W912DS25BA019 Lake Montauk Harbor Channel plans RTA.pdf

PDF 15 MB Posted

Attached to
LAKE MONTAUK HARBOR (LMH)
Solicitation number
W912DS25BA019
Issued by

About this file

These are detailed engineering and design plans for the Lake Montauk Harbor Navigation Improvement Project prepared by the U.S. Army Corps of Engineers New York District. The project involves deepening the existing navigation channel from -12 feet to -17 feet Mean Lower Low Water (MLLW), with a 2-foot paid overdredge tolerance. A new 100-foot wide deposition basin will be constructed east of the channel. The dredging project will remove approximately 100,000 cubic yards of sand and 15,000 cubic yards of hard material (cobbles, rock, and boulders), with hard materials to be transported to Mattituck Reef, a state artificial reef site.

The project documents include nine technical sheets showing general plans, dredging boundaries, channel profiles, cross-sections, and placement areas for dredged materials. Specific environmental considerations include maintaining a buffer around submerged aquatic vegetation between April 15 and October 15, with a 250-foot buffer for areas with 95% sand. The dredging window is limited to October through December 2025, excluding mobilization and demobilization periods. The project is located in East Hampton, Suffolk County, New York, with an estimated cost between $5 million and $10 million, and is classified as an unrestricted procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

NEW YORK DISTRICT

LAKE MONTAUK HARBOR

NAVIGATION IMPROVEMENT PROJECT

TOWN OF EAST HAMPTON, NY

W912DS 25 B A019

BK

G

C O

VE

R

S H

EE

T

AN

D

IN

D

EX

T

O D

R

AW

IN

G

S

G-001

C :\P

R O

G R

AM

D

AT

A\

LA

KE

M O

N

TA

U K

H

AR

BO

R

\L

AK

E M

O N

TA

U

K

SH

EE

TS

.D W

G 5:

:2

PM

/1

1/

M

O N

O C

H R

O M

E.

C

TB

E3

EN

D

BK

G

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

W

2D S

B

A

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

T

PR

O

JE

C T

TO

W

N O

F

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

US Army Corps of Engineers ®

DATE

DATE

APPROVED:

This project was designed by the New York District of the U.S. Army Corps of Engineers.

The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.

STAN SEDWICK, P.E.

SUBMITTED:

ENCER R. SHAFFER, P.E.

CHIEF, DESIGN BRANCH

CHIEF, ENGINEERING DIVISION

LAKE MONTAUK

HARBOR CHANNEL

INDEX TO DRAWINGS

G-001 COVER SHEET AND INDEX TO DRAWINGS 1 OF 9

G-101 GENERAL PLAN 2 OF 9

G-102 GENERAL PLAN FOR CHANNEL 3 OF 9

C-101 DREDGING PLAN 4 OF 9

C-102 PLACEMENT OF DREDGED MATERIAL

PLAN 5 OF 9

C-103 MATTITUCK REEF DISPOSAL AREA PLAN 6 OF 9

C-201 CHANNEL PROFILE 7 OF 9

C-301 CHANNEL CROSS SECTIONS 8 OF 9

C-302 PLACEMENT OF DREDGED MATERIAL

CROSS SECTIONS 9 OF 9

+1

8.

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

13+00

14+00

15+00

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

BK

G

G

EN

ER

AL

P

LA

N

G-101

C :\P

R O

G R

AM

D

AT

A\

LA

KE

M O

N

TA

U K

H

AR

BO

R

\L

AK

E M

O N

TA

U

K

SH

EE

TS

.D W

G 5:

:2

PM

/1

1/

M

O N

O C

H R

O M

E.

C

TB

E3

EN

D

BK

G

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

W

2D S

B

A

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

TS

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

N 339,000

E 1, 3, E 1, 4, E 1, 5, N 338,000

N 337,000

E 1, 3, E 1, 4, E 1, 5, N 338,000

N 337,000

N 339,000

NOTES:

1. DREDGE IN NAVIGATION CHANNEL, INCLUDING REMOVAL

OF HARD MATERIAL, TO AN AUTHORIZED DEPTH OF -17 FT

MLLW WITH 2.0 FT OF ALLOWABLE PAID OVERDREDGE.

2. REMOVE MATERIAL FROM THE DEPOSITION BASIN TO 17'

BELOW MLLW OR REFUSAL, WHICHEVER COMES FIRST.

3. PER NMFS EFH RECOMMENDATION, MAINTAIN A BUFFER

BETWEEN THE DREDGING AREA AND THE SUBMERGED

AQUATIC VEGETATION BED BETWEEN APRIL 15 AND

OCTOBER 15 EACH YEAR. FOR AREAS WITH 95% SAND, THE

BUFFER SHOULD BE 250 FT.

4. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS

THE RESULTS OF A SURVEY PERFORMED BY THE USACE

NEW YORK SURVEY SECTION FROM 14 JAN 2025 TO 16 JAN

2025 AND SHOULD ONLY BE CONSIDERED AS THE GENERAL

CONDITIONS EXISTING AT THAT TIME.

5. THE PLANIMETRICS DEPICTED ON THIS MAP ARE FOR

ORIENTATION PURPOSES ONLY.

6. COORDINATES REFER TO THE US STATE PLANE

COORDINATE SYSTEM NAD 1983, LONG ISLAND LAMBERT -

ZONE 3104, US SURVEY FEET.

7. CONTOURS IN THIS PLAN SET ARE REFERENCED TO MEAN

LOWER LOW WATER.

8. MEAN LOWER LOW WATER IS 1.5 FT BELOW NAVD88 AS

DETERMINED USING VDATUM (VER. 4.1). MEAN LOW WATER

IS 1.4 FT BELOW NAVD88. MEAN HIGH WATER IS 0.6 FT

ABOVE NAVD88. THIS IS COMPREHENSIVE EVALUATION OF

PROJECT DATUMS (CEPD) COMPLIANT.

9. CONTOUR DATA IN THIS PLAN SET WAS COLLECTED USING

PROJECT CLASSIFICATION SOFTWARE AS SPECIFIED IN EM

1110-2-1003.

10. CONTOURS DEPICTED IN THIS PLAN SET SHOULD NOT BE

USED FOR VOLUME CALCULATION PURPOSES.

11. AERIAL IMAGERY PROVIDED BY NEW YORK GIS

CLEARINGHOUSE, DATED 2020.

12. THE SURVEY WAS PERFORMED USING REAL TIME

KINEMATIC GPS FROM STATION "851 0448 A".

13. SEE SHEET G-102 FOR REFERENCE LINE DATA AND

CHANNEL BOUNDARY COORDINATES.

14. SEE SHEET C-301 FOR CROSS SECTIONS.

N

CHANNEL REFERENCE LINE

DREDGING BOUNDARY

PROPOSED STAGING AREA

PLACEMENT AREA OF DREDGED MATERIAL

N

AVIG

ATIO

N

C H

AN

N

EL

D

EPO

SITIO

N

BASIN

E1 ,5

,0

E

1, 2, N 336,000 N 336,000

SUBMERGED AQUATIC VEGETATION

LOCAL CONTROL DATA

BENCHMARK: COAST MONTAUK

ELEVATION: 8.10' (NAVD88)

NSRS BENCHMARK

BENCHMARK: 851 0448 A

ELEVATION: 6.94' (NAVD88)

400'0 200'

SUBMERGED AQUATIC VEGETATION

33+18.93

0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+00

17+00

18+00

19+00

20+00

21+00

22+00

23+00

24+00

25+00

26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

BK

G

G

EN

ER

AL

P

LA

N F

O R

C H

AN

N

EL

G-102

C :\P

R O

G R

AM

D

AT

A\

LA

KE

M O

N

TA

U K

H

AR

BO

R

\L

AK

E M

O N

TA

U

K

SH

EE

TS

.D W

G 5:

:3

PM

/1

1/

M

O N

O C

H R

O M

E.

C

TB

E3

EN

D

BK

G

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

W

2D S

B

A

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

T

PR

O

JE

C T

TO

W

N O

F

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

N N

,0

N

,0

N

,0

E 1,554,000

E 1,553,000

N

,0

N

,0

N

,0

E 1,553,000

E 1,554,000

NOTES:

1. DREDGE IN NAVIGATION CHANNEL, INCLUDING REMOVAL

OF HARD MATERIAL, TO AN AUTHORIZED DEPTH OF -17 FT

MLLW WITH 2.0 FT OF ALLOWABLE PAID OVERDREDGE.

2. REMOVE MATERIAL FROM THE DEPOSITION BASIN TO 17'

BELOW MLLW OR REFUSAL, WHICHEVER COMES FIRST.

3. PER NMFS EFH RECOMMENDATION, MAINTAIN A BUFFER

BETWEEN THE DREDGING AREA AND THE SUBMERGED

AQUATIC VEGETATION BED BETWEEN APRIL 15 AND

OCTOBER 15 EACH YEAR. FOR AREAS WITH 95% SAND, THE

BUFFER SHOULD BE 250 FT.

4. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS

THE RESULTS OF A SURVEY PERFORMED BY THE USACE

NEW YORK SURVEY SECTION FROM 14 JAN 2025 TO 16 JAN

2025 AND SHOULD ONLY BE CONSIDERED AS THE GENERAL

CONDITIONS EXISTING AT THAT TIME.

5. THE PLANIMETRICS DEPICTED ON THIS MAP ARE FOR

ORIENTATION PURPOSES ONLY.

6. COORDINATES REFER TO THE US STATE PLANE

COORDINATE SYSTEM NAD 1983, LONG ISLAND LAMBERT -

ZONE 3104, US SURVEY FEET.

7. CONTOURS IN THIS PLAN SET ARE REFERENCED TO MEAN

LOWER LOW WATER.

8. MEAN LOWER LOW WATER IS 1.5 FT BELOW NAVD88 AS

DETERMINED USING VDATUM (VER. 4.1). MEAN LOW WATER

IS 1.4 FT BELOW NAVD88. MEAN HIGH WATER IS 0.6 FT

ABOVE NAVD88. THIS IS COMPREHENSIVE EVALUATION OF

PROJECT DATUMS (CEPD) COMPLIANT.

9. CONTOUR DATA IN THIS PLAN SET WAS COLLECTED USING

PROJECT CLASSIFICATION SOFTWARE AS SPECIFIED IN EM

1110-2-1003.

10. CONTOURS DEPICTED IN THIS PLAN SET SHOULD NOT BE

USED FOR VOLUME CALCULATION PURPOSES.

11. AERIAL IMAGERY PROVIDED BY NEW YORK GIS

CLEARINGHOUSE, DATED 2020.

12. THE SURVEY WAS PERFORMED USING REAL TIME

KINEMATIC GPS FROM STATION "851 0448 A".

13. SEE SHEET G-102 FOR REFERENCE LINE DATA AND

CHANNEL BOUNDARY COORDINATES.

14. SEE SHEET C-301 FOR CROSS SECTIONS.

LAKE MONTAUK HARBOR

CHANNEL COORDINATES

POINT NORTHING EASTING

1 339,322.57 1,552,499.72

2 337,772.57 1,552,871.75

3 337,440.57 1,553,201.76

4 336,861.58 1,554,392.78

5 336,996.49 1,554,458.37

6 337,564.35 1,553,290.21

7 337,848.48 1,553,007.79

8 337,996.24 1,552,972.32

9 339,357.57 1,552,645.58

DETENTION BASIN COORDINATES

8 337,996.24 1,552,972.32

9 339,357.57 1,552,645.58

10 339,380.91 1,552,742.82

11 338,116.81 1,553,046.22

150'

150'

DREDGING BOUNDARY

REFERENCE LINE

LAKE MONTAUK HARBOR CHANNEL REFERENCE LINE DATA

POINT STATION NORTHING EASTING COURSE DISTANCE BEARING

1 0+00.00 339,340.07 1,552,572.65 1-2 1,572.99' S13° 29' 47.50"E 2 15+72.99 337,810.52 1,552,939.77 2-3 434.36' S44° 49' 40.59"E 3 20+07.35 337,502.46 1,553,245.98 3-4 1,311.58' S64° 04' 28.18"E 4 33+18.93 336,929.03 1,554,425.57 - - -

PROPOSED STAGING AREA

150' 100'

VAR

IES

150'

NAVIGATION CHANNEL

DEPOSITION BASIN

SUBMERGED AQUATIC

VEGETATION LOCAL CONTROL DATA

BENCHMARK: COAST MONTAUK

ELEVATION: 8.10' (NAVD88)

NSRS BENCHMARK

BENCHMARK: 851 0448 A

ELEVATION: 6.94' (NAVD88)

KNOWN ROCK

LOCATIONS

(2018)

100' 200'0

-1

-1

-17

-1

-12

-10 -8

-1

-10

-17

-19

33+18.93

0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+00

17+00

18+00

19+00

20+00

21+00

22+00

23+00

24+00

25+00

26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

BK

G

D R

ED

G

IN

G

P

LA

N

C-101

C :\P

R O

G R

AM

D

AT

A\

LA

KE

M O

N

TA

U K

H

AR

BO

R

\L

AK

E M

O N

TA

U

K

SH

EE

TS

.D W

G 5:

:1

PM

/1

1/

M

O N

O C

H R

O M

E.

C

TB

E3

EN

D

BK

G

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

W

2D S

B

A

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

T

PR

O

JE

C T

TO

W

N O

F

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

N

,0

N

,0

N

,0

E 1,554,000

E 1,553,000

N

,0

N

,0

N

,0

E 1,553,000

E 1,554,000

NOTES:

1. DREDGE IN NAVIGATION CHANNEL, INCLUDING REMOVAL

OF HARD MATERIAL, TO AN AUTHORIZED DEPTH OF -17 FT

MLLW WITH 2.0 FT OF ALLOWABLE PAID OVERDREDGE.

2. REMOVE MATERIAL FROM THE DEPOSITION BASIN TO 17'

BELOW MLLW OR REFUSAL, WHICHEVER COMES FIRST.

3. PER NMFS EFH RECOMMENDATION, MAINTAIN A BUFFER

BETWEEN THE DREDGING AREA AND THE SUBMERGED

AQUATIC VEGETATION BED BETWEEN APRIL 15 AND

OCTOBER 15 EACH YEAR. FOR AREAS WITH 95% SAND, THE

BUFFER SHOULD BE 250 FT.

4. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS

THE RESULTS OF A SURVEY PERFORMED BY THE USACE

NEW YORK SURVEY SECTION FROM 14 JAN 2025 TO 16 JAN

2025 AND SHOULD ONLY BE CONSIDERED AS THE GENERAL

CONDITIONS EXISTING AT THAT TIME.

5. THE PLANIMETRICS DEPICTED ON THIS MAP ARE FOR

ORIENTATION PURPOSES ONLY.

6. COORDINATES REFER TO THE US STATE PLANE

COORDINATE SYSTEM NAD 1983, LONG ISLAND LAMBERT -

ZONE 3104, US SURVEY FEET.

7. CONTOURS IN THIS PLAN SET ARE REFERENCED TO MEAN

LOWER LOW WATER.

8. MEAN LOWER LOW WATER IS 1.5 FT BELOW NAVD88 AS

DETERMINED USING VDATUM (VER. 4.1). MEAN LOW WATER

IS 1.4 FT BELOW NAVD88. MEAN HIGH WATER IS 0.6 FT

ABOVE NAVD88. THIS IS COMPREHENSIVE EVALUATION OF

PROJECT DATUMS (CEPD) COMPLIANT.

9. CONTOUR DATA IN THIS PLAN SET WAS COLLECTED USING

PROJECT CLASSIFICATION SOFTWARE AS SPECIFIED IN EM

1110-2-1003.

10. CONTOURS DEPICTED IN THIS PLAN SET SHOULD NOT BE

USED FOR VOLUME CALCULATION PURPOSES.

11. AERIAL IMAGERY PROVIDED BY NEW YORK GIS

CLEARINGHOUSE, DATED 2020.

12. THE SURVEY WAS PERFORMED USING REAL TIME

KINEMATIC GPS FROM STATION "851 0448 A".

13. SEE SHEET G-102 FOR REFERENCE LINE DATA AND

CHANNEL BOUNDARY COORDINATES.

14. SEE SHEET C-301 FOR CROSS SECTIONS.

REFERENCE LINE

DREDGING BOUNDARY

TOP OF 1:3 SLOPE (typ)

CROSS SECTIONS

250' @

EL. -17'

150' @ EL. -17'

WEST JETTY LIGHT

EAST JETTY LIGHT

NAVIGATION CHANNEL

DEPOSITION BASIN

START 1:1.5 SLOPE

AT STA 27+00

TOP OF 1:3 SLOPE (typ)

END 1:1.5 SLOPE

AT STA 30+75

LOCAL CONTROL DATA

BENCHMARK: COAST MONTAUK

ELEVATION: 8.10' (NAVD88)

NSRS BENCHMARK

BENCHMARK: 851 0448 A

ELEVATION: 6.94' (NAVD88)

100' 200'0

N

TOP OF 1:3 SLOPE (typ)

-14

-12

-12

-10

-10

-10

-8

-8

-8

-6

-6

-6

-4

-4

-4

-2

-2

-2

-6 MLLW

-6 MLLW

-6 MLLW

ST

A.

1+

ST

A.

ST

A.

ST

A.

ST

A.

ST

A.

ST

A.

ST

A.

ST

A.

ST

A.10

ST

A.

ST

A.

ST

A.

ST

A.

C /E

C /E

C /E

C /E

C/E

C/E

C/E

C/E

C/E

C/E C/E C/E C/E C/E C/E C/E C/E C

/E

C/E C/E C/E

C /E

C/E

C /E

C /E

C /E

C /E

C /E

C /E

C /E

SL

O

PE

1:

BERM @ ELEV. 8.0'

APPROXIMATE TOE

OF 1:15 SLOPE

N 338000

E

WEST LAKE DRIVE

STAGING AREA

WORKING LIMITS

WORKING LIMITS

SL

O

PE

1:

BERM @ ELEV. 8.0'

E

0 N 338000

E

N 338000

W

EST LAKE D

R

IVE

REFERENCE LINE

TAPER TO EXISTING

N 338345.05 E 1552582.88

N 337801.36 E 1551600.03

TAPER TO EXISTING

N 338149.98 E 1552145.38

N 337881.38 E 1551725.38

SUBMERGED

AQUATIC

VEGETATION

BEDS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

S.

R

E.

G

E.

G

E.

G

PL

AC

EM

EN

T

O F

D R

ED

G

ED

M

AT

ER

IA

L

PL

AN

S H

EE

T

C-102

SCALE:1"=60'

NOTES:

1. COORDINATES REFER TO US STATE PLANE COORDINATE SYSTEM NAD 1983,

LONG ISLAND LAMBERT - ZONE 3104, US SURVEY FEET

2. CONTOURS AND ELEVATIONS ON THIS SHEET ARE IN FEET AND REFERENCED TO

NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) AS DETERMINED USING

VDATUM VERSION 4.6.1. THE -6 MLLW CONTOUR IS DISPLAYED FOR

ENVIRONMENTAL REQUIREMENTS.

· MEAN LOWER LOW WATER IS 1.5 FEET BELOW NAVD88

· MEAN LOW WATER IS 1.4 FEET BELOW NAVD88

· MEAN HIGH WATER IS 0.6 FEET BELOW NAVD88

3. THE DATA DEPICTED ON THIS MAP SHOULD NOT BE USED FOR VOLUME

CALCULATIONS PURPOSES.

4. AERIAL IMAGERY PROVIDED BY USACE NEW YORK DISTRICT SURVEYS AND

MAPPING BRANCH (2025) AND IS ORIENTATION PURPOSES ONLY.

5. THE PLANIMETRICS DEPICTED ON THIS MAP ARE FOR ORIENTATION PURPOSES

ONLY.

6. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULTS OF

SURVEYS MADE ON JANUARY 2025 AND CAN ONLY BE CONSIDERED AS THE

GENERAL CONDITIONS EXISTING AT THAT TIME.

7. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

8. FOR GENERAL PLAN, GENERAL NOTES, AND DREDGING BOUNDS SEE SHEET G-101

9. FOR CROSS SECTIONS SEE SHEET C-302

10. REMOVE & DISPOSE MISCELLANEOUS DEBRIS WITHIN BEACH FILL AREAS PRIOR

TO PLACEMENT OF DREDGED MATERIALS

11. PER NMFS EFH RECOMMENDATION, MAINTAIN A BUFFER AROUND THE

SUBMERGED AQUATIC VEGETATION (SAV) BEDS BETWEEN APRIL 15 AND

OCTOBER 15 EACH YEAR. FOR AREAS WITH 95% SAND, THE BUFFER SHOULD BE

250 FT.

12. PER NYSDEC WQC ALL DREDGE MATERIAL PLACE BETWEEN OCTOBER 16 AND

APRIL 14, INCLUSIVE, OF ANY CALENDAR YEAR, MUST BE DEPOSITED SO THAT

THE TOE OF THE SLOPE EXTENDS NO CLOSER THAN 25 LINEAR FEET FROM ANY

MAPPED SAV BEDS.

SAND PLACEMENT REFERENCE LINE ALIGNMENT DATA TABLE

PI STATION NORTHING EASTING DISTANCE DIRECTION

0+00.00 338,096.56' 1,552,665.58'

401.01' S70° 35' 14.58"W 4+01.01 337,963.28' 1,552,287.37'

806.15' S70° 35' 13.58"W

12+07.16 337,695.33' 1,551,527.05'

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

+X

XX

XX

X-

XX

-X

-X

XX

X

+M M

M M

M M

M M

M M

Y

YY

Y

AN

SI

F

U

LL

B

LE

ED

D

(2 2.

X

4.

IN

C H

ES

+X

XX

XX

X-

XX

-X

-X

XX

X

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

T

PR

O

JE

C T

TO

W

N O

F

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

60' 120'0

© 2024 Microsoft Corporation Earthstar Geographics SIO © 2023 TomTom

N 328063.64 E 1377629.27

N 328033.52 E 1379133.02

N 326588.13 E 1377648.70

N 326581.55 E 1379106.18

MATTITUCK

ARTIFICIAL REEF

LAKE MONTAUK

HARBOR

APX. 35 MILES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

+X

XX

XX

X-

XX

-X

-X

XX

X

+M M

M M

M M

M M

M M

Y

YY

Y

AN

SI

F

U

LL

B

LE

ED

D

(2 2.

X

4.

IN

C H

ES

+X

XX

XX

X-

XX

-X

-X

XX

X

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

T

PR

O

JE

C T

TO

W

N O

F

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

S.

R

E.

G

E.

G

E.

G

M

AT

TI

TU

C

K R

EE

F

D

IS

PO

SA

L

AR

EA

P

LA

N

S H

EE

T

C-103

SCALE:1"=6000'

NOTES:

1. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

2. MATTITUCK REEF DETAILS ARE TO BE PROVIDED TO THE CONTRACTOR

WITHIN THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL

CONSERVATION (NYSDEC) WATER QUALITY CERTIFICATE (WQC)

ATTACHED TO THE CONTRACT SPECIFICATIONS

Feet 0 6000 12000

LAKE MONTAUK HARBOR

PROFILE ALONG REFERENCE LINE

-25

-20

-10

-25

-20

-10

0+

1+

2+

3+

4+

5+

6+

7+

8+

9+

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

BK

G

C H

AN

N

EL

P

R O

FI

LE

C-201

C :\P

R O

G R

AM

D

AT

A\

LA

KE

M O

N

TA

U K

H

AR

BO

R

\L

AK

E M

O N

TA

U

K

SH

EE

TS

.D W

G 6:

:5

PM

/1

1/

M

O N

O C

H R

O M

E.

C

TB

E3

EN

D

BK

G

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

W

2D S

B

A

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

T

PR

O

JE

C T

TO

W

N O

F

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

NOTES:

1. THE VERTICAL IS SCALED 5 TIMES.

2. CROSS SECTION UNITS ARE SHOWN IN FEET.

3. MEAN LOWER LOW WATER IS 1.5 FT BELOW NAVD88. MEAN LOW

WATER IS 1.4 FT BELOW NAVD88. MEAN HIGH WATER IS 0.6 FT ABOVE

NAVD88.

4. THE PLANE OF MEAN LOWER LOW WATER WAS DERIVED USING

VDATUM. THIS IS CEPD COMPLIANT.

PROPOSED DREDGING

DEPTH (-17.0', typical)

2' MAX. PAID OVERDREDGE

TOLERANCE (typical)

MLLW -1.5'

MHW 0.6'

EXISTING SURVEY DEPTH

(January 2025)

SCALE: 1H=100'

SCALE: 1V=5'

0 100' 200'

0 5' 10'

R L

STA 4+00

-25

-20

-15

-10

-5

-25

-20

-15

-10

-5

0 1000-100-200

R L

STA 13+00

-25

-20

-15

-10

-5

-25

-20

-15

-10

-5

0 1000-100-200

R L

STA 14+00

-25

-20

-15

-10

-5

-25

-20

-15

-10

-5

0 1000-100-200

R L

STA 16+50

-25

-20

-15

-10

-5

-25

-20

-15

-10

-5

0 1000-100-200

R L

STA 21+00

-25

-20

-15

-10

-5

-25

-20

-15

-10

-5

0 1000-100-200

R L

STA 28+00

-25

-20

-15

-10

-5

-25

-20

-15

-10

-5

0 1000-100-200

R L

STA 33+00

-25

-20

-15

-10

-5

-25

-20

-15

-10

-5

0 1000-100-200

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

BK

G

C H

AN

N

EL

C

R O

SS

S

EC

TI

O N

S

C-301

C :\P

R O

G R

AM

D

AT

A\

LA

KE

M O

N

TA

U K

H

AR

BO

R

\L

AK

E M

O N

TA

U

K

SH

EE

TS

.D W

G 6:

:5

PM

/1

1/

M

O N

O C

H R

O M

E.

C

TB

E3

EN

D

BK

G

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

FI

LE

N U

M

BE

R

W

2D S

B

A

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

T

PR

O

JE

C T

TO

W

N O

F

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

MLLW -1.5' (NAVD88)

CURRENT SURVEY

DEPTH (January 2025)

2' MAX. PAID OVERDREDGE

TOLERANCE (typical)

REQUIRED DREDGING

DEPTH (-17.0', typical)

SCALE: 1H=100'

SCALE: 1V=10'

NOTES:

1. CROSS SECTION UNITS ARE SHOWN IN FEET.

2. SOUNDINGS ARE REFERENCED TO MEAN LOWER LOW WATER.

3. MEAN LOWER LOW WATER IS 1.5' BELOW NAVD88.

4. MEAN HIGH WATER IS 0.6' ABOVE NAVD88.

5. THE PLANE OF MEAN LOWER LOW WATER WAS DERIVED USING VDATUM. THIS

IS CEPD COMPLIANT.

6. CROSS SECTIONS SHOWN ARE PERPENDICULAR TO THE REFERENCE LINE.

7. REMOVE ALL MATERIAL FROM THE NAVIGATION CHANNEL, INCLUDING HARD

OBSTRUCTIONS, TO THE DESIGN DEPTH PLUS OVERDREDGE.

8. REMOVE MATERIAL FROM THE DEPOSITION BASIN TO 17' BELOW MLLW OR

REFUSAL, WHICHEVER COMES FIRST.

9. EAST SLOPE IS 1:1.5 TO ACCOMMODATE DOCK FROM STA 27+00 TO STA 30+75.

D

EP

O

SI

TI

O

N B

AS

IN

N

AV

IG

AT

IO

N

C H

AN

N

EL

150'100'

1.5

0 100' 200'

0 10' 20'

R L

STA. 1+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 500 6000-100

R L

STA. 2+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 500 6000-100

R L

STA. 3+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 500 6000-100

R L

STA. 4+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 500 600

R L

STA. 5+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 5000-100

R L

STA. 6+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 5000-100

R L

STA. 7+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 5000-100

R L

STA. 8+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 5000-100

R L

STA. 9+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 5000-100

R L

STA. 10+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 5000-100

R L

STA. 11+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 5000-100

R L

STA. 12+00

-30

-20

-10

-30

-20

-10

0 100 200 300 400 5000-100

-6 MLLW

8.0' NAVD88

1' TOLERANCE

-6 MLLW

-6 MLLW

8.0' NAVD88

1' TOLERANCE

8.0' NAVD88

1' TOLERANCE

-6 MLLW

8.0' NAVD88

1' TOLERANCE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

Y O

R K

D

IS

TR

IC

T

F

ED

ER

AL

P

LA

ZA

N

EW

Y

O R

K, N

Y

+X

XX

XX

X-

XX

-X

-X

XX

X

+M M

M M

M M

M M

M M

Y

YY

Y

AN

SI

F

U

LL

B

LE

ED

D

(2 2.

X

4.

IN

C H

ES

+X

XX

XX

X-

XX

-X

-X

XX

X

LA

KE

M O

N

TA

U K

H

AR

BO

R

N

AV

IG

AT

IO

N

IM

PR

O

VE

M

EN

T

PR

O

JE

C T

TO

W

N O

F

EA

ST

H

AM

PT

O N

, N Y

R

TA

S U

BM

IS

SI

O

N

S.

R

E.

G

E.

G

E.

G

PL

AC

EM

EN

T

O F

D R

ED

G

ED

M

AT

ER

IA

L

C R

O

SS

S

EC

TI

O

N S

H

EE

T

C-302

NOTES:

1. CONTOURS AND ELEVATIONS ON THIS SHEET ARE IN FEET AND REFERENCED TO NORTH AMERICAN

VERTICAL DATUM 1988 (NAVD88) AS DETERMINED USING VDATUM VERSION 4.6.1. THE -6 MLLW

DEPTH IS DISPLAYED FOR ENVIRONMENTAL REQUIREMENTS.

· MEAN LOWER LOW WATER IS 1.5 FEET BELOW NAVD88

· MEAN LOW WATER IS 1.4 FEET BELOW NAVD88

· MEAN HIGH WATER IS 0.6 FEET BELOW NAVD88

2. THE DATA DEPICTED ON THIS MAP SHOULD NOT BE USED FOR VOLUME CALCULATIONS PURPOSES.

3. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULTS OF SURVEYS MADE ON JANUARY 2025 AND CAN ONLY BE CONSIDERED AS THE GENERAL CONDITIONS EXISTING AT THAT

TIME.

4. FOR COVER SHEET AND INDEX TO DRAWINGS SEE SHEET G-001.

5. FOR GENERAL PLAN, GENERAL NOTES, AND DREDGING BOUNDS SEE SHEET G-101

6. FOR PLAN VIEW OF BEACH PLACEMENT AREA SEE SHEET C-102

Feet 0 100 200

Feet 0 10 20

VERTICAL SCALE:1V"=10'

HORIZONTAL SCALE:1H"=100'

Lake Montauk sheets-G-001 Cover.pdf
Sheets and Views
G-001 Cover
Sheet 1
Lake Montauk sheets-G-101 General Plan.pdf
Sheets and Views
G-101 General Plan
Sheet 1
Lake Montauk sheets-G-102 General Plan for Channel.pdf
Sheets and Views
G-102 General Plan for Channel
Sheet 1
Lake Montauk sheets-C-101 Dredging Plan.pdf
Sheets and Views
C-101 Dredging Plan
Sheet 1
Lake Montauk sheets-C-201 Channel Profile.pdf
Sheets and Views
C-201 Channel Profile
Sheet 1
Lake Montauk sheets-C-301 Channel Cross Sections.pdf
Sheets and Views
C-301 Channel Cross Sections
Sheet 1

File details come from the government source that posted it. Updated .