES

07 22 00 SD-08 Manufacturer’s Instructions

2.3Fasteners

2.1Insulation

07 27 26 SD-01 Preconstruction Submittals

1.6.1Qualifications of Manufacturer

1.6.2Qualifications of Installer

SD-02 Shop Drawings

1.4 G AEFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 G AEFluid-Applied Membrane Air

Barrier

2.3 G AETransition Membrane

2.2 G AEPrimers, Adhesives, and Mastics

2.6 G AEReinforcement

1.4.2 G AESafety Data Sheets

SD-06 Test Reports

1.4.3 G AEField Peel Adhesion Test

1.4.3 G AEFlame Propagation of Wall

Assemblies

1.4.3 G AEFlame Spread and Smoke

Developed Index Ratings

3.4.1 G AESite Inspections

SD-07 Certificates

1.4Fluid-Applied Membrane Air

Barrier

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 126 PAGES

07 27 26 2.3Transition Membrane

SD-08 Manufacturer’s Instructions

1.4Fluid-Applied Membrane Air

Barrier

2.3Transition Membrane

2.2Primers, Adhesives, and Mastics

07 27 36 SD-01 Preconstruction Submittals

1.9.1Qualification of Manufacturer

1.9.2Qualification of Installer

1.10Quality Control Plan

1.10Safety Plan

1.8.1Fire Prevention Plan

1.8.2 G AERespirator Plan

SD-02 Shop Drawings

1.5 G AESpray Foam Air Barrier

1.10 G AESpray Foam Air Barrier

SD-03 Product Data

2.1.2 G AEClosed Cell

2.2 G AEPrimers, Adhesives, and Mastics

2.5 G AESealants

1.5.2 G AESafety Data Sheets

1.5.3 G AEAccessories

SD-06 Test Reports

1.5.4 G AEField Peel Adhesion Test

1.5.3 G AEPrimers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 126 PAGES

07 27 36 1.5.4 G AEFlame Spread And Smoke

Developed Index Ratings Of SPF

Products

1.5.4 G AEFlame Propagation Of Wall

Assemblies

3.4.1 G AESite Inspections

SD-07 Certificates

2.1.6 SIndoor Air Quality for Spray Foam

Air Barrier

SD-08 Manufacturer’s Instructions

1.6.1SPF Handling, Storage, and

Spray Procedures

3.2.1Substrate Preparation

2.2Primers, Adhesives, and Mastics

SD-09 Manufacturer’s Field

Reports

1.10 GCore Samples

3.3.2 GDaily Work Record

07 42 63 SD-01 Preconstruction Submittals

1.5.3Qualification of Manufacturer

1.5.4Qualification of Installer

1.5.4.1Qualifications for Welding Work

SD-02 Shop Drawings

1.5.1 G AEFabrication and Installation

drawings

1.5.1 G AEWall Panel Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 126 PAGES

07 42 63 1.5.1 G AEFlashing and Accessories

1.5.1 G AEAnchorage Systems

SD-03 Product Data

1.5.1 G AECertification

1.5.1sustainable acquisition

1.5.1Manufacturer's catalog data

1.5.7.1Insulated Metal Wall Panels

1.5.7.2Metal Composite Material (MCM)

Wall Panels

1.5.1 G AEFactory Color Finish

1.5.1 G AEClosure Materials

2.1.1.2 G AEInsulation

2.4.4.1 G AESealants and Caulking

1.5.1 G AEAccessories

SD-04 Samples

1.5.1Wall Panel Assemblies

1.5.1Metal Closure Strips

1.5.1manufacturer's color charts and chips

SD-05 Design Data

1.5.1 G AEWind Design Analysis

SD-06 Test Reports

3.7.2 G AELeakage Tests

1.3.4 G AEWind Load Tests

1.5.1 G AEFactory Color Finish

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 126 PAGES

07 42 63 1.5.1Fasteners

1.5.1wall system assembly wind load and fire rating classification listings

SD-08 Manufacturer’s Instructions

1.5.1instructions

1.5.1Installation of Wall Panels

SD-11 Closeout Submittals

1.5.1Warranty

07 52 00 SD-02 Shop Drawings

1.4.5 G AERoof Plan

1.4.5Field Inspection and Existing

Conditions Report

SD-03 Product Data

2.3 G AEModified Bitumen Sheets

2.5 G AECold-Applied Membrane

Adhesive

2.3 G AEFiberglass Felt

2.7 G AEPrimer

2.8 G AEModified Bitumen Roof Cement

2.3 G AESubstrate Board

2.11 G AEPre-Manufactured Accessories

2.3 G AECover Board

2.12 G AEWalkways

2.10 G AEFasteners And Plates

2.13 G AEROOFTOP PAVERS

2.13.1 G AEPedestal Support

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 126 PAGES

07 52 00 1.8 G AEWarranty

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.4Wind Uplift Resistance

1.4.3Fire Resistance

SD-08 Manufacturer’s Instructions

3.3.6Modified Bitumen Membrane

Application

3.3.7Flashing

2.3Base Sheet

3.3.4.1Cold Adhesive Applied Modified

Bitumen Membrane

2.7Primer

2.10.1Fasteners

1.6Cold Weather Installation

SD-11 Closeout Submittals

1.8Warranty

3.8Information Card

3.7INSTRUCTIONS TO

CONTRACTOR PERSONNEL

07 60 00 SD-02 Shop Drawings

2.1.1 G AEExposed Sheet Metal

3.1.14 G AEGutters

3.1.15 G AEDownspouts

3.1.20 G AEExpansion Joints

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 126 PAGES

07 60 00 2.1.1 G AEGravel Stops and fascia

3.1.16 G AEFlashing for Roof Drains

3.1.10 G AEBase Flashing

3.1.11 G AECounterflashing

3.1.21 G AEFlashing at Roof Penetrations

and Equipment Supports

2.1.10 G AEReglets

3.1.17 G AEScuppers

3.1.24 G AECopings

3.1.18 G AEConductor Heads

2.2.1 G AERoof Hatches and Accessories

SD-03 Product Data

2.1.16 G AESelf-Adhering, High Temperature

Modified Bitumen Underlayment

2.2.1 G AERoof Hatches and Accessories

G AEBallasted Gaurdrail

SD-04 Samples

1.4.2 G AEFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3Instructions for Installation

SD-10 Operation and Maintenance

Data

1.4.3 G AECleaning and Maintenance

07 61 15 SD-02 Shop Drawings

2.1 G AERoofing Panels

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 126 PAGES

07 61 15 2.1 G AERoofing Panels

2.1.1 SRecycled Content of Aluminum

Roofing Products

2.2 G AEAttachment Clips

2.3.1 G AEClosures

2.3 G AEAccessories

1.8 G AEWarranty

SD-04 Samples

2.1 G AERoofing Panels

2.3Accessories

SD-05 Design Data

1.5 GLoad Calculations

SD-06 Test Reports

1.3.2.5 GStructural Performance

1.6.6 GPanel Finish

3.5 GManufacturer's Field Inspection

SD-07 Certificates

1.6.2 GTechnical Representative

1.6.3 GQualification of Installer

2.1.1.5 GCoil Stock

SD-08 Manufacturer’s Instructions

2.3.3Sealant

3.3 GInstallation

SD-11 Closeout Submittals

3.7Information Card

1.8 GWarranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 126 PAGES

07 81 00 SD-02 Shop Drawings

2.1 GFraming Plans

SD-03 Product Data

2.1 G AEFireproofing Material

3.3 G AEFireproofing Material

SD-06 Test Reports

1.2.2 G AEFire Resistance Rating

3.6 G AEField Tests

1.2.3 G AEEvaluation Reports

SD-07 Certificates

1.4.1Installer Qualifications

3.1Surface Preparation Report

3.5.2Manufacturer's Inspection Report

07 84 00 SD-02 Shop Drawings

2.1 G AEFirestopping System

SD-03 Product Data

2.2 G AEFirestopping Materials

SD-06 Test Reports

3.3 G AEInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 G AEInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 G AESealants

2.2 G AEPrimers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 126 PAGES

07 92 00 2.3 G AEBond Breakers

2.4 G AEBackstops

3.1 G AEField Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.2 G AEDoors

2.2 G AEDoors

2.6 G AEFrames

2.6 G AEFrames

2.4 G AEAccessories

SD-03 Product Data

2.2 G AEDoors

2.6 G AEFrames

2.4 G AEAccessories

2.6recycled content for steel frame product

2.2recycled content for steel door product

08 13 73 SD-02 Shop Drawings

1.7 G AESliding Metal Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 126 PAGES

08 13 73 2.2 G AESliding Metal Doors

SD-03 Product Data

2.2.1 G AESliding Metal Door Assemblies

2.2.3Locking Hardware

2.2.6 G AEFinish

SD-07 Certificates

1.4Fabrication Drawings

1.4 G AEInstallation Drawings

1.2.1 G AEDesign Analysis and Calculations

1.2.1Sliding Door Assemblies

1.2.1Hardware and Accessories

1.2.1Test reports documenting forced entry performance

2.1Doors

SD-10 Operation and Maintenance

Data

1.6 G AEWarranty

08 14 00 SD-02 Shop Drawings

2.1 G AEDoors

SD-03 Product Data

2.1 G AEDoors

2.2 G AEAccessories

2.3.7 G AEWater-resistant Sealer

1.5 G AEWarranty

2.1.2 G AEFire Resistance Rating

SD-04 Samples

SUBM…