GC-100.pdf
PDF 3 MB Posted
- Solicitation number
- W912DS24B0015
About this file
This is an engineering drawing showing the soil erosion and sediment control plan and site access overview for the Spring Creek North Ecosystem Restoration Project in Brooklyn and Queens, New York. The drawing includes detailed construction specifications for a 36.5-acre project area with various erosion control measures such as silt fencing, compost filter socks, stabilized construction access points, and channel access ramps.
The plan identifies specific construction elements including temporary waterway crossings, channel blocks, tidal water control features, anchored stabilization matting, and both single and multiple coir log stabilization systems. Key project requirements include using low ground pressure equipment (max 2 PSI) for wetland areas, implementing additional site inspections for areas over 5 acres of soil disturbance, and following strict soil stabilization measures within 7 days of ceased activity. The drawing contains detailed soil information from SSURGO database and references FEMA 100-year floodplain boundaries. This is part of US Army Corps of Engineers contract W912DS-24-B-0015, with a 100% design submission dated August 2024 and amendment 04 dated December 6, 2024.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wx Wx W x Wx Wx Wx Wx Wx
W x
W x
Wx
W x
X
X X
X
X
X X
X
X
X
X
X X
X X
X X X X
X
X
X
X
X X
X X
X
X
X X
X X
X
X
X X
X X
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X X X
X X
X X
X
X
X
X
X
X
X
XX
X
X
X
X X
X
X
X
X X
X
X X
XXXX
XXXXXXXXXXXXX
X
X
X X
X
X
X
X X
X
X
V
V
U
U
U
V
V
V
V
U
U U
U U
U
U
U
U
U
U
U U
U
U
U
V
U U U
V
U U
U
V
U U
U
U
SSx SSx
SDx
SDx
SDx
Gx GxGx Gx
GxGx
G x
G x
G x
Gx Gx
LPG LPG LPG LPG LPG
GxGx GxGx Gx
W x
Wx
Gx
SD
x
O H
Tx O
H Tx
O HTx
O HTx
O HTx
O HTx
O HTx
O HTx
OHTx
OHTx
OHTx
O HTx
SD
x
SD
x
SDx
SS
x
SS
xSSx
SSx SS x
SS
xSSx
SSx
SSx SSx
SSx
SSx SSx SSxSSx SSx SSx
SSxSSx
SSxSSxSSxSSxSSx SSx
SSx
SS
x
SSx
SSx SSx
SSx
SSx
SSx SSx SSx SSx SSx
SSxSSxSSxSSxSSx SSx
SSx
SS
x
SSx
SSx
SSx
SSx
SSx SSx SSx SSx SSx SSx
SSx
SSx
FOUNTAIN AVE.
BELT PKWY
FLATLANDS AVE.
75TH ST
157TH ST
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
W
UVA
UoAUFA
IPA
IPA
FoA BiB
BiA
BiA
W
BiB
BiA
BiA
IPA
IPA
FoA
UmA
BiB
IPA
W
IPA
SF
SF
SF
SF
SF
SF
SF
STABILIZED CONSTRUCTION
ACCESS
PRIMARY CONSTRUCTION
STAGING OF EQUIPMENT
AND MATERIALS (TYP.)
COMPOST FILTER SOCK (TYP.)
PROJECT AREA
ACCESS ROAD (TYP.)
TEMPORARY
UTILITY CROSSING
TEMPORARY FENCE
TEMPORARY WATERWAY
CROSSING
TEMPORARY
UTILITY CROSSING
CHANNEL
ACCESS RAMP
AND BANK REPAIR
TIDAL WATER CONTROL
AND ROCK FILTER
meet.google.com/tto-qttc-fuj
MULTIPLE COIR LOGS
STABILIZATION (TYP.)
CHANNEL BLOCK (TYP.)
FEMA 100-YEAR
FLOODPLAIN (TYP.)
SSURGO SOILS
LIMIT (TYP.)
TEMPORARY INLET PROTECTION (TYP.)
GC-501
GC-502
GC-501
GC-503
GC-503
GC-501
GC-503
ANCHORED
STABILIZATION MATTING
CUT SLOPE 3H:1V
GC-502
ANCHORED
STABILIZATION MATTING
CUT SLOPE 3H:1V
GC-502
GC-503
GC-503
GC-504
GC-503
SINGLE COIR LOG
STABILIZATION (TYP.)
GC-504
MUDFLAT
SHORELINE
STABILIZATION
GC-504
STABILIZED CONSTRUCTION ACCESS1
GC-501
ACCESS ROAD (TYP.)
COMPOST FILTER SOCK (TYP.)2
GC-501
SEWER EASEMENT CROSSING WILL BE RESTRICTED TO
MOWERS AND/OR OTHER LIGHT DUTY EQUIPMENT. A
TEMPORARY UTILITY CROSSING (DETAIL 8, GC-502)
SHALL BE INSTALLED IF HEAVY EQUIPMENT MUST
CROSS OVER THE SEWER EASEMENT.
TREE PROTECTION
FENCE (TYP.)
GC-502
SECONDARY ACCESS VIA EXISTING GATE
RESTRICTED TO MOWERS AND/OR OTHER
LIGHT DUTY EQUIPMENT WITH PRIOR
APPROVAL FROM PROJECT ENGINEER.
IN-CHANNEL ACCESS ROAD (TYP.)5
GC-503
STABILIZED CONSTRUCTION ACCESS1
GC-501
EARTH DIKE 5
GC-501
TEMPORARY INLET
PROTECTION (TYP.)
GC-501
SILT FENCE (TYP.)4
GC-504
TEMPORARY GATE
COMPOST FILTER SOCK
POST FILL PLACEMENT (TYP.)
GC-501
TIDAL WETLAND 50 FT BUFFER
LIMIT OF DISTURBANCE
SOIL RESTORATION APPLIED TO
TEMPORARY ACCESS ROADS
OUTSIDE WETLAND
CONVERSION AREAS (TYP).
SOIL SCREENING
OPERATION LOCATION A
SOIL
SCREENING
OPERATION
LOCATION B
SOIL SCREENING
OPERATION LOCATION C
SOIL EROSION AND SEDIMENT CONTROL LEGEND
PROJECT AREA
ACCESS ROAD
STAGING/STOCKPILE AREA
TEMPORARY FENCE
TREE PROTECTION FENCE
MULTIPLE COIR LOGS
STABILIZATION
SSURGO SOILS LIMIT
FEMA 100-YEAR FLOODPLAIN
STABILIZED CONSTRUCTION
ACCESS
TEMPORARY WATERWAY
CROSSING
CHANNEL ACCESS RAMP
CHANNEL BLOCK
TIDAL WATER CONTROL ROCK
FILTER
TIDAL WATER CONTROL
SUPER SAND BAG BARRIER
ANCHORED STABILIZATION
MATTING
EARTH DIKE
TEMPORARY INLET
PROTECTION
SINGLE COIR LOG
STABILIZATION
MUDFLAT SHORELINE
STABILIZATION
IN-CHANNEL ACCESS ROAD
TEMPORARY UTILITY
CROSSING
SILT FENCESF
CHANNEL ACCESS RAMP
REPAIR
COMPOST FILTER SOCK
POST FILL PLACEMENT
TIDAL WETLAND 50 FT BUFFER
SOIL RESTORATION
LIMIT OF DISTURBANCE
COMPOST FILTER SOCK
SOIL SCREENING OPERATION
GC-100
SO
IL
E R
O
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
AN
D
S
IT
E
AC
C
ES
S O
VE
R
VI
EW
S H
EE
T
BC
S/
AE
M
BC
S
C P/
JH
PR
IN
C
ET
O N
H
YD
R O
N
1" = 150'-0"
( IN FEET )
GRAPHIC SCALE
NOTES:
1. CLEARING LIMITS ARE SHOWN ON SHEETS CD-101 TO CD-108.
2. RESTORATION AND PLANTING DESIGN IS SHOWN ON SHEETS LP-100 TO LP-108.
3. STORMWATER MANAGEMENT FEATURES ARE SHOWN ON SHEETS CG-101 TO CG-108.
4. FEMA 100-YEAR FLOODPLAIN OBTAINED FROM FLOOD INSURANCE RATE MAP EFFECTIVE
9/5/2007, OBTAINED FROM FEMA FLOOD MAP SERVICE CENTER:
HTTPS://MSC.FEMA.GOV/PORTAL/
5. SSURGO SOILS OBTAINED FROM NRCS, USDA, SOIL SURVEY GEOGRAPHIC (SSURGO)
DATABASE FOR KINGS AND QUEENS COUNTIES, NEW YORK. PROJECT AREA SOILS ARE AS
FOLLOWS:
BiA: BIGAPPLE FINE SAND, 0-3% SLOPES BiB: BIGAPPLE FINE SAND, 3-8% SLOPES FoA: FORTRESS SAND, 0-3% SLOPES
IPA: IPSWICH-PAWCATUCK COMPLEX, 0-1% SLOPES, VERY FREQUENTLY FLOODED
UFA: URBAN LAND- FLATBUSH COMPLEX, 0-3% SLOPES
UVA: URBAN LAND-VERRAZANO COMPLEX, 0-3% SLOPES
UVAI: URBAN LAND-VERRAZANO COMPLEX, 0-3% SLOPES, LOW IMPERVIOUS SURFACE
UmA: URBAN LAND, TIDAL MARSH SUBSTRATUM, 0-3% SLOPES UoA: URBAN LAND, OUTWASH SUBSTRATUM, 0-3% SLOPES
W: WATER
6. TOTAL SOIL RESTORATION AREA IS 47,314 SF.
7. SEE V-SERIES AND CG-SERIES FOR EXISTING AND PROPOSED CONDITIONS SYMBOLOGY
8. FOR CONSTRUCTION ACCESS WITHIN RALPH'S CREEK OR ON THE EXISTING MARSH
PLATFORM (I.E., AREAS IDENTIFIED AS "WETLAND RESTORATION AREAS" ON G-402)
CONTRACTOR SHALL USE LOW GROUND PRESSURE EQUIPMENT AND/OR MATTING TO
NOT EXCEED A MAXIMUM GROUND PRESSURE OF 2 PSI.
9. IN ACCORDANCE WITH RCNY 19.1-03.3.B.6 FOR PROJECTS THAT PROPOSE MORE THAN
FIVE ACRES OF DISTURBANCE, THE FOLLOWING ADDITIONAL REQUIREMENTS SHALL BE
IMPLEMENTED IN ORDER TO BE AUTHORIZED TO DISTURB GREATER THAN FIVE ACRES OF
SOIL, AT ANY ONE TIME:
9.1. A QUALIFIED CONSTRUCTION INSPECTOR WOULD CONDUCT AT LEAST TWO SITE
INSPECTIONS IN ACCORDANCE WITH THE NYSDEC CONSTRUCTION GENERAL PERMIT,
EVERY SEVEN CALENDAR-DAYS AND WITHIN TWENTY-FOUR HOURS OF A 0.5-INCH
RAINFALL EVENT, FOR AS LONG AS GREATER THAN FIVE ACRES OF SOIL REMAIN
DISTURBED. THE INSPECTIONS WOULD BE SEPARATED BY A MINIMUM OF TWO FULL
CALENDAR DAYS. THE INSPECTOR WOULD COMPLETE INSPECTION REPORT FORMS
WHICH CONSIST OF A MONTHLY SUMMARY REPORT FOUND IN APPENDIX C OF THE
APPROVED SWPPP.
9.2. IN AREAS WHERE SOIL DISTURBANCE ACTIVITY HAS TEMPORARILY OR PERMANENTLY
CEASED, THE APPLICATION OF SOIL STABILIZATION MEASURES MUST BE INITIATED BY
THE END OF THE NEXT BUSINESS DAY AND COMPLETED WITHIN SEVEN DAYS FROM THE
DATE THE CURRENT SOIL DISTURBANCE ACTIVITY CEASED. THE SOIL STABILIZATION
MEASURES SELECTED MUST BE IN CONFORMANCE WITH THE TECHNICAL STANDARD,
NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT
CONTROL, DATED NOVEMBER 2016.
9.3. THE OWNER OR DEVELOPER MUST PREPARE A PHASING PLAN THAT DEFINES MAXIMUM
DISTURBED AREA PER PHASE AND SHOWS REQUIRED CUTS AND FILL.
9.4. THE OWNER OR DEVELOPER MUST INSTALL ANY ADDITIONAL SITE-SPECIFIC
PRACTICES NEEDED TO PROTECT WATER QUALITY, WHICH ARE DEPICTED ON SHEETS
GC-505, GC-506, AND GC-507. ADDITIONALLY, WATER-BASED AND LAND-BASED TIMING
RESTRICTIONS WOULD BE ADHERED TO FOR WATER QUALITY PROTECTION (SEE SHEET
GC-601 OF THE PROJECT PLANS).
LIMIT OF DISTURBANCE
= 36.5 ACRES
D
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
N
EW
Y O
R K, N Y
8-
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K D
IS
TR
IC
T
N
EW
Y O
R K
C
IT
Y
PA
R
KS
N
EW
Y
O R
K C
IT
Y, N
EW
Y O
R K
BO
R
O U
G H
S O
F
BR
O O
KL
YN
Q
U
EE
N S
EC
O
SY
ST
EM
R
ES
TO
R
AT
IO
N
P R
O
JE
C T
SP
R
IN
G
C R
EE
K
N O
R
TH
100% SUBMISSION
W
2D S-
XX
-X
-X
XX
X
W
2D S-
-B
-0
AU
G
U
ST
0% D
ES
IG
N S
U
BM
IS
SI
O N
AM
EN
D M
EN
T
/0 6/
D
/0 1/
| Sheets and Views |
| GC-100 |
File details come from the government source that posted it. Updated .