This document is a technical specification section for steel H-piles to be used in the construction of the Port Monmouth Hurricane and Storm Damage Reduction Project, Contract 4B in Middletown Township, New Jersey.
The key details are:
- The specification covers the requirements for steel H-piles, including materials, fabrication, delivery, storage, handling, and installation. It also outlines requirements for pile driving equipment, pile driving records, pile placement tolerances, and pile testing procedures.
- The overall federal contract opportunity involves the construction of 1,521 LF of floodwall, 1,040 LF of levee, 119,300 LF of steel H-piles, and 11 static load tests on primary and secondary test piles. The contract will be awarded via Invitation for Bids (IFB) and is expected to be issued around May 10, 2024 with bids due 30 days later. The project is a Small Business Set-Aside with a NAICS code of 237990.
View the file
Other files
Show 40 more
Latest 50 of 82 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Por t Monmout h Phase I I Cont r act 4B NJ PORTMONPI I CT4B Amendment 0006
SECTI ON 31 62 16. 16
STEEL H- PI LES
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN WELDI NG SOCI ETY ( AWS)
AWS D1. 1/ D1. 1M ( 2020) St r uct ur al Wel di ng Code - St eel
ASTM I NTERNATI ONAL ( ASTM)
ASTM A572/ A572M ( 2018) St andar d Speci f i cat i on f or Hi gh- St r engt h Low- Al l oy Col umbi um- Vanadi um St r uct ur al St eel
ASTM D1143/ D1143M ( 2007; R 2013) Pi l es Under St at i c Axi al Compr essi ve Load
ASTM D3689 ( 2007; E 2013; R 2013) St andar d Test Met hods f or Deep Foundat i ons Under St at i c Axi al Tensi l e Load
ASTM D3966/ D3966M ( 2007) St andar d Test Met hods f or Deep Foundat i ons Under Lat er al Load
ASTM D4945 ( 2017) St andar d Test Met hod f or Hi gh- St r ai n Dynami c Test i ng of Deep Foundat i ons
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Pi l e spl i ces; G, DO
Submi t det ai l dr awi ngs of pi l e spl i ces pr i or t o f abr i cat i on.
Pi l e pl acement ; G, DO
Submi t pi l e pl acement pl an at l east 30 days pr i or t o del i ver y of pi l es t o t he j ob s i t e.
SD- 03 Pr oduct Dat a
SECTI ON 31 62 16. 16 Page 1
Pi l e dr i v i ng equi pment ; G, DO
Submi t descr i pt i ons of pi l e dr i v i ng equi pment at l east 30 days pr i or t o commencement of wor k.
Pi l e dr i v i ng r ecor ds; G, DO
Submi t t he pr oposed f or m f or compi l i ng pi l e dr i v i ng r ecor ds 30 days pr i or t o commencement of wor k.
Del i ver y, st or age, and handl i ng; G, RO
Submi t del i ver y, st or age, and handl i ng pl ans f or pi l es at l east 30 days pr i or t o del i ver y of pi l es t o t he j ob s i t e.
Pi l e t est s; G, DO
Submi t pi l e l oad t est pl an at l east 30 days pr i or t o i nst al l i ng any t est pi l es. Appr oval of t he pl an shal l not r el i eve t he Cont r act or of t he r esponsi bi l i t y f or st r uct ur al and oper at i onal adequaci es of t he t est i ng syst em.
SD- 04 Sampl es
Test pi l es; G, DO
SD- 05 Desi gn Dat a
Wave equat i on anal ysi s; G, DO
Submi t wave equat i on anal ysi s.
SD- 06 Test Repor t s
Pi l e dr i v i ng t est s; G, DO
Submi t pi l e dr i v i ng t est dat a wi t hi n one ( 1) week af t er each t est i s compl et ed.
Pi l e dr i v i ng anal yzer ; G, DO
Submi t pi l e dr i v i ng anal yzer dat a wi t hi n one ( 1) week af t er each t est i s compl et ed.
Pi l e l oad t est s; G, DO
Submi t f our copi es of t he l oad t est r epor t f or each pi l e t est ed wi t hi n one ( 1) week af t er t he l oad t est i s compl et ed.
Dynami c t est i ng of pi l es; G, DO
Submi t r epor t s of t he dynami c t est i ng of pi l es wi t hi n one ( 1) week af t er dynami c t est i ng i s compl et ed.
SD- 11 Cl oseout Submi t t al s
Pi l e dr i v i ng r ecor ds
Submi t t o t he Cont r act i ng Of f i cer compl et e and accur at e t est and
SECTI ON 31 62 16. 16 Page 2 j ob pi l e dr i v i ng r ecor ds as speci f i ed i n par agr aph ent i t l ed " Recor ds" of t hi s sect i on, wi t hi n 15 cal endar days af t er compl et i on of dr i v i ng.
1. 3 DELI VERY, STORAGE, AND HANDLI NG
Conf or m al l del i ver y, st or age, and handl i ng of mat er i al s t o t he r equi r ement s speci f i ed her ei n. Devel op and submi t pl ans f or t he del i ver y, st or age, and handl i ng of pi l es.
1. 3. 1 Del i ver y and St or age
St ack pi l es dur i ng del i ver y and st or age so t hat each pi l e i s mai nt ai ned i n a st r ai ght posi t i on and i s suppor t ed ever y 10 f eet or l ess al ong i t s l engt h ( ends i ncl usi ve) t o pr event exceedi ng t he maxi mum camber or sweep.
Do not st ack pi l es mor e t han 5 f eet hi gh.
1. 3. 2 Handl i ng
Li f t pi l es usi ng a cr adl e or mul t i pl e poi nt s pi ck- up t o ensur e t hat t he maxi mum per mi ssi bl e camber or sweep i s not exceeded due t o i nsuf f i c i ent suppor t , except t hat a one- poi nt pi ck- up may be used f or l i f t i ng pi l es t hat ar e not ext r emel y l ong i nt o t he dr i v i ng l eads. Poi nt pi ck- up devi ces must be of t he t ype t hat c l amp t o bot h pi l e f l anges at each pi ck- up poi nt . Hol es may be bur ned i n t he f l anges or webs of pi l es above t he cut of f l engt h f or l i f t i ng pi l es i nt o t he l eads. Do not dr ag pi l es acr oss t he gr ound.
I nspect pi l es f or excessi ve camber and sweep and f or damage bef or e t r anspor t i ng t hem f r om t he st or age ar ea t o t he dr i v i ng ar ea and i mmedi at el y pr i or t o pl acement i n t he dr i v i ng l eads. Camber , cur vat ur e i n t he pi l e i n t he di r ect i on nor mal t o t he pi l e f l anges, must be measur ed wi t h t he pi l e f l ange base l ayi ng on a f l at sur f ace and i s t he di st ance bet ween t he f l ange base at t he mi d- l engt h of t he pi l e and t he f l at sur f ace. Sweep, cur vat ur e i n t he pi l e i n t he di r ect i on par al l el t o t he pi l e f l anges, must be measur ed wi t h t he pi l e f l ange t i ps l ayi ng on a f l at sur f ace and i s t he di st ance bet ween t he f l ange t i ps at t he mi d- l engt h of t he pi l e and t he f l at sur f ace. The maxi mum per mi ssi bl e camber or sweep i s 2 i nchesover t he l engt h of t he pi l e. Pi l es havi ng excessi ve camber or sweep wi l l be r ej ect ed.
PART 2 PRODUCTS
2. 1 MATERI ALS
2. 1. 1 H- Pi l es
ASTM A572/ A572M, Gr ade 50. Pr ovi de t est pi l es i dent i cal t o t hose used el sewher e i n t he pr oj ect . Pr ovi de H- pi l es of t he shape and sect i ons shown. Det er mi ne l engt hs of pi l es as speci f i ed i n par agr aph " I nst al l at i on, " subpar agr aph " Lengt hs of Job Pi l es" .
2. 1. 2 Pi l e Spl i ces
ASTM A572/ A572M, Gr ade 50 f or spl i ce pl at es.
2. 1. 3 Pi l e Poi nt s
Pi l e poi nt s may not be needed f or t he pr oj ect .
SECTI ON 31 62 16. 16 Page 3
2. 1. 4 Pi l e Caps ( Dr i ve Cap I nser t s)
ASTM A572/ A572M, Gr ade 50. Pi l e caps must conf or m t o det ai l s shown.
2. 1. 5 Pi l e Tensi on Anchor s
Pi l e t ensi on anchor s may not be needed f or t he pr oj ect .
2. 1. 6 FABRI CATI ON
Fabr i cat i on must conf or m t o t he r equi r ement s shown and as speci f i ed her ei n and i n Sect i on 05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS.
2. 1. 6. 1 Pi l e Spl i ces
Fabr i cat e pi l e spl i ces as shown. Submi t det ai l dr awi ngs of spl i ces i n accor dance wi t h par agr aph " Submi t t al s. "
2. 1. 6. 2 Pi l e Caps ( Dr i ve Cap I nser t s)
At t ach pi l e caps ( dr i ve cap i nser t s) as shown. Gr ound t he t op of pi l es suf f i c i ent l y smoot h t o pr ovi de a good cont act sur f ace f or st r uct ur al - shape pi l e caps.
2. 1. 7 CORROSI ON PROTECTI ON
A coal t ar epoxy pai nt syst em or equi val ent must be appl i ed f or at l east t op 10 f eet of t he H- pi l es unl ess speci f i ed ot her wi se. The mi ni mum coat i ng t hi ckness i s 16- mi l . See speci f i cat i on 09 97 02 f or i nf or mat i on r egar di ng coal t ar epoxy pai nt i ng syst ems.
PART 3 EXECUTI ON
3. 1 PI LE DRI VI NG EQUI PMENT
Sel ect t he pr oposed pi l e dr i v i ng equi pment , i ncl udi ng hammer s and ot her r equi r ed i t ems, and submi t compl et e descr i pt i ons of t he pr oposed equi pment i n accor dance wi t h par agr aph " Submi t t al s. " Fi nal appr oval of t he pr oposed equi pment i s subj ect t o t he sat i sf act or y compl et i on and appr oval of pi l e t est s. Changes i n t he sel ect ed pi l e dr i v i ng equi pment wi l l not be al l owed af t er t he equi pment has been appr oved except as di r ect ed. No addi t i onal cont r act t i me wi l l be al l owed f or Cont r act or pr oposed changes i n t he equi pment .
3. 1. 1 Pi l e Dr i v i ng Hammer s
Pr ovi de i mpact t ype pi l e dr i v i ng hammer s.
3. 1. 1. 1 I mpact Hammer s
Pr ovi de st eam, ai r , hydr aul i c, or di esel - power ed i mpact pi l e hammer s of t he s i ngl e- act i ng, doubl e- act i ng, or di f f er ent i al - act i ng t ype. The si ze or capaci t y of hammer s must be as r ecommended by t he hammer manuf act ur er f or t he t ot al pi l e wei ght and t he char act er of t he soi l f or mat i on t o be penet r at ed. The r at ed dr i v i ng ener gy of hammer s i s l i mi t ed t o a mi ni mum of 15, 000 f oot - pounds. Hammer s must be capabl e of , and so demonst r at ed dur i ng t he devel opment of r ef usal cr i t er i a, har d dr i v i ng i n excess of 20 bl ows per i nch. Pr ovi de boi l er , compr essor , or engi ne capaci t y suf f i c i ent
SECTI ON 31 62 16. 16 Page 4 t o oper at e hammer s cont i nuousl y at t he f ul l r at ed speed. Hammer s must have a gage t o moni t or hammer bounce chamber pr essur e f or di esel hammer s or pr essur e at t he hammer f or ai r and st eam hammer s. Thi s gage must be oper at i onal dur i ng t he dr i v i ng of pi l es and be mount ed i n an accessi bl e l ocat i on f or moni t or i ng by t he Cont r act or and t he Cont r act i ng Of f i cer .
Pr ovi de t wo spar e oper at i onal bounce chamber r ead out uni t s on si t e.
Pr ovi de bounce chamber pr essur e gage cor r ect i on t abl es and char t s f or t he t ype and l engt h of hose t o be used wi t h t he pr essur e gage t o t he Cont r act i ng Of f i cer . Obt ai n dr i v i ng ener gy by use of a heavy r am and a shor t st r oke wi t h l ow i mpact vel oci t y, r at her t han a l i ght r am and a l ong st r oke wi t h hi gh i mpact vel oci t y. Posi t i on a pi l e cap or dr i ve cap bet ween t he pi l e and hammer . Pl ace hammer cushi on or cap bl ock bet ween r am and t he pi l e cap or dr i ve cap. Hammer cushi on or cap bl ock must have consi st ent el ast i c pr oper t i es, mi ni mi ze ener gy absor pt i on, and t r ansmi t hammer ener gy uni f or ml y and consi st ent l y dur i ng t he ent i r e dr i v i ng per i od. I n accor dance wi t h par agr aph " Submi t t al s, " submi t t he f ol l owi ng i nf or mat i on f or each i mpact hammer pr oposed:
a. Make and model .
b. Ram wei ght ( pounds) .
c. Anvi l wei ght ( pounds) .
d. Rat ed st r oke ( i nches) .
e. Rat ed ener gy r ange ( f oot - pounds) .
f . Rat ed speed ( bl ows per mi nut e) .
g. St eam or ai r pr essur e, hammer , and boi l er or compr essor ( psi ) .
h. Rat ed bounce chamber pr essur e cur ves or char t s, i ncl udi ng pr essur e cor r ect i on char t f or t ype and l engt h of hose used wi t h pr essur e gage ( pounds per squar e i nch) .
i . Pi l e dr i v i ng cap, make, and wei ght ( pounds) .
j . Cushi on bl ock di mensi ons and mat er i al t ype.
k. Power pack descr i pt i on.
3. 1. 1. 2 Vi br at or y Hammer s
The use of v i br at or y hammer s i s dependent upon sat i sf act or y dr i v i ng and l oad t est i ng of pi l es. Fi nal appr oval of t he pr oposed hammer and ot her dr i v i ng equi pment i s subj ect t o t he sat i sf act or y compl et i on and appr oval of t he pi l e t est s. The si ze or capaci t y of hammer s must be as r ecommended by t he hammer manuf act ur er f or t he t ot al pi l e wei ght and t he char act er of t he soi l f or mat i on t o be penet r at ed. The hammer must pr ovi de f or mai nt ai ni ng a r i gi d connect i on bet ween t he hammer and t he pi l e. I n accor dance wi t h par agr aph " Submi t t al s, " submi t t he f ol l owi ng i nf or mat i on f or each vi br at or y hammer pr oposed:
a. Make and model .
b. Eccent r i c moment ( i nch- pounds) .
c. Dynami c f or ce ( t ons) .
SECTI ON 31 62 16. 16 Page 5
d. St eady st at e f r equency or f r equency r ange ( cycl es per mi nut e) .
e. Vi br at i ng wei ght ( pounds) .
f . Ampl i t ude ( i nches) .
g. Maxi mum pul l capaci t y ( t ons) .
h. Non- vi br at i ng wei ght ( pounds) .
i . Power pack descr i pt i on.
3. 1. 2 Pi l e Dr i v i ng Leads
Suppor t and gui de hammer s wi t h suspended l eads, f i xed ext ended l eads or f i xed under hung l eads. For dr i v i ng bat t er ed pi l es, suppor t and gui de i mpact hammer s wi t h t hr ee- axi s, f i xed- ext ended l eads capabl e of 1 H and 2- 1/ 2 V f or e and af t bat t er and 1 H on 6 V si de bat t er , wi t h 30 degr ee r ot at i on each si de of an axi s r unni ng al ong t he cent er l i ne of r ot at i on of t he cr ane t hr ough t he cent er l i ne of t he l eads. For dr i v i ng bat t er ed pi l es, suppor t and gui de vi br at or y hammer s wi t h f i xed ext ended l eads or t empl at es. Pr ovi de t wo i nt er medi at e suppor t s f or t he pi l e i n t he l eads t o r educe t he unbr aced l engt h of t he pi l e dur i ng dr i v i ng and pul l i ng.
3. 1. 3 Pi l e Ext r act or s
Pi l e ext r act or s may be vi br at or y or i mpact pi l e dr i v i ng hammer s. I mpact hammer s ar e r equi r ed f or pul l i ng pi l es not ext r act abl e wi t h v i br at or y hammer s.
3. 2 I NSTALLATI ON
I nspect pi l es when del i ver ed and when i n t he l eads i mmedi at el y bef or e dr i v i ng. Cut pi l es at cut of f gr ade by an appr oved met hod. Wher e cut of f i s bel ow exi st i ng gr ound or mudl i ne el evat i on, compl et e excavat i on, sheet i ng, and dewat er i ng bef or e dr i v i ng pi l e t o cut of f el evat i on.
3. 2. 1 Lengt hs of Job Pi l es
The est i mat ed quant i t i es of pi l es ar e gi ven f or bi ddi ng pur poses onl y.
The Cont r act i ng Of f i cer wi l l det er mi ne t he act ual l engt hs of pi l es r equi r ed t o be dr i ven bel ow cut of f el evat i on f or t he var i ous l ocat i ons i n t he wor k and wi l l f ur ni sh t he Cont r act or a quant i t i es l i s t i ndi cat i ng l engt hs and l ocat i ons of al l pi l es t o be i nst al l ed. These act ual l engt hs wi l l be det er mi ned f r om t he r esul t s of t he pi l e t est s speci f i ed i n par agr aph " Pi l e Test s. " Wher e r equi r ed bear i ng capaci t i es ar e at t ai nabl e wi t h pi l es of l esser l engt h t han t hose speci f i ed, shor t er pi l es may be used subj ect t o pr i or wr i t t en appr oval . . The Cont r act or ' s equi pment must be abl e t o dr i ve pi l es wi t h l engt hs r angi ng f r om 50 f eet t o 100 f eet .
3. 2. 2 Pi l e Dr i v i ng Recor ds
Devel op a f or m f or compi l i ng pi l e dr i v i ng r ecor ds, whi ch must be appr oved, f or r ecor di ng pi l e dr i v i ng dat a.
Compi l e and submi t accur at e r ecor ds of t he pi l e dr i v i ng oper at i ons on t he appr oved f or m i n accor dance wi t h par agr aph " Submi t t al s. " I ncl ude i n dr i v i ng r ecor ds f or each pi l e dat e dr i ven, pi l e i dent i f i cat i on number , SECTI ON 31 62 16. 16 Page 6 cr oss sect i on shape and pi l e di mensi ons, l ocat i on, devi at i ons f r om desi gn l ocat i on, or i gi nal l engt h, gr ound el evat i on, t op el evat i on, t i p el evat i on, bat t er al i gnment , descr i pt i on of hammer used, number of bl ows r equi r ed f or each f oot of penet r at i on t hr oughout t he ent i r e l engt h of t he pi l e and f or each i nch of penet r at i on i n t he l ast f oot of penet r at i on, t ot al dr i v i ng t i me i n mi nut es and seconds, and any ot her per t i nent i nf or mat i on as r equi r ed or r equest ed such as unusual dr i v i ng condi t i ons, i nt er r upt i ons or del ays dur i ng dr i v i ng, damage t o pi l e r esul t i ng f r om dr i v i ng, heave i n adj acent pi l es, r edr i v i ng, weavi ng, obst r uct i ons, j et t i ng, pr edr i l l i ng, and dept h and descr i pt i on of voi ds f or med adj acent t o t he pi l e.
Addi t i onal dat a r equi r ed t o be r ecor ded f or i mpact hammer s i ncl udes t he r at e of hammer oper at i on, make, s i ze, and t he l engt h of t he bounce hose.
Addi t i onal dat a r equi r ed t o be r ecor ded f or v i br at or y hammer s i ncl udes hammer power pack descr i pt i on, make, s i ze, hor sepower appl i ed t o pi l e, and hammer oper at i ng f r equency.
3. 2. 3 Pi l e Pl acement and Tol er ances i n Dr i v i ng
Devel op and submi t a pi l e pl acement pl an whi ch shows t he i nst al l at i on sequence and t he met hods pr oposed f or cont r ol l i ng t he l ocat i on and al i gnment of pi l es Compl et e al l r emoval of unsui t abl e mat er i al and densi f i cat i on of f oundat i on f i l l i n t he ar ea pr i or t o t he pl acement of pi l es f or dr i v i ng. Accur at el y pl ace pi l es i n t he cor r ect l ocat i on and al i gnment s, bot h l at er al l y and l ongi t udi nal l y, and t o t he ver t i cal or bat t er l i nes i ndi cat ed. Est abl i sh a per manent base l i ne t o pr ovi de f or i nspect i on of pi l e pl acement by t he Cont r act i ng Of f i cer dur i ng pi l e dr i v i ng oper at i ons pr i or t o dr i v i ng j ob pi l es and mai nt ai n dur i ng t he i nst al l at i on of t he j ob pi l es.
A f i nal l at er al devi at i on f r om t he cor r ect l ocat i on at t he cut of f el evat i on of not mor e t han 1 i nch wi l l be per mi t t ed f or ver t i cal and bat t er ed pi l es. Mani pul at i on of pi l es wi l l not be per mi t t ed. A var i at i on of not mor e t han 0. 25 i nch per f oot of pi l e l engt h f r om t he ver t i cal f or ver t i cal pi l es nor mor e t han 0. 25 i nch per f oot of pi l e l engt h f r om t he r equi r ed angl e f or bat t er pi l es wi l l be per mi t t ed. I n addi t i on t o compl yi ng wi t h t he t ol er ances st at ed her ei n, t he c l ear di st ance bet ween t he heads of pi l es and t he edges of caps must be not l ess t han 16 i nches.
Wi t h pr i or appr oval of t he Cont r act i ng Of f i cer , t he Cont r act or may pr ovi de addi t i onal concr et e and r ei nf or cement t o mai nt ai n t he r equi r ed mi ni mum cl ear di st ance. Redesi gn of pi l e caps or addi t i onal wor k r equi r ed due t o i mpr oper l ocat i on of pi l es i s t he r esponsi bi l i t y of t he Cont r act or . A f i nal var i at i on i n r ot at i on of t he pi l e about t he cent er l i ne of t he web of not mor e t han 7. 5 degr ees i s per mi t t ed. A ver t i cal devi at i on of not mor e t han 1 i nch f r om t he cor r ect cut of f el evat i ons shown i s per mi t t ed.
I nspect pi l es f or heave. Redr i ve heaved pi l es t o t he r equi r ed t i p el evat i on. Mai nt ai n t he cor r ect r el at i ve posi t i on of al l pi l es by t he use of t empl at es or by ot her appr oved means. Pi l es damaged or not l ocat ed pr oper l y or exceedi ng t he maxi mum l i mi t s f or r ot at i on, l at er al and ver t i cal devi at i on, or var i at i on i n al i gnment must be pul l ed and new pi l es r edr i ven, or pr ovi de addi t i onal pi l es, at a l ocat i on di r ect ed at no addi t i onal cost t o t he Gover nment .
3. 2. 3. 1 Sur vey Dat a
Af t er t he dr i v i ng of each pi l e gr oup i s compl et e and bef or e super i mposed concr et e i s pl aced, pr ovi de t he Cont r act i ng Of f i cer wi t h an as- dr i ven sur vey showi ng act ual l ocat i on and t op el evat i on of each pi l e. Do not pr oceed wi t h pl aci ng concr et e unt i l t he Cont r act i ng Of f i cer has r evi ewed
SECTI ON 31 62 16. 16 Page 7 t he sur vey and ver i f i ed t he saf e l oad f or t he pi l e gr oup dr i ven. Pr esent a sur vey i n such f or m t hat i t gi ves devi at i on f r om pl an l ocat i on i n t wo per pendi cul ar di r ect i ons and el evat i ons of each pi l e t o near est hal f i nch.
Sur vey must be pr epar ed and cer t i f i ed by a l i censed l and sur veyor .
3. 2. 4 Pi l e Penet r at i on Cr i t er i a
The cont r ol l i ng r ef usal bl ow count ( number of bl ows r equi r ed t o at t ai n t he f i nal i nch of penet r at i on) f or j ob pi l es wi l l be det er mi ned by t he Cont r act i ng Of f i cer . The r equi r ed r ef usal bl ow count wi l l be est abl i shed subsequent t o t he anal ysi s of pi l e t est s as speci f i ed i n par agr aph " Pi l e Test s. "
3. 2. 5 Pi l e Dr i v i ng
Not i f y t he Cont r act i ng Of f i cer 30 days pr i or t o t he dat e pi l e dr i v i ng i s t o begi n. Do not dr i ve pi l es wi t hi n 100 f eet of concr et e l ess t han 7 days ol d. Dr i ve j ob and t est pi l es wi t h hammer s of t he same model and manuf act ur er , same ener gy and ef f i c i ency, and usi ng t he same dr i v i ng syst em. Oper at e hammer s at al l t i mes at t he speed and under t he condi t i ons r ecommended by t he manuf act ur er . Wher e heave i s ant i c i pat ed, t he sequence of i nst al l at i on must be such t hat pi l e heave i s mi ni mi zed by st ar t i ng pi l e dr i v i ng at t he cent er of t he gr oup and pr oceedi ng out war d and by dr i v i ng ver t i cal pi l es pr i or t o dr i v i ng bat t er ed pi l es wher e pr act i cabl e. Pr i or t o dr i v i ng and wi t h t he pi l e head seat ed i n t he hammer , check each pi l e t o ensur e t hat i t has been al i gned cor r ect l y and t hat t he or i ent at i on of t he web about t he cent er l i ne i s as shown. Once pi l e dr i v i ng has begun, keep condi t i ons such as al i gnment and bat t er const ant . Check and moni t or t he al i gnment of bat t er ed pi l es dur i ng dr i v i ng wi t h an accur at e bat t er boar d l evel and sur veyi ng i nst r ument .
Dr i ve each pi l e cont i nuousl y and wi t hout i nt er r upt i on unt i l t he r equi r ed r ef usal bl ow count has been at t ai ned. Devi at i on f r om t hi s pr ocedur e wi l l be per mi t t ed onl y when dr i v i ng i s st opped by causes t hat r easonabl y coul d not have been ant i c i pat ed. A pi l e t hat can not be dr i ven t o t he r equi r ed dept h because of an obst r uct i on, as i ndi cat ed by a sudden unexpl ai ned change i n bl ow count and dr i f t i ng, must be pul l ed and r edr i ven or cut of f and abandoned, whi chever i s di r ect ed. Af t er pi l es ar e dr i ven, cut of f squar e as r equi r ed at t he i ndi cat ed cut of f el evat i on. Backf i l l any voi ds ar ound pi l es or abandoned hol es f or pul l ed pi l es wi t h sand and compact t o t he same densi t y as t he sur r oundi ng soi l . I f , i n dr i v i ng, i t i s f ound t hat pi l e i s not of suf f i c i ent l engt h t o gi ve t he capaci t y speci f i ed, not i f y t he Cont r act i ng Of f i cer , who wi l l det er mi ne t he pr ocedur e t o be f ol l owed.
3. 2. 5. 1 Spl i c i ng Pi l es
A pi l e t hat has not r eached t he r equi r ed r ef usal bl ow count when t he t op has been dr i ven t o t he cut of f el evat i on must be spl i ced as shown and dr i ven t o a suf f i c i ent dept h t o devel op t he r equi r ed r ef usal bl ow count .
When appr oved, pr ovi de spl i ces of t he f ul l penet r at i on but t wel d t ype or pr opr i et ar y pr ef abr i cat ed spl i cer s l eeves. For wel ded spl i ces, spl i ces shal l be wi t h a cont i nuous f ul l penet r at i on but t wel d i n accor dance wi t h AWS D1. 1/ D1. 1M or as appr oved by t he Cont r act i ng Of f i cer . Ul t r asoni c t est i ng shal l be per f or med on al l wel ds i n accor dance wi t h AWS D1. 1/ D1. 1M.
Use onl y one spl i ce per l engt h of pi l e. Avoi d f i el d spl i ces f or l engt hs under 80 f eet . Const r uct spl i ces t o mai nt ai n t he t r ue al i gnment and posi t i on of t he pi l e sect i ons. Spl i ces must devel op t he f ul l st r engt h of t he pi l e i n bot h bear i ng and bendi ng. Spl i c i ng oper at i ons must be per f or med bef or e pi l e dr i v i ng any sect i on of t he pi l e. Spl i ces must be
SECTI ON 31 62 16. 16 Page 8 pl aced i n t he mi ddl e t hi r d of t he pi l e. The pi l e must be dr i ven wi t h t he shor t er spl i ced l engt h of t he over al l l engt h bei ng dr i ven f i r st .
3. 2. 5. 2 Jet t i ng
Jet t i ng of pi l es i s not be per mi t t ed.
3. 2. 5. 3 Pr edr i l l i ng
Pr edr i l l i ng i s not be per mi t t ed.
3. 2. 5. 4 Heaved Pi l es
When dr i v i ng pi l es i n c l ust er s or under condi t i ons of r el at i vel y c l ose spaci ng, per f or m obser vat i ons t o det ect heave of adj acent pi l es.
Backdr i ve heaved pi l es t o or i gi nal r ef usal bl ow count wi t hout addi t i onal cost t o t he Gover nment .
3. 2. 5. 5 Pul l ed Pi l es
Pul l and r epl ace pi l es damaged or i mpai r ed f or use dur i ng dr i v i ng wi t h new pi l es, or cut of f and abandon and dr i ve new pi l es as di r ect ed wi t hout addi t i onal cost t o t he Gover nment . The Cont r act i ng Of f i cer may r equi r e t hat any pi l e be pul l ed f or i nspect i on. Redr i ve pi l es pul l ed as di r ect ed and f ound t o be i n sui t abl e condi t i on at anot her l ocat i on as di r ect ed.
Repl ace pi l es pul l ed as di r ect ed and f ound t o be damaged wi t h new pi l es at t he Cont r act or ' s expense.
3. 2. 5. 6 Long Pi l es
Handl e and dr i ve pi l es of a hi gh sl ender ness r at i o car ef ul l y t o pr event over st r ess. Pr ovi de pi l e dr i v i ng r i g wi t h r i gi d suppor t s so t hat l eads r emai n accur at el y al i gned. Wher e a hi gh degr ee of accur acy i s r equi r ed, er ect t empl at es or gui de f r ames at or c l ose t o t he gr ound or wat er sur f ace.
3. 2. 5. 7 Wel di ng
Al l wel di ng must be i n conf or mance wi t h AWS D1. 1/ D1. 1M.
3. 3 PI LE TESTS
Pi l e Test s - Per f or m pi l e dr i v i ng t est s and pi l e l oad t est s as as di r ect ed. The Cont r act i ng Of f i cer wi l l devel op t he cor r el at i on bet ween pi l e dr i v i ng r esi st ance and pi l e capaci t y dur i ng t he pi l e dr i v i ng t est s and pi l e l oad t est s f or t he sel ect ed pi l e dr i v i ng syst em.
Based on t he cor r el at i ons devel oped, t he Cont r act i ng Of f i cer wi l l det er mi ne t he r ef usal bl ow count f or t he j ob pi l es. Changes i n t he appr oved pi l e dr i v i ng syst em dur i ng or af t er compl et i on of t est s wi l l not be al l owed unl ess addi t i onal t est s ar e per f or med as di r ect ed t o est abl i sh t he cor r el at i on bet ween dr i v i ng r esi st ance and pi l e capaci t y f or t he pr oposed changed syst em. For changes i n t he appr oved pi l e dr i v i ng syst em pr oposed by t he Cont r act or , per f or m r equi r ed addi t i onal pi l e dr i v i ng t est s and pi l e l oad t est s at t he Cont r act or ' s expense. No addi t i onal cont r act t i me wi l l be al l owed. I n accor dance wi t h par agr aph " Submi t t al s, " devel op and submi t a det ai l ed pi l e l oad t est pl an whi ch i ncl udes dr awi ngs as appr opr i at e and cont ai n t he f ol l owi ng i nf or mat i on:
a. Met hod of r eact i ng st at i c t est l oads.
SECTI ON 31 62 16. 16 Page 9
b. Met hod of suppor t i ng r ef er ence beams.
c. Met hod of at t achi ng and suppor t i ng di al gages f or measur i ng pi l e movement s.
d. Met hod of appl y i ng st at i c t est l oad t o pi l es.
e. Met hod of set up of secondar y measur ement syst em ( sur veyor ' s l evel , l aser beam, et c. ) .
f . Det ai l s of st r ai n r od f abr i cat i on and i nst al l at i on.
g. Det ai l s of l oadi ng f r ame and r eact i on syst ems desi gn, i ncl udi ng desi gn comput at i ons and f abr i cat i on det ai l s.
h. Cal i br at i on cur ves f or t he l oad cel l and r eadout devi ce.
Appr oval of t he pl an does not r el i eve t he Cont r act or of t he r esponsi bi l i t y f or st r uct ur al and oper at i onal adequaci es of t he t est i ng syst em.
3. 3. 1 Test Pi l es
Pr ovi de 20 t est pi l es of t he same si ze and t ype as speci f i ed f or j ob pi l es. Fur ni sh t est pi l es wi t h l engt h as shown on t he dr awi ngs and dr i ve t hem t he addi t i onal dept h, i f di r ect ed. Pr ovi de t est pi l es of t he i ndi cat ed l engt hs and pl ace at t he i ndi cat ed or di r ect ed l ocat i ons. Dr i ve t est pi l es wi t h t he same equi pment speci f i ed i n par agr aph " Pi l e Dr i v i ng Equi pment " and i n t he same manner speci f i ed i n par agr aph " Pi l e Dr i v i ng" f or j ob pi l es. Recor d t he dr i v i ng r ecor d dat a f or each t est pi l e dr i ven as speci f i ed i n par agr aph " Pi l e Dr i v i ng Recor ds. " Pr ovi de and oper at e a pi l e dr i v i ng anal yzer as speci f i ed by t he manuf act ur er dur i ng t he dr i v i ng of each t est pi l e. I f appr oved af t er t est compl et i on, i ncl ude pr oper l y l ocat ed t est pi l es i n t he f i ni shed wor k. Wi t hdr aw 5 t est pi l es af t er r eachi ng t he speci f i ed t i p el evat i on t o pr ovi de f or v i sual i nspect i on of t he pi l e.
3. 3. 2 Pi l e Dr i v i ng Test s
Per f or m 7 pi l e dr i v i ng t est s. The Cont r act i ng Of f i cer wi l l be pr esent dur i ng each pi l e dr i v i ng t est . Compl et e al l pi l e dr i v i ng t est s wi t hout i nt er r upt i on. Any pi l e dr i v i ng t est not accompl i shed i n accor dance wi t h t hi s speci f i cat i on must be r edone at no addi t i onal cost t o t he Gover nment . Pul l each dr i v i ng t est pi l e wi t hi n one ( 1) day af t er t he compl et i on of t hat pi l e dr i v i ng t est , document damages, and st or e at const r uct i on s i t e. Remove pul l ed t est pi l es f r om t he si t e when di r ect ed.
3. 3. 2. 1 Secondar y Test Pi l es
The Cont r act or shal l per f or m a Wave Equat i on Anal ysi s t o det er mi ne i f t he hammer t o be used wi l l be adequat e t o dr i ve t he secondar y pi l es. The r equi r ed penet r at i on r esi st ance ( bl ow count ) i ndi cat ed by t he wave equat i on at t he end of dr i v i ng shal l be bet ween 30 and 110 bl ows per f oot f or t he dr i v i ng equi pment t o be accept abl e. Dr i ve secondar y t est pi l es wi t h t he same equi pment speci f i ed i n par agr aph " Pi l e Dr i v i ng Equi pment " and i n t he same manner speci f i ed i n par agr aph " Pi l e Dr i v i ng" f or j ob pi l es. Recor d t he dr i v i ng r ecor d dat a f or each t est pi l e dr i ven as speci f i ed i n par agr aph " Pi l e Dr i v i ng Recor ds. " Pr ovi de and oper at e a pi l e dr i v i ng anal yzer as speci f i ed by t he manuf act ur er dur i ng t he dr i v i ng of
SECTI ON 31 62 16. 16 Page 10 each secondar y t est pi l e. Do not per f or m any st at i c pi l e l oad t est s or any dynami c r est r i ke t est i ng on t he secondar y t est pi l es unl ess di r ect ed t o do so by t he Cont r act i ng Of f i cer .
3. 3. 3 Dynami c Test i ng of Pi l es
Empl oy a speci al t y engi neer i ng f i r m t o per f or m dynami c t est i ng of pi l es t o det er mi ne vel oci t y of st r ess wave pr opagat i on, accel er at i on, moni t or hammer and dr i ve syst em per f or mance, assess pi l e i nst al l at i on st r esses and i nt egr i t y , and t o eval uat e pi l e capaci t y. Fur ni sh per sonnel exper i enced i n per f or mi ng wave equat i on anal ysi s, dynami c t est i ng, and i nt er pr et at i on of r esul t s t o i nst al l and oper at e t he t est i ng equi pment and t o i nt er pr et i t s r esul t s. Fur ni sh equi pment t o obt ai n dynami c measur ement s, r ecor d, r educe and di spl ay i t s dat a and meet t he r equi r ement of ASTM D4945. The equi pment must have been cal i br at ed wi t hi n 12 mont hs t her eaf t er t hr oughout t he cont r act dur at i on. Suppl y al l power r equi r ement s f or oper at i ng t he equi pment . Pr i or t o commenci ng pi l e dr i v i ng, per f or m and submi t wave equat i on anal ysi s i n accor dance wi t h par agr aph " Submi t t al s. "
3. 3. 3. 1 Test Pi l es
Per f or m dynami c and st at i c t est i ng on 7 t est pi l es as i ndi cat ed. Per f or m t est i ng dur i ng t he f ul l l engt h of pi l e dr i v i ng. Rest r i ke pi l es whi ch ar e st at i cal l y l oad t est ed wi t hi n 48 hour s af t er compl et i on of st at i c l oad t est t o cor r el at e st at i c and dynami c t est r esul t s. Rest r i ke pi l es i nst al l ed as par t of pi l e dr i v i ng t est af t er a mi ni mum wai t i ng per i od of 21 days. War m up t he hammer pr i or t o r est r i k i ng. Rest r i ke t he pi l e f or 50 bl ows or unt i l t he pi l e penet r at es an addi t i onal 3 i nches, whi chever occur s f i r st . I n t he event t he pi l e movement i s l ess t han one- quar t er i nch dur i ng r est r i ke, t he r est r i ke may be t er mi nat ed af t er 20 bl ows.
3. 3. 3. 2 Job Pi l es
Per f or m dynami c pi l e t est i ng on 5 per cent j ob pi l es dur i ng t he f ul l l engt h of i ni t i al dr i v i ng and dur i ng r est r i ke dr i v i ng. Test ed pi l es must be as sel ect ed by t he Cont r act i ng Of f i cer over t he dur at i on of i nst al l at i on.
The Cont r act i ng Of f i cer wi l l di r ect t est i ng of addi t i onal pi l es i f t he hammer or dr i v i ng syst em i s modi f i ed or r epl aced.
3. 3. 3. 3 Repor t s
Pr epar e and submi t a summar y r epor t of dynami c t est r esul t s f or t est pi l es. Di scuss i n t he r epor t pi l e capaci t y obt ai ned f r om dynami c t est i ng as i t compar es t o st at i c t est r esul t s comput ed by t he Gover nment , and al so i ncl ude vel oci t y of st r ess wave pr opagat i on, accel er at i on, eval uat i on of hammer and dr i v i ng syst em per f or mance, dr i v i ng st r ess l evel s, and pi l e i nt egr i t y. Per f or m a CAPWAP, or s i mi l ar , anal ysi s of t he dynami c t est dat a on dat a obt ai ned f r om t he end of i ni t i al dr i v i ng and t he begi nni ng of r est r i ke f or 7 t est pi l es as di r ect ed. Use t he anal ysi s t o pr edi ct pi l e capaci t y, est abl i sh r esi st ance di st r i but i on, and pr edi ct quake and dampi ng f act or s. I ncl ude r ef i ned wave equat i on anal yses i ncor por at i ng t he r esul t s of dynami c t est i ng and anal ysi s. For j ob pi l es, pr epar e and submi t a f i el d summar y r epor t . The f i el d summar y r epor t must mi ni mal l y cont ai n ener gy t r ansf er r ed t o t he pi l e, cal cul at ed dr i v i ng st r esses, pi l e i nt egr i t y and est i mat ed pi l e capaci t y at t he t i me of t est i ng. I ncl ude i n t he r epor t f or t he t est pi l es and t he mont hl y r epor t f or j ob pi l es t he pi l e dr i v i ng r ecor d as an at t achment and al so addr ess t he i t ems l i s t ed i n par agr aph " 7. 1. 5 Dynami c Test i ng" of ASTM D4945.
SECTI ON 31 62 16. 16 Page 11
3. 3. 4 Pi l e Load Test s
Per f or m l oad t est s at l ocat i ons shown, or as di r ect ed. Pr ovi de t est i ng and measur i ng equi pment , per f or m l oadi ng, and pr ovi de obser vat i on f aci l i t i es f or per sonnel t o i nspect , r ecor d, and anal yze set t l ement / movement and def l ect i on of pi l es under t est l oads. Do not mobi l i ze l oad t est equi pment unt i l di r ect ed by t he Cont r act i ng Of f i cer .
Per f or m pi l e l oad t est s under t he super vi s i on of a r egi st er ed pr of essi onal engi neer pr ovi ded by t he Cont r act or and exper i enced i n conduct i ng pi l e l oad t est s. Loadi ng f r ames and equi pment f or pi l e l oad t est s must be r eady t o be pl aced i n oper at i on as soon as a l oad t est pi l e has been dr i ven. Pr ovi de l oadi ng equi pment of suf f i c i ent capaci t y t o appl y t he maxi mum l oad speci f i ed i n a saf e manner . St ar t l oadi ng of each t est pi l e when di r ect ed.
The Cont r act or i s r esponsi bl e f or t he appl i cat i on of l oads. Accur at el y det er mi ne and cont r ol t he magni t ude of appl i ed l oads usi ng a cal i br at ed l oad cel l and r eadout devi ce. The desi gn wor ki ng l oad, as conf i r med by t he r esul t s of l oad t est s, wi l l be det er mi ned by t he Cont r act i ng Of f i cer .
Load t est pi l es i ndi cat ed or di r ect ed t o be dr i ven i n per manent l ocat i ons may be i ncor por at ed i nt o t he wor k i f , af t er sat i sf act or y compl et i on of l oad t est , t hey ar e appr oved f or i ncl usi on i n t he wor k. Any pi l e l oad t est not accompl i shed i n accor dance wi t h t hi s speci f i cat i on wi l l be r ej ect ed. A new pi l e l oad t est must be conduct ed f or each r ej ect ed pi l e l oad t est . The Cont r act or must compi l e a r epor t f or each pi l e l oad t est i ncl udi ng, as a mi ni mum, al l appl i cabl e i nf or mat i on r equi r ed by t he speci f i ed t est .
3. 3. 4. 1 Compr essi ve Load Test
Per f or m 7 pi l e compr essi ve l oad t est s i n accor dance wi t h ASTM D1143/ D1143M , Pr ocedur e C. Appl y a compr essi ve l oad, up t o a maxi mum of 300 per cent of t he l oad val ue t abul at ed on t he pl ans, t o each compr essi on l oad t est pi l e as i ndi cat ed.
3. 3. 4. 2 Tensi l e Load Test
Per f or m 2 pi l e t ensi l e l oad t est s i n accor dance wi t h ASTM D3689, Pr ocedur e C. Appl y a t ensi l e l oad, up t o a maxi mum of 300 per cent of t he l oad val ue t abul at ed on t he pl ans, t o each t ensi l e l oad t est pi l e as i ndi cat ed. The t ensi on t est can onl y be per f or med af t er a mi ni mum wai t i ng per i od of 21 days af t er t he compr essi on l oad t est on t he t ensi on t est pi l e i s per f or med.
3. 3. 4. 3 Lat er al Load Test
Per f or m 1 pi l e l at er al l oad t est i n accor dance wi t h ASTM D3966/ D3966M.
The l ocat i on of t he f i r st pi l e l at er al l oad t est wi l l be as di r ect ed by t he Gover nment . Per f or m l at er al l oad t est s consi st i ng of j acki ng t wo pi l es apar t wi t h a hydr aul i c j ack, wi t h one pi l e ser vi ng as t he r eact i on pi l e f or t he ot her . Appl y a l at er al l oad of 10 t ons t o each pai r of l at er al l oad t est pi l es. Take r equi r ed movement r eadi ngs and r ecor d f or each pi l e. The magni t ude of t he maxi mum l at er al l oad t o be appl i ed coul d be modi f i ed as di r ect ed by t he Cont r act i ng Of f i cer .
Af t er concl usi on of t he f i r st pi l e l at er al l oad t est , t he Gover nment may el ect t o r equest a second pi l e l at er al l oad t est . Af t er t he concl usi on of t he second t est , t he Gover nment may el ect t o r equest a t hi r d pi l e l at er al l oad t est .
SECTI ON 31 62 16. 16 Page 12
3. 3. 5 Pi l e Load Test i ng Schedul e
The Cont r act or shal l f ol l ow t he f ol l owi ng pi l e l oad t est schedul e unl ess di r ect ed ot her wi se i n wr i t i ng by t he Cont r act i ng Of f i cer :
1. Dr i ve Pr i mar y and Secondar y t est pi l es and al l pi l es needed f or t he pi l e l oad t est r eact i on f r ame.
2. Wai t a mi ni mum of 21 days f r om t he end of dr i v i ng of t he l ast pi l e l i s t ed above f or each pi l e l oad t est l ocat i on.
3. Per f or m a st at i c compr essi ve pi l e l oad t est on t he Pr i mar y t est pi l e.
Per f or m a dynami c r est r i ke t est on t he same pi l e wi t hi n 48 hour s of t he compl et i on of t he st at i c l oad t est . I f a t ensi on t est i s r equi r ed, wai t 21 days t hen per f or m a st at i c t ensi on pi l e l oad t est on t he Pr i mar y t est pi l e.
4. Per f or m a st at i c pi l e l oad t est on t he Secondar y t est pi l e i f di r ect ed t o do so by t he Cont r act i ng Of f i cer . Per f or m a dynami c r est r i ke t est on t he same pi l e wi t hi n 48 hour s of t he compl et i on of t he st at i c l oad t est i f a st at i c l oad t est i s per f or med. I f a t ensi on t est i s r equi r ed, wai t 21 days t hen per f or m a st at i c t ensi on pi l e l oad t est on t he secondar y t est pi l e.
5. Remove al l t est and r eact i on pi l es. Gr out i n any r emai ni ng hol es or depr essi ons caused by r emoval of t he pi l es.
3. 3. 6 Saf e Desi gn Capaci t y
Load t est pi l es t o t wi ce t he ant i c i pat ed wor ki ng l oad unl ess f ai l ur e occur s f i r st . The saf e desi gn capaci t y of a l oad t est as det er mi ned f r om t he r esul t s of l oad t est s i s t he l esser of t he t wo val ues comput ed accor di ng t o t he f ol l owi ng:
a. One- hal f t he l oad t hat causes a net set t l ement af t er r ebound of not mor e t han 0. 01 i nch per t on of t ot al t est l oad.
b. One- hal f t he l oad t hat causes a gr oss set t l ement of not mor e t han 1 i nch pr ovi ded t he l oad set t l ement cur ve shows no si gn of f ai l ur e.
- - End of Sect i on - -
SECTI ON 31 62 16. 16 Page 13
THI S PAGE I NTENTI ONALLY LEFT BLANK
SECTI ON 31 62 16. 16 Page 14
| 31 62 16.16 - STEEL H-PILES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.3.1 Delivery and Storage |
| 1.3.2 Handling |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 H-Piles |
| 2.1.2 Pile Splices |
| 2.1.3 Pile Points |
| 2.1.4 Pile Caps Drive Cap Inserts |
| 2.1.5 Pile Tension Anchors |
| 2.1.6 FABRICATION |
| 2.1.6.1 Pile Splices |
| 2.1.6.2 Pile Caps Drive Cap Inserts |
2.1.7 CORROSION PROTECTION
| PART 3 EXECUTION |
| 3.1 PILE DRIVING EQUIPMENT |
| 3.1.1 Pile Driving Hammers |
| 3.1.1.1 Impact Hammers |
| 3.1.1.2 Vibratory Hammers |
| 3.1.2 Pile Driving Leads |
| 3.1.3 Pile Extractors |
| 3.2 INSTALLATION |
| 3.2.1 Lengths of Job Piles |
| 3.2.2 Pile Driving Records |
| 3.2.3 Pile Placement and Tolerances in Driving |
| 3.2.3.1 Survey Data |
| 3.2.4 Pile Penetration Criteria |
| 3.2.5 Pile Driving |
| 3.2.5.1 Splicing Piles |
| 3.2.5.2 Jetting |
| 3.2.5.3 Predrilling |
| 3.2.5.4 Heaved Piles |
| 3.2.5.5 Pulled Piles |
| 3.2.5.6 Long Piles |
| 3.2.5.7 Welding |
| 3.3 PILE TESTS |
| 3.3.1 Test Piles |
| 3.3.2 Pile Driving Tests |
| 3.3.2.1 Secondary Test Piles |
| 3.3.3 Dynamic Testing of Piles |
| 3.3.3.1 Test Piles |
| 3.3.3.2 Job Piles |
| 3.3.3.3 Reports |
| 3.3.4 Pile Load Tests |
| 3.3.4.1 Compressive Load Test |
| 3.3.4.2 Tensile Load Test |
| 3.3.4.3 Lateral Load Test |
| 3.3.5 Pile Load Testing Schedule |
| 3.3.6 Safe Design Capacity |