Section 00 90 01_Para 3.3_Att A_S-PJ-4 AS-BUILT_COMPLETE SET_030813.pdf

PDF 20 MB Posted

Attached to
Maintenance Dredging of the New York and New Jersey Harbor, Port Jersey Channel, New Jersey, Federal Navigation Project.
Solicitation number
W912DS24B0011
Issued by

About this file

This document appears to be a Solicitation for the Maintenance Dredging of the New York and New Jersey Harbor, Port Jersey Channel, New Jersey, Federal Navigation Project. The U.S. Army Corps of Engineers New York District is seeking to perform approximately 420,000 cubic yards of maintenance dredging to a depth of -50 feet MLLW plus 1-foot allowable overdepth. The dredged material would be transported and placed as remediation material at the Historic Area Remediation Site (HARS) located 5 miles east of Sandy Hook, New Jersey. The work is estimated to cost between $5,000,000 and $10,000,000. The solicitation is expected to be available in June 2024 with bid opening in July 2024 and award in August 2024. The contractor must commence work within 5 calendar days of the notice to proceed and complete the work within 50 calendar days, maintaining a minimum dredging production rate of 6,000 CY per calendar day, or 1,000 CY per calendar day when dredging over the Passaic Valley Sewerage Commission utility corridor. Liquidated damages of $2,520 per calendar day will be assessed for delays. This is an unrestricted procurement.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEEKS MARINE

AS-BUILT

03-08-13

DRWG NO. ABPL-01

DRWG NO. ABPL-02

DRWG NO. ABPL-03

DRWG NO. ABPL-04

DRWG NO. ABPL-05

DRWG NO. ABPL-06

BACK RANGE AS-BUILT LOCATION

N 671522.75 E 604520.77

FRONT RANGE AS-BUILT LOCATION

N 670905.34 E 605639.35

WEEKS MARINE

BACK RANGE AS-BUILT LOCATION

N 671522.75 E 604520.77

FRONT RANGE AS-BUILT LOCATION

N 670905.34 E 605639.35

WEEKS MARINE

JACKET STRUCUTRE

SEE DWGS WMI01 - WMI02

JACKET STRUCUTRE

SEE DWGS WMI01 - WMI02

WEEKS MARINE

DRILLED SHAFT FOUNDATION

SEE DRWG WMI03 / S-1 FOR DETAILS

DRILLED SHAFT FOUNDATION

SEE DRWG WMI03 / S-1 FOR DETAILS

WEEKS MARINE

SEE DWG WMI03 FOR

CONNECTION DETAIL (TYP)

WEEKS MARINE

03-08-13DRWG NO. WMI01

03-08-13 DRWG NO. WMI02

SUBSURFACE PROFILE AT REAR RANGE TOWER LOCATION

DRILLED SHAFT ELEVATION

SECTION SECTION

ANCHOR BOLT DETAIL

WEEKS MARINE

03-08-13DRWG NO. WMI03

File details come from the government source that posted it. Updated .