This document is a Solicitation for the Maintenance Dredging of the New York and New Jersey Harbor, Port Jersey Channel, New Jersey, Federal Navigation Project. The U.S. Army Corps of Engineers, New York District, plans to remove approximately 420,000 cubic yards of sand, silt, and clay from the Port Jersey Channel to a depth of -50 feet Mean Lower Low Water plus 1-foot allowable overdepth. The dredged material will be transported and placed at the Historic Area Remediation Site approximately 5 miles east of Sandy Hook, New Jersey. The work is estimated to cost between $5,000,000 and $10,000,000. The solicitation is expected to be available in June 2024, with bid opening in July 2024 and contract award in August 2024. The contractor will be required to commence work within 5 calendar days of the Notice to Proceed and complete the work within 50 calendar days, maintaining a minimum dredging production rate of 6,000 cubic yards per day. Liquidated damages of $2,520 per calendar day of delay will be assessed.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New York District
THIS IS AN UNRESTRICTED PROCUREMENT NAISC CODE 237990
SAFETY PAYS
MAINTENANCE DREDGING
NEW YORK & NEW JERSEY HARBOR,
PORT JERSEY CHANNEL, NEW JERSEY
FEDERAL NAVIGATION PROJECT
Solicitation &
Specifications
IFB No. W912DS-24-B-0011
Maintenance Dredging of NY&NJ Harbor, Port Jersey Channel, NJ FNP PJ24
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 00 01 04/21 COVER SHEET
00 00 02 04/21 CHECK LIST FOR BIDDERS
00 01 15 06/07 LIST OF DRAWINGS
00 10 00 01/20 SF 1442 AND BIDDING SCHEDULE
00 21 13 01/20 INSTRUCTIONS, CONDITIONS, AND NOTICE
TO BIDDERS
00 45 00 01/20 REPRESENTATION AND CERTIFICATION
00 70 00 01/20 CONTRACT CLAUSES
00 90 00 01/20 WAGE RATES
00 90 01 06/07 LIST OF DOCUMENTS, EXHIBITS, AND OTHER
ATTACHMENTS
00 90 02 06/07 FCD / WATER QUALITY CERTIFICATE
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 06/07 SUMMARY OF WORK
01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES
01 30 00 06/07 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 08/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 26 11/20, CHG 4: 08/23 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 06/07 QUALITY CONTROL
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 20.00 10 04/06 ENVIRONMENTAL PROTECTION
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23 06/07 DREDGING
35 20 23.05 18 DREDGING PVSC CORRIDOR
35 20 23.10 18 06/07 DREDGED MATERIAL TRANSPORT, PLACEMENT
AND MONITORING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 00 01
COVER SHEET
04/21
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00 00 01 Page 1
SECTION 00 00 01
COVER SHEET
04/21
PART 1 GENERAL
NEW YORK DI STRI CT
CORPS OF ENGI NEERS
NEW YORK, NEW YORK 10278- 0090
I NVI TATI ON FOR BI DS
FOR
MAI NTENANCE DREDGI NG
NEW YORK & NEW JERSEY HARBOR,
PORT JERSEY CHANNEL, NEW JERSEY
FEDERAL NAVI GATI ON PROJECT
1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-24-B-0011 .
2. BIDS MUST SET FORTH full, accurate, and complete information as requested by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed in Title 18, United States Code, Section 1001.
3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 13).
4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 72 00 of this IFB.)
5. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS
SOLICITATION. Bidders, Offerors, and applicants are cautioned to note the "Certification of Nonsegregated Facilities" in the solicitation.
Failure of bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitation involving awards of contracts exceeding $10,000, which are not exempt from the provisions of Equal Opportunity Clause. (1984 APR)
6. REPRESENTATIONS AND CERTIFICATIONS- SECTION 00 45 00
Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.
7. THIS PROJECT IS NOT A SMALL BUSINESS SET-ASIDE.
DOCUMENT 00 00 01 Page 2
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section --
DOCUMENT 00 00 01 Page 3
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 00 02
CHECK LIST FOR BIDDERS
04/21
PART 1 GENERAL
DOCUMENT 00 00 02 Page 1
SECTION 00 00 02
CHECK LIST FOR BIDDERS
04/21
PART 1 GENERAL
ATTACHED IS IFB FOR
MAI NTENANCE DREDGI NG
NEW YORK & NEW JERSEY HARBOR,
PORT JERSEY CHANNEL, NEW JERSEY
FEDERAL NAVI GATI ON PROJECT
ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE
FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR BID INELIGIBLE FOR
AWARD. IMPORTANT ITEMS FOR YOU TO CHECK ARE INCLUDED IN BUT NOT LIMITED
TO THOSE LISTED BELOW. THIS INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN
SUBMITTING A PROPER BID.
__ HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?
__ HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION 00
45 00) PORTION OF THE SOLICITATION?
__ IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?
__ IS YOUR BID PROPERLY SIGNED?
__ A BID BOND IS REQUIRED. HAS YOUR SURETY PROVIDED YOU WITH A BID BOND ON
STANDARD FORM 24 OR A SIMILAR FORM CONTAINING THE SAME LANGUAGE AS A
STANDARD FORM 24?
__ IS YOUR BID GUARANTEE IN THE PROPER AMOUNT?
__ IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY AND
ARE ALL REQUIRED SEALS AFFIXED?
__ IS THE NAME IN WHICH YOU SUBMITTED THE BID THE SAME ON YOUR BID AS ON
THE BID BOND?
__ IS YOUR BID BOND INCLUDED WITH YOUR BID? (A LATE BID GUARANTEE IS
TREATED THE SAME AS A LATE BID)
__ HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR BID BY ALTERING THE
PROVISIONS OF THE SOLICITATION?
__ WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH BID ITEM? (THE
SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)
__ ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES
LEGIBLE?
__ IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY
INITIALED BY THE PERSON SIGNING THE BID?
__ DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT IS A
DOCUMENT 00 00 02 Page 2
SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID
OPENING TIME?
__ WILL YOUR BID ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE
SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE INSTRUCTIONS,
CONDITIONS, AND NOTICES TO BIDDERS, SECTION 00 21 16 OF THE SOLICITATION.)
BIDDER IS RESPOSIBLE TO ENSURE BID IS SUBMITTED ON TIME.
DOCUMENT 00 00 02 Page 3
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15
LIST OF DRAWINGS
06/07
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 01 15 Page 1
SECTION 00 01 15
LIST OF DRAWINGS
06/07
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS
a. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
b. The Contractor shall:
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
c. In general:
(1) Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
d. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
e. The work shall conform to the following contract drawings and maps, all of which form a part of these specifications and are available in the office of the District Engineer, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, New York, N.Y.
DOCUMENT 00 01 15 Page 2
10278-0090:
Contract drawings are as follows:
FY 2024
Maintenance Dredging of New York & New Jersey Harbor, Port Jersey Channel, New Jersey, Federal Navigation Project
SHEET NO. DESCRIPTION
Sheet 1 Cover and Index
Sheet 2 Location Map and Detail Sheet
Sheet 3 Dredging Limits
Sheet 4 Dredging Limits
Sheet 5 Dredging Limits
Sheet 6 Dredging Limits
f. The Contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements unless dimensions are specified. Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have thereby been avoided (DOD FAR Suppl. 52.236-7002).
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
DOCUMENT 00 01 15 Page 3
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
01/20
PART 1 GENERAL
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD
1.2 BID SCHEDULE
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 10 00 Page 1
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
01/20
PART 1 GENERAL
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD
To be provided by Contracting Division.
1.2 BID SCHEDULE
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 10 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 21 13
INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
01/20
PART 1 GENERAL
DOCUMENT 00 21 13 Page 1
SECTION 00 21 13
INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
01/20
PART 1 GENERAL
To be provided by Contracting Division.
DOCUMENT 00 21 13 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 45 00
REPRESENTATION AND CERTIFICATION
01/20
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 45 00 Page 1
SECTION 00 45 00
REPRESENTATION AND CERTIFICATION
01/20
PART 1 GENERAL
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 45 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 70 00
CONTRACT CLAUSES
01/20
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 70 00 Page 1
SECTION 00 70 00
CONTRACT CLAUSES
01/20
PART 1 GENERAL
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 70 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 90 00
WAGE RATES
01/20
PART 1 GENERAL
1.1 NOTE
PART 2 PRODUCTS
PART 3 EXECUTION
DOCUMENT 00 90 00 Page 1
SECTION 00 90 00
WAGE RATES
01/20
PART 1 GENERAL
1.1 NOTE
Wage rates provided by Contracting Division.
A copy of the wage rate shall be displayed at a highly visible location on the dredge at all times for the duration of the project.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 90 00 Page 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 90 01
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
06/07
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 ATTACHMENTS
3.1.1 Attachment A Port Jersey Channel, New York & New Jersey Harbor
3.1.2 Attachment B Sample Daily Construction Quality Control Report
3.1.3 Attachment C Project Sign and Safety Sign
3.1.4 Attachment D Title 33 Oil and Hazardous Material Operations
3.1.5 Attachment E Accident Prevention Plan Worksheet
3.1.6 Attachment F Daily Reports for Dredging
3.1.7 Attachment G USACE Transportation and Placement Log
3.1.8 Attachment H Daily Site Safety and Health Inspection Log
3.1.9 Attachment I Daily Whale, Turtle and Sturgeon Report Logs
3.1.10 Attachment J Sampling and Testing Results from 2023 for reference only- See attachments to this solicitation on SAM.GOV for complete 2022-2023 Sampling and Testing Results Package
3.1.11 Attachment K Submittal Register EXAMPLE
3.1.12 Attachment L XYZ Data of February 2024 Plans & Specifications
Survey
3.1.13 Attachment M NOAA NMFS Essential Fish Habitat (EFH)
Recommendation Letter 07 February 2017
3.1.14 Attachment N USCG Requirement Letter dated 28 March 2024
3.2 Potential Underwater Hazard (UH)
3.3 PREVIOUS DREDGING ACTIVITIES
3.4 PVSC UTILITY CORRIDOR EXAMPLE SUBMITTALS
DOCUMENT 00 90 01 Page 1
SECTION 00 90 01
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
06/07
PART 1 GENERAL
1.1 SUBMITTALS
Not Used
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 ATTACHMENTS
The following attachments have been provided for reference to the bidder for use in performing the contract requirements.
3.1.1 Attachment A Port Jersey Channel, New York & New Jersey Harbor Project Map
3.1.2 Attachment B Sample Daily Construction Quality Control Report
3.1.3 Attachment C Project Sign and Safety Sign
3.1.4 Attachment D Title 33 Oil and Hazardous Material Operations
3.1.5 Attachment E Accident Prevention Plan Worksheet
3.1.6 Attachment F Daily Reports for Dredging
3.1.7 Attachment G USACE Transportation and Placement Log
3.1.8 Attachment H Daily Site Safety and Health Inspection Log
3.1.9 Attachment I Daily Whale, Turtle and Sturgeon Report Logs
3.1.10 Attachment J Sampling and Testing Results from 2023 for reference only- See attachments to this solicitation on SAM.GOV for complete 2022-2023 Sampling and Testing Results Package
3.1.11 Attachment K Submittal Register EXAMPLE
3.1.12 Attachment L XYZ Data of February 2024 Plans & Specifications Survey
3.1.13 Attachment M NOAA NMFS Essential Fish Habitat (EFH) Recommendation Letter 07 February 2017
a. EFH Dredge Restriction:Portions of the North and South Entrance - No dredging January 15th thru May 31st
DOCUMENT 00 90 01 Page 2
3.1.14 Attachment N USCG Requirement Letter dated 28 March 2024
3.2 Potential Underwater Hazard (UH)
Potential Underwater Hazard (UH) may be present within the dredging area as shown on the sidescan survey of the Port Jersey Channel conducted in 2015. Please see Section 35 20 23 DREDGING, Para 3.2.8 Obstructions and Debris for more information. The sidescan survey is made available to bidders as an attachment to this solicitation on SAM.GOV
3.3 PREVIOUS DREDGING ACTIVITIES
As builts from previous dredging activities within Port Jersey Channel as part of the NY&NJ Harbor Deepening Project are made available to bidders as attachments to this solicitation on SAM.GOV [for information only] :
a. S PJ-4 Steel Plate Installation As-Built Drawings (08 March 2013)
b. S-AN-UC As-Built Drawings
3.4 PVSC UTILITY CORRIDOR EXAMPLE SUBMITTALS
Should Option 2 - PVSC Corridor be exercised, the Contractor shall adhere to Section 35 20 23.05 18 DREDGING PVSC CORRIDOR for dredging requirements within the PVSC Corridor. Example submittals are made available to bidders as attachments to this solicitation on SAM.GOV [for information only] :
a. Mapping of Protective Plates AD
b. PVSC Steel Plate Damage Prevention Work Plan EXAMPLE
DOCUMENT 00 90 01 Page 3
Dredging Area
Placement Area
SECTION 00 90 01 ATTACHMENT A
NEW YORK & NEW JERSEY HARBOR, PORT JERSEY CHANNEL,
NJ FEDERAL NAVIGATION PROJECT
REFERENCE MAP
PVSC CORRIDOR
PORT JERSEY FEDERAL NAVIGATION CHANNEL
APPROXIMATE AREA TO BE
DREDGED TO -50 FEET
MLLW + 1 FEET
ALLOWABLE OVERDEPTH
Introduction: Construction Project Signs EP 310-1-6a 01 Jun 06
16-1
The use of signs to identify Corps managed or supervised design, construc-tion, and rehabilitation projects - both for military and civil works - is an important part of efforts to keep the public informed of Corps work. For this purpose, a construction project sign package has been adopted. This package consists of two signs: one for project identification and the other to show on-the-job safety performance of the contractor.
These two signs are to be displayed side by side and mounted for reading by passing viewers. Exact placement location will be designated by the contracting officer’s representative.
The panel sizes and graphic formats have been standardized for visual consistency throughout all Corps operations.
Panels are fabricated using HDO plywood or aluminum with dimensional lumber uprights and bracing. The sign faces are nonreflective vinyl.
All legends are to be die-cut or computer-cut in the sizes and typefaces specified and applied to the white panel back-ground following the graphic formats shown on pages 16-2 and 16-3. The Communication Red panel on the left side of the construction project sign with Corps Signature (reverse version) is screen-printed onto the white back-ground.
A display of these two signs is shown on the following two pages. Mounting and fabrication details are provided on page 16-4.
Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.
00 90 01 ATT. C- 1
Construction Project Identification Sign
16-2
EP 310-1-6a 01 Jun 06
Below are two samples of the Construc-tion Project Identification sign showing how this panel is adaptable for use to identify either military (top) or civil works projects (bottom). The graphic format for this 4’x 6' sign panel follows the legend guidelines and layout as specified below.
The large 4’x 4' section of the panel on the right is to be white with black legend.
The 2’x 4' section of the sign on the left with the full Corps Signature (reverse version) is to be screen-printed Commu-nication Red on the white background The designation of a sponsor in the area indicated is optional with Military or Civil Works construction signs. Signs may list one sponsoring entity. If agreement on a sponsor designation cannot be achieved, the area should be left blank.
This sign is to be placed with the Safety Performance sign shown on the following page. Mounting and fabrication details are provided on page 16-4.
Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.
Legend Group 1: One- to two-line description of Corps relationship to project.
Color: White Typeface: 1.25" Helvetica Regular Maximum line length: 19”
Legend Group 2: Division or District Name (optional). Placed below 10.5” reverse Signature (6” Castle).
Color: White Typeface: 1.25" Helvetica Regular
Legend Group 2a: One- to three-line identifica-tion of Military or Civil Works sponsor (optional). Place below Corps Signature to cross-align with Group 5a-b.
Color: White Typeface: 1.25" Helvetica Regular Maximum line length: 19"
Legend Group 3: One- to three-line project title legend describes the work being done under this contract.
Color: Black Typeface: 3" Helvetica Bold Maximum line length: 42"
Legend Group 4: One- to two-line identification of project or facility (civil works) or name of sponsoring department (military).
Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"
Cross-align the first line of Legend Group 4 with the first line of the Corps Signature (US Army Corps) as shown.
Legend Groups 5a-b: One- to five-line identification of prime contractors including:
type (architect, general contractor, etc.), corporate or firm name, city, state. Use of Legend Group 5 is optional.
Color: Black Typeface: 1.25" Helvetica Regular Maximum line length: 21"
All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow Corps standards as specified in Appendix D.
Sign Legend Panel Post Specification Mounting Color Type Size (A) Size Size Code Height Bkg/Lgd
CID-01 various 4’x6’ 4”x4” HDO-3 48” WH-RD/BK
4.5” 2”
6.25”
10.5”
2.5”
3” 3” 42” 3”
6”
4.5”
4.5”
6”
2.25”
9.5”
1.875” 1.875” 1.875” 1.875”
7.75”
3” 21” 1” 21” 2”
00 90 01 ATT. C- 2
Safety Performance Sign EP 310-1-6a
16-3
Each contractor’s safety record is to be posted on Corps managed or supervised construction projects and mounted with the Construction Project Identification sign specified on page 16-2.
The graphic format, color, size and type-faces used on the sign are to be repro-duced exactly as specified below. The title with First Aid logo in the top section of the sign, and the performance record captions are standard for all signs of this type. Legend groups 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.
Safety record numbers are mounted on individual metal plates and are screw-mounted to the background to allow for daily revisions to posted safety perfor-mance record.
Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.
Legend Group 1: Standard two-line title “Safety is a Job Requirement” with 8” (outside diameter) Safety Green first aid logo.
Color: To match Pantone system 347 Typeface: 3" Helvetica Bold Color: Black
Legend Group 2: One- to two-line project title legend describes the work being done under this contract and name of host project.
Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"
Legend Group 3: One- to two-line identifica-tion: name of prime contractor and city, state address. Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"
Legend Group 4: Standard safety record captions as shown.
Color: Black Typeface: 1.25” Helvetica Regular
Replaceable numbers are to be mounted on white .060 aluminum plates and screw-mounted to background.
Color: Black Typeface: 3" Helvetica Regular Plate size: 2.5" x 4.5"
All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow Corps standards as specified in Appendix D.
3” 33.030” eq. 8” eq.
6”
4.5”
10.5”
2.25” 3”
2.25” 3”
4.875”
4.875”
6.75”
4.875” .75” 4.875”
4.5”
3”
3” 42” 3”
2.25” 2.25” 2.25” 2.25”
.75”
3”
.75”
Sign Legend Panel Post Specification Mounting Color Type Size (A) Size Size Code Height Bkg/Lgd
CID-02 various 4’x4’ 4”x4” HDO-3 48” WH/BK-SG
00 90 01 ATT. C- 3
Fabrication and Mounting GuidelinesEP 310-1-6a
16-4
All Construction Project Identification signs and Safety Performance signs are to be fabricated and installed as de-scribed below. The signs are to be erected at a location designated by the contracting officer representative and shall conform to the size, format, and typographic standards shown on pages16-2 and 16-3. Detailed specifica-tions for HDO plywood panel preparation are provided in Appendix B.
Shown below the mounting diagram is a panel layout grid with spaces provided for project information. Photocopy this page and use as a worksheet when preparing sign legend orders.
For additional information on the proper method to prepare sign panel graphics, contact the district Sign Program Manager.
The sign panels are to be fabricated from .75" High Density Overlay Plywood. Panel preparation to follow HDO specifications provided in Appendix B.
Sign graphics to be prepared on a white nonreflective vinyl film with positionable adhesive backing.
All graphics except for the Communication Red background with Corps Signature on the project sign are to be die-cut or computer-cut nonreflective vinyl, prespaced legends prepared in the sizes and typefaces specified and applied to the background panel following the graphic formats shown on pages 16-2 and 16-3.
The 2’x 4’ Communication Red panel (to match Pantone system 032) with full Corps Signa-ture (reverse version) is to be screen-printed on the white background. Identification of the district or division may be applied under the signature with white cut vinyl letters prepared to Corps standards.
Drill and insert six (6) .375" T-nuts from the front face of the HDO sign panel. Position holes as shown. Flange of T-nut to be flush with sign face.
Apply graphic panel to prepared HDO plywood panel following manufacturers’ instructions.
Sign uprights to be structural grade 4" x 4" treated Douglas Fir or Southern Yellow Pine, No.1 or better. Post to be 12' long. Drill six (6) .375" mounting holes in uprights to align with T-nuts in sign panel. Countersink (.5") back of hole to accept socket head cap screw (4" x .375").
Assemble sign panel and uprights. Imbed assembled sign panel and uprights in 4' hole.
Local soil conditions and/or wind loading may require bolting additional 2" x 4" struts on inside face of uprights to reinforce installation as shown.
48”
48”
18”
Construction Project Identification Sign Legend Group 1: Corps Relationship 1.
2.
Legend Group 2: Division/District Name 1.
2.
Legend Group 3: Project Title 1.
2.
3.
Legend Group 4: Facility Name 1.
2.
Legend Group 5: Contractor/A&E 1.
2.
3.
4.
5.
Safety Performance Sign Legend Group 2: Project Title 1.
2.
Legend Group 3: Contractor/A&E 1.
2.
Legend Group 2a: Military/Civil Works Sponsor 1.
2.
Legend Group 5b: Contractor/A&E 1.
2.
3.
4.
5.
00 90 01 ATT. C- 4
transfer oil or hazardous materials to or from a vessel or public vessel. Also included are facilities that tank clean or strip and any floating structure that is used to support an integral part of the facility's operation. A facility includes federal, state, municipal, and private facilities.
Facility operator means the person who owns, operates, or is responsible for the operation of the facility. Hazardous material means a liquid material or substance, other than oil or liquefied gases, listed under 46 CFR 153.40 (a), (b), (c), or (e).
Marine transfer area means that part of a waterfront facility handling oil or hazardous materials in bulk between the vessel, or where the vessel moors, and the first manifold or shutoff valve on the pipeline encountered after the pipeline enters the secondary containment required under 40 CFR 112.7 or 49 CFR 195.264 inland of the terminal manifold or loading arm, or, in the absence of secondary containment, to the valve or manifold adjacent to the bulk storage tank, including the entire pier or wharf to which a vessel transferring oil or hazardous materials is moored.
MARPOL 73/78 means the International Convention for the Prevention of Pollution from Ships, 1973 (done at London, November 2, 1973) as modified by the Protocol of 1978 relating to the International Convention for the Prevention of Pollution from Ships, 1973 ( done at London, February 17, 1978).
Mobile facility means any facility that can readily change location, such as a tank truck or tank car, other than a vessel or public vessel.
Monitoring device means any fixed or portable sensing device used to monitor for a discharge of oil or hazardous material onto the water, within or around a facility, and designed to notify operating personnel of a discharge of oil or hazardous material.
Officer in Charge, Marine Inspection (OCMI) means the U.S. Coast Guard officer commanding a Marine Inspection Zone described in Part 3 of this chapter, or an authorized representative.
Offshore facility means any facility of any kind located in, on, or under, any of the navigable waters of the United States, and any facility of any kind which is subject to the jurisdiction of the United States and is located in, on, or under any other waters, other than a vessel or a public vessel.
Oil means oil of any kind or in any form, including but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil.
Onshore facility means any facility (including, but not limited to, motor vehicles and rolling stock) of any kind located in, on, or under any land within the United States other than submerged land.
Person in charge means an individual designated as a person in charge of transfer operations under Sec. 154.710 (for facilities) or Sec. 155.700 (for vessels) of this chapter.
00 90 01 ATT. D- 2
ENG FORM 6293, AUG 2023 Page of1 8
U.S. Army Corps of Engineers (USACE)
ACCIDENT PREVENTION PLAN (APP) WORKSHEET
For use of this form, see EM 385-1-1; the proponent agency is CESO.
This form serves as a guide. It does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Occupational Health Requirements Manual. The references included in this form correspond to the applicable chapters of EM 385-1-1. No work will begin onsite until the accident prevention plan (APP) is developed according to the EM 385-1-1, reviewed to ensure minimum requirements are met, and approved by the appropriate personnel identified in “Part 1 -Signatures”
PART 1 - SIGNATURES
1. Name: 2. Title:
4. Phone Number:3. Email Address:
5. Signature
Plan Preparer - For example: Qualified Person (QP), Competent Person (CP), or project Quality Control (QC).
Plan Approver - Corporate Safety Official
1. Name: 2. Title:
4. Phone Number:3. Email Address:
5. Signature
Plan Concurrence - For example: Industrial hygienist, Project Manager, Superintendent, Site Safety & Health Officer, Quality Control, etc.
1. Name: 2. Title:
4. Phone Number:3. Email Address:
5. Signature:
PART 2: PROJECT INFORMATION
1. Project Name:
2. Project Address (attach map in Appendix 1):
3. Estimated Project Start Date: 4. Estimated Project Completion Date:
5. Project Description / Description of work to be performed:
00 90 01 ATT. E
ENG FORM 6293, AUG 2023 Page of2 8
PART 3: PRIME CONTRACTOR INFORMATION
1. Prime Contractor Name:
2. Contract Number:
3. Project Manager Name:
4. Quality Control (QC) Manager Name:
5. Contractor Corporate Safety Official Name:
6. Primary Site Safety & Health Officer (SSHO) Name:
7. Alternate Site Safety & Health Officer (SSHO) Name(s):
PART 4: SOH COMMITMENT AND POLICY
1. Provide a statement of safety and health policy detailing commitment to providing a safe and healthful workplace for all employees on this project.
2. Provide a statement outlining the Contractor's safety program goals and objectives.
3. Identify policies and procedure regarding non-compliance with safety requirements.
4. Provide written procedures for holding managers and supervisors accountable for safety.
5. Prime contractor is responsible for the implementation and enforcement of the SOH program for contractor employees, subcontractors, suppliers, and visitors at the site of work? Yes No
6. Prime contractor will require subcontractors, suppliers, and visitors to comply with the APP and EM 385-1-1? Yes No
7. No work will be performed unless a designated SSHO is present on the site of work. Yes No
8. A list of all known subcontractor(s) and supplier(s) are listed in Appendix 2. Yes No
9. If all subcontractor(s) and supplier(s) are not known at the time of initial APP submittal, Appendix 2 will be updated and resubmitted to the KO/COR for acceptance prior to the start of any work activities. Yes No
10. All subcontractors will have a copy of the APP, applicable AHAs and will be required to comply with them. Yes No
11. Subcontractors and suppliers at the site of work will abide by the EM 385-1-1, this APP, and all AHAs. Yes No
12. This APP and AHAs will be available to all workers at the site of work. Yes No
ENG FORM 6293, AUG 2023 Page of3 8
PART 5: TRAINING
1. All employees will be trained according to applicable EM 385-1-1, federal, state, and local requirements prior to the commencement of work.
Yes No
2. The following personnel are identified and designated as personnel responsible for SOH on this project. Add the following documentation to Appendix 3 of this worksheet: 1) SSHO designation letter (ENG Form 6282), 2) instructor signed OSHA 30-hour card (or course completion certificate if within 90 days of having completed the OSHA 30-hour training), and 3) proof of 24 hours of competency of SOH training within the last 3 years for the personnel identified below. (EM 385-1-1, Chapter 2, 2-3 Personnel Qualification/Training):
(Check and list names of personnel being designated)
Primary SSHO Name:
Alternate SSHO Name(s):
3. QP(s) and CP(s) required by EM 385-1-1 (for example, excavation, confined space, scaffolding, fall protection, etc.) for this project will be included in Appendix 3. Include 1) List of names or designation letters and 2) proof of qualification/competency.
PART 6: SOH INSPECTIONS
1. All applicable inspections required by EM 385-1-1, contract, federal, state, and local requirements will be completed. Yes No
2. The following personnel are assigned to conduct inspections, the type of inspection and frequency for the worksite. At minimum the SSHO must conduct daily site inspections.
Who will conduct inspection? Frequency? What type of inspection?
3. Employees that conduct inspections will have technical proficiency needed to perform inspections. Proof of inspector's training/qualification is included in Appendix 3. Yes No
4. Deficiencies will be documented and tracked as required by this EM 385-1-1? Yes No
6. Will any external inspections be required (for example, USCG, OSHA, etc.)?
If yes, describe:
Yes No
PART 7: ACCIDENT REPORTING AND INVESTIGATION
1. Exposure data (man-hours worked) will be reported to KO/COR as required by the contract? Yes No
2. All accidents will be reported as soon as possible according to EM 385-1-1? Yes No
3. All accidents occurring incidentally to an operation, project, or facility for which the EM 385-1-1 is applicable will be thoroughly investigated and analyzed. Corrective actions to prevent reoccurrence will be implemented as soon as reasonably possible.
The KO/COR will be notified when corrective actions are completed.
Yes No
4. Accident notification will be provided to the KO/COR as stated below: Yes No
ACCIDENT TYPE KO/COR NOTIFICATION TIME
Fatality, permanent and partial disability, or property damage over $600,000 Immediately, no later than (NLT) 8 hours
All other accidents and near misses Immediately, NLT 24 hours
ENG FORM 6293, AUG 2023 Page of4 8
PART 8: SOH OVERSIGHT
1. A risk management process that meets or exceeds the requirement of the EM 385-1-1 will be implemented on this project site? Yes No
2. Hazardous conditions and unsafe acts will be immediately corrected? Yes No
3. APP and AHAs will be prepared by a QP or CP according to the EM 385-1-1 prior to the start of any work activities on the site of work (as much as the information can be known at that point in time). Yes No
4. The plans and AHAs will be updated throughout the life of the project to include changes in personnel, equipment, conditions, etc. Additional revisions must be incorporated as necessary to reflect changing site conditions, construction methods, personnel roles and responsibilities and construction schedules.
Yes No
5. No activity/work will be started at the site of work until the APP is reviewed and submitted to the KO/COR for acceptance, with the site-specific plans and procedures required by the EM 385-1-1 to complete the project? Yes No
6. APP and AHAs will be provided to and reviewed by all workers involved in the activity prior to work? Yes No
7. Workers will sign AHA(s) to concur with identified job steps and controls needed to mitigate hazards? Yes No
PART 9: SEVERE WEATHER PLAN
1. The SSHO or designated onsite personnel is responsible for checking the weather conditions at a minimum of twice a day? Yes No
2. What severe weather forecast will require the SSHO to monitor weather conditions continuously? Describe.
3. What are the training requirements for severe weather precautions and actions?
4. Identify area of retreat or other actions to be taken such as evacuation, shelter in place, etc.
5. Identify procedures to stop outdoor activities if extreme weather conditions to include thunderstorms are in the area.
ENG FORM 6293, AUG 2023 Page of5 8
PART 10: ACTIVITY HAZARD ANALYSIS (RISK MANAGEMENT)
1. Major phases of work anticipated:
2. Definable Features of Work (DFOW) Note. An activity-specific AHA will be submitted to the KO/COR for each DFOW prior to any work being performed.
3. List equipment to be used:
4. Anticipated High-Risk Activities: (See examples below, check all that apply):
Electrical and/or Hazardous Energy Confined Space
Working at Heights Excavations & Trenching
Scaffolding Other:
Diving Other:
Load Handling Equipment Other:
Occupational Exposure Other:
5. Detailed project-specific hazards and controls will be provided utilizing AHAs for each activity/DFOW. Yes No
6. No work will begin on an activity/DFOW until the initial AHA addressing the project-specific hazards has been developed, reviewed, and accepted by the KO/COR. (See EM 385-1-1 Chapter 2 section 2-6). Yes No
7. AHAs are living documents and are intended to be created, utilized in the field, and updated (by the workers) as necessary. Yes No
8. Workers/crews will have accepted AHA(s) that reflects current site conditions, personnel, equipment, control measures, etc.
while the work is being performed? Yes No
9. AHA will be used by the contractor personnel to assure work is being performed consistent with the AHA? Yes No
10. Once the activity has been completed, the AHA will be available and kept onsite for the length of the contract. Yes No
11. AHAs for unknown work activities will be submitted to the KO/COR prior to work and attached to Appendix 4 of this document. Yes No
12. Who has the authority to accept residual risk on AHA(s)? (List below)
Category of Risk
Extremely High Risk
Approval Authority (Name and Title)
High Risk
Medium Risk
Low Risk
ENG FORM 6293, AUG 2023 Page of6 8
PART 11: REQUIRED PROJECT SITE-SPECIFIC PLANS AND PROCEDURES
1. Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the contractor will ensure that all applicable SOH risks and associated compliance plans are in place. Yes No
2. Include all project-specific compliance plans, as applicable to the work being performed, and as identified below. The plans will incorporate project-wide procedures to control hazards to which the employees of all project employers may be exposed. Yes No
3. These plans and procedures will be coordinated with all project employers and be included in project-specific emergency response and evacuation procedures. Yes No
4. Address each of the plans in the outline below in the order that they are listed.
Option 1: If a plan is applicable, develop and attach it to Appendix 5. Submit to the KO/COR with this worksheet for acceptance prior to work.
Option 2: If a plan is applicable, but all of the minimum required information for the plan is not yet known, provide justification next to each plan title, and provide an expected date the plan will be created, reviewed, and attached to Appendix 5. Submit to the KO/COR with this worksheet for acceptance prior to work.
Option 3: If a plan is not applicable because of the nature of the work to be performed, provide justification next to each plan title.
Minimum plans required by EM 385-1-1 Justification for Option 2 and Option 3 Select Option
Reference
EM 385-1-1
paragraph:
Exposure Control Plan 3-7.a
AED Program 3-7.b
Construction Site Plan 4-7.a
Access/Haul Road Plan 4-7.b
Hearing Conservation Program 5-7.a
Respiratory Protection Program 5-7.b
Hazard Communication (HazCom) Program 6-7.a
Process Safety Management (PSM) Program 6-7.b
Lead Compliance Plan 6-7.c
Asbestos Management Plan 6-7.d
Ionizing Radiation Safety Plan 6-7.e
Radiofrequency Plan 6-7.e
Abrasive Blasting Plan 6-7.g
Thermal Stress Management Plan 6-7.h
Mold Remediation Plan 6-7.i
Silica Compliance Plan 6-7.j
Fatigue Management Plan 6-7.k
Night Operations Lighting Plan 7-7
Traffic Control Plan 8-7
Fire Prevention Plan 9-7.a
Wildland Fire Management Plan 9-7.b
Housekeeping Plan 10-7
Electrical Safety Plan 11-7
Assured Equipment Grounding Conductor Program 11-7.b
Energy Control Plan 12-7.a
Hazard Isolation Procedures 12-7.b
ENG FORM 6293, AUG 2023 Page of7 8
Demolition Plan 17-7
Emergency Plan for Marine Activities 19-7.a
Severe Weather Plan for Marine Activities 19-7.b
Float Plans 19-7.c
Tow Plans 19-7.d
Fall Protection and Prevention Plan 21-7.a
Rescue Plan 21-7.b
Scaffold Work Plan 21-7.b
Rope Access Work Plan 23-7
Excavation and Trenching Plan 25-7
Fire Prevention and Protection Plan 26-7 a & f
Compressed Air Work Plan 26-7 a & b
Contingency Response Plan 26-7 a & c
Emergency Rescue Plans and Equipment 26-7 a & d
Ventilation and Dust Control Plan 26-7 a & e
Formwork and Shoring Plan 27-7.a
Masonry Bracing Plan 27-7.b
Steel Erection Plan 28-7.a
Site Layout Plan 28-7.b
Explosive Site Safety Plan 29-7.a
Master Blasting Plan 29-7.b
Vibrations Monitoring Plan 29-7.c
Dive Operations Plan 30-7.a & d
Emergency Management Plan 30-7.a & e
Safe Practices Manual 30-7.b
Snorkeling Plan 30-7.f
Tree Maintenance and Removal Plan 31-7
Construction Safety and Phasing Plan 32-7.a
Safety Plan Compliance Document 32-7.b
Aviation Pre-Accident Plan 33-7
Standard Lift Plan 34-7.b
Confined Space Plan 34-7.b & c
Standard Lift Plan - Floating Plan 34-7.c
Critical Lift Plan 34-7.d
Pile Driving 34-7.e
Housekeeping Plan 35-7.a
Extermination Plan 35-7.b
Site Safety and Health Plan 36-7.a
Comprehensive Work Plan 36-7.b
Emergency Response Plan 36-7.c
ENG FORM 6293, AUG 2023 Page of8 8
PART 12: PROJECT SITE COORDINATION
1. Provide procedures for coordinating SOH activities with other employers on the site of work:
PART 13: REQUIRED APPENDICES
Indicate if each of the following items are, or are not, attached to this plan.
Appendix 1. Project Map Yes No
Appendix 2. Subcontractor/Suppliers Yes No
Appendix 3. Personal Qualifications and Designations Yes No
Appendix 4. Activity Hazard Analysis Yes No
Appendix 5. Site-specific plans and procedures Yes No
Appendix 6. Any additional plans, procedures, etc. can be added to this appendix and will be coordinated with the KO/COR. Yes No
S-9
S-8
S-7
S-6
S-5
S-4
S-3 S-2
S-1
S-21
S-20
S-19
S-18
S-17
S-16
S-15
S-14
S-13
S-12
S-11
S-10
Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community
608000
608000
609000
609000
610000
610000
611000
611000
612000
612000
613000
613000
614000
614000
615000
615000
616000
616000
Aqua Survey Inc.
469 Point Breeze Rd.
Flemington, NJ 08822
Tel: (908) 788-8700 Fax: (908) 788-9165 www.AquaSurvey.com
© OpenStreetMap (and) contributors, CC-BY-SA µ
ASI Project: 43-011
Coordinate System:
State Plane NAD 83
New Jersey US Survey Foot
USACE-NYD
Port Jersey Channel
Sample Locations Map
0 500 1,000 1,500250
Feet
Figure 1. Sample Locations Map
00 90 01 ATT. J- 1
Table 3. Test Performance Summary (% Survival)
Test Organism Control Reference Composite
Solid Phase A. abdita 94% 95% 91%
A. bahia 98% 99% 98%
Conc. % Composite
SPP M. beryllina 0 98%
1 90%
10 94%
50 91%
100 95%
A. bahia 0 99%
1 96%
10 96%
50 97%
100 99%
M. galloprovincialis 0 92%
1 91%
10 92%
50 92%
100 70%
Control Reference Composite
Bioaccumulation T. japonica 100% 99% 99%
A. virens 98% 96% 97%
2100 90 01 ATT. J- 2
Table 4a. Grain Size Distribution, Percent Moisture, and TOC Values of Test Sediments
Sample ID ASI # Total % Gravel
Total % Sand
Total % Silt
Total % Clay
Moisture
TOC
ppm
% TOC
of Dry Weight
S-1 20230021 0.0 9.2 66.0 24.8 58.28 30,590 3.06
S-2 20230022 0.0 8.3 65.1 26.6 58.40 29,027 2.90
S-3 20230023 0.0 9.4 62.2 28.4 60.10 28,833 2.88
S-4 20230024 0.0 36.5 44.4 19.1 46.32 15,390 1.54
S-5 20230025 0.0 22.0 57.2 20.8 46.99 25,220 2.52
S-6 20230026 0.0 10.0 64.0 26.0 58.13 27,756 2.78
S-7 20230027 0.0 4.9 61.1 34.0 57.73 30,147 3.01
S-8 20230028 0.0 7.6 60.2 32.2 58.46 29,605 2.96
S-9 20230029 0.0 4.6 60.6 34.8 57.56 29,560 2.96
S-10 20230030 0.0 5.9 63.1 31.0 61.32 28,699 2.87
S-11 20230031 0.0 4.3 61.3 34.4 57.88 28,644 2.86
S-12 20230032 0.0 6.9 60.9 32.2 63.34 31,735 3.17
S-13 20230033 0.0 4.7 59.7 35.6 63.40 31,872 3.19
S-14 20230034 0.7 15.2 52.5 31.6 52.25 26,185 2.62
S-15 20230035 0.0 4.1 59.8 36.1 59.55 29,307 2.93
S-16 20230036 0.0 6.8 59.0 34.2 59.24 29,986 3.00
S-17 20230037 0.0 7.5 63.1 29.4 55.33 30,596 3.06
S-18 20230038 0.0 6.5 65.5 28.0 56.29 28,198 2.82
S-19 20230039 0.0 7.0 62.6 30.4 55.85 28,776 2.88
S-20 20230040 0.0 15.8 58.4 25.8 57.65 22,826 2.28
S-20 20230040 dup 0.0 14.3 59.6 26.1 57.54
S-20 20230040 trp 0.0 14.9 62.0 23.1 62.88
S-21 20230041 0.0 7.4 63.5 29.1 63.16 28,598 2.86
Composite 20230048 0.0 11.7 59.8 28.5 56.21 27,169 2.72
Composite 20230048 dup 0.0 12.1 58.9 29.0 56.09
Composite 20230048 trp 0.0 11.8 59.0 29.2 62.88
2200 90 01 ATT. J- 3
Table 4b. Grain Size Distribution, Percent Moisture, and TOC Values of Reference and Control Sediments
Table 5. Specific Gravity, Bulk Density, and Atterberg Limits
Sample ID ASI # Total % Gravel
Total % Sand
Total % Silt
Total % Clay
Moisture
TOC
ppm
% TOC
of Dry Weight
Mud Dump Reference 20230002 0.0 97.8 2.2 21.48 553 0.06
Mud Dump Reference 20230002 dup 0.0 97.4 0.3 2.3
Mud Dump Reference 20230002 trp 0.0 97.5 0.2 2.3
Solid Phase Control 20230435 0.0 36.8 49.7 13.5 67.99 32,28
3.23
Worm Control 20230436 0.2 56.5 30.0 13.3 28.08 7,759 0.78
Clam Control 20230437 2.1 94.2 1.4 2.3 15.73 1,235 0.12
Sample ID ASI # Specific Gravity
Bulk Density (g/mL)
Atterberg Limits (moisture content) wet dry Liquid Limit Plastic Limit
Composite 20230048 2.50 1.36 0.59 89 38
Composite 20230048 dup 2.53 1.37 0.59 88 39
Composite 20230048 trp 2.51 1.38 0.63 87 38
Mean 2.51 1.37 0.60 88 38
2300 90 01 ATT. J- 4
L-1
W912DS24B0011
Attachment L: Port Jersey Channel XYZ Data
District: CENAN Name: Port Jersey Survey ID: PJ_01_PJE_20240502_OT_5349_30 Survey Date: 5/2/2024
Direct Link to Plans and Specification Survey XYZ data:
https://ehydroprod.blob.core.usgovcloudapi.net/ehydro-surveys/CENAN/CENAN_DIS_PJ_01_PJE_20240502_OT_5349_30.ZIP
For additional survey data sets:
https://navigation.usace.army.mil/ https://ehydroprod.blob.core.usgovcloudapi.net/ehydro-surveys/CENAN/CENAN_DIS_PJ_01_PJE_20240502_OT_5349_30.ZIP https://ehydroprod.blob.core.usgovcloudapi.net/ehydro-surveys/CENAN/CENAN_DIS_PJ_01_PJE_20240502_OT_5349_30.ZIP https://navigation.usace.army.mil/
Peter Weppler, Chief
Environmental Analysis Branch
New York District
U.S. Army Corps of Engineers
26 Federal Plaza
New York, NY 10278-0900
Dear Mr. Weppler:
UNITED STATES DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
NATIONAL MARINE FISHERIES SERVICE
GREATER ATLANTIC REGIONAL FISHERIES OFFICE
55 Great Republic Drive Gloucester, MA 01930-2276
FEB - 7 2017
We have been working closely with your staff to conclude the reinitiation of the essential fish habitat (EFH) consultation for the New York District's (NYD) Harbor Deepening Project (HDP) and to refine the seasonal protections included as EFH conservation recommendations in our original consultation letter issued July 27, 2001. The consultation was also expanded to include not only the initial construction of the HDP, but also any subsequent maintenance dredging of the channels identified as part of the HDP.
The HDP, also known as the Harbor Navigation Project, involves deepening approximately 30 nautical miles of federal navigation channels within the Port of New York and New Jersey. The primary intent of the HDP was to create a 50-foot deep (MLW) channel to five berthing and associated anchorage areas within the port. These areas included the Ports of Newark and Elizabeth, the New York Container Terminal at Howland Hook, Port Jersey Global Marine
Terminal, South Brooklyn and Red Hook. The initial construction of the project is complete and it has now entered the maintenance phase.
A revised EFH assessment was submitted to us within a report entitled, "Essential Fish Habitat Knowledge Gained during the Harbor Deepening, Parts I and II." With the information contained in the report, as well as a number of other reports and studies undertaken by the NYD, including the Aquatic Biological Sampling (ABS) Program, Total Suspended Solids (TSS)
Monitoring Program and the Migratory Finfish Survey, we have been able to refine the seasonal protections NOAA trust resources in the harbor both spatially and temporally as compared to those recommended in our July 27, 2001 letter.
The attached map was jointly developed by NOAA Fisheries, NYD and its consultant, HDR, Inc., and it represents the revised recommended seasonal dredging windows to minimize impacts to EFH, as well as other NOAA trust resources including anadromous fish and blue crabs. This map also depicts the EFH conservation recommendations listed below.
00 90 01 ATT. M- 1
Magnuson Steven Fishery Conservation and Management Act
Essential Fish Habitat Conservation Recommendations
Pursuant to Section 305(b)(4)(A) of the MSA we recommend the following EFH conservation recommendations (CRs) to minimize adverse effects on EFH for winter flounder, summer flounder, windowpane, bluefish and skates:
Anchorage Channel:
• Avoid dredging from January 15 to May 31 in the outer portion of the Port Jersey
Channel, the Claremont Channel and the channel that connects these two, as well as, the channel south ofMOTBY adjacent to Robbins Reef to protect winter flounder early life stages and their EFH.
Buttermilk, Red Hook, and Bay Ridge Channels
• Avoid dredging from November 15 to April 15 to minimize adverse effects to overwintering winter flounder and overwintering striped bass, a prey species for federally managed bluefish, summer flounder and windowpane.
Kill Van Kill, Arthur Kill:
• A void dredging from March 1 to May 31 of each year to minimize impacts to migrating and spawning anadromous fishes which are prey species for federally managed bluefish, summer flounder, windowpane and skates.
Newark Bay:
• Avoid dredging from March 1 to May 31 of each year in the main channel of Newark Bay to minimize impacts to migrating and spawning anadromous fishes which are prey species for federally managed bluefish, summer flounder, windowpane and skates. This seasonal restriction is not needed in the South Elizabeth Channel and the inner portions of the Port Newark and Elizabeth Channels.
Passaic River, Hackensack River. Hudson River above Upper Bay and tributaries to the Arthur Kill:
• Avoid dredging from March 1 to June 30 of each year to minimize impacts to migrating and spawning anadromous fishes which are prey species for federally managed bluefish, summer flounder, windowpane and skates
As mentioned above, these revised seasonal windows apply to future maintenance dredging within the channels identified as part of the HDP. This consultation and the resulting seasonal windows are not applicable in private facilities within the project area or in federal navigation channels outside of the HDP, such as the channels within Raritan and Lower Bays although applicable data collected by the NYD for the HDP will be used in the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .