About this file

This document is an amendment to Solicitation No. W912DS-24-B-0011 for the Maintenance Dredging of the New York and New Jersey Harbor, Port Jersey Channel, New Jersey, Federal Navigation Project.

The amendment clarifies several items, including the anticipated award and notice to proceed timeline, allowance for bed-leveling, requirements for side slopes and box-cutting, and inconsistencies between the bid schedule and project plans. It also provides responses to questions received from potential bidders. The project involves mechanical dredging of approximately 420,000 cubic yards from the Port Jersey Channel to a depth of -50 feet Mean Lower Low Water plus 1-foot allowable overdepth. The dredged material is to be transported and placed at the Historic Area Remediation Site. The work is estimated to cost between $5,000,000 and $10,000,000, with liquidated damages of $2,520 per calendar day of delay. The solicitation is unrestricted, and the government intends to award the contract in August 2024.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1) Bid opening remains 08 Aug 2024 at 2:00 P.M

2) Notify potential bidders that the Government w ill no longer respond to RFIs received after 05 August 2024.

3) Please see continuation page.

NOTE Bidders must acknow ledge receipt of this amendment by date specif ied in the bid ( or as arrended) by one of the follow ing methods.

In space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE BY DATE SPECFIED MAY RESULT IN REJECTION OF YOUR BID ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID

(FAR 14.304)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS24B0011

X 9B. DATED (SEE ITEM 11)

09-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0002:

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Aug-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

AMENDMENT 0002

Maintenance Dredging of NY&NJ Channel, Port Jersey Channel

Federal Navigation Project Solicitation No. W912DS-24-B-0011

The purpose of this Amendment 0002 is to respond to RFIs received by potential bidders and revise plan sheets VH- 102, VH-105, and VH-106 for consistency.

Q1. When does USACE anticipate award of the project?

A1. USACE would like to issue contract award as early as practicable, anticipated in the August – September 2024 time frame but is subject to change at USACE’s discretion.

Q2. When does USACE anticipate issuing the Notice to Proceed?

A2. USACE would like to issue Notice to Proceed as early as practicable, anticipated in the August – September 2024 time frame but is subject to change at USACE’s discretion.

Q3. Is bed-leveling (dragging) allowed?

A3. Per Section 35 20 23 Paragraph 1.2.5, “An environmental bucket is required for this project…TOGS 5.1.9)”. Per Section 00 90 02 Paragraph 3.1.1 (2), “The contractor must comply with all conditions of the Water Quality Certificate(s)”. In addition, per Section 01 30 00 Paragraph 1.10, “…Should any shoals, lumps, or other lack of contract depth be disclosed by this examination, the Contractor will be required to remove same by dredging at the contract rate for dredging or by other method approved by the Contracting Officer, but if the bottom is soft and the shoal areas are small and form no material obstruction to navigation, the removal of such shoals may be waived by the discretion of the Contracting Officer and/or his Representative…”

Q4. Spec Section 3.2.7.2 Side Slopes states "Side slopes in the dredge areas within this contract will be measured and paid based on a 3 feet horizontal to 1 foot vertical ratio. Dredging on side slopes must follow, as closely as practicable, the dredge area limits indicated on associated layout drawings." This section does not state specifically if side slopes are required to be dredged. Please clarify is sides slopes are required to be dredged and cleared to the 3:1 slope?

A4. Side slopes are required as indicated in the “Typical Cross Section” Project Plan VH-102, Sheet 2 of 6.

Q5. Is box-cutting of the slopes allowed?

A5. Per Section 35 20 23 Paragraph 3.2.7.2, “Dredging on side slopes must follow, as closely as practicable, the dredge area limits indicated on associated layout drawings”. In addition, per Section 00 90 02 Paragraph 3.1.1 (2), “The contractor must comply with all conditions of the Water Quality Certificate(s)”. The WQC / FCD for this project permit dredging to -50 feet MLLW plus 1 foot of allowable overdepth (or 0.5 foot of allowable overdepth

W912DS24B0011

over the PVSC Corridor), with side slopes extending 150 feet orthogonal to the channel toe on a plane / slope of 1 foot vertical on 3 feet horizontal.

Q6. Specification Section 01 11 00, 1.2.1 “Project Description” indicates that Option 2 includes “Central Reach” and “PVSC Corridor” and that both CLIN 0005 and CLIN 0006 are Option 2. This is inconsistent with the Bid Schedule which indicates that CLIN 0006 is Option 3. Please clarify.

A6. Please see Amendment 0001 for the revised Bid Schedule. Option 2 contains two subCLINs under CLIN 0005; CLIN 0005AA Central Reach Dredging, and CLIN 0005AB PVSC Corridor.

Q7. Project Plan VH-102, "Typical Cross Section" presents ‘Required’ and ‘Overdepth’ elevations that are inconsistent with the project depths on the "Bid Schedule" and Specification Section 01 11 00, 1.2.1 "Project Description". Please clarify.

A7. The “Typical Cross Section” located on Project Plan VH-102 is based off of the typical bottom of the sea level in relations to the project depth of -50 feet Mean Lower Low Water plus 1 foot allowable overdepth for the majority of the channel and does not include a representation of a cross section of the dredging area over the Central Reach and PVSC Corridor. The project depth over the PVSC Corridor is at -50 feet Mean Lower Low Water plus

0.5 allowable foot overdepth. See revised Project Plan VH-102, “Typical Cross Section” for consistency. Please note that the “Typical Cross Section” is NOT TO SCALE.

Q8. Please provide the X,Y coordinates of the line you’re using to split the Basic Work and Option 1.

A8. Please see the revised plan sheets VH-105 AND VH-106 for the Easting (X) and Northing (Y) coordinates.

(End of Summary of Changes)