31 00 00.pdf
PDF 78 KB Posted
- Solicitation number
- W912DS24B0015
About this file
This is Section 31 00 00 Earthwork specifications document for the Spring Creek North Ecosystem Restoration Project, detailing requirements for excavation, fill placement, and grading activities. The document outlines specific measurement procedures and requirements for various earthwork activities including demolition, vegetation clearing, upland to wetland excavation, clean cap material import, and earthwork placement.
Key requirements include: excavated materials must be screened to remove items larger than 3 inches; disposal of unsatisfactory materials including metals, concrete debris, tires and trash must be documented with weight tickets; strict access limitations after final grading with only foot traffic and hand tools permitted; specific compaction requirements ranging from 80-95% laboratory maximum density depending on application; comprehensive testing requirements including moisture content, density, and subgrade tolerance tests; and detailed procedures for trench excavation, backfilling, and utility protection. The contractor must also implement dewatering and water control measures, protect underground utilities, and properly dispose of surplus materials in accordance with applicable regulations.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spr i ng Cr eek Nor t h Ecosyst em Rest or at i on Pr oj ect P1880012
SECTI ON 31 00 00
EARTHWORK
08/ 08, CHG 2: 02/ 21
PART 1 GENERAL
1. 1 SCOPE OF WORK
Under t hi s sect i on, t he Cont r act or shal l per f or m excavat i on, f i l l , pl acement , r ough gr adi ng and di sposal act i v i t i es r equi r ed f or gr adi ng t he si t e t o t he pr oposed gr ades. Excavat ed and f i l l mat er i al s shal l be pl aced and compact ed, wher e necessar y, i n accor dance wi t h t he pl ans, speci f i cat i ons, and di r ect i ons of t he Cont r act i ng Of f i cer .
Af t er f i nal gr adi ng i s compl et e, access t o gr aded ar eas shal l be onl y on f oot . Onl y hand t ool s wi l l be used on t he si t e af t er f i nal gr adi ng has occur r ed.
The Cont r act or shal l be l i abl e f or any and al l damages t o pr oper t y caused by t he Cont r act or ' s oper at i ons. Any damages t o pr oper t y or t o veget at i on wi t hi n t he pr ot ect ed ar eas shal l be r est or ed t o t he or i gi nal condi t i ons and compl y wi t h Cont r act Document s.
1. 2 MEASUREMENT PROCEDURES
1. 2. 1 Demol i t i on and Veget at i on Cl ear i ng
Asphal t Scar i f i cat i on, 6" Deep ( SY)
1. 2. 2 Ear t hwor k - Upl and t o Wet l and Excavat i on t o Subgr ade i n Upl and Fi l l Pl acement Ar ea ( Excavat e, Haul , Scr een, Pl ace)
Ear t hwor k f or Mat er i al Excavat ed Above Mean Hi gh Wat er ( BCY) Ear t hwor k f or Mat er i al Excavat ed Bel ow Mean Hi gh Wat er ( BCY)
Payment of t he above wi l l be based on i n pl ace vol ume of mat er i al excavat ed f r om t he exi st i ng upl and ar eas. Payment wi l l be based on a compar i son of t he exi st i ng condi t i ons sur vey and t he bot t om of excavat i on sur vey.
Di sposal of Unsat i sf act or y Mat er i al s Al l ocat i on ( T&M) Di sposal and Tr ucki ng f or Ti r es ( TON) Di sposal and Tr ucki ng f or Car Par t s and Met al s ( TON) Di sposal and Tr ucki ng f or Ot her Mat er i al s ( TON)
Payment f or t he above wi l l be based on t he submi t t ed wWei ght t i cket s f r om t he di sposal f aci l i t y shal l be pr ovi ded t o t he Cont r act i ng Of f i cer or Cont r act i ng Of f i cer ' s Repr esent at i ve. The t ot al cost of t he di sposal shal l be wi t hi n t he t ot al al l ocat ed f or t he pr oj ect . The Cont r act or shal l not i f y t he Cont r act i ng Of f i cer when f unds wi t hi n t he al l ocat i on r each 25% r emai ni ng.
1. 2. 3 Ear t hwor k - Cl ean Cap Mat er i al I mpor t
Mar sh Pl acement - Mat er i al and Del i ver y of Sand I mpor t - Vi a Tr ucki ng
( TON)
AMENDMENT 04 - Revised 2024.12.06 SECTI ON 31 00 00 Page 1
Payment f or t he above i t em shal l be based on t he f i nal gr ade as- bui l t sur veys. t he vol ume of mat er i al bet ween t he subgr ade or excavat i on l i mi t and t he f i nal gr ade as- bui l t sur veys. .
Sand I mpor t Vi a Bar ge f or Thi n Layer Pl acement ( TON)
Payment f or t he above i t em shal l be based on t he del i ver y s l i ps. Del i ver y s l i ps f or t he Sand I mpor t v i a Bar ge f or Thi n Layer Pl acement shal l be pr ovi ded t o t he Cont r act i ng Of f i cer or Cont r act i ng Of f i cer ' s Repr esent at i ve.
1. 2. 4 Ear t hwor k - Upl and t o Wet l and Conver si on Ar ea Cl ean Sand Pl acement
Ear t hwor k - Cl ean Soi l Pl acement - Pr oposed Wet l and Cr eat i on ( BCY)
Payment f or t he above i t em shal l be t he vol ume of mat er i al bet ween t he subgr ade or excavat i on l i mi t and t hebased on f i nal gr ade as- bui l t sur veys.
1. 2. 5 Ear t hwor k - Upl and Pl acement Ar ea - Cl ean Mat er i al I mpor t
Sand I mpor t Vi a Tr ucki ng ( LCY) Bi d Al t er nat e 1: Sand I mpor t f or NYC Soi l Bank ( LCY)
Payment f or t he above i t em( s) shal l t he vol ume of mat er i al bet ween t he subgr ade or excavat i on l i mi t andbe based on t he f i nal gr ade as- bui l t sur veys.
1. 2. 6 Ear t hwor k - Upl and Pl acement Ar ea - Loadi ng, Haul i ng, and Gr adi ng
Ear t hwor k - Cl ean Mat er i al Loadi ng, Haul i ng, and Gr adi ng ( LCY)
1. 2. 7 Excavat i on
The uni t of measur ement f or excavat i on and bor r ow wi l l be t he cubi c yar d, comput ed by t he aver age end ar ea met hod f r om cr oss sect i ons t aken bef or e and af t er t he excavat i on and bor r ow oper at i ons, i ncl udi ng t he excavat i on f or di t ches, gut t er s, and channel changes, when t he mat er i al i s accept abl y ut i l i zed or di sposed of as her ei n speci f i ed. The measur ement sExcavat i on per mi ssi bl e f or payment wi l l i ncl ude aut hor i zed excavat i on of r ock ( except f or pi pi ng t r enches t hat i s cover ed bel ow) , aut hor i zed excavat i on of unsat i sf act or y subgr ade soi l , and t he vol ume of l oose, scat t er ed r ocks and boul der s col l ect ed wi t hi n t he l i mi t s of t he wor k; al l owance wi l l be made on t he same basi s f or sel ect ed backf i l l or der ed as r epl acement . The measur ement wi l l not i ncl ude t he vol ume of subgr ade mat er i al or ot her mat er i al t hat i s scar i f i ed or pl owed and r eused i n- pl ace, and wi l l not i ncl ude t he vol ume excavat ed wi t hout aut hor i zat i on or t he vol ume of any mat er i al used f or pur poses ot her t han di r ect ed. The vol ume of over bur den st r i pped f r om bor r ow pi t s and t he vol ume of excavat i on f or di t ches t o dr ai n bor r ow pi t s, unl ess used as bor r ow mat er i al , wi l l not be measur ed f or payment . The measur ement wi l l not i ncl ude t he vol ume of any excavat i on per f or med pr i or t o t he t aki ng of el evat i ons and measur ement s of t he undi st ur bed gr ade.
1. 2. 8 Pi pi ng Tr ench Excavat i on
Measur e t r ench excavat i on by t he number of l i near f eet al ong t he cent er l i ne of t he t r ench and excavat e t o t he dept hs and wi dt hs speci f i ed f or t he par t i cul ar s i ze of pi pe. Repl ace unst abl e t r ench bot t oms wi t h a
SECTI ON 31 00 00 Page 2 sel ect ed gr anul ar mat er i al . I ncl ude t he addi t i onal wi dt h at manhol es and si mi l ar st r uct ur es, t he f ur ni shi ng, pl aci ng and r emoval of sheet i ng and br aci ng, pumpi ng and bai l i ng, and al l i nci dent al s necessar y t o compl et e t he wor k r equi r ed by t hi s sect i on.
1. 2. 9 Rock Excavat i on f or Tr enches
Measur e and pay f or r ock excavat i on by t he number of cubi c yar ds of accept abl y excavat ed r ock mat er i al . Measur e t he mat er i al i n pl ace, but base vol ume on a maxi mum 30 i nches wi dt h f or pi pes 12 i nches i n di amet er or l ess, and a maxi mum wi dt h of 16 i nches gr eat er t han t he out si de di amet er of t he pi pe f or pi pes over 12 i nches i n di amet er . Pr ovi de t he measur ement t o i ncl ude al l aut hor i zed over dept h r ock excavat i on as det er mi ned by t he Cont r act i ng Of f i cer . For manhol es and ot her appur t enances, comput e vol umes of r ock excavat i on on t he basi s of 1 f oot out si de of t he wal l l i nes of t he st r uct ur es.
1. 2. 10 Topsoi l Requi r ement s
Separ at e excavat i on, haul i ng, and spr eadi ng or pi l i ng of t opsoi l and r el at ed mi scel l aneous oper at i ons wi l l be consi der ed subsi di ar y obl i gat i ons of t he Cont r act or , cover ed under t he cont r act uni t pr i ce f or excavat i on.
1. 2. 11 Over haul Requi r ement s
Al l ow t he uni t of measur ement f or over haul t o be t he st at i on- yar d. The over haul di st ance wi l l be t he di st ance i n st at i ons bet ween t he cent er of vol ume of t he over haul mat er i al i n i t s or i gi nal posi t i on and t he cent er of vol ume af t er pl aci ng, mi nus t he f r ee- haul di st ance i n st at i ons. The haul di st ance wi l l be measur ed al ong t he shor t est r out e det er mi ned by t he Cont r act i ng Of f i cer as f easi bl e and sat i sf act or y. Do no measur e or wast e unsat i sf act or y mat er i al s f or over haul wher e t he l engt h of haul f or bor r ow i s wi t hi n t he f r ee- haul l i mi t s.
1. 2. 12 Sel ect Gr anul ar Mat er i al
Measur e sel ect gr anul ar mat er i al i n pl ace as t he act ual cubi c yar ds r epl aci ng wet or unst abl e mat er i al i n t r ench bot t oms [ wi t hi n t he l i mi t s shown] [ i n aut hor i zed over dept h ar eas] . Pr ovi de uni t pr i ces whi ch i ncl ude f ur ni shi ng and pl aci ng t he gr anul ar mat er i al , excavat i on and di sposal of unsat i sf act or y mat er i al , and addi t i onal r equi r ement s f or sheet i ng and br aci ng, pumpi ng, bai l i ng, c l eani ng, and ot her i nci dent al s necessar y t o compl et e t he wor k.
1. 3 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN ASSOCI ATI ON OF STATE HI GHWAY AND TRANSPORTATI ON OFFI CI ALS
( AASHTO)
AASHTO T 180 ( 2017) St andar d Met hod of Test f or Moi st ur e- Densi t y Rel at i ons of Soi l s Usi ng a 4. 54- kg ( 10- l b) Rammer and a 457- mm ( 18- i n. ) Dr op
SECTI ON 31 00 00 Page 3
AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)
AWWA C600 ( 2017) I nst al l at i on of Duct i l e- I r on Mai ns and Thei r Appur t enances
ASTM I NTERNATI ONAL ( ASTM)
ASTM D698 ( 2012; E 2014; E 2015) Labor at or y Compact i on Char act er i st i cs of Soi l Usi ng St andar d Ef f or t ( 12, 400 f t - l bf / cu. f t .
( 600 kN- m/ cu. m. ) )
ASTM D1140 ( 2017) St andar d Test Met hods f or Det er mi ni ng t he Amount of Mat er i al Fi ner t han 75- µm ( No. 200) Si eve i n Soi l s by Washi ng
ASTM D1557 ( 2012; E 2015) St andar d Test Met hods f or Labor at or y Compact i on Char act er i st i cs of Soi l Usi ng Modi f i ed Ef f or t ( 56, 000 f t - l bf / f t 3) ( 2700 kN- m/ m3)
ASTM D2487 ( 2017; E 2020) St andar d Pr act i ce f or Cl assi f i cat i on of Soi l s f or Engi neer i ng Pur poses ( Uni f i ed Soi l Cl assi f i cat i on Syst em)
ASTM D4718/ D4718M ( 2015) St andar d Pr act i ce f or Cor r ect i on of Uni t Wei ght and Wat er Cont ent f or Soi l s Cont ai ni ng Over si ze Par t i c l es
ASTM D6938 ( 2017a) St andar d Test Met hod f or I n- Pl ace Densi t y and Wat er Cont ent of Soi l and Soi l - Aggr egat e by Nucl ear Met hods ( Shal l ow Dept h)
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2024) Saf et y and Occupat i onal Heal t h ( SOH) Requi r ement s
1. 4 DEFI NI TI ONS
1. 4. 1 Sat i sf act or y Excavat ed Mat er i al s
Sat i sf act or y excavat ed mat er i al s compr i se of any soi l s excavat ed wi t hi n t he conf i nes of t he pr oj ect s i t e. Sat i sf act or y mat er i al s f or gr adi ng compr i se st ones l ess t han 8 i nches, except f or f i l l mat er i al f or pavement s and r ai l r oads whi ch compr i se st ones l ess t han 3 i nches i n any di mensi on.
1. 4. 2 Unsat i sf act or y Excavat ed Mat er i al s
Mat er i al s whi ch do not compl y wi t h t he r equi r ement s f or sat i sf act or y excavat ed mat er i al s ar e unsat i sf act or y. Unsat i sf act or y mat er i al s al so i ncl ude man- made f i l l s ; t r ash; r ef use; backf i l l s f r om pr evi ous const r uct i on; and t i r es. Not i f y t he Cont r act i ng Of f i cer when encount er i ng any cont ami nat ed mat er i al s.
SECTI ON 31 00 00 Page 4
1. 4. 3 Degr ee of Compact i on
Degr ee of compact i on r equi r ed, except as not ed i n t he second sent ence, i s expr essed as a per cent age of t he maxi mum densi t y obt ai ned by t he t est pr ocedur e pr esent ed i n ASTM D1557 abbr evi at ed as a per cent of l abor at or y maxi mum densi t y. Si nce ASTM D1557 appl i es onl y t o soi l s t hat have 30 per cent or l ess by wei ght of t hei r par t i c l es r et ai ned on t he 3/ 4 i nch si eve, expr ess t he degr ee of compact i on f or mat er i al havi ng mor e t han 30 per cent by wei ght of t hei r par t i c l es r et ai ned on t he 3/ 4 i nch si eve as a per cent age of t he maxi mum densi t y i n accor dance wi t h AASHTO T 180 and cor r ect ed wi t h ASTM D4718/ D4718M.
1. 4. 4 Topsoi l
Topsoi l i s not ant i c i pat ed t o be used f or t hi s pr oj ect .
1. 4. 5 Har d/ Unyi el di ng Mat er i al s
Har d/ Unyi el di ng mat er i al s compr i se weat her ed r ock, dense consol i dat ed deposi t s, or congl omer at e mat er i al s whi ch ar e not i ncl uded i n t he def i ni t i on of " r ock" wi t h st ones gr eat er t han 24 i nches i n any di mensi on or as def i ned by t he pi pe manuf act ur er , whi chever i s smal l er . These mat er i al s usual l y r equi r e t he use of heavy excavat i on equi pment , r i pper t eet h, or j ack hammer s f or r emoval .
1. 4. 6 Rock
Sol i d homogeneous i nt er l ocki ng cr yst al l i ne mat er i al wi t h f i r ml y cement ed, l ami nat ed, or f ol i at ed masses or congl omer at e deposi t s, nei t her of whi ch can be r emoved wi t hout syst emat i c dr i l l i ng and bl ast i ng, dr i l l i ng and t he use of expansi on j acks or f eat her wedges, or t he use of backhoe- mount ed pneumat i c hol e puncher s or r ock br eaker s; al so l ar ge boul der s, bur i ed masonr y, or concr et e ot her t han pavement exceedi ng 1/ 2 cubi c yar d i n vol ume. Removal of har d mat er i al wi l l not be consi der ed r ock excavat i on because of i nt er mi t t ent dr i l l i ng and bl ast i ng t hat i s per f or med mer el y t o i ncr ease pr oduct i on.
1. 4. 7 Sel ect Gr anul ar Mat er i al f or Pi pe Backf i l l and Cap Sand
1. 4. 7. 1 Gener al Requi r ement s
Sel ect gr anul ar mat er i al consi st of mat er i al s c l assi f i ed as SW, or SP by ASTM D2487 wher e i ndi cat ed. Sel ect gr anul ar mat i al shal l cont ai n no mor e t han 10 per cent by wei ght of mat er i al passi ng a No. 200 si eve when t est ed i n accor dance wi t h ASTM D1140.
1. 4. 8 I ni t i al Backf i l l f or Fi l l Pl acement Mat er i al s
I ni t i al backf i l l consi st s of sel ect gr anul ar mat er i al or sat i sf act or y mat er i al s f r ee f r om r ocks 1 i nch or l ar ger i n any di mensi on or f r ee f r om r ocks of such si ze as r ecommended by t he Cont r act i ng Of f i cer , whi chever i s smal l er .
1. 5 SYSTEM DESCRI PTI ON
Subsur f ace soi l bor i ng l ogs ar e shown on t he dr awi ngs i n t he B- Ser i es.
Thi s dat a r epr esent s t he best subsur f ace i nf or mat i on avai l abl e; however , var i at i ons may exi st i n t he subsur f ace bet ween bor i ng l ocat i ons.
SECTI ON 31 00 00 Page 5
1. 5. 1 Cl assi f i cat i on of Excavat i on
Fi ni sh t he speci f i ed excavat i on on a c l assi f i ed basi s, i n accor dance wi t h t he f ol l owi ng desi gnat i ons and cl assi f i cat i ons.
1. 5. 1. 1 Common Excavat i on
I ncl ude common excavat i on wi t h t he sat i sf act or y r emoval and di sposal of al l mat er i al s not c l assi f i ed as r ock excavat i on.
1. 5. 1. 1. 1 Above Mean Hi gh Wat er
Excavat i on above mean hi gh wat er shal l i ncl ude r emoval of st umps and t r ees i n addi t i on t o excavat i on, onsi t e haul i ng t o be scr eened, as wel l as scr eeni ng, sor t i ng, and r emoval of unsat i sf act or y excavt i on mat er i al s.
1. 5. 1. 1. 2 Bel ow Mean Hi gh Wat er
Excavat i on bel ow mean hi gh wat er shal l i ncl ude excavat i on, onsi t e haul i t ng t o be scr eened, as wel l as scr eeni ng, sor t i ng, and r emoval of unsat i sf act or y excavat i on mat er i al s.
1. 5. 2 Dewat er i ng and Wat er Cont r ol Pl an
Submi t pr ocedur es f or accompl i shi ng dewat er i ng wor k.
1. 6 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Ti dal Wat er Cont r ol Pl an ( Mat er i al s) ; G, DO
Dewat er i ng and Wat er Cont r ol Pl an; G, DO
Haul Road Const r uct i on Pl an; G, DO
Dewat er i ng Wor k Pl an; G, DO
SD- 03 Pr oduct Dat a
Ut i l i zat i on of Excavat ed Mat er i al s; G, DO
Di sposal Locat i on( s) f or Unsat i sf act or y Mat er i al s
SD- 06 Test Repor t s
Test i ng; G, DO
Wi t hi n 24 hour s of concl usi on of physi cal t est s, submi t 3 copi es of t est r esul t s, i ncl udi ng cal i br at i on cur ves and r esul t s of cal i br at i on t est s.
SECTI ON 31 00 00 Page 6
SD- 07 Cer t i f i cat es
Test i ng
PART 2 PRODUCTS
2. 1 BURI ED WARNI NG AND I DENTI FI CATI ON TAPE
Pr ovi de pol yet hyl ene pl ast i c war ni ng t ape manuf act ur ed speci f i cal l y f or war ni ng and i dent i f i cat i on of bur i ed ut i l i t y l i nes. Pr ovi de t ape on r ol l s, 3 i nches mi ni mum wi dt h, col or coded as speci f i ed bel ow f or t he i nt ended ut i l i t y wi t h war ni ng and i dent i f i cat i on i mpr i nt ed i n bol d bl ack l et t er s cont i nuousl y over t he ent i r e t ape l engt h. War ni ng and i dent i f i cat i on t o r ead, " CAUTI ON, BURI ED ( i nt ended ser vi ce) LI NE BELOW" or s i mi l ar wor di ng. Pr ovi de per manent col or and pr i nt i ng, unaf f ect ed by moi st ur e or soi l .
War ni ng Tape Col or Codes
Red El ect r i c
Yel l ow Gas, Oi l ; Danger ous Mat er i al s
Or ange Tel ephone and Ot her Communi cat i ons
Bl ue Wat er Syst ems
Gr een Sewer Syst ems
Whi t e St eam Syst ems
Gr ay Compr essed Ai r
2. 1. 1 Det ect abl e War ni ng Tape f or Non- Met al l i c Pi pi ng
Pr ovi de pol yet hyl ene pl ast i c t ape conf or mi ng t o t he wi dt h, col or , and pr i nt i ng r equi r ement s speci f i ed above, wi t h a mi ni mum t hi ckness of 0. 004 i nch, and a mi ni mum st r engt h of 1500 psi l engt hwi se and 1250 psi cr osswi se. Manuf act ur e t ape wi t h i nt egr al wi r es, f oi l backi ng, or ot her means of enabl i ng det ect i on by a met al det ect or when t ape i s bur i ed up t o 3 f eet deep. Encase met al l i c el ement of t he t ape i n a pr ot ect i ve j acket or pr ovi de wi t h ot her means of cor r osi on pr ot ect i on.
PART 3 EXECUTI ON
3. 1 ACCESS MATTI NG
Al l ar eas desi gnat ed as par t of t he wet l and or channel shal l adher e t o t he r equi r ement s f or t he access mat t i ng as def i ned i n Sect i on 35 20 24 THI N LAYER PLACEMENT i n subpar agr aph 2. 1. 2.
3. 2 GENERAL EXCAVATI ON
Per f or m excavat i on of ever y t ype of mat er i al encount er ed wi t hi n t he l i mi t s of t he pr oj ect t o t he l i nes, gr ades, and el evat i ons i ndi cat ed and as speci f i ed. Per f or m t he gr adi ng i n accor dance wi t h t he t ypi cal sect i ons shown and t he t ol er ances speci f i ed i n par agr aph FI NI SHI NG.
SECTI ON 31 00 00 Page 7
Tr anspor t excavat ed mat er i al t o t he st agi ng and scr eeni ng ar ea. Soi l scr eeni ng wi l l r emove i t ems gr eat er t han t hr ee ( 3) i nches i n s i ze, whi ch i s ant i c i pat ed t o r emove t he maj or i t y of smal l er const r uct i on and demol i t i on debr i s. Scr een al l excavat ed mat er i al t o r emove unsat i sf act or y mat er i al i ncl udi ng, but not l i mi t ed t o, met al s, l ar ge concr et e or masonr y debr i s, t i r es, and t r ash. Tr anspor t r emai ni ng sat i sf act or y, scr eened, excavat ed mat er i al s and pl ace i n pr oposed f i l l pl acement ar eas wi t hi n t he l i mi t s of t he wor k. St ockpi l es of unsat i sf act or y and wast e mat er i al s shal l not be al l owed t o accumul at e and shal l be per i odi cal l y t r anspor t ed of f s i t e t o appr oved f aci l i t i es. Dur i ng const r uct i on, per f or m excavat i on and f i l l i n a manner and sequence t hat wi l l pr ovi de pr oper dr ai nage at al l t i mes.
3. 2. 1 Di t ches, Gut t er s, and Channel Changes
Fi ni sh excavat i on of di t ches, gut t er s, and channel changes by cut t i ng accur at el y t o t he cr oss sect i ons, gr ades, and el evat i ons shown on Dr awi ng Sheet No. CG- 201, CG- 301, and CG- 302. The GC- 500 ser i es depi ct s t he associ at ed det ai l s. Do not excavat e di t ches and gut t er s bel ow gr ades shown. Backf i l l t he excessi ve open di t ch or gut t er excavat i on wi t h sat i sf act or y, t hor oughl y compact ed, mat er i al or wi t h sui t abl e st one or cobbl e t o gr ades shown. Wher e possi bl e, st ockpi l es wi l l be pl aced a di st ance f r om t he edge of excavat i on equal t o ( or gr eat er t han) t he dept h of t he excavat i on. Mai nt ai n excavat i ons f r ee f r om det r i ment al quant i t i es of l eaves, br ush, st i cks, t r ash, and ot her debr i s unt i l f i nal accept ance of t he wor k.
3. 2. 2 Dr ai nage St r uct ur es
Make excavat i ons t o t he l i nes, gr ades, and el evat i ons shown, or as di r ect ed. Pr ovi de t r enches of suf f i c i ent s i ze t o per mi t t he pl acement and r emoval of f or ms f or t he f ul l l engt h and wi dt h of ut i l i t y as shown.
3. 2. 3 Dr ai nage
Pr ovi de f or t he col l ect i on and di sposal of sur f ace and subsur f ace wat er encount er ed dur i ng const r uct i on. Compl et el y dr ai n const r uct i on s i t e dur i ng per i ods of const r uct i on t o keep soi l mat er i al s suf f i c i ent l y dr y.
Const r uct st or m dr ai nage f eat ur es ( swal es and pi pes as per t he const r uct i on sequence) and pr ovi de t empor ar y di t ches, swal es, and ot her dr ai nage f eat ur es and equi pment as r equi r ed t o mai nt ai n dr y soi l s. When unsui t abl e wor ki ng pl at f or ms f or equi pment oper at i on and unsui t abl e soi l suppor t f or subsequent const r uct i on f eat ur es devel op, r emove unsui t abl e mat er i al and pr ovi de new soi l mat er i al as speci f i ed her ei n. I t i s t he r esponsi bi l i t y of t he Cont r act or t o assess t he soi l and gr ound wat er condi t i ons pr esent ed by t he pl ans and speci f i cat i ons and t o empl oy necessar y measur es t o per mi t const r uct i on t o pr oceed.
3. 2. 4 Dewat er i ng
Cont r ol gr oundwat er f l owi ng t owar d or i nt o excavat i ons t o pr event s l oughi ng of excavat i on s l opes and wal l s, boi l s, upl i f t and heave i n t he excavat i on and t o el i mi nat e i nt er f er ence wi t h or der l y pr ogr ess of const r uct i on per t he dewat er i ng and wat er cont r ol pl an. The cont r act or shal l i mpl ement t he necessar y dewat er i ng and/ or wat er cont r ol s t o compl et e t he pr oposed const r uct i on act i v i t i es. The cont r act or shal l submi t a Dewat er i ng Wor k Pl an whi ch shal l i ncl ude t he necessar y mechani cal means and met hods as wel l as const r uct i on oper at i ons and sequence t o mai nt ai n
SECTI ON 31 00 00 Page 8 or der l y pr ogr ess.
3. 2. 5 Tr ench Excavat i on Requi r ement s
Excavat e t he t r ench as r ecommended by t he manuf act ur er of t he pi pe t o be i nst al l ed. Sl ope t r ench wal l s bel ow t he t op of t he pi pe, or make ver t i cal , and of such wi dt h as r ecommended i n t he manuf act ur er ' s pr i nt ed i nst al l at i on manual . Pr ovi de ver t i cal t r ench wal l s wher e no manuf act ur er ' s pr i nt ed i nst al l at i on manual i s avai l abl e. Shor e t r ench wal l s, cut back t o a st abl e s l ope, or pr ovi de wi t h equi val ent means of pr ot ect i on f or empl oyees who may be exposed t o movi ng gr ound or cave i n, as det er mi ned by t he Cont r act or ’ s Saf et y Engi neer or ot her compet ent per son; r ef er t o USACE publ i cat i on EM 385- 1- 1. Excavat e t r ench wal l s whi ch ar e cut back t o at l east t he angl e of r epose of t he soi l . Gi ve speci al at t ent i on t o s l opes whi ch may be adver sel y af f ect ed by weat her or moi st ur e cont ent . Do not exceed t he t r ench wi dt h bel ow t he pi pe t op of 24 i nches pl us pi pe out si de di amet er ( O. D. ) f or pi pes of l ess t han 24 i nches i nsi de di amet er , and do not exceed 36 i nches pl us pi pe out si de di amet er f or s i zes l ar ger t han 24 i nches i nsi de di amet er . Wher e r ecommended t r ench wi dt hs ar e exceeded, pr ovi de r edesi gn, st r onger pi pe, or speci al i nst al l at i on pr ocedur es by t he Cont r act or . The Cont r act or i s r esponsi bl e f or t he cost of r edesi gn, st r onger pi pe, or speci al i nst al l at i on pr ocedur es wi t hout any addi t i onal cost t o t he Gover nment .
3. 2. 5. 1 Bot t om Pr epar at i on
Gr ade t he bot t oms of t r enches accur at el y t o pr ovi de uni f or m bear i ng and suppor t f or t he bot t om quadr ant of each sect i on of t he pi pe. Excavat e bel l hol es t o t he necessar y s i ze at each j oi nt or coupl i ng t o el i mi nat e poi nt bear i ng. Remove st ones of 3 i nches or gr eat er i n any di mensi on, or as r ecommended by t he pi pe manuf act ur er , whi chever i s smal l er , t o avoi d poi nt bear i ng.
3. 2. 5. 2 Removal of Unyi el di ng Mat er i al
Wher e unyi el di ng mat er i al i s encount er ed i n t he bot t om of t he t r ench, r emove such mat er i al 6 i nches bel ow t he r equi r ed gr ade and r epl aced wi t h sui t abl e mat er i al s as pr ovi ded i n par agr aph BACKFI LLI NG AND COMPACTI ON.
3. 2. 5. 3 Removal of Unst abl e Mat er i al
Wher e unst abl e mat er i al i s encount er ed i n t he bot t om of t he t r ench, r emove such mat er i al t o t he dept h di r ect ed and r epl ace i t t o t he pr oper gr ade wi t h sel ect gr anul ar mat er i al as pr ovi ded i n par agr aph BACKFI LLI NG AND COMPACTI ON. When r emoval of unst abl e mat er i al i s r equi r ed due t o t he Cont r act or ' s f aul t or negl ect i n per f or mi ng t he wor k, t he Cont r act or i s r esponsi bl e f or excavat i ng t he r esul t i ng mat er i al and r epl aci ng i t wi t hout addi t i onal cost t o t he Gover nment .
3. 2. 5. 4 Excavat i on f or Appur t enances
Pr ovi de excavat i on f or manhol es, cat ch- basi ns, i nl et s, or s i mi l ar st r uct ur es suf f i c i ent t o l eave at l east 12 i nches cl ear bet ween t he out er st r uct ur e sur f aces and t he f ace of t he excavat i on or suppor t member s.
Cl ean r ock or l oose debr i s and cut t o a f i r m sur f ace ei t her l evel , st epped, or ser r at ed, as shown or as di r ect ed. Remove l oose di s i nt egr at ed r ock and t hi n st r at a. Speci f y r emoval of unst abl e mat er i al .
SECTI ON 31 00 00 Page 9
3. 2. 6 Under gr ound Ut i l i t i es
The Cont r act or i s r esponsi bl e f or movement of const r uct i on machi ner y and equi pment over pi pes and ut i l i t i es dur i ng const r uct i on. Per f or m wor k adj acent t o non- Gover nment ut i l i t i es as i ndi cat ed i n accor dance wi t h pr ocedur es out l i ned by ut i l i t y company. Excavat i on made wi t h power - dr i ven equi pment i s not per mi t t ed wi t hi n 10 f eet of known Gover nment - owned ut i l i t y or subsur f ace const r uct i on. For wor k i mmedi at el y adj acent t o or f or excavat i ons exposi ng a ut i l i t y or ot her bur i ed obst r uct i on, excavat e by hand. St ar t hand excavat i on on each si de of t he i ndi cat ed obst r uct i on and cont i nue unt i l t he obst r uct i on i s uncover ed or unt i l c l ear ance f or t he new gr ade i s assur ed. Suppor t uncover ed l i nes or ot her exi st i ng wor k af f ect ed by t he cont r act excavat i on unt i l appr oval f or backf i l l i s gr ant ed by t he Cont r act i ng Of f i cer . Repor t damage t o ut i l i t y l i nes or subsur f ace const r uct i on i mmedi at el y t o t he Cont r act i ng Of f i cer .
3. 3 OPENI NG AND DRAI NAGE OF EXCAVATI ON
Not i f y t he Cont r act i ng Of f i cer suf f i c i ent l y i n advance of t he openi ng of any excavat i on t o per mi t el evat i ons and measur ement s of t he undi st ur bed gr ound sur f ace t o be t aken. Except as ot her wi se per mi t t ed, excavat e bor r ow pi t s and ot her excavat i on ar eas pr ovi di ng adequat e dr ai nage.
Tr anspor t over bur den and ot her spoi l mat er i al t o desi gnat ed spoi l ar eas or ot her wi se di spose of as di r ect ed. Pr ovi de neat l y t r i mmed and dr ai ned bor r ow pi t s af t er t he excavat i on i s compl et ed. Ensur e t hat excavat i on of any ar ea, oper at i on of bor r ow pi t s, or dumpi ng of spoi l mat er i al r esul t s i n mi ni mum det r i ment al ef f ect s on nat ur al envi r onment al condi t i ons.
3. 4 GRADI NG AREAS
Wher e i ndi cat ed, di v i de wor k i nt o gr adi ng ar eas wi t hi n whi ch sat i sf act or y excavat ed mat er i al wi l l be pl aced i n embankment s, f i l l s , and r equi r ed backf i l l s . Do not haul sat i sf act or y mat er i al excavat ed i n one gr adi ng ar ea t o anot her gr adi ng ar ea except when so di r ect ed i n wr i t i ng. Pl ace and gr ade st ockpi l es of sat i sf act or y mat er i al s as speci f i ed. St ockpi l es of unsat i sf act or y and wast e mat er i al s shal l not be al l owed t o accumul at e and shal l be per i odi cal l y t r anspor t ed of f s i t e t o appr oved f aci l i t i es. Keep st ockpi l es i n a neat and wel l dr ai ned condi t i on, gi v i ng due consi der at i on t o dr ai nage at al l t i mes. Cl ear , gr ub, and seal by r ubber - t i r ed equi pment , t he gr ound sur f ace at st ockpi l e l ocat i ons; separ at el y st ockpi l e excavat ed sat i sf act or y and unsat i sf act or y mat er i al s. Pr ot ect st ockpi l es of sat i sf act or y mat er i al s f r om cont ami nat i on whi ch may dest r oy t he qual i t y and f i t ness of t he st ockpi l ed mat er i al . I f t he Cont r act or f ai l s t o pr ot ect t he st ockpi l es, and any mat er i al becomes unsat i sf act or y, r emove and r epl ace such mat er i al wi t h sat i sf act or y mat er i al f r om appr oved sour ces.
3. 5 GROUND SURFACE PREPARATI ON
3. 5. 1 Gener al Requi r ement s
Remove and r epl ace unsat i sf act or y mat er i al wi t h sat i sf act or y mat er i al s, as di r ect ed by t he Cont r act i ng Of f i cer , i n sur f aces t o r ecei ve f i l l or i n excavat ed ar eas. Scar i f y t he sur f ace t o a dept h of 6 i nches bef or e t he f i l l i s st ar t ed. Pl ow, st ep, bench, or br eak up sl oped sur f aces st eeper t han 1 ver t i cal t o 4 hor i zont al so t hat t he f i l l mat er i al wi l l bond wi t h t he exi st i ng mat er i al . When subgr ades ar e l ess t han t he speci f i ed densi t y, br eak up t he gr ound sur f ace t o a mi ni mum dept h of 6 i nches, pul ver i z i ng, and compact i ng t o t he speci f i ed densi t y. When t he subgr ade i s par t f i l l and par t excavat i on or nat ur al gr ound, scar i f y t he excavat ed
SECTI ON 31 00 00 Page 10 or nat ur al gr ound por t i on t o a dept h of 12 i nches and compact i t as speci f i ed f or t he adj acent f i l l .
3. 5. 2 Fr ozen Mat er i al
Do not pl ace mat er i al on sur f aces t hat ar e muddy, f r ozen, or cont ai n f r ost . Fi ni sh compact i on by sheepsf oot r ol l er s, pneumat i c- t i r ed r ol l er s, st eel - wheel ed r ol l er s, or ot her appr oved equi pment wel l sui t ed t o t he soi l bei ng compact ed. Moi st en mat er i al as necessar y t o pr ovi de t he moi st ur e cont ent t hat wi l l r eadi l y f aci l i t at e obt ai ni ng t he speci f i ed compact i on wi t h t he equi pment used.
3. 6 UTI LI ZATI ON OF EXCAVATED MATERI ALS
Al l excavat ed sat i sf act or y mat er i al shal l be pl aced on si t e i n t he pr oposed f i l l pl acement ar eas. Submi t pr ocedur e and l ocat i on f or di sposal of unused sat i sf act or y excavat i on mat er i al .
3. 7 BURI ED TAPE AND DETECTI ON WI RE
3. 7. 1 Bur i ed War ni ng and I dent i f i cat i on Tape
Pr ovi de bur i ed ut i l i t y l i nes wi t h ut i l i t y i dent i f i cat i on t ape. Bur y t ape 12 i nches bel ow f i ni shed gr ade; under pavement s and sl abs, bur y t ape 6 i nches bel ow t op of subgr ade.
3. 7. 2 Bur i ed Det ect i on Wi r e
Bur y det ect i on wi r e di r ect l y above non- met al l i c pi pi ng at a di st ance not t o exceed 12 i nches above t he t op of pi pe. Ext end t he wi r e cont i nuousl y and unbr oken, f r om manhol e t o manhol e. Ter mi nat e t he ends of t he wi r e i nsi de t he manhol es at each end of t he pi pe, wi t h a mi ni mum of 3 f eet of wi r e, coi l ed, r emai ni ng accessi bl e i n each manhol e. Fur ni sh i nsul at ed wi r e over i t s ent i r e l engt h. I nst al l wi r es at manhol es bet ween t he t op of t he cor bel and t he f r ame, and ext end up t hr ough t he chi mney seal bet ween t he f r ame and t he chi mney seal . For f or ce mai ns, t er mi nat e t he wi r e i n t he val ve pi t at t he pump st at i on end of t he pi pe.
3. 8 FI LLI NG, BACKFI LLI NG AND COMPACTI ON
Pl ace f i l l and backf i l l beneat h and adj acent t o any and al l t ype of st r uct ur es, i n successi ve hor i zont al l ayer s of l oose mat er i al not mor e t han 8 i nches i n dept h, or i n l oose l ayer s not mor e t han 5 i nches i n dept h when usi ng hand- oper at ed compact i on equi pment . Compact t o at l east 90 per cent of l abor at or y maxi mum densi t y f or cohesi ve mat er i al s or 95 per cent of l abor at or y maxi mum densi t y f or cohesi onl ess mat er i al s, except as ot her wi se speci f i ed. Per f or m compact i on i n such a manner as t o pr event wedgi ng act i on or eccent r i c l oadi ng upon or agai nst t he st r uct ur e.
Moi st ur e condi t i on f i l l and backf i l l mat er i al t o a moi st ur e cont ent t hat wi l l r eadi l y f aci l i t at e obt ai ni ng t he speci f i ed compact i on.
Pr epar e gr ound sur f ace on whi ch backf i l l i s t o be pl aced and pr ovi de compact i on r equi r ement s f or backf i l l mat er i al s i n conf or mance wi t h t he appl i cabl e por t i ons of par agr aphs GROUND SURFACE PREPARATI ON. Fi ni sh compact i on by sheepsf oot r ol l er s, pneumat i c- t i r ed r ol l er s, st eel - wheel ed r ol l er s, v i br at or y compact or s, or ot her appr oved equi pment .
SECTI ON 31 00 00 Page 11
3. 8. 1 Tr ench Backf i l l
Backf i l l t r enches t o t he gr ade shown and r ef er ence det ai l 01 on CG- 501 f or t r ench speci f i c det ai l s. .
3. 8. 1. 1 Beddi ng and I ni t i al Backf i l l
Pr ovi de beddi ng of t he t ype and t hi ckness shown. Pl ace i ni t i al backf i l l mat er i al and compact i t wi t h appr oved t amper s t o a hei ght of at l east one f oot above t he ut i l i t y pi pe or condui t . Br i ng up t he backf i l l evenl y on bot h s i des of t he pi pe f or t he f ul l l engt h of t he pi pe. Take car e t o ensur e t hor ough compact i on of t he f i l l under t he haunches of t he pi pe.
Except as speci f i ed ot her wi se i n t he i ndi v i dual pi pi ng sect i on, pr ovi de beddi ng f or bur i ed pi pi ng i n accor dance wi t h AWWA C600, Type 4, except as speci f i ed her ei n. Compact backf i l l t o t op of pi pe t o 95 per cent of ASTM D698 maxi mum densi t y. Pr ovi de pl ast i c pi pi ng wi t h beddi ng t o spr i ng l i ne of pi pe. Pr ovi de mat er i al s as f ol l ows:
3. 8. 1. 1. 1 Cl ass I
Angul ar , 0. 25 t o 1. 5 i nch, gr aded st one, i ncl udi ng a number of f i l l mat er i al s t hat have r egi onal s i gni f i cance such as cor al , s l ag, c i nder s, cr ushed st one, and cr ushed shel l s.
3. 8. 1. 1. 2 Cl ass I I
Coar se sands and gr avel s wi t h maxi mum par t i c l e s i ze of 1. 5 i nch, i ncl udi ng var i ous gr aded sands and gr avel s cont ai ni ng smal l per cent ages of f i nes, gener al l y gr anul ar and noncohesi ve, ei t her wet or dr y. Soi l Types GW, GP, SW, and SP ar e i ncl uded i n t hi s c l ass as speci f i ed i n ASTM D2487.
3. 8. 1. 2 Fi nal Backf i l l
Fi l l t he r emai nder of t he t r ench, except f or speci al mat er i al s f or r oadways, r ai l r oads and ai r f i el ds, wi t h sat i sf act or y mat er i al . Pl ace backf i l l mat er i al and compact as f ol l ows:
3. 8. 1. 2. 1 Si dewal ks, Tur f ed or Seeded Ar eas and Mi scel l aneous Ar eas
Deposi t backf i l l i n l ayer s of a maxi mum of 12 i nches l oose t hi ckness, and compact i t t o 85 per cent maxi mum densi t y f or cohesi ve soi l s and 90 per cent maxi mum densi t y f or cohesi onl ess soi l s. Do not per mi t compact i on by wat er f l oodi ng or j et t i ng. Appl y t hi s r equi r ement t o al l ot her ar eas not speci f i cal l y desi gnat ed above.
3. 9 SPECI AL REQUI REMENTS
Speci al r equi r ement s f or bot h excavat i on and backf i l l r el at i ng t o t he speci f i c ut i l i t i es ar e as f ol l ows:
3. 9. 1 Beddi ng Pl acement
Spr ead f i l t er f abr i c beddi ng mat er i al uni f or ml y t o a t hi ckness of at l east 3 i nches on pr epar ed subgr ade as i ndi cat ed. Compact i on of beddi ng i s not r equi r ed. Fi ni sh beddi ng t o pr esent even sur f ace f r ee f r om mounds and wi ndr ows.
SECTI ON 31 00 00 Page 12
3. 10 EMBANKMENTS
3. 10. 1 Ear t h Embankment s
Const r uct ear t h f i l l s f r om sat i sf act or y mat er i al s f r ee of f r ozen mat er i al and r ocks wi t h any di mensi on gr eat er t han 3 i nches. Pl ace t he mat er i al i n successi ve hor i zont al l ayer s of l oose mat er i al not mor e t han 12 i nches i n dept h. Spr ead each l ayer uni f or ml y on a soi l sur f ace t hat has been moi st ened or aer at ed as necessar y, and scar i f i ed or ot her wi se br oken up so t hat t he f i l l wi l l bond wi t h t he sur f ace on whi ch i t i s pl aced. Af t er spr eadi ng, pl ow, di sk, or ot her wi se br eak up each l ayer ; moi st en or aer at e as necessar y; t hor oughl y mi x; and compact t o at l east 80 per cent l abor at or y maxi mum densi t y f or cohesi ve mat er i al s or 80 per cent l abor at or y maxi mum densi t y f or cohesi onl ess mat er i al s. Backf i l l and f i l l mat er i al must be t o a moi st ur e cont ent t hat wi l l r eadi l y f aci l i t at e obt ai ni ng t he speci f i ed compact i on.
Compact i on r equi r ement s f or t he upper por t i on of ear t h embankment s f or mi ng subgr ade f or pavement s ar e i dent i cal wi t h t hose r equi r ement s speci f i ed i n par agr aph SUBGRADE PREPARATI ON. Fi ni sh compact i on by sheepsf oot r ol l er s, pneumat i c- t i r ed r ol l er s, st eel - wheel ed r ol l er s, v i br at or y compact or s, or ot her appr oved equi pment .
3. 11 SUBGRADE PREPARATI ON
3. 11. 1 Const r uct i on
Shape subgr ade t o l i ne, gr ade, and cr oss sect i on, and compact as speci f i ed. I ncl ude pl owi ng, di ski ng, and any moi st eni ng or aer at i ng r equi r ed t o obt ai n speci f i ed compact i on f or t hi s oper at i on. Remove sof t or ot her wi se unsat i sf act or y mat er i al and r epl ace wi t h sat i sf act or y excavat ed mat er i al or ot her appr oved mat er i al as di r ect ed. Excavat e r ock encount er ed i n t he cut sect i on t o a dept h of 6 i nches bel ow f i ni shed gr ade f or t he subgr ade. Br i ng up l ow ar eas r esul t i ng f r om r emoval of unsat i sf act or y mat er i al or excavat i on of r ock t o r equi r ed gr ade wi t h sat i sf act or y mat er i al s, and shape t he ent i r e subgr ade t o l i ne, gr ade, and cr oss sect i on and compact as speci f i ed. Do not var y t he el evat i on of t he f i ni sh subgr ade mor e t han 0. 05 f oot f r om t he est abl i shed gr ade and cr oss sect i on.
3. 11. 2 Compact i on
Fi ni sh compact i on by sheepsf oot r ol l er s, pneumat i c- t i r ed r ol l er s, st eel - wheel ed r ol l er s, v i br at or y compact or s, or ot her appr oved equi pment as necessar y t o achi eve t he r equi r ed compact i on per cent f or t he ar ea.
3. 12 FI NI SHI NG
Fi ni sh t he sur f ace of excavat i ons, embankment s, and subgr ades t o a smoot h and compact sur f ace i n accor dance wi t h t he l i nes, gr ades, and cr oss sect i ons or el evat i ons shown. Pr ovi de t he degr ee of f i ni sh f or gr aded ar eas wi t hi n 0. 1 f oot of t he gr ades and el evat i ons i ndi cat ed except t hat t he degr ee of f i ni sh f or subgr ades speci f i ed i n par agr aph SUBGRADE PREPARATI ON. Fi ni sh swal es and conveyance f eat ur es i n a manner t hat wi l l r esul t i n ef f ect i ve dr ai nage. Fi ni sh t he sur f ace of ar eas t o be veget at ed t o a smoot hness sui t abl e f or t he appl i cat i on of seed and veget at i on mat er i al s. Repai r gr aded, t opsoi l ed, or backf i l l ed ar eas pr i or t o accept ance of t he wor k, and r e- est abl i shed gr ades t o t he r equi r ed el evat i ons and sl opes.
SECTI ON 31 00 00 Page 13
3. 12. 1 Subgr ade and Embankment s
Dur i ng const r uct i on, keep f i l l s and excavat i ons shaped and dr ai ned.
Mai nt ai n di t ches and dr ai ns al ong subgr ade t o dr ai n ef f ect i vel y at al l t i mes. D Pr ot ect and mai nt ai n t he f i ni shed subgr ade i n a sat i sf act or y condi t i on unt i l veget at i on and st abi l i zat i on i s pl aced. Do not per mi t t he st or age or st ockpi l i ng of mat er i al s on t he f i ni shed subgr ade. Do not l ay subbase, base cour se, bal l ast , or pavement unt i l t he subgr ade has been checked and appr oved, and i n no case pl ace subbase, base, sur f aci ng, pavement , or bal l ast on a muddy, spongy, or f r ozen subgr ade.
3. 13 TESTI NG
Per f or m t est i ng by a Cor ps val i dat ed commer ci al t est i ng l abor at or y or t he Cont r act or ' s val i dat ed t est i ng f aci l i t y . Submi t qual i f i cat i ons of t he Cor ps val i dat ed commer ci al t est i ng l abor at or y or t he Cont r act or ' s val i dat ed t est i ng f aci l i t i es. I f t he Cont r act or el ect s t o est abl i sh t est i ng f aci l i t i es, do not per mi t wor k r equi r i ng t est i ng unt i l t he Cont r act or ' s f aci l i t i es have been i nspect ed, Cor ps val i dat ed and appr oved by t he Cont r act i ng Of f i cer .
a. Det er mi ne f i el d i n- pl ace densi t y i n accor dance wi t h ASTM D6938.
b. Check t he cal i br at i on cur ves f ur ni shed wi t h t he moi st ur e gauges al ong wi t h densi t y cal i br at i on checks as descr i bed i n ASTM D6938; check t he cal i br at i on of bot h t he densi t y and moi st ur e gauges at t he begi nni ng of a j ob on each di f f er ent t ype of mat er i al encount er ed and at i nt er val s as di r ect ed by t he Cont r act i ng Of f i cer . When t est r esul t s i ndi cat e, as det er mi ned by t he Cont r act i ng Of f i cer , t hat compact i on i s not as speci f i ed, r emove t he mat er i al , r epl ace and r ecompact t o meet speci f i cat i on r equi r ement s.
c. Per f or m t est s on r ecompact ed ar eas t o det er mi ne conf or mance wi t h speci f i cat i on r equi r ement s. Appoi nt a r egi st er ed pr of essi onal c i v i l engi neer t o cer t i f y i nspect i ons and t est r esul t s. These cer t i f i cat i ons shal l st at e t hat t he t est s and obser vat i ons wer e per f or med by or under t he di r ect super vi s i on of t he engi neer and t hat t he r esul t s ar e r epr esent at i ve of t he mat er i al s or condi t i ons bei ng cer t i f i ed by t he t est s. The f ol l owi ng number of t est s, i f per f or med at t he appr opr i at e t i me, wi l l be t he mi ni mum accept abl e f or each t ype oper at i on.
3. 13. 1 Moi st ur e Cont ent s
I n t he st ockpi l e, excavat i on, or bor r ow ar eas, per f or m a mi ni mum of t wo t est s per day per t ype of mat er i al or sour ce of mat er i al bei ng pl aced dur i ng st abl e weat her condi t i ons. Dur i ng unst abl e weat her , per f or m t est s as di ct at ed by l ocal condi t i ons and appr oved by t he Cont r act i ng Of f i cer .
3. 13. 2 Opt i mum Moi st ur e and Labor at or y Maxi mum Densi t y
Per f or m t est s f or each t ype mat er i al or sour ce of mat er i al i ncl udi ng bor r ow mat er i al t o det er mi ne t he opt i mum moi st ur e and l abor at or y maxi mum densi t y val ues. One r epr esent at i ve t est per 1000 cubi c yar ds of f i l l and backf i l l , or when any change i n mat er i al occur s whi ch may af f ect t he opt i mum moi st ur e cont ent or l abor at or y maxi mum densi t y.
SECTI ON 31 00 00 Page 14
3. 13. 3 Tol er ance Test s f or Subgr ades
Per f or m cont i nuous checks on t he degr ee of f i ni sh speci f i ed i n par agr aph SUBGRADE PREPARATI ON dur i ng const r uct i on of t he subgr ades.
3. 14 DI SPOSI TI ON OF SURPLUS MATERI AL
Sur pl us mat er i al and excavat ed unsat i sf act or y mat er i al not r equi r ed or sui t abl e f or f i l l i ng or backf i l l i ng, and br ush, r ef use, st umps, r oot s, t i mber , concr et e, masonr y, met al s, t i r es, and t r ash shal l be r emoved f r om Gover nment pr oper t y and pr oper l y di sposed of i n accor dance wi t h al l appl i cabl e l aws and r egul at i ons.
- - End of Sect i on - -
SECTI ON 31 00 00 Page 15
File details come from the government source that posted it. Updated .